SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF NER/CONSTRUCTION ORGANISATION. AS ON 30.09.09 . REF:- GM/Vigilance letter No. Z/13/SS/Tender information/Web – site Dt. 11.09.09. Sl. NO . Name of Project O.T. No. Name of work LOA & date CA No., date & CA Value Original DOC Actual/Ex tended DOC Position of final bill Tentative date for final bill Reason for delay 1 2 3 4 5 6 7 8 9 10 11 Dy. CE/Con/I/IZN 1 Bareilly - Lalkua CAO/Con/20/05 Constn of bridges/Major Br. No. 1032 in BRY - IZN W/Con/362/II/666/W-3 Dt. 25.01.06 CAO/Con/GKP/870 Dt. 21.02.06 Rs. 34648304.00 24.09.06 30.08.08 Work completed 31.12.09 2 Bareilly - Lalkua CAO/Con/45/06 (2) Linking of BG railway track n PSC sleepers etc. in Bareilly Jn. _ Izatnagar Workshop section. W/Con/362/II/844/W-3 (2) Dt. 04.12.06 CAO/Con/GKP/1064 Dt. 27.03.08 Rs. 6799613.26 03.05.07 30.06.09 Work completed 30.09.09 3 Bareilly - Lalkua CAO/Con/45/07 (2) Construction of S&T Building between Bareilly Jn. (excluding) to Lalkua (excluding) in connection with Bareilly Lalkua section. W/Con/362/II/905/W-3 (2) Dt. 19.09.07 CAO/Con/GKP/1024 Dt. 07.01.08 Rs. 8255017.23 18.08.08 30.09.09 Work not started due to non supply of portion. - Work in progress 4 Bareilly - Lalkua CAO/Con/86/07 (4) Widening of rail joints 90R/52 Kg. New/SH rails between BE-IZN section. A/L No. W/Con/362/II/940/W-3 (4) Dt. 13.02.08 A/L No. W/Con/362/II/940/W -3 (4) Dt. 13.02.08 Rs. 642000/- 12.08.08 - - - - 5 Bareilly - Lalkua CAO/Con/92/07 (2) Rebuilding of Minor bridges, earthwork, blanketing etc. between IZN - BPR W/Con/362/II/941/W-3 (2) Dt. 02.04.08 CAO/Con/GKP/1086 Dt. 01.08.08 Rs. 58262162/- 01.03.09 31.07.09 - - Work in progress 6 Bareilly - Lalkua CAO/Con/30/08 (2) Supply of ballast from LKU Quarry and loading thereof. W/Con/362/II/760/W-3 (2) Dt. 30.07.08 Dy. CE/Con/I/IZN/02 Dt. 02.10.08 Rs. 47430000/- 29.04.09 31.12.09 - - Work in progress 7 Bareilly - Lalkua CAO/Con/43/08 (2) Construction of high level passenger platform, rake handling platform, approach road, platform benches etc. and BC, IZN & DOX station including earthwork in filling from private land in platform, approach road, good shed etc. surfacing provision of CC paver etc. in connection with gauge conversion of BRY- LKU Section from MG into BG (Phase –I). W/Con/362/II/972/W-3 (2) Dt. 02.09.08 CAO/Con/GKP/1115 Dt. 27.10.08 Rs. 29087909.18 01.04.09 31.12.09 - - Work in progress

Upload: others

Post on 07-May-2020

23 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF NER/CONSTRUCTION

ORGANISATION. AS ON 30.09.09

. REF:- GM/Vigilance letter No. Z/13/SS/Tender information/Web – site Dt. 11.09.09.

Sl.

NO

.

Name of Project O.T. No. Name of work LOA & date CA No., date & CA

Value

Original

DOC

Actual/Ex

tended

DOC

Position

of final

bill

Tentative

date for

final bill

Reason

for delay

1 2 3 4 5 6 7 8 9 10 11

Dy. CE/Con/I/IZN

1 Bareilly - Lalkua CAO/Con/20/05 Constn of bridges/Major Br.

No. 1032 in BRY - IZN

W/Con/362/II/666/W-3

Dt. 25.01.06

CAO/Con/GKP/870

Dt. 21.02.06

Rs. 34648304.00

24.09.06 30.08.08 Work

completed

31.12.09

2 Bareilly - Lalkua CAO/Con/45/06 (2) Linking of BG railway track n

PSC sleepers etc. in Bareilly

Jn. _ Izatnagar Workshop

section.

W/Con/362/II/844/W-3

(2)

Dt. 04.12.06

CAO/Con/GKP/1064

Dt. 27.03.08

Rs. 6799613.26

03.05.07 30.06.09 Work

completed

30.09.09

3 Bareilly - Lalkua CAO/Con/45/07 (2) Construction of S&T

Building between Bareilly Jn.

(excluding) to Lalkua

(excluding) in connection

with Bareilly – Lalkua

section.

W/Con/362/II/905/W-3

(2)

Dt. 19.09.07

CAO/Con/GKP/1024

Dt. 07.01.08

Rs. 8255017.23

18.08.08 30.09.09 Work not

started

due to non

supply of

portion.

- Work in

progress

4 Bareilly - Lalkua CAO/Con/86/07 (4) Widening of rail joints

90R/52 Kg. New/SH rails

between BE-IZN section.

A/L No.

W/Con/362/II/940/W-3

(4)

Dt. 13.02.08

A/L No.

W/Con/362/II/940/W

-3 (4)

Dt. 13.02.08

Rs. 642000/-

12.08.08 - - - -

5 Bareilly - Lalkua CAO/Con/92/07 (2) Rebuilding of Minor bridges,

earthwork, blanketing etc.

between IZN - BPR

W/Con/362/II/941/W-3

(2)

Dt. 02.04.08

CAO/Con/GKP/1086

Dt. 01.08.08

Rs. 58262162/-

01.03.09 31.07.09 - - Work in

progress

6 Bareilly - Lalkua CAO/Con/30/08 (2) Supply of ballast from LKU

Quarry and loading thereof.

W/Con/362/II/760/W-3

(2)

Dt. 30.07.08

Dy.

CE/Con/I/IZN/02

Dt. 02.10.08

Rs. 47430000/-

29.04.09 31.12.09 - - Work in

progress

7 Bareilly - Lalkua CAO/Con/43/08 (2) Construction of high level

passenger platform, rake

handling platform, approach

road, platform benches etc.

and BC, IZN & DOX station

including earthwork in filling

from private land in platform,

approach road, good shed etc.

surfacing provision of CC

paver etc. in connection with

gauge conversion of BRY-

LKU Section from MG into

BG (Phase –I).

W/Con/362/II/972/W-3

(2)

Dt. 02.09.08

CAO/Con/GKP/1115

Dt. 27.10.08

Rs. 29087909.18

01.04.09 31.12.09 - - Work in

progress

Page 2: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

8 Bareilly - Lalkua CAO/Con/35/08 (3) Transportation of Rails, PSC

Sleepers, P Way materials

etc. between Bareilly –

Lalkua and Bareilly –

Kasganj section in connection

with gauge conversion of

Bareilly – Lalkua – Kasganj

section.

W/Con/362/II/765/W-3

(3)

Dt. 18.08.08

CAO/Con/GKP/1117

Dt. 12.11.08

Rs. 22222101.50

17.08.10 - - - Work in

progress

9 Bareilly - Lalkua CAO/Con/28/08 (5) Rebuilding of Major bridge

No.11,13,18,20,24,47,50,

(3x6.1m Girder) on same

alignment/temporary

diversion with pile foundation

and PSC Slab/RCC Box

including earthwork in

temporary diversion between

Izatnagar – Lalkua section in

connection with Gauge

conversion of Bareilly –

Lalkua section.

W/Con/362/II/902/W-3

(5)

Dt. 11.09.08

Dy.

CE/Con/I/IZN/12

Dt. 29.03.09

Rs. 7,11,72,543/-

10.03.10 - - - Work in

progress

10 Bareilly - Lalkua CAO/Con/11/08 (3) Rebuilding of balance minor

bridges between Bhojipura –

Lalkua (12 Nos.) and

provision of hectometer post

between Bhojipura – lalkua

and left over widening of

formation in lalkua –

Bhojipura between Km. 0/0 –

Km 16/0 (length = 12 Km) in

connection with gauge

conversion of Bareilly –

Lalkua section.

W/Con/362/II/951/W-3

(3)

Dt. 24.06.08

Dy.

CE/Con/I/IZN/03

Dt. 19.12.08

Rs. 18156407/-

23.01.10 31.12.09 - - Work in

progress

11 Bareilly - Lalkua CAO/Con/43/08 (3) Manufacturing, supply and

stacking of 65mm size

machine crushed track ballast

as per RDSO's specification

of June/2004 with up to date

correction slips along the side

of track between Baheri to

Izatnagar in connection with

gauge conversion of Izatnagar

- Lalkua section.

W/Con/362/II/972/W-3

(3)

Dt. 18.08.08

Dy.

CE/Con/I/IZN/04

Dt. 27.12.08

Rs. 31860000/-

17.05.09 31.12.09 - - Work in

progress

12 Bareilly - Lalkua CAO/Con/43/08 (4) Manufacturing, supply and

stacking of 65mm size

machine crushed track ballast

as per RDSO's specification

of June/2004 with up to date

correction slips along the side

of track between Lalkua to

Baheri in connection with

gauge conversion of Izatnagar

- Lalkua section.

W/Con/362/II/972/W-3

(4)

Dt. 23.09.08

Dy.

CE/Con/I/IZN/09

Dt. 07.03.09

Rs. 16417400/-

22.03.09 31.12.09 - - Work in

progress

13 Bareilly - Lalkua CAO/Con/43/08 (1) Construction of high level

passenger platform, rake

handling platform, approach

road, platform benches etc. at

Baheri, Kichha & Richha

W/Con/362/II/972/W-3

(1)

Dt. 07.11.08

Dy.

CE/Con/I/IZN/06

Dt. 31.01.09

Rs. 21603611.02

06.07.09 31.03.10 - - Work in

progress

Page 3: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

Road station including

earthwork in filling from

private land in platform,

approach road, goodsshed etc,

surfacing. provision of CC

Paver etc. in connection with

gauge conversion of Bareilly

Jn. - Lalkua Jn. Section from

MG into BG (Phase - I).

14 Bareilly - Lalkua CAO/Con/61/08 (1) Rebuilding of Major Bridge

No.2 (3x12.20m Girder),

Bridge No. 23 (3x12.2m

Girder), Bridge No.39

(1x12.2m Girder) & Bridge

No.45A (1x12.2m Girder), on

well & pile foundation on

PSC Girder and deck slab on

permanent diversion

between Bhojipura-Lalkua in

connection with Gauge

Conversion of Bareilly-

Lalkua section.

W/Con/362/II/987/W-3

(1)

Dt. 13.01.09

CAO/Con/GKP/1132

Dt. 09.06.09

Rs. 102503235/-

11.12.09 - - - Work in

progress

15 Bareilly - Lalkua CAO/Con/76/08 (5) Construction of high

level/medium level passenger

platforms/island platforms,

rake handling platform,

approach road, platform

benches, earthwork for dead

end/sand humps, in

approaches of yards/in

formation in yard etc. at

Lalkua, Pantnagar &

Dewrania stations including

earthwork in approach road,

goodshed etc and surfacing of

platform and other

miscellaneous civil works in

connection with gauge

conversion of Bareilly -

Lalkua Section on these

stations/yards.

W/Con/362/II/1001/W-

3 (5)

Dt. 19.02.09

Dy.

CE/Con/I/IZN/16

Dt. 06.04.09

Rs. 22777853.56

18.12.09 - - - Work in

progress

16 Bareilly - Lalkua CAO/Con/92/08 (3) Hiring of Road vehicle (Tata

Sumo/Jeep, Bolero, Marshall

or similar) for supervision of

ongoing works under

AXEN/Con/Pilibhit and

AXEN/Con/Kasganj

W/Con/362/II/1017/W-

3

Dt. 16.03.09

W/Con/362/II/1017/

W-3

Dt. 16.03.09

Rs. 862436/-

15.01.11 - - - Work in

progress

17 Bareilly - Lalkua Dy. CE/Con/IZN/

2008-09

Preparation/Scanning and

Degitation of drawing

through Auto CAD for yard

plans, building, bridges, LWR

& gradient plants etc.

W/Con/247/IZN/II/Quot

ation/2008-09/01

dt. 16.03.09

Dy.

CE/Con/I/IZNI/01/

2008-09 dt. 16.09.08

Rs. 195730/-

15.01.09 15.07.09 - - Work in

progress

18 Bareilly - Lalkua CAO/Con/16/09 (2) Construction of high

level/medium level/rail level

passenger platforms/island

platforms, approach road,

platform benches, earthwork

W/Con/247/IZN/2/W-1

Dt. 24/29.06.09

W/Con/247/IZN/2/W

-1

Dt. 24/29.06.09

Rs. 12700750/-

28.05.10 - - - Work in

progress

Page 4: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

for dead end/sand humps, in

approaches of yards/in

formation in yard etc. at

Bhojipura & Atamanda

stations including earthwork

in approach road and

surfacing of platform and

other miscellaneous civil

works in connection with

gauge conversion of Bareilly

- Lalkua Section on these

stations/yards.

19 Bareilly - Lalkua CAO/Con/16/09 (1) Supplying and Laying of

blanketing material on

permanent diversions of

major bridges no 11,13,18,20

,23,47 and 50 and other left

over miscell civil works

between Izatagar-Lalkuan

section in connection with

gauge conversion Bareilly-

Lalkuan section.

W/Con/247/IZN/1/W-

1/1

Dt. 18.06.09

W/Con/247/IZN/1/W

-1/1

Dt. 18.06.09

Rs. 28133721.59

17.12.09 - - - Work in

progress

20 Bareilly - Lalkua CAO/Con/45/06 (1) Repair & maintenance of

quarters & offices camp

office & constn. Of record

room PWI/IOW office at

Izatnagar.

W/Con/362/II/844/W-3

(1)

Dt. 04.12.06

CAO/Con/GKP/965

Dt. 15.03.07

Rs. 2543682.34

03.06.07 31.03.08 Work

completed

- -

21 FBD - KSJ CAO/Con/06/06 (1) Rebuilding of balance minor

bridges bet. FBD - KSJ

W/Con/362/II/870/W-3

(1)

Dt. 15.06.06

CAO/Con/GKP/914

Dt. 28.08.08

Rs. 41787517.13

14.03.07 31.10.07 Work

completed

- -

22 FBD - KSJ CAO/Con/66/07 (3) Execution of balance works

of passenger platform for

high level etc. bet. KSJ

(Excl.) – DRO (Incl.)

W/Con/362/II/865/W-3

(3)

Dt. 05.02.09

CAO/Con/GKP/955

Dt. 28.02.07

Rs. 11721091.85

04.06.07 30.10.07 - - Vitiation is

under vetting

23 FBD - KSJ CAO/Con/06/06 (2) Transportation of 52 Kg.

New/SH rails, 90 lbs rails

PSC Sleepers etc.

W/Con/362/II/807/W-3

(2)

Dt. 06.06.06

CAO/Con/GKP/903

Dt. 14.07.06

Rs. 20094835.08

05.02.07 31.07.07 Work

completed

30.09.09 -

24 FBD – KSJ CAO/Con/33/06 (4) Level Crossing between KSJ

- DRO

W/Con/362/II/836/W-3

(4)

Dt. 28.09.06

CAO/Con/GKP/973

Dt. 28.03.07

Rs. 4822714.60

27.04.07 28.02.08 Work

completed

- -

25 FBD – KSJ CAO/Con/06/06 (3) Const. of 1 no. 600 mm long

washing pit etc. at Kasganj

W/Con/362/II/807/W-

3(3)

Dt. 03.06.06

CAO/Con/GKP/919

Dt. 06.09.06

Rs. 34632109.24

12.03.07 30.06.08 Work

completed

- -

26 FBD – KSJ CAO/Con/35/06 (1) Supplying, stacking and

spreading of blanketing

materials on top at new

embankment on approaches

of Bridge No. 254 bet. BHK-

SWRT stations.

W/Con/362/II/838/W-

3(1)

Dt. 13.11.06

CAO/Con/GKP/974

Dt. 29.03.07

Rs. 5701400/-

12.03.06 30.06.07 Work

completed

- -

27 FBD – KSJ CAO/Con/66/06 (4) Const. of Signal building,

camp office etc. at Kasganj.

W/Con/362/II/865/W-

3(4)

Dt. 26.02.07

CAO/Con/GKP/968

Dt. 22.03.07

Rs. 7717244.30

25.08.07 30.06.08 Work

completed

15.10.09 -

28 FBD – KSJ CAO/Con/46/06 (1) Linking of BG railway track

on PSC sleepers etc. in Zone

–I of FBD – KSJ section.

W/Con/362/II/845/W-

3(1)

Dt. 29.10.07

CAO/Con/GKP/957

Dt. 28.02.07

Rs. 9151676.81

28.06.07 31.03.08 Work

completed

15.10.09 -

Page 5: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

29 FBD – KSJ CAO/Con/46/06 (2) Linking of BG railway track

on PSC sleepers etc. in Zone

–II of FBD – KSJ section.

W/Con/362/II/845/W-

3(2)

Dt. 29.01.07

CAO/Con/GKP/958

Dt. 28.02.07

Rs. 11320486.64

24.06.07 31.03.08 Work

completed

31.10.09 -

30 FBD – KSJ CAO/Con/46/06 (3) Linking of BG railway track

on PSC sleepers etc. in Zone

–III of FBD – KSJ section.

W/Con/362/II/845/W-

3(3)

Dt. 29.10.07

CAO/Con/GKP/959

Dt. 28.02.07

Rs. 10458938.56

30.06.07 31.03.08 Work

completed

15.09.09 -

31 FBD – KSJ CAO/Con/46/06 (4) Linking of BG railway track

on PSC sleepers etc. in Zone

–IV of FBD – KSJ section.

W/Con/362/II/844/W-

3(4)

Dt. 02.02.07

CAO/Con/GKP/967

Dt. 22.03.07

Rs. 7834077.56

28.06.07 31.03.08 Work

completed

30.09.09 -

32 FBD – KSJ CAO/Con/46/06 (5) Linking of BG railway track

on PSC sleepers etc. in Zone

–V of FBD – KSJ section.

W/Con/362/II/845/W-

3(5)

Dt. 29.01.07

CAO/Con/GKP/978

Dt. 20.04.07

Rs. 10937361.56

28.06.07 31.03.08 Work

completed

- -

33 FBD - KSJ CAO/Con/60/07 (1) Construction of high level

passenger platform at Kampil

road station and surfacing of

rake handling facilities 15m

width at Farrukhabad

including drain in yards in

connection with gauge

conversion of Farrukhabad –

Kasganj section.

W/Con/362/II/926/W-

3(1)

Dt. 16.10.07

CAO/Con/GKP/1017

Dt. 10.12.07

Rs. 10315285.9

15.04.08 31.03.09 Work

completed

10.11.09 -

34 SZP-PBE-TPU CAO/Con/49/05 Provision of Hectometer post

and Cable huts in SZP-PBE-

TPU section.

W/Con/362/II/796/W-3

Dt. 13.02.06

CAO/Con/GKP/925

Dt. 30.10.06

Rs. 2622086.96

12.11.06 31.10.07 Work

completed

31.12.09 -

35 Mechanical

Workshop, Izatnagar

CAO/Con/81/08 (1) Construction of foundation,

supplying & erection of

sheeting, dismantling of

existing floor including

disposal of debris,

construction/renovation of

flooring including linking of

track, construction of service

buildings & other

miscellaneous works in

connection of

extension/renovation of Bogie

overhauling section (Bay-2),

extension of open gantry in

Bay-2 & 3 (G-2 & G-3),

extension/renovation of

carriage wheel shop (3E),

extension/renovation of

corrosion shop, BG coach

lifting and lowering corrosion

shop (4E, 4E1 & 4E2) for

developing 50 BG Coaches

POH at Mechanical

Workshop, Izatnagar. (Zone -

I).

W/Con/362/II/1006/W-

3(1)

Dt. 23.02.09

Dy CE/Con/I/IZN/13

Dt. 06.04.09

Rs. 64349938.92

22.02.11 - - - Work in

progress

36 Mechanical

Workshop, Izatnagar

CAO/Con/81/08 (3) Construction of foundation,

supplying and erection of

sheeting, dismantling of

existing floor including

disposal of debris,

construction/renovation of

flooring in shed no. 28 & 29

W/Con/362/II/1006/W-

3(3)

Dt. 23.02.09

Dy CE/Con/I/IZN/14

Dt. 06.04.09

Rs. 64673872.75

22.02.11 - - - Work in

progress

Page 6: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

including linking of track,

construction of service

buildings related to BTC,

Centralized Library,

supervisors room, meeting

hall, laboratory (1,2 &3)

including septic tanks,

70,000 Gallons capacity static

tank including pump house,

culvert and Gas godown and

construction/renovation/exten

sion of SSE offices, cycle

stand in connection of

developing 50 BG Coaches

POH at Mechanical

Workshop, Izatnagar. (Zone -

III).

37 Mechanical

Workshop, Izatnagar

CAO/Con/81/08 (2) Construction of foundation,

supplying & erection of

sheeting, dismantling of

existing floor including

disposal of debris,

construction/renovation of

flooring including linking of

track in General shed (SE-10,

shed no. 21, 21/A, 26 & 27

and repair of sheeting in shed

no. 18A, repair/renovation of

floors & roofs and other

works in shed SPR-20,

construction/widening of CC

roads and

construction/renovation of

existing drain in connection

of developing 50 BG Coaches

POH at Mechanical

Workshop, Izatnagar. (Zone -

II).

W/Con/362/II/1006/W-

3(2)

Dt. 28.04.09

W/Con/362/II/1006/

W-3(2)

Dt. 28.04.09

Rs. 60283758.58

27.04.11 - - - Work in

progress

38 PBR-PBE-TPU CAO/Con/50/08 (2) Construction of S&T

Buildings between Bhojipura

(excl.) to Tanakpur (incl.),

Camp Office at Pilibhit and

extension of Dy. Chief

Engineer/Con/I/Izatnagar's

office and construction of

Two units VIP Officer's Rest

House and one unit Camp

Office at Izatnagar.

W/Con/362/II/980/W-

3(2)

Dt. 08.11.08

Dy CE/Con/I/IZN/05

Dt. 30.12.08

Rs. 11341483.54

07.10.09 0 - - Work in

progress

39 PBR-PBE-TPU CAO/Con/50/08 (1) Rebuilding of substructure of

Major Bridge No.27, Bridge

No. 34A, Bridge No.53, Br.

No. 57B & Br. No. 65 PSC

Girder on well foundation on

permanent

diversion/temporary diversion

including earthwork on

permanent

diversion/temporary diversion

W/Con/362/II/980/W-

3(1)

Dt. 09.02.09

W/Con/362/II/980/W

-3(1)

Dt. 09.02.09

Rs. 162082639/-

08.08.10 - - - Work in

progress

Page 7: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

and supplying and laying of

Blanketing material on the

permanent diversion of these

bridges, between Pilibhit -

Tanakpur stations in

connection with Gauge

Conversion of Bhojipura -

Pilibhit-Tanakpur section.

40 PBR-PBE-TPU CAO/Con/73/08 (4) Construction/Rebuilding of

minor bridges (Br. No. 319 to

299 i.e. total 20 Nos. to be

rebuilt) including earthwork

in filling in widening of

formation, temporary

diversion and other

miscellaneous civil works

between Bhojipura-Saithal

from Km. 286/10 to 300/2-3

in connection with gauge

conversion Bhojipura-

Pilibhit-Tanakpur section.

W/Con/362/II/998/W-

3(4)

Dt. 28.02.09

W/Con/362/II/998/W

-3(4)

Dt. 28.02.09

Rs. 20976288.5

27.02.11 - - - Work in

progress

41 PBR-PBE-TPU CAO/Con/73/08 (2) Construction/Rebuilding of

minor bridges (Br. No. 52 to

75 i.e. total 21 Nos. to be

rebuilt) including earthwork

in filling in widening of

formation, temporary

diversion and other

miscellaneous civil works

between Khatima (excl) -

Tanakpur in connection with

gauge conversion Bhojipura-

Pilibhit-Tanakpur section.

W/Con/362/II/998/W-

3(2)

Dt. 15.05.09

W/Con/362/II/998/W

-3(2)

Dt. 15.05.09

Rs. 41765085/-

14..05.11 - - - Work in

progress

42 PBR-PBE-TPU CAO/Con/92/08 (1) Construction/Rebuilding of

minor bridges (Br. No. 1 to

51 i.e. total 42 Nos. to be

rebuilt) including earthwork

in filling in widening of

formation, temporary

diversion and other

miscellaneous civil works

between Pilibhit –Khatima

(incl.) in connection with

gauge conversion Bhojipura-

Pilibhit -Tanakpur section.

Dy. CE/Con/I/IZN/18

Dt. 11.08.09

Dy.

CE/Con/I/IZN/18

Dt. 11.08.09

Rs. 38279443.5

14.05.11 - Work

completed

- Work in

progress

Dy. CE/Con/East

43 Chhapra - Ekma

doubling

CAO/CON/44/2007 Construction of drainage in

Chhapra Yard in connection

with Chhapra – Ekma

doubling

W/Con/362/II/905/W-3

dated 16.10.2007

CAO/Con/GKP/1114

dated: 23.10.2008

Rs. 1636080.00

15.02.08 31.07.08 - - Work is in

progress

44 Ekma - Jiradei

doubling

CAO/CON/26/2005

(2)

Earthwork and Blanketing in

formation, construction of

minor bridges & other misc.

works such as signal building,

platform, FOB, OFC Hut,

fencing etc. between

Chainwa(ex.) –

W/Con/362/II/674/W-3

(2) dated 24.06.2006

CAO/Con/GKP/917

dated: 05.09.2006

Rs. 40769041.50

23.10.07 31.01.08 Under

preparatio

n

31.10.09 Due to

engagement

in doubling

work.

Page 8: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

Dhuraundha(in.) section in

connection with doubling of

Ekma - Jiradei section of

Varanasi Division

45 CAO/CON/26/2005

(5)

Earthwork and Blanketing in

formation, construction of

minor bridges & other misc.

works such as signal building,

platform, FOB, OFC Hut,

fencing etc. between

Siwan(ex.) – Jiradei(in.)

section in connection with

doubling of Ekma - Jiradei

section of Varanasi Division.

W/Con/362/II/674/W-3

(5) dated 06.03.2006

CAO/Con/GKP/915

dated: 29.08.2006

Rs. 41809049.00

05.11.07 30.06.09 - - Final bill

will be

prepared

after CRS

46 CAO/CON/30/2006

(2)

Earthwork and Blanketing in

formation, construction of

minor bridges & other misc.

works such as signal building,

platform, FOB etc. between

Ekma (excluding) – Chainwa

(including) and Duraundha

(excluding) - Siwan

(including) section in

connection with doubling of

Ekma - Jiradei section of

Varanasi Division.

W/Con/362/II/883/W-3

(2) dated 21.09.2006

CAO/Con/GKP/940

dated 27.11.2006

Rs. 82256431.00

20.03.08 28.02.09 - 30.11.09 Final bill

will be

prepared

after CRS

47 CAO/CON/69/2007

(3)

Supplying, laying and fixing

of heavy duty hexagonal

paver blocks on level

crossings, CC pavers on

passenger platforms & other

misc. works between Chhapra

(in.) - Jiradei(in.) section in

connection with Chhapra -

Ekma - Jiradei doubling work

W/Con/362/II/926/W-3

(3) dated 25.01.2008

CAO/Con/GKP/1077

dated: 24.04.2008

Rs. 9615936.00

24.04.08 30.07.08 - - Final bill

will be

prepared

after CRS

48 CAO/CON/04/2007

(1)

Linking of BG track manually

including slewing &

dismantling B.G. track

wherever required, carting

and stacking of released

materials, spreading of

ballast, transportation of 52

Kg/90R SH/New Rails, PSC

sleepers, 60 Kg from sleeper

factory or any other Railway

stations, P.Way materials etc.

from different places to

various stations/places and

linking level crossing, bridge

etc. between Ekma (excl.) -

Pachrukhi (incl.) in

connection with Ekma -

Jiradei patch doubling

project.

W/Con/362/II/873/W-3

(1) dated 17.05.2007

CAO/Con/GKP/991

dated 06.08.2007

Rs. 22512743.50

16.01.08 30.06.09 Under

preparatio

n

31.10.09 Due to

engagement

in doubling

work.

49 CAO/CON/04/2007

(1)

Linking of BG track manually

including slewing &

dismantling B.G. track

wherever required, carting

W/Con/362/II/873/W-3

(2) dated 15.06.2007

CAO/Con/GKP/1069

dated 31.03.2009

Rs. 18183662.50

14.02.08 30.09.09 - - Work is in

progress

Page 9: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

and stacking of released

materials, spreading of

ballast, transportation of 52

Kg/90R SH/New Rails, PSC

sleepers, 60 Kg from sleeper

factory or any other Railway

stations, P.Way materials etc.

from different places to

various stations/places and

linking level crossing, bridge

etc. between Pachrukhi

(excl.) - Jiradei (incl.) in

connection with Ekma -

Jiradei patch doubling

project.

50 CAO/CON/84/2008

(3)

Casting of deck slab on Major

Bridge No. 103 (6x18.30m)

at Km. 395/5-6 between

Siwan - Jiradei section in

connection with Ekma -

Jiradei doubling work.

W/Con/362/II/995/W-3

(3) dated 19.01.2009

Dy.CE/Con/GKP/Eas

t/06 dated 20.04.2009

Rs. 3521550.00

18.03.09 18.03.09 - - Final will be

done after

CRS

51 CAO/CON/18/2009

(3)

Alumino Thermit Welding of

52kg./90R rails by SKV

Process at cess/in stack in

connection with Ekma -

Jiradei doubling and

construction of Chhapra

Gramin new station and

various projects running in

the jurisdiction of Dy.Chief

Engineer/Con/East /GKP.

W/Con/362/II/994/W-3

(2)

Dated 22.05.2009

Dy.CE/Con/GKP/Eas

t/09 dated 10.09.2009

Rs. 4611000.00

21.11.09 21.11.09 - - Work is in

progress

52 CAO/CON/52/2008 Earthwork and blanketing in

formation, construction of

minor bridges and other misc.

works between Maharajganj

to Basantpur (excluding) at

chainage 19.500 in

connection with Mahrajganj-

Mashrakh new BG line

project.

W/Con/362/II/982/W-3

(3) dated 06.11.2008

CAO/Con/GKP/1129

dated: 27.03.2009

Rs.18173525.00

05.02.10 05.02.10 - - Work is in

progress

53 CAO/CON/63/2008

(1)

Earthwork and blanketing in

formation, construction of

minor bridges and other misc.

works between Basantpur

(including) to Mashrakh

(including) in connection with

Mahrajganj-Mashrakh new

BG line project.

W/Con/362/II/990/W-3

(1) dated 10.02.2009

CAO/Con/GKP/1131

dated 02.06.2009

Rs. 176101500.00

09.05.10 09.05.10 - - Work is in

progress

54

Maharajganj -

Masrakh new BG

Line

CAO/CON/68/2008

(1)

Carrying out soil

investigation for construction

of major bridges, minor

bridges, platform wall and

embankments in Thawe -

Chhapra & Maharajganj -

Mashrakh in connection with

gauge conversion of Chhapra-

Siwan-Thawe -Kaptanganj

section & construction of new

W/Con/362/II/994/W-3

(1) dated 19.12.2008

Dy.CE/Con/East/GK

P/ 04 dated

07.03.2009

Rs. 553950.00

18.06.09 - - - Work is in

progress

Page 10: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

BG line from Maharajganj -

Mashrakh.

55 CAO/CON/33/2008

(1)

Manufacturing, carting &

fixing of RCC Boundary

Pillar as per CE’s (MET) plan

No. M/59/62 with

contractor’s tool, labour,

material, reinforcement,

cement, complete. As per

specified intervals or as

directed by Engineer-in-

charge in connection with

Mahrajganj-Masrakh new BG

line.

W/Con/362/II/936/W-3

(4) dated 07.08.2008

Not done

Rs. 603488.00

06.11.08 Extension

upto

31.10.09

is under

process.

- - Work is in

progress

56 CAO/CON/06/2009

(1)

Construction of major bridges

on well/open foundation etc.

with other misc. works

between Maharajganj -

Mashrakh section in

connection with Maharajganj-

Mashrakh new BG line

project.

W/Con/362/II/1023/W-

3 (1)

Dated 02.06.2009

Not done

Rs.113742975.39

01.09.10 - - - Work yet to

be started.

57 CAO/CON/19/2009

(1)

Supply of two nos. Road

Vehicle at Chhapra/Siwan for

the use of the officers of

Dy.Chief

Engineer/Con/East/GKP's at

Chhapra/Siwan unit of

N.E.Railway.

W/247/BG/W – Hiring

Dated 09.07.2009

Not done

Rs.661481.76

08.07.10 - - - Work is in

progress

58 CAO/CON/31/2006 Supplying, leading and

loading of machine crushed

track ballast confiroming to

RDSO's specification of

June/2004 with upto date

correction slips from Pakur

Quarry into any type of

Railway wagon.

W/Con/362/II/834/W-3

dated 16.11.2006

CAO/Con/GKP/949

dated 29.01.2007

Rs.19600000.00

15.05.07 31.12.07 - - Case fill has

been seized

by Railway

Board

Vigilance

59 CAO/CON/44/2007 Supplying, leading and

loading of machine crushed

track ballast confiroming to

RDSO's specification of

June/2004 with upto date

correction slips from Pakur

Quarry into any type of

Railway wagon.

W/Con/362/II/834/W-3

dated 16.11.2006

CAO/Con/GKP/908

dated 28.07.2006

Rs. 17600000.00

15.05.07 31.12.07 - - Case fill has

been seized

by Railway

Board

Vigilance

60 CAO/CON/29/2007 Supplying, leading and

loading of machine crushed

track ballast confiroming to

RDSO's specification of

June/2004 with upto date

correction slips from Pakur

Quarry into any type of

Railway wagon.

W/Con/362/II/943/W-3

(2) dated 28.07.2008

CAO/Con/GKP/1103

dated: 29.08.2008

Rs. 46500000.00

27.09.09 15.11.09 - - Work is in

progress

61

Ballast supply from

Pakur Quarry

CAO/CON/29/2007 Supplying, leading and

loading of machine crushed

W/Con/362/II/943/W-3

(1) dated 28.07.2008

CAO/Con/GKP/1109

dated: 01.10.2008

27.09.09 27.11.09 - - Work is in

progress

Page 11: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

track ballast confiroming to

RDSO's specification of

June/2004 with upto date

correction slips from Pakur

Quarry into any type of

Railway wagon.

Rs. 46500000.00

62 CAO/CON/53/2008 Supplying, leading and

loading of machine crushed

track ballast confirming to

RDSO's specification of

June/2004 with upto date

correction slips from Pakur

Quarry into any type of

Railway wagon

W/Con/362/II/976/W-3

(3) dated 06.10.2008

Dy.CE/Con/East/GK

P/01 Dated:

31.12.2008

Rs. 46800000.00

05.08.09 31.12.09 - - Work is in

progress

63 CAO/CON/35/2008

(1)

Supplying, leading and

loading of quarry dust to be

used as blanketing material

on Railway embankment

from Pakur Quarry into any

type of Railway wagons.

W/Con/362/II/965/W-3

(1) dated 17/19.12.2008

Dy.CE/Con/East/GK

P/03 Dated:

19.02.2009

Rs. 3460000.00

16.04.09 15.06.09 - - Work is in

progress

64 CAO/CON/97/2008

(1)

Supplying, leading and

loading of quarry dust to be

used as blanketing material

on Railway embankment

from Pakur Quarry into any

type of Railway wagons.

W/Con/247/East/Tender

/Quarry Dust (2)

dated 30.03.2009

Dy.CE/Con/East/GK

P/07 Dated:

05.06.2009

Rs. 1809926.00

29.09.09 - - - Work is in

progress

65 CAO/CON/97/2008

(1)

Supplying, leading and

loading of quarry dust to be

used as blanketing material

on Railway embankment

from Pakur Quarry into any

type of Railway wagons.

W/Con/247/East/Tender

/Quarry Dust (12)

dated 30.03.2009

Dy.CE/Con/East/GK

P/08 Dated:

15.06.2009

Rs. 1809926.00

29.09.09 - - - Work is in

progress

66 CAO/CON/22/2009

(1)

Supplying, leading and

loading of quarry dust to be

used as blanketing material

on Railway embankment

from Pakur Quarry into any

type of Railway wagons.

W/Con/247/Dy.CE/East

/Tender/03 (1)

Dated 22.07.2009

Not done

Rs. 1810000.00

21.01.10 - - - Work yet to

be started.

67

Dust supply from

Pakur

CAO/CON/22/2009

(1)

Supplying, leading and

loading of quarry dust to be

used as blanketing material

on Railway embankment

from Pakur Quarry into any

type of Railway wagons.

W/Con/247/Dy.CE/East

/Tender/03 (2)

Dated 22.07.2009

Not done

Rs. 1810000.00

21.01.10 - - - Work yet to

be started.

68 CAO/CON/55/2005 Construction of platform,

minor bridge, linking of track

& other misc works between

Chhapra Jn. (in.) and Chhapra

Kachery(in.) section and upto

TP 323/3 in connection with

doubling of Chhapra -

Hajipur section.

W/Con/362/II/800/W-3

dated 29.06.2006

CAO/Con/GKP/888

dated: 01.05.2006

Rs. 4545777.50

28.06.06 31.07.07 Under

preparatio

n

31.10.09

69

Chhapra - Hajipur

doubling (E. C.

Railway Project)

CAO/CON/16/2007

(1)

Construction of station

building & platform and

W/Con/362/II/882/W-3

(1) dated 19.06.2007

CAO/Con/GKP/1009

dated: 20.11.2007

18.11.07 30.04.09 - - Earthwork

being done

Page 12: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

misc.works between Chhapra

Kachery - Goldenganj in

connection with construction

of New Chhapra Gramin

Railway station.at Chhapra

Gramin and other misc. works

in connection with doubling

of Chhapra - Hajipur project.

Rs. 32241845.00 by E. C.

Railway.

70 CAO/CON/68/2008

(5)

Manufacture & erection of

105x15 steel covered shed

including construction of

foundation, examination pit,

flooring, circulating area,

drain and other misc. works at

Chhapra yard in connection

with gauge conversion of CPJ

- THE - SV - CPR section.

W/Con/362/II/994/W-3

(5) dated 06.01.2009

Dy.CE/Con/East/GK

P/05 Dated:

19.02.2009

Rs. 23451361.68

05.07.09 Extension

upto

31.10.09

is under

process.

- - Work is in

progress

71

Chhapra - Thawe

gauge conversion

CAO/CON/22/2009

(3)

Transportation of PSC

Turnouts, switches, rails and

other P. Way materials etc.

from different places to

various stations/places

between Chhapra - Thawe

section in connection with

Kaptanganj - Thawe - siwan -

Chhapra gauge conversion

project

W/Con/247/Dy.CE/East

/Tender/02

Dated 22.07.2009

Not done

Rs. 3085755/-

21.01.10 - - - Work yet to

be started.

Dy CE/Con/West

72 GKP-GD (loop) &

ANDN-NTV G.C.

Project

L.T.No.

CAO/Con/23/06 (1)

Provision of Hectometer Post

in GKP-ANDN-NTV section

and loading of ballast into all

type of railway Wagons

W/Con/362/II/824/W-

3(1) dt.30.08.06

CAO/Con/GKP/943

dt.22.12.06

Rs. 2199060.36

29.1.07 31.12.08 Final bil

entered in

MB. Final

variation

under pre

paration.

31.10.09

73 CAO/Con/56/06 (5) Transportation of PSC line

sleepers from sleeper

factory/station yards to

various locations etc. in

connection with gauge

conversion of Gorakhpur-

Anandnagar-Nautanwa

section.

W/Con/362/II/855/W-

3(5) dt. 01.02.07

CAO/Con/GKP/962

dt.15.3.07

Rs. 22211384.95

30.4.07 30.04.09 Final bill

is being

entered in

MB.

10.11.09

74 CAO/Con/56/06 (4) Transportation of PSC line

sleepers from sleeper factory/

station yards to various

locations in connection with

gauge conversion of GKP-

ANDN-NTV section.

W/Con/362/Ii/855/W-

3(4) dt.01.02.07

CAO/Con/GKP/963

dt.15.3.07

Rs. 23706598/-

30.4.07 30.08.09 Extension

under

process,

work in

progress

75 CAO/Con/56/06 (1 ) Linking of BG track manually

between GKP(in)-

Peppeganj(in)

W/Con/362/11/855/W-

3(1)/2173 dt.26.06.07

CAO/Con/GKP/1061

dt.26.03.08

Rs. 15376380/-

25.10.07 31.10.09 Work in

progress

76 CAO/Con/56/06 (2) Linking of BG track manually

betweeen Peppeganj(ex)-

Purandarpur.

W/Con/362/II/855/W-

3(2) /2431 dt.20.07.07.

CAO/Con/GKP/1079

dt.30.4.08

Rs. 14730575/-

19.11.07 30.09.09 Extension

under

process,

work in

progress

Page 13: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

77 CAO/Con/56/06 (3) Linking of BG track manually

betweeen Purandarpur-

Nautanwa.

W/Con362/II/855/W-

3(3) dt. 12.07.07

CAO/Con/GKP/1044

dt.26.2.08

Rs. 14583575/-

11.11.07 31.10.09 Work in

progress

78 L.T.No.

CAO/Con/43/07 (4)

Construction & extension of

P.F. bet. GKP(ex)-MIM(in)

W/Con/362/II/904/W-

3(4)/2976 dt.119.07

CAO/Con/GKP/1026

dt.11.01.08

Rs. 4030950/-

10.01.08 31.07.09 Extension

under

process,

work in

progress

79 LTNo.

CAO/Con/43/07 (3)

Construction & extension of

P.F.- bet. MIM(ex)-

Peppeganj(in)

W/Con/362/Ii/904/W-

3(3)2973 dt. 11.09.07

CAO/Con/GKP/1015

dt.10.12.07

Rs. 3767080.50

15.03.08 28.02.09 Final

variation

under

vetting

4/11/2009

80 CAO/Con/43/07 Construction & extension of

P.F. bet. Peppeganj(ex)-

Campier ganj (in).

W/con/362/II/904/W-

3(5) dt. 21.08.07

CAO/Con/GKP/1010

dt.20.11.07

Rs. 2295805.5

20.12.07 30.05.09 Final

variation

under

vetting

25/10/09

81 L.T.No.

CAO/Con/43/07 (1)

Construction & extension of

P.F. bet. Campier ganj (ex)-

Lokvidyapith Nagar.

W/Con/362/II/904/W-

3(1)/2912 dt. 6.9.07.

CAO/Con/GKP/1032

dt.25.01.08

Rs. 7268289.96

5.10.08 31.07.09 Final bill

entered in

MB.

82 L.T.No.

CAO/ Con/43/07(3)

Construction & extension of

P.F. bet. Purandarpur-

Nautanwa (ex.) .

W/Con362/II/904/W-

3(3)/2801 dt.17.08.07

CAO/Con/GKP/1020

dt.24.12.07

Rs. 4460535/-

16.12.07 31.03.09 Extension

under

process,

work in

progress

83 CAO/Con/31/ 08 (2) Construction and extension of

platform etc. and other

miscellaneous work between

Gorakhpur(ex) to

Nautanwa(ex)

W/Con/362/II/962/W-

3(2)/2705 dt. 18.8.08

CAO/Con/GKP/1124

dt.12.01.2009

Rs. 24514745/-

17.11.08 31.12.09 Work in

progress

84 LT No.

CAO/Con/ 01/08 (2)

Construction & extension of

P.F. at Nakha jungle.

W/Con/362/II/946/W-

3(2) dt.31.03.08

CAO/Con/GKP/1107

dt.29.09.08

Rs. 4877595.20

30.06.08 30.04.09 Final bill

is being

entered in

MB.

15.11.09

85 CAO/Con/45/ 08 Construction of 2 no.

Washable Aprons along with

the water filling arrangement

and other leftover

miscellaneous work at

Gorakhpur Yard

W/Con/362/II/974/W-

3/365 dt. 19.11.08.

Dy.CE/Con/W/GKP/

01 dt. 06.01.09

Rs. 43725800/-

18.03.09 31.10.09 Work in

progress

86 CAO/Con/03/07 Construction of Rake

handling platform, approach

road etc. at Nautanwa .

W/Con362/II/872/W-3

dt. 24.05.07.

CAO/Con/GKP/1012

dt.28.11.07

Rs. 15398932/-

23.10.07 30.11.09 Work in

progress

87 CAO/Con/54/ 07 (2) Widening, regrading,

resurfacing the approach road

of various level crossing as

per Rly. standard (IRPWM)

and specification etc. between

ANDN(excl.) to NTV(incl.)

W/Con/362/II/914/W-

3(2) dt. 14.9.07

Dy.CE/Con/W/GKP/

03 dated 12.05.09

Rs. 7575800/-

14.12.07 31.10.09 Work in

progress

88 CAO/Con/33/ 07 (4) Construction of Island

platform at GKP etc.

dt.19.9.07,

W/Con/362/II/897/W-

3(4) dt. 19.09.07.

CAO/Con/GKP/1041

dt.15.02.08

Rs. 32239645/-

18.01.08 31.05.09 Extension

under

process,

work in

progress

89 CAO/Con/54/ 07 (1) Widening, regrading, re-

surfacing of the approach

road of various level crossing

etc between GKP-ANDN.

W/Con/362/II/914/W-

3/6 dt. 31.12.07

CAO/Con/GKP/1078

dt.25.4.08

Rs. 8037120/-

30.03.08 30.09.09 Extension

under

process,

work in

Page 14: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

progress

90 CAO/Con/05/08 (1) Construction washable apron

, water filling arrangement

etc. and other miscellaneous

work at Nautanwa

W/Con/362/II/947/W-

3(1)/1474 dt. 28.04.08.

CAO/Con/GKP/1126

dt.13.01.09.

Rs. 20776050/-

27.07.08 30.08.09 Extension

under

process,

work in

progress

91 CAO/C/04/08 (2) Manufacturing , supplying

and stacking of 65 mm

maximum size machine

crushed stone ballast etc bet.

ANDN-BNY km.41/0 to

Km.112/9 .

W/Con/362/II/945/W-3

(2)

dt.16.3.08

CAO/Con/GKP/1087

dt.10.06.2008.

Rs. 61560000/-

15.09.08 25.09.09 Final bill

entered in

MB. Final

variation

under

preparatio

n.

92 CAO/Con/27/07 (1) Rebuilding /strengthening of

left over minor Br. No.2, 25,

26 & 28 and other misc. work

etc. (Rs.7258370/-)

W/Con/362(II)/

891/W-3(1) dt.

22/6.7.09

CAO/Con/GKP/1033

dt.25.01.08

Rs. 7258370/-

5.12.07 31.08.09 Final bill

is being

entered in

MB.

25.11.09

93 CAO/Con/52/06 (1) Rebuilding /strengthening of

major bridges No.71(8x6.1

mtr. PSC slab) on pile

foundation etc. in connection

of gauge conversion of GKP-

GD (loop) including ANDN-

NTV section (Rs.83787293/-)

W/Con/362/II/850/W-

3(1) dt.5.02.07

CAO/Con/GKP/983

dt.30.5.07

Rs. 83787293/-

4.05.08 31.12.09 Work in

progress

94 L.T.No.

CAO/Con/21/ 07

Earthwork in formation, other

miscellaneous work including

linking of B.G. track for

Engg. siding at Katka

W/Con/362/II/886/W-

3/1621 dt. 23.05.07

CAO/Con/GKP/989

dt.25.7.07

Rs. 2205897/-

22.7.07 30.11.08 Final bill

is being

entered in

MB.

10.11.09

95 CAO/Con/53/ 03 Rebuilding/strengthening of

major bridges between Anand

nagar-Naugarh station.

W/Con/362/II/594/W-3

dt.12.4.04.

CAO/Con/GKP/817

dt.31.05.05

Rs. 24136528/-

11.10.05 20.06.200

7

Final bill

entered in

MB. Final

variation

in

process.

30.10.09

96 CAO/Con/37/ 04 Rebuilding of

Br.No.55(5x3.65 PRC slab)

Br.No.59(3x6.09 RCC

slab),Br.No.61(5x3.65 RCC

slab),Br.No.62,63,67with

PSC slab on open foundation

including track linking on

temporary&permanent

diversion bet. Sohratgarh to

Burhni station in ANDN-GD

section.

W/Con/362/II/634/W-

3/3243 dt. 31.08.04

CAO/Con/GKP/822

dt.17.05.05

Rs. 29869080/-

30.02.06 30..06.07 Final bill

entered in

MB. Final

variation

in

process.

10.11.09

97 CAO/Con/89/08 (1) Hiring of 2 nos. road vehicle

Tata Sumo or Marshal or

Bolero for inspection at

various on going work during

Mega Block period.

W/Con/362/II/1014/W-

3(1)/170 dt. 25.3.09

Dy.CE/Con/W/GKP/

04 dt. 20.07.09

Rs. 232400/-

24.07.09 24.07.09 Final bill

entered in

MB. Final

variation

in

process.

30.11.09

98 CAO/Con/58/07 (3) Hiring of vehicles in

connection with supervision

of various work in connection

with patch doubling work bet.

MND-BV, DMG-SWA and

W/Con/362/II/905/W-

3/3251 dt. 4.10.07

CAO/Con/GKP/1008

dt. 14.11.07

Rs. 886600/-

3.9.08 31.3.09 Final

variation

under

vetting

31.10.09

Page 15: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

gauge conversion of GKP-

Barhni-GKP-ANDN.

99 CAO/Con/14/08 (1) Hiring of road vehicle(Tata

Sumor/Marshal/Bol;ero/Quali

st or similar for officials

under Dy.CE/Con/West

W/Con/362/II/953/W-

3(1) dt. 27.5.08

CAO/CON/gkp/1125

dt. 12.11.09

Rs. 263550/-

26.05.09 26.5.09 Final

variation

under

vetting

31.10.09

Dy. CE/Con/NE

100 Hathua-Bhatani CAO/Con/69/ 08 Construction of well

foundations Pier abutment for

major bridge on Jharahi river

(4x18.30m composite girder)

between Bhatni - Bathua Bazar

including costing of deck slab

in connection with Hathua

Bhatni New B.G. line

W/Con/362/ II/989/W-3

dt. 6.11.08

Dy CE/Con

/NE/GKP/06 dt.

19.3.09

Rs. 25563725/-

05.7.09 - - - Due to non

availability

of girder

work is in

heldup

101 -do- CAO/Con/58/2008/

(3)

Linking of track loading/

leading/unloading of various

P. Way materials between

Phulwaria and Bathua Bazar

stations in connection with

construction of Hathua -

Bhatni New BG line.

W/Con/362/ II/986/W-

3(3) dt. 24.11.08

Dy

CE/Con/NE/GKP/07

dt. 13.4.09

Rs.4450112.77

23.3.09 31.10.09 - - Work is in

progress

102 -do- CAO/Con/83/2007/

(2)

Balance earthwork and

blanketing in formation,

construction of minor bridges

and casting of deck slab etc.

on major bridges between km

2.42 to km 22.00 in Hathua -

Bathua Bazar section in

connection with Hathua-

Bhatni New BNG line.

W/Con/362/ II/924/W-3

(3) dt. 2.01.08

CAO/Con/1051 dt.

10.3.08

Rs.59952364.40

01.03.09 31.5.09 - - -

103 -do CAO/Con/45/ 06

(4)

Alumino Thermit welding of

52Kg/90R rails by SKV

process at cess in stack

between Hathua - Bathua

Bazar section in connection

with Hathua-Bhatni New BG

line.

W/Con/362/ II/814/W-3

(4) dt. 13.09.06

CAO/Con/ GKP/941

dt. 27.11.06

Rs.4360850/-

12.01.07 30.09.08 - - -

104 -d- CAO/Con/02/ 06

(1)

Linking of track construction

of station building platform at

Lain Bazar Construction of

level crossing gate lodge

staff quarters and other misc

works between Hathua (incl)

to km 12/0 in connection with

co0nstruction of Hathua –

Bhatni new BG line.

W/Con/362/ II/827/W-3

(1) dt. 20.09.06

CAO/Con/ GKP/927

dt. 7.11.06

Rs.16349483.45

19.12.06 15.12.08 Final bill

under

preparatio

n

-

105 -do- CAO/Con/53/ 07 (5) Hiring of Tata Sumo/Bolero

or similar vehicle for

inspection of ongoing

construction works of

Hathua-Bhatni new line and

W/Con/362/ II/913/W-3

(5) dt. 8.10.07

CAO/Con/GKP/1019

dt. 20.10.07

Rs.427980/-

07.8.07 - - - -

Page 16: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

Gorakhpur Cantt.- Baitalpur

doubling

106 -do- CAO/Con/53/ 06 Consultancy preparation &

supply of Architectural

drawings including plan with

site plan elevation etc. on

AUTO CAD of Lain Bazar,

Salar Khurd, Phulwaria &

Bathua Bazar station

buildings or any other station

and scaled down models of

Salar Khurd and Phulwaria

station building or any other

station in connection with the

Const. of New BG line.

W/Con/362/ II/851/W-3

dt. 23.11.06

CAO/Con/ GKP/947

dt. 18.01.07

Rs.167300.50

22.12.06 22.7.07

Final bill

under

preparatio

n

- -

107 -do- CAO/Con/68/07 (2) Construction works on

platform staff quarters at

different stations gang hut &

other misc. works in Hathua

Bathua Bazar section in

connection with Hathua

Bhatni new BG line project.

W/Con/362/ II/924/W-3

(2) dt. 27.11.07

CAO/Con/GKP/1070

dt. 31.3.08

Rs.16961461/-

26.5.08 30.7.09 - - Applied for

DOC &

work is in

progress

108 -do- CAO/Con/11/ 08 (1) Construction of well

foundations Pier abutment for

major bridge on Chhoti

Gandak river (8x18.30m

composite girder) between

Bhatni - Bathua Bazar

including costing of deck slab

in connection with Hathua

Bhatni New B.G. line

W/Con/247/02/NE(1)

dt. 7.05.09

-

Rs. 41828651.25

06.5.2010 - - - Work to be

started

109 -do- CAO/Con/11/ 08(2) Construction of well

foundations Pier abutment for

major bridge on Haldi Khas

river (2x18.30m composite

girder) and Khanua river

(6x18.30m composite girder)

between Bhatni-Bathua Bazar

including costing of deck slab

in connection with Hathua

Bhatni New B.G. line

W/Con/247/02/NE(2)

dt. 7.05.09

-

Rs. 46628172.10

6.05.2010 - - - Work is in

progress

110 Chhitauni-Tamkuhi

Rd.

CAO/Con/25/ 07 (2) Construction of station

buildings & platform at

Chhitauni, gate lodge staff

quarter and other misc. works

between Paniyahwa-Chhitauni

in connection with Constn.of

Paniyahwa Chhitauni Tamkuhi

Rd. new BG line.

W/Con/362/ II/889/W-3

(2) dt 7.6.07

CAO/Con/GKP/1042

dt. 20.2.08

Rs.9000302.50

6.9.07 31.3.09 Final bill

under

preparatio

n

- -

111 -do- CAO/Con/30/07 Earthwork and blanketing in

formation and turfing etc.

between Paniyahwa –

Chhitauni stations in

connection with new BG line

W/Con/362/ II/871/W-3

dt.31.5.07

CAO/Con/GKP/1037

dt. 6.2.08

Rs.17440455/-

30.11.07 15.7.09 Final bill

under

preparatio

n

- -

Page 17: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

between Chhitauni Tamkuhi

Rd.

112 -do- CAO/Con/25/07 (1) Linking of track, construction

of level crossing, installation

of lifting barrier etc. and other

misc. works between

Paniyahwa- Chhitauni in

connection with construction

of Paniyahwa – Chhitauni –

Tamkuhi Rd. new BG line.

W/Con/362/ II/889/W-3

(1) dt. 27.6.07

Not done

Rs.4120559/-

- Delay due to

nonavailabili

ty of

material

113 GKC-BALR CAO/Con/82/ 07 (2) Alumino Thermit welding of

52Kg/90R rails by SKV

process at cess in stack in

Gorakhpur Cantt.-Baitalpur

section in connection with

doubling of Gorakhpur

Cantt.-Baitalpur or any where

in the jurisdiction Dy

CE/Con/NE/GKP.

W/Con/362/ II/921/W-3

(2) dt. 17.03.08

CAO/Con/ GKP/04

dt. 02.02.09

Rs.4060000/-

16.12.08 31.12.09 - - Work is in

progress

114 -do- CAO/Con/37/ 06 In Connection with doubling

of Gorakhpur Cantt. to

Baitalpur section of Varanasi

Division construction of

bridges on well foundation,

substructure and deck in

super structure of bridge

No.171 (2x18.30m composite

girder) between Kusmhi-

Sardarnagar stations and well

foundation, substructure and

PSC superstructure of Br. No.

149 (3x18.30m PSC girder)

between Gauri Bazar -

Baitalpur stations Br. No. 160

(3X18.30m PSC girder)

between Chauri Chaura -

Gauri Bazar stations Br.

No.172 (4x18.30m PSC

girder) between Kusmhi -

Sardarnagar stations and Br.

No. 173 (4x18.30m PSC

girder) between Gorakhpur

Cantt.-Kusmhi stations.

W/Con/362/ II/830/W-3

dt. 23.11.06

CAO/Con/ GKP/954

dt. 23.02.07

Rs.108090217/-

22.01.08 28.2.09 Final bill

under

preparatio

n

- -

115 -do- CAO/Con/63/08 (2) Supplying, Laying and fixing

of 100mm thick stone blocks

(from Chunar or near by area)

of approved size and shape

etc. over 50 mm thickness of

local sand layer on 299mm

thick WBM etc. at rake

handling platforms of Kusmhi

and Sardarnagar stations. The

rates is inclusive of all labour,

materials, sand, tools, plants,

equipments etc. with all lead,

W/Con/362/ II/990/W-3

(2) dt. 19.01.09

Dy CE/Con /NE/

GKP/05 dt. 03.03.09

Rs.31542669.30

18.7.09 31.12.09 - - Work is in

progress

Page 18: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

lifts ascends, descends, xing

of track, cutting of stone

blocks etc. at site for proper

completion of work as per

direction of Engineer - in -

Charge at site complete job.

116 -do- CAO/Con/68/ 07(1) Construction of camp office

& store for Sr. Section

Engineer/Con/Tel. in Bichhia

Railway Colony, Gorakhpur

W/Con/362/ II/924/W-3

(1) dt 06.11.07

CAO/Con/GKP/1030

dt. 18.01.08

Rs.3558902.23

05.3.08 15.03.09 Final bill

under

preparatio

n

- Work is in

progress

117 -do- CAO/Con/03/ 09(2) Hiring of 2 Nos. Road

vehicles like Tata

Sumo/Marshal/Bolero or

Similar vehicle for official

use of XEN/Con /NE/GKP &

XEN/Con / HTW.

W/Con/247/ 01/NE dt

31.3.09

DY CE/Con/ GKP/09

dt. 16.6.09

Rs.564279.60

30.3.2010 - - - Work is in

progress

118 -do- CAO/Con/28/ 06(1) Earthwork and blanketing in

formation, construction of

minor bridges and other misc.

work such as signal building

platforms, FOBs OFC huts,

fencing etc. between

Gorakhpur cantt to Baitalpur

station in connection with

doubling of Gorakhpur Cantt.

to Baitalpur section of

Varanasi Division.

W/Con/362/ II/830/W-3

(1) dt. 18/29.01.07

CAO/Con/ GKP/969

dt. 23.3.07

Rs.238723165/-

28.3.08 31.7.09 - - Applied

DOC &

Work is in

progress

119 -do- CAO/Con/26/ 08(1) Manufacturing, supplying and

stacking of 50mm nominal

size machine crushed stone

ballast as per RDSO’s

specification of June04 with

up to date correction slips

from Pvt. Quarry in

DALLA/Billi range to Chauri

Chaura (excl.) to Baitalpur

(incl) in GKC-BALR section

of Varanasi Division of N E

Railway along the cess in

Rly. land as per direction of

Engineer-in-charge in

connection with doubling of

Gorakhpur Cantt. - Baitalpur

section.

W/Con/362/ II/958/W-3

(1) dt. 4.8.08

Dy CE/Con/ NE/

GKP/03 dt. 29.01.09

Rs.33329300/-

03.5.09 31.3.2009 - - Work is in

progress

120 -do- CAO/Con/28/ 07(3) Linking of BG track manually

including slewing and

dismantling BG track

wherever required, carting

and stacking of released

materials, spreading of

ballast, transportation of

52kg/90R S.H./New Rails,

PSC sleepers 60kg from

sleeper factory or any other

Railway station, P.way

materials etc. from different

W/Con/362/ II/892/W-3

(3) dt. 16.08.07

CAO/Con/GKP/1006

dt. 7.11.07

Rs.15564949/-

15.12.07 31.12.09 - - Work is in

progress

Page 19: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

places to various station

places and linking level xing,

bridges etc. between Chauri

Chaura (incl)-Baitalpur (incl)

in connection with GKC-

BALR patch doubling

project.

121 -do- CAO/Con/28/ 07(2) Linking of BG track manually

including slewing and

dismantling BG track

wherever required, carting

and stacking of released

materials, spreading of

ballast, transportation of

52kg/90R S.H./New Rails,

PSC sleepers 60kg from

sleeper factory or any other

Railway station, P.way

materials etc. from different

places to various

station/places and linking

level xing, bridges etc.

between GKC (incl) Chauri

Chaura (excl.) in connection

with GKC-BALR patch

doubling project.

W/Con/362/ II/892/W-3

(2) dt. 08.08.07

CAO/Con/GKP/1003

dt. 11.10.07

Rs.16120686/-

7.12.07 31.12.09 - - Work is in

progress

122 -do- CAO/Con/26/ 08(2) Manufacturing, supplying and

stacking of 50mm nominal

size machine crushed stone

ballast as per RDSO’s

specification of June04 with

upto date correction slips

from Pvt. Quarry in

DALLA/Billi range to

Gorakhpur Cantt. - Chauri

Chaurar (incl) in GKC-BALR

section of Varanasi Division

of N E Railway along the cess

in Rly land as per direction of

site Engineer-in-charge in

connection with doubling of

Gorakhpur Canll. - Baitalpur

section.

W/Con/362/ II/958/W-3

(2) dt. 4.8.08

Not done

Rs. 33506745/-

02.5.09 31.3.

2010

- - Work to be

started

123 -do- CAO/Con/72/ 07(3) Supplies Laying and fixing of

CC paver on passenger

platform of various stations

between GKC-BALR

interlocking doubling work

W/Con/362/ II/915/W-3

(3) dt. 6.2.08

Not done

Rs. 4647428/-

05-11-08 - - - Work to be

started

124 CPJ-THE CAO/Con/78/ 07(1) Earthwork and blanketing on

permanent diversion,

construction of major bridges

Nos. 46A between Ramkola -

Barharaganj, 40B bet.

Padrauna - Kathkuiyan on

well foundation and other

misc. work in connection with

gauge conversion of

W/Con/362/ II/929/W-3

(1) dt. 03-01-08

CAO/Con/GKP/1076

dt. 23.4.08

Rs.38173676/-

02.10.08 31.08.09 - - -

Page 20: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

Kaptanganj–Thawe-Siwan-

Chhapra project.

125 -do- CAO/Con/54/ 08(3) Linking of track loading/

leading/unloading of various

P. Way materials and fixing

of hexagonal/Paver block

between Dudahi (excl) -

Thawe stations in connection

with gauge conversion of

Kaptanganj – Thawe section.

W/Con/362/ 948 /W-

3(2) dt. 23.10.08

Dy CE/Con /NE/

GKP/01 dt. 26.12.08

Rs.55345876.57

22.7.09 - - - Delay due to

non

availability

of material

126 -do- CAO/Con/58/ 08(4) Linking of track loading/

leading/unloading of various

P. Way materials and fixing

of hexagonal /Paver blocks

between Kaptanganj (incl) -

Dudaahi (incl) stations in

connection with gauge

conversion of Kaptanganj –

Thawe section.

W/Con/362/ II/ 968/W-

3 (4) dt. 23.10.08

Dy CE/Con/ NE/

GKP/10 dt. 28.8.09

Rs.54871861.70

22.7.09 30.5.2010 - - Work is in

progress

127 -do- CAO/Con/73/07(1) Earthwork in

formation/widening/

temporary diversion,

construction of minor bridges,

signal building platform OFC

hut, FOB, fencing etc. and

other misc works bet.

Tamkuhi Road (excl) –

Thawe (incl) in connection

with gauge conversion of

Kaptanganj–Thawe-Siwan-

Chhapra project.

W/Con/362/ II/894/W-3

(1) dt. 7.12.07

CAO/Con/GKP/1052

dt. 10.3.08

Rs.46110712.50

6.2.09 31.12.09 - - Work is in

progress

128 -do- CAO/Con/01/ 05(1) Construction of platform,

signal building , level

crossing & other misc. works

in Dudahi (incl) – Kaptanganj

(incl) in Kaptanganj-Thawe-

Siwan-Chhapra gauge

conversion project.

W/Con/362/ II/648/W-3

(1) dt. 31.3.05

CAO/Con/ GKP/856

dt. 15.12.05

Rs.4758171/-

30.11.09 31.3.07 Final bill

under

preparatio

n

-

129 -do- CAO/Con/11 /04 Supplying, Spreading,

stacking, blanketing material

as per RDSO’s guideline for

earthwork in Rly. Project with

upto date correction slips

including Mechanical

compaction with vibratory

Roller and manufacturing &

stacking of 50mm nominal

size hand broken track ballast

as per RDSO’s specification

1999 with upto date

correction slips on the top

/along the bank of the newly

constructed permanent

diversion of bridge No. 22 at

km 358/6-7 between

Bodarwar-Kaptanganj in

W/Con/362/ II/610/W-3

dt. 3.6.04

CAO/Con/ GKP/857

dt. 15.12.05

Rs.6440050/-

2.11.04 15.2.08 Final bill

under

preparatio

n

- -

Page 21: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

Gorakhpur –Khadda section

in connection with rebuilding

of bridges under SRSF.

130 -do- CAO/Con/73/ 07(2) E/work in

formation/widening/

temporary diversion const. of

minor bridges, signal building

platform OFC hut, FOB ,

fencing etc. and other misc.

works between Kaptanganj

(incl.)Tamkuhi Rd. (incl.) in

connection with gauge

conversion of Kaptanganj –

Thawe –Siwan - Chhapra

project.

W/Con/362/II/879/W-

3(2) dt. 24.12.07

CAO/Con/GKP/1092

dt. 11.7.08

Rs.46342488.50

23.2.09 31.10.09 Work is in

progress

131 -do- CAO/Con/15/08 E/work and blanketing on

permanent diversion const. of

major bridges No. 20A,

between Dudhai -Tamkuhi Rd

9 between Jalalpur -

Sasamusa and 3A bet

.Sasamusa - Thawe on pile

foundation and other misc.

work in connection with

gauge conversion of

Kaptanganj-Thawe-Siwan-

Chhapra project.

W/con/362/II/929/W-

3(2) dt 21/23.05.08

Dy CE/Con/NE/

GKP/02

dt. 07.01.09

Rs.28752429.85

22.02.09 31.3.2010 Work is in

progress

132 -do- CAO/Con/76/ 07(2) Carrying out soil

investigation for const. of

bridges, platform wall and

embankments in the

jurisdiction of Dy

CE/Con/NE/GKP

W/Con/II/927/W-3(2) dt

24.1.08

CAO/Con/GKP/1111

dt. 01.10.08

Rs.262570/-

11.11.08 - Final bill

under

preparatio

n

133 -do- CAO/Con/65/ 06(1) Supplying, stacking,

spreading of blanketing

materials as per RDSO’s

guide line for E/work in Rly

project with upto date

correction slips including

mechanical compaction with

vibratory roller, unloading &

spreading of ballast on the

top/along the bank of newly

constructed permanent

diversion of bridge No. 38 at

km 340/5-6 bet.

Ghughli/Siswa Bazar stations

and rebuilding of minor

bridge No. 21 (1x3.66m)

RCC Box at km 359/3-4

between Bodarwar-

Kaptanganj stations and other

misc. works in Gorakhpur -

Khadda section under SRSF.

W/Con/362/ II/864/W-3

(1) dt. 6.3.07

CAO.Con/ GKP/995

dt. 27.8.07

Rs.10444637.50

05.8.07 30.11.08 Final bill

under

preparatio

n -.

Page 22: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

Dy CE/Con/Bridge

134 Jiradai-Bhatani CAO/CON/91/07 (I) Fabrication, supplying,

transporting stacking of

12x24.4m. and span welded

type composite girders as per

RDSO,Drg.No.

RDSO/B/1730 &

RDSO/B/1569/R series for

bridge No.112(5x24.4m.)

and Br.No.119(7x24.4) on

Varanasi divi.of N.E.Railway.

W/Con/362/II/908/W-

3/(1)

Dt. 5.4.2008

Dy.CE/Con/Br/GKP/

03 dt.18.03.09

Rs. 4,43,14,730/-

04.03.09 30.10.09 - - Work is in

progress.

135 DMG-SWA

KLD-MND

CPJ-THE

CAO/CON/

10/2006(I)

Fabrication,supplying and

stacking of riveted type MBG

standard Open Web Bridge

girders of 31x30.5m span

including bearings for

Br.No.182,183,238 and 137

of N.E.Railway.

W/Con/362/II/

811/W-3/(1)

Dt.10.08.2006

CAO/Con/

GKP/922 dt.19.10.06

Rs. 12,62,47,693/-

09.02.08 09.06.10 - - Work in

progress

136 DMG-SWA CAO/CON/

10/07 (2)

Fabrication,supplying and

stacking of riveted type MBG

standard Open Web Bridge

girders of 9x45.7m span as

per including bearings for

Br.No.184 on GKP-GD

section of LJN divi. of

N.E.Railway.

W/Con/362/II/811/W-

3/(11)

3144

Dt.25/3.08.06

CAO/Con/

GKP/1045

Dt.04.03.08

Rs. 4,61,38,431/-

30.07.07 31.05.09 Final bill

prepared.

- Final bill

Under

signnature

137 DMG-SWA

SWA-MND

ANDN-GD

(Loop)

CAO/CON/

17/2006

Fabrication,supplying and

fixing of steel channel

sleepers for

Br.No.66,72,137,57,182,183,

& 238.

W/Con/362/11/908/W-

3/(1)

Dt.20.06.06

CAO/Con/

GKP/952

Dt.09.02.07

Rs.3,21,18,205/-

19.05.09 30.9.09 - - Work is in

progress.

E.O.T.

applied.

138 CPJ-THE

EKMA-ZRDE

GKP-GD

(Loop)

KSJ-MRT

BE-IZN.

CAO/CON/91/07 (I) Fabrication,supplying and

fixing of steel channel

sleepers for

Br.No.39,40B,20A,3A,63,97,

3,4,34,80,335 & 1032.

W/Con/362/II/898/W-3

Dt.27.04.08

CAO/Con/

GKP/1106

Dt.15.05.08

Rs.3,83,59,850/-

26.03.09 31.12.09 - - Work is in

progress.

139 MUR-BV CAO/CON/

86/2007 (5)

Fabrication, supply and

erection of steel structure of

FOB of MUR-BV section.

W/Con/362/II/

907/W-3/(1)

1155

Dt.03.04.08

Dy.CE/Con/Br/GKP/

04

Dt.31.03.09

Rs.1,42,75,456/-

03.03.09 30.7.09 - - Work is in

progress.

E.O.T.

applied.

140 SWA-MND

MND-BV

CAO/Con/

79/08(I)

Fabrication and erection of

steel structure of FOB at

diff.stations on SWA-MND,

& MND-BV section.

W/Con/362/II/952/W-

3/(1)

Dt.18.12.08

Dy.CE/Con/Br/GKP/

05

Dt.01.05.09

Rs.2,49,09,000/-

17.11.09 - - - Work is in

progress.

141 Indara-Mau Doubling

Bhatni-BathuaBazar

New Line

THE-CPR

GC &

ANDN-GD (Loop)

CAO/Con/

79/08(1)

Fabrication,transporting,suppl

y and stacking of 6x24.4m.

welded type Bridge girders at

Br.No. 72 of Indara-Mau

Jn.doubling work as per

drg.No.RDSO/BA-16005

series, 5x18.3 m. welded type

W/Con/362/II/

1004/W-3/(1)

715

Dt.04.04.09

-

Rs.4,11,31,515/-

03.03.10

- - - Work is in

progress.

Page 23: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

composite girders at

Br.No.32(4x18.3m.) of

Bhatni-Bathua Bazar new line

project and

Br.No.22(1x18.3m.) at THE-

CPR gauge conversion

pro9ject and 9x12.2m. welded

plate girders for

Br.No.57(9x12.2m.) span for

GKP-GD(L00p) Gauge

conversion project of

N.E.Railway.

142 MAU-Indara,

CPR-THE

CPJ-THE

BUW-BBK

CKG-GHT

BE-LKU

KSJ-BE

CAO/Con/05/2009 Fabrication, Galvanising,

supplying and fixing of steel

channel sleepers with fittings

on Br.No.72(6x24.4m.)

53A(2x45.7m.) &

46B(1x45.7m.) on Varanasi

division

Br.No9.s403(1x30.5m.)

404(1x30.5m.) & 391

(17x61.0m.) on Lucknow

division and Br.No.41

(4x30.5m.) & Br.No.409

(10x61.0) on Izatnagar

division of N.E.Railway.

W/247/Con/Br/Ch.Sleep

er/

61.0 m

Dt.15.05.09

-

Rs.5,34,97,968.78

14.11.10 - - - Work is in

progress.

143 KSJ-MRT CAO/Con/12/08(1) Fabrication and erection of

steel structure of FOB and

PP.Shelter at different station

on KSJ-MRT section of IZN

division

W/Con/362/II/952/W-

3/(1) dt. 7.10.08

CAO/Con/GKP/1122

dt.30.12.08

Rs. 1,16,65,000/-

06.02.09 - Variation

statement

prepared.

- Work

completed

Variation

statement

under

contractor

signature.

144 BE-IZN

ANDN-GD

CPJ-THE

KSJ-MRT

CAO/CON/

48/07 (3)

Assembling & Launching of

riveted type open web

bridgegirders of 30.5m. and

45.7m. span as per RDSO’

drg.for different bridges on

Br.No.1032, 34, 20A, 40B &

335 of Varanasi, Lucknow &

IZN division of N.E.Railway.

W/Con/362/II/908/W-3/

(3)

Dt.13.9.07

CAO/Con/GKP/1039

Dt.06.02.08

Rs.2,05,44,902/-

12.08.08 31.10.09 - - Work is in

progress.

145 DMG-SWA CAO/Con

52/06(3)

Assembling & Launching of

open web type bridge girders

of 9x 45.7m. for Br.No.184

bet.Sahajanwa-Jagatbala

stations on GKP-GD section

of, Lucknow division of

N.E.Railway including

fabrication & erection of

trolly refuges and footpath on

the bridge girder.

W/Con/362/II/850/W-

3/(3)3012

Dt.13/17.9.07

CAO/Con/GKP/1098

Dt.31.07.08

Rs.2,99,05,020/-

16.08.08 15.06.09 - - Work held

up on

account of

unavailabilit

y of girders.

146 DMG-SWA CAO/Con/64/06 Assembling & Launching of

open web type bridge girders

of 14x30.5m. Br.No.183

bet.Domingarh-Jagatbala

stations on GKP-SWA

doubling work of Lucknow

division of N.E.Railway

W/Con/362/II863/W-3

Dt.15.3.07

_

Rs.2,38,81,050/-

14.02.08 31.10.09 - - Work is in

progress.

Page 24: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

including fabrication &

erection of trolly refuges and

footpath on the bridge girder.

147 DMG-SWA SWA-

MND

CAO/Con/57/06 Assembling & Launching of

rivetted type bridge girders of

10x30.5m. Br.No.182

bet.Domingarh-Jagatbala

stations on GKP-SWA

doubling work and 238

(2x30.5m.) bet.Chureb-

Munderwa station of

Lucknow division of

N.E.Railway including

bearing as per RDSO’s

drg.No.RDSO/BA-11341-57

series including fabrication

& erection of trolly refuges

and footpath on the bridge

girder.

W/Con/362/II856/W-3

Dt.24/1.6/02 2007.

Dy.CE/Con/Br/GKP/

06 dt.10.08.09

Rs.1,98,01,900/-

05.01.08 31.10.09 - - Work is in

progress.

148 EKMA-ZRDE,GKP-

BALR, BALR-BTT,

BTT-ZRDE.

ANDN-GD

(Loop)

CAO/Con79/2008

(4)

Assembling and launching of

24.4 m., 18.3 m. and 12.2 m.

welded & composite girders

on Br.No.103, 171, 133, 97,

112, 119, 80 & Br.No.57 of

BSB & LJN division of

N.E.Rly.

W/Con/362/II/1004/W-

3/(4)599

Dt.27.01.09

Dy.CE/Con/Br/GKP/

02

Dt.27.02.09

Rs.2,60,45,682/-

26.12.09 - - - Work is in

progress.

149 GKP-GD

(Loop)

CPR-BSB SRSF.

- Erection and launching of

steel component for 30.5 m.

open web girders at

br.No.3(2x30.5m.) and

Br.No. 4(5x30.5 m) of GKP-

GD(loop) section of LJN div.

and Br.137(13x30.5 m) of

CPR-BSB section of BSB

division of N.E.Rly.

- CAO/Con/

GKP/828 dt. 27.6.05.

Rs.2,13,67,000/-

27.10.05 12.12.08 Work

completed

.

- Case file and

MB with

GM/Vig.

150 KSJ-BE

GKP-GD

(loop)

BUW-BBK

CAO/Con

79/08(3)

Carting of fabricated bridge

girders of 10x61.0 m. Open

web girders and 3x30.5 m.

welded type MBG standard

O.W. girders from

EWS/Arkonam, 8x30.5 m.

girders from BWS/Sabarmati

to and 7x30.5 m. girders

from EWS/MMR to different

bridge sites of N.E. Rly.

W/Con/362/II/1004/W-

3(3)/716 dt. 8.4.09

-

Rs.2,85,71,995/-

7.10.09 - - - Work is in

progress.

Dy. CE/Con/IZN/II

151 Kasganj – Mathura

GC

CAO/Con/23/04 Rebuilding of substructure of

Major bridge No. 272,272A

& 268

W/Con/362/II/615/W-3

/2351 Dt. 23.06.04

CAO/Con/GKP/773

dt. 09.08.04

Rs.47408151/-

22.02.06 31.12.07 Not

Drawn

31.03.10 Final bill

under

preparation

152 Kasganj – Mathura

GC

CAO/Con/20/06 (2) Rebuilding of substructure of

Major bridge No. 335 for

RKN-MTJ.

W/Con/362/II/821/W-3

(2) Dt. 10.08.06

CAO/Con/GKP/937

dt. 09.11.06

Rs. 33109743.20

09.07.07 31.12.08 Not

Drawn

31.12.09 Final bill

under

preparation

153 Kasganj – Mathura

GC

CAO/Con/36/07 (5) Transportation of P. Way

material etc.

W/Con/362/II/902/W-3

(5)/4237 Dt. 27.12.07

CAO/Con/GKP/1028

dt. 14.01.08

Rs. 34847600/-

26.10.08 30.08.09 Not

Drawn

31.03.09 Final bill

under

preparation

Page 25: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

154 Kasganj – Mathura

GC

CAO/Con/36/07 (3) Misc works at station and

block section for KSJ(Excl)

Mendu (incl).

W/Con/362/II/902/W-3

(3) Dt. 17.09.07

CAO/Con/GKP/1022

dt. 31.12.07

Rs.23148511/-

16.08.08 31.05.09 Not

Drawn

30.11.09 Final bill

under

preparation

155 Kasganj – Mathura

GC

CAO/Con/36/07 (4) Misc works at station and

block section for Mendu

(Excl) Mathura (incl).

W/Con/362/II/902/W-3

(4)/4268 Dt. 27.12.07

CAO/Con/GKP/1035

dt. 04.02.08

Rs. 50668981.46

26.11.08 15.07.09 Not

Drawn

31.12.09 N.S. Under

process.

156 Kasganj – Mathura

GC

CAO/Con/65/07 (4) Const. of platform No. 2

washable apron etc.. at KSJ.

W/Con/362/II/921/W-3

(4)/461 Dt. 07.02.08

CAO/Con/GKP/1096

dt. 26.07.08

Rs. 28627868/-

06.08.08 15.08.09 Not

Drawn

31.12.09 Final bill

under

preparation

157 Kasganj – Mathura

GC

CAO/Con/13/08 Supply stacking of spreading

of blanketing materials.

W/Con/362/II/905/W-3

(3)/1631 Dt. 19.05.08

CAO/Con/GKP/1093

dt. 14.07.08

Rs. 52176054/-

18.09.08 31.01.09 Not

Drawn

31.12.09 N.S. under

process

158 Kasganj – Mathura

GC

CAO/Con/93/07 (2) Const. of Minor bridges for

Km.288/11-350/6

W/Con/362/II/939/W-3

(2)/249Dt. 18.01.08

CAO/Con/GKP/1058

dt. 24.03.08

Rs. 36265286.71

17.05.08 30.07.09 Not

Drawn

31.03.10 N.S. under

process

159 Kasganj – Mathura

GC

CAO/Con/93/07 (1) Const. of Minor Bridges for

Km. 245/2-3 to 288/11

W/Con/362/II/939/W-3

(1)/403 Dt. 21.01.08

CAO/Con/GKP/1057

dt. 24.03.08

Rs. 25094363.85

20.05.08 31.08.09 Not

Drawn

- Work in

progress

160 Kasganj – Mathura

GC

CAO/Con/93/07 (3) Const. of Minor Bridges of

span 1.00m, 1.5m and 2.00

(Segmental Construction).

W/Con/362/II/939/W-3

(3)/250 Dt. 18.01.08

CAO/Con/GKP/1054

dt. 13.03.08

Rs. 33925660.49

17.05.08 30.05.09 Not

Drawn

31.03.10 Final bill

under

preparation

161 Kasganj – Mathura

GC

CAO/Con/56/07 (7) Ballast supply on cess for

Mursan – Mathura Jn. From

Km. 321/3-4 to 350/12

W/Con/362/II/915/W-3

(7)/1232 Dt. 10.04.08

CAO/Con/GKP/1085

dt. 29.05.08

Rs. 34249300/-

09.01.09 09.04.09 Not

Drawn

30.11.09 Variation

under vetting

162 Kasganj – Mathura

GC

CAO/Con/56/07 (5) Ballast supply on cess for

Km. 283/5 to Km. 321/3.4

W/Con/362/II/915/W-3

(5) Dt.31.03.08

CAO/Con/GKP/1082

dt. 06.05.08

Rs. 40091000/-

30.12.08 28.02.09 Final

vitiation

under

process

30.11.09 Final bill

under

preparation

163 Kasganj – Mathura

GC

CAO/Con/80/07 (5) Ballast supply on cess for

Kasganj – Mathura section

from Km. from 247/13 to

Km. 256/11.

W/Con/362/II/905/W-3

(4)/1414 Dt. 28.04.08

CAO/Con/GKP/1101

dt. 20.08.08

Rs. 16746120/-

27.10.08 15.03.09 Not

Drawn

31.12.09 Final bill

under

preparation

164 Kasganj – Mathura

GC

CAO/Con/91/07 (4) Ballast supply in mendu

quarry.

W/Con/362/II/908/W-3

(4) Dt. 28.04.08

CAO/Con/GKP/1123

dt. 31.12.08

Rs. 44000000/-

27.10.08 31.08.09 Not

Drawn

- Work in

progress.

165 Kasganj – Mathura

GC

CAO/Con/77/08 (2) Ballast supply on cess for

Kasganj – Mathura section

W/Con/362/II/1002/W-

3 (2) Dt. 23.01.09

Dy

CE/Con/II/IZN/05

dt. 21.03.09

Rs. 19140000/-

22.03.09 31.07.09 Not

Drawn

- Work in

progress

166 Kasganj – Mathura

GC

CAO/Con/57/07 (4) Linking BG track Zone-I W/Con/362/II/917/W-3

(4)/3254 Dt. 03.10.07

CAO/Con/GKP/1048

dt. 04.03.08

Rs.20713619.10

02.04.08 30.06.09 Not

Drawn

31.03.10 N.S. under

process

167 Kasganj – Mathura

GC

CAO/Con/57/07 (5) Linking BG track (Zone-II) W/Con/362/II/917/W-3

(5) Dt. 05.11.07

CAO/Con/GKP/1105

dt. 10.08.08

Rs. 19756160.89

04.05.08 30.06.09 Not

Drawn

31.03.10 N.S. under

process

168 Kasganj – Mathura

GC

CAO/Con/57/07 (6) Linking BG track (Zone-III) W/Con/362/II/917/W-3

(6)/3253 Dt. 03.10.07

CAO/Con/GKP/1062

dt. 27.03.08

Rs. 23242807.50

02.04.08 15.07.09 Not

Drawn

31.03.10 N.S. under

process

Page 26: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

169 Kasganj – Mathura

GC

CAO/Con/67/08 (4) Casting Manufacturing

transportation PSC Slab.

W/Con/362/II/991/W-3

(4) Dt. 22.11.08

Dy

CE/Con/II/IZN/01

Rs. 1013100/-

21.12.08 29.01.09 Not

Drawn

31.12.09 Subsidiary

Agreement

to be done

after

variation

170 Kasganj – Mathura

GC

CAO/Con/65/08 L.C. from L.C. No. 250 to

350A (55 Nos.)

W/Con/362/II/937/W-3

(1) Dt. 18.11.08

Dy

CE/Con/II/IZN/02

Rs. 17761610/-

02.03.09 25.05.09 Not

Drawn

31.12.09 Final bill

under

preparation

171 Kasganj – Mathura

GC

CAO/Con/65/07 (5) Widening of 52 Kg/90R Rails

by SKV process.

W/Con/362/II/921/W-3

(5)/981 Dt. 20.03.08

Dy

CE/Con/II/IZN/03

Rs. 12149000/-

09.03.09 30.06.09 Not

Drawn

- Work in

progress

172 Kasganj – Mathura

GC

CAO/Con/24/06 Manufacturing supplying &

stacking of 65 mm hand

broken ballast & Tanakpur

Yard.

W/Con/362/II/825/W-3

(4) Dt. 20.11.06

CAO/Con/GKP/960

dt. 02.03.07

Rs. 8265000/-

19.10.07 30.06.09 Not

Drawn

31.12.09 Final bill

under

preparation

173 Kasganj – Mathura

GC

CAO/Con/24/06 Manufacturing, supply and

stacking of 65 mm hand

broken ballast & Tanakpur

Yard.

W/Con/362/II/825/W-3

(1) Dt. 20.11.06

CAO/Con/GKP/965

dt. 12.01.07

Rs. 8265000/-

19.10.07 30.06.09 Not

Drawn

31.12.09 Final bill

under

preparation

174 Kasganj – Mathura

GC

CAO/Con/24/06 Manufacturing supplying &

stacking of 65 mm hand

broken ballast & Tanakpur

Yard.

W/Con/362/II/825/W-3

(3) Dt. 20.11.06

CAO/Con/GKP/944

dt. 12.01.08

Rs. 8265000/-

19.10.07 30.06.09 Not

Drawn

31.12.09 Final bill

under

preparation

175 Kasganj – Mathura

GC

CAO/Con/24/06 Manufacturing supplying &

stacking of 65 mm hand

broken ballast & Tanakpur

Yard.

W/Con/362/II/825/W-3

(2) Dt. 20.11.06

CAO/Con/GKP/946

dt. 12.01.09

Rs. 8265000/-

19.10.07 30.09.09 Not

Drawn

31.12.09 Final bill

under

preparation

176 Kasganj – Mathura

GC

CAO/Con/96/07 (2) Widening regarding,

resurfacing of L.C. No. 306 to

357.

W/Con/362/II/937/W-3

(2) Dt. 23.04.08

CAO/Con/GKP/1104

dt. 08.09.08

Rs. 27644583.97

22.04.08 31.08.09 Not

Drawn

- Work in

progress

177 Kasganj – Mathura

GC

CAO/Con/17/09 (1) Execution of balance misc.

work etc. from Km. 302/0 to

Km. 350/6.

W/Con/247/Type-

II/Mendu/MTJ-KJN

Dt. 08.08.09

Not executed as yet

07.02.09 - Not

Drawn

- Work in

progress

178 Bareilly – Kasganj

GC

CAO/Con/45/07 (1) Construction of S&T building

bet. BRY Jn. – KSJ Jn. BRY

– KSJ section.

W/Con/362/II/905/W-3

(1) Dt. 19.09.07

CAO/Con/GKP/1025

dt. 07.01.08

Rs.10928251/-

18.08.08 31.03.09 Not

Drawn

- Work in

progress

179 Bareilly – Kasganj

GC

CAO/Con/71/07 (3) Manufacturing supplying &

stacking of machine crushed

broken ballast KSJ- SRN.

W/Con/362/II/903/W-3

(3) Dt. 06.05.08

CAO/Con/GKP/1100

dt. 08.08.08

Rs. 15810000/-

05.03.09 31.07.09 Not

Drawn

- Work in

progress

180 Bareilly – Kasganj

GC

CAO/Con/55/08 (2) Rebuilding of Major bridge

No.

375,377,378,379,400,404,406

,407A, 408,411,418.

W/Con/362/II/884/W-3

(2) Dt. 13.01.09

CAO/Con/GKP/1134

dt. 14.07.09

Rs. 306343685/-

12.07.10 12.07.10 Not

Drawn

- Work in

progress

181 Bareilly – Kasganj

GC

CAO/Con/55/08 (1) Rebuilding of Major bridge

No. 347, 352, 357, 358, 360,

361, 364, 373 & 374.

W/Con/362/II/884/W-3

(1)/62 Dt. 05.01.09

CAO/Con/GKP/1133

dt. 10.06.09

Rs. 320980285/-

04.07.10 04.04.10 Not

Drawn

- Work in

progress

182 Bareilly – Kasganj

GC

CAO/Con/76/08 (3) Manufacturing supplying &

stacking BRY – KSJ section

between Bareilly – Badaun.

W/Con/362/II/1001/W-

3 (3) Dt. 18.06.09

CA Not executed as

yet

17.06.10 17.06.10 Not

Drawn

- Work in

progress

183 Bareilly – Kasganj

GC

CAO/Con/76/08 (4) Manufacturing supplying &

stacking SRN – BEM section

W/Con/362/II/1001/W-

3 (4) Dt. 18.06.09

CA Not executed as

yet

17.06.10 17.06.10 Not

Drawn

- Work in

progress

Page 27: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

184 Diesal Shed/

Izatnagar

CAO/Con/61/08 (2) Construction of new shed etc.

for creation of maintenance

facilities for 25 locos.

W/Con/362/II/987/W-3

(2) Dt. 16.01.09

Dy

CE/Con/II/IZN/15

Dt. 06.04.09

Rs. 21457559/-

15.04.10 15.04.10 Not

Drawn

- Work in

progress

Dy. CE/Con/Genl

185 SWA-MND Patch

doubling project.

CAO/Con/ 30/05(1) Earthwork and Blanketing in

formation, construction of

minor bridges & other misc.

works such as signal building,

platform, FOB, OFC Hut,

fencing etc. between

Sahjanwa(excl.) –

Maghar(incl.) section in

connection with patch

doubling of Sahjanwa (excl.)

to Munderwa section

W/Con/362/II/667/W-

3(1), dt.06.02.06

CAO/Con/GKP/871

dt. 21.02.08

Rs.67166749/-

05.8.07 31.5.09 - - In progress.

186 -do- CAO/Con/ 30/05(2) Earthwork and Blanketing in

formation, construction of

minor bridges & other misc.

works such as signal building,

platform, FOB, OFC Hut,

fencing etc. between

Maghar(excl.) –

Khalilabad(incl.) section in

connection with patch

doubling of Sahjanwa (excl.)

to Munderwa section

W/Con/362/II/667/W-

3(2), 24.03.06

CAO/Con/GKP/896

dt. 21.06.09

Rs.57219702/-

23.9.07 30.6.09 - - In progress.

187 -do- CAO/Con/ 29/05(2) Earthwork and Blanketing in

formation, construction of

minor bridges & other misc.

works such as signal building,

platform, FOB, OFC Hut,

fencing etc. between

Chureb(excl.) –

Munderwa(incl.) section in

connection with patch

doubling of Sahjanwa (excl.)

to Munderwa section

W/Con/362/II/667/W-

3(2), 24.02.06

CAO/Con/GKP/905

dt. 25.7.06

Rs.61675653/-

23.8.07 31.12.09 - - In progress.

188 -do- CAO/Con/ 30/05(3) Earthwork and Blanketing in

formation, construction of

minor bridges & other misc.

works such as signal building,

platform, FOB, OFC Hut,

fencing etc. between

Khalilabad(excl.) –

Chureb(incl.) section in

connection with patch

doubling of Sahjanwa (excl.)

to Munderwa section

W/Con/362/II/667/W-

3(3),24.02.06

CAO/Con/GKP/906

dt. 25.7.06

Rs.50470493/-

23.8.07 30.9.09 - - In progress.

189 -do- CAO/Con/ 9/06 Construction of Br. no. 200

(10x12.20m PSC Girder) on

well foundation between

Sahjanwa - Maghar stations,

Br. no. 236(2x4.57m PSC

slab) on pile foundation and

Br. no. 238 (2x30.50m

W/Con/362/II/812/W-3,

05.8.06

CAO/Con/GKP/920

dt. 12.10.06

Rs.51639857/-

04.02.08 31.3.09 - - In progress.

Page 28: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

Girder) on well foundation

between Chureb - Munderwa

stations in connection with

patch doubling work between

Sahjanwa (exc.) - Munderwa

(incl.) section

190 -do- CAO/Con/ 01/09(1) Widening, regrading, re-

surfacing of approach roads

of various level crossing as

per IRPWM, erecting rail

fencing, casting and erection

of various type of boards and

other misc. works between

Sahajanwa- Khalilabad

section in connection with

patch doubling of Sahajanwa-

Munderwa project

W/Con/247/BG/G/

Calling of tender,

24.03.09

Dy.CE/Con/G./GKP/

08, 08.09.09

Rs.5696505/-

23.7.09 31.10.09 - - In progress.

191 -do- CAO/Con/ 48/07 Linking of BG track manually

including slewing &

dismantling B.G. track

wherever required, carting

and stacking of released

materials, spreading of

ballast, transportation of 52

Kg/90R SH/New Rails, PSC

sleepers, 60 Kg from sleeper

factory or any other Railway

stations, P.Way materials etc.

from different places to

various stations/places and

linking level crossing, bridge

etc. between

Sahjanwa(excl.)-Munderwa

(incl.) Km.522/9-10 to

Km.554/12-13 in connection

with Sahjanwa - Munderwa

patch doubling project

W/Con/362/II/809/03

(7) 06.09.07

CAO/Con/GKP/1029

dt. 18.01.08

Rs.27790852/-

05.01.08 31.03.10 - - In progress.

192 -do- CAO/Con/ 66/07(3) Manufacturing, supplying and

stacking of 50mm nominal

size machine crushed stone

ballast as per R.D.S.O.'s

specification of June/04 with

up to date correction slips

from private quarry in

DALA/BILLI range to SWA

- MND section along the cess

in Rly land as per direction of

site Engineer in connection

with patch doubling of

SWA(excl.) - MND(incl.)

section in Lucknow Division

of N.E.Railway.

W/Con/362/II/888/ W-3

(1) dt. 07.02.08

CAO/Con/GKP/1066

dt. 28.3.08

Rs.31350000/-

06.08.08 30.6.09 - - In progress.

193 -do- CAO/Con/ 02/09(1) Maintenance of newly laid

BG track - main line, loop

lines and points and crossing

between Sahjanwa and

Khalilabad stations of

Sahjanwa - Munderwa patch

W/Con/247/04/G/

Invitation of open

tender 22.04.09

W/Con/247/BG/G/In

vi.tender 22.04.09

Rs.1999415-

22.10.09 - - - Work to be

started after

linking

work.

Page 29: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

doubling project.

194 -do- CAO/Con/ 78/08 Supplying, laying and fixing

of 100mm thick stone block

(from Chunar or near by area)

of approved size and shape

etc. over 50mm thick local

sand layer on 200mm thick

previously laid WBM at Rake

handling platform of

Khalilabad station in

connection with patch

doubling work of Sahjanwa –

Munderwa section

W/Con/362/II/ 1003/

W-3 dt. 5.01.09

Dy.CE/Con/G./GKP/

01, 07.02.09

Rs.4975515/-

14.03.09 20.10.09 - - In progress.

195 -do- CAO/Con/ 46/08 Hiring of 01 no. road vehicle

Tata Sumo/S Marshal/ Bolero

for Dy.CE/Con/General/

Gorakhpur for inspection of

various ongoing works.

W/Con/362/II/975/W-3,

dt.29.8.08

CAO/Con/GKP/1113

dt. 20.11.08

Rs.315240/-

28.8.09 30.11.09 - - In progress.

196 -do- Loading, unloading and

transportation of 52 Kg/90R

(new/S.H. rails), P.Way

material, P.S.C. sleepers 60

Kg from sleeper factory /

various places by road

vehicles/trailer & other misc.

works etc. in Sahjanwa (excl.)

to Khalilabad (incl.) section

under the jurisdiction of

Dy.CE/Con/Gen/GKP in

connection with SWA -

MND patch doubling project

CAO/Con/GKP/997

dt. 20.09.07

Rs. 3737408/-

Under

preparatio

n

31.10.09 Final

variation

under

vetting.

197 -do- Loading, unloading of 52

Kg/90R (new/S.H. rails),

P.Way material, P.S.C.

sleepers 60 Kg from sleeper

factory / various places by

road vehicles/trailer & other

misc. works etc. in

Khalilabad (excl.) to

Munderwa (incl.) section

under the jurisdiction of

Dy.CE/Con/Gen/GKP in

connection with SWA -

MND patch doubling project

CAO/Con/GKP/1027

dt.14.01.08

Rs.3393105/-

- 31.10.09 Final bill is

under

process.

198 -do- Construction of new skew

canal bridge no. 235A

(1x3.50m RCC box) on

proposed alignment for

doubling at Km. 550/2-4

between Chureb and

Munderwa stations

17.06.09. Dy.CE/Con/G/GKP/

07 dt. 17.6.09.

Rs.1130344/-

23.07.09. 15.9.09 - - Work is in

progress.

199 -do- CAO/Con/ 7/09(1) Hiring of 01 No. road vehicle

Tata Sumo/Marshal/Bolero

for AXEN/Con/ GKP for

inspection of various ongoing

works (SWA-MND patch

doubling project) under

Dy.CE/Con/Gen/GKP.

W/Con/247/BG/G/ dt.

24.4.09

Dy.CE/Con/G/GKP/

06 dt. 28.05.09

Rs.285292/-

23.04.10 Work is in

progress.

Page 30: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

200 -do- CAO/Con/ 30/09(3) Providing CC M-15 (1:2:4)

flooring with vacuum

dewatering in fresh concrete

work on island passenger

platform at Chureb in

connection with Sahjanwa -

Munderwa patch doubling

work.

W/Con/247/BG/G/

Tender/SWA-MND/ 02

dt. 20.08.09

-

Rs. 1574956.5

20.10.09 - - - Work is in

progress.

201 BNY - GD section of

GKP-GD (loop)

Gauge Conversion

project.

CAO/Con/ 84/08/(5) Hiring of road vehicle Tata

Sumo/Jeep for official use of

XEN/Con/Balrampur under

Dy.CE/Con./Gen./GKP.

W/Con/362/II/1009/ W-

3(5) dt. 04.03.09

CA no.

DY.CE/CON/Gen./G

KP/05

dt. 21.05.2009.

Rs.442497/-

2.09.10 - - - In progress.

202 -do- CAO/Con/ 30/03(1) Construction of well

foundations and substructure

of Bridge no. 103 (3x12.2m

Composit Girder) and well

foundations, substructure and

PSC superstructure of Bridge

no. 104 (9x12.2m ) and 104A

(5x12.2m ) on permanent

diversions between

Pachperwa and Gainsari

stations in connection with

Gauge Conversion of

Gorakhpur-Gonda (loop)

project

W/Con/362/II/570/ W-

3(1) dt. 20.11.2003

CAO/Con/GKP/718,

dt-29.12.2003

Rs.58162825/-

19.8.05 30.6.07 Under

preparatio

n.

Oct./09 Final

variation is

under

vetting.

203 -do- CAO/Con/

85/2007(1)

Rebuilding of major bridge

no. 107(7x6.10m girder) by

(7x6.10m PSC slab) on pile

foundation of permanent

diversion and minor Bridge

no. 106(1x3.05m RCC box)

coming on permanent

diversion of Br. no. 107

between Gainsari – Tulsipur

in Barhni – Gonda section of

Gorakhpur – Gonda (loop)

Gauge conversion project of

Lucknow Division

W/Con/ 362/ II/ 933/

W-3(1) dt. 23.01.08

CAO/Con/GKP/1056

dt- 18.3.08.

Rs.22106955/-

22.05.09 - Under

preparatio

n.

Nov./09 Final

measurement

is progress.

204 -do- CAO/Con/ 05/08(5) Construction of bridges on

permanent diversions

including earthwork and

blanketing for Br. no. 111

(8x6.10m PSC slab), Br. no.

130 (3x6.10m PSC slab) &

Br. no. 132 (4x6.10m PSC

slab) on pile foundations, Br.

no. 111A (1x1.00m RCC

box), 111B(1x1.00m RCC

box), Br. no. 112(1x2.00m

RCC box), Br.no.

121(1x1.00m RCC box),

Br.no. 123 (1x1.00m RCC

box), Br.no.126 (1x1.00m

RCC box), Br. no. 127

(1x3.66m RCC box), Br. no.

129 (1x1.00m RCC box) and

W/Con/ 362/ II/947/ W-

3(5) 15.05.08

CAO/Con/GKP/1088

dt. 19.6.2008.

81204071/-

14.11.09 - - - In progress.

Page 31: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

Br. no. 131 (4x6.10m PSC

slab) on open foundation

between Barhni and Kawapur

stations in Barhni - Gonda

section of GKP - GD (loop)

gauge conversion project.

205 -do- CAO/Con/ 37/ 2008

(3)

Construction of Br. no. 140

(3x12.20m PSC girder),

Br.no. 145(2x12.20m PSC

girder), Br.no. 146 (4x12.20m

PSC girder), Br.

no.148(4x12.20m PSC girder)

on well foundations and Br.

no. 138B (1x1.00m RCC

box), Br. no. 141 (1x6.10m

RCC box) and Br. no. 144A

(1x1.00m RCC box) between

Kawapur and Gainjahwa

stations in Barhni - Gonda

section of GKP - GD (loop)

gauge conversion project.

W/Con/362/II/972/ W-

3(3) dt. 10.10.08

CAO/Con/GKP/1118

dt. 21.11.08.

151495351/-

09.04.10 - - - In progress.

206 -do- CAO/Con/ 42/2008

(2)

Construction of Br.

No.162(5x12.20m PSC

girder) on well foundation,

Br. No. 157(7x6.10m PSC

slab), Br. No. 167(6x6.10m

PSC slab) on pile foundation,

Br. No. 153 (5x6.10m PSC

slab) on open foundation and

Br. No. 158(1x3.66m RCC

box) between Gainjahwa and

Gonda stations, construction

of retaining wall of the bridge

approach at Bridge No. 107,

in Barhni - Gonda section of

Gorakhpur - Gonda (loop)

gauge conversion project

W/Con/362/II/972/ W-

3(2) dt. 10.10.08

CAO/Con/GKP/1119

dt. 25.11.08

Rs.141090289/-

09.04.10 - - - In progress.

207 -do- CAO/Con/ 12/08(2) Remaining earthwork and

blanketing in formation on

permanent diversion of Br.no.

103, 104 & 104A between

Pachperwa & Gainsari

stations in Barhni - Gonda

section of Gorakhpur - Gonda

(loop) Gauge Conversion

Project.

W/Con/362/II/952/W-3

(2) dt. 17.06.08

CAO/Con/GKP/

1120 dt. 15.12.08

Rs.24493190/-

16.03.09 30.6.09 - - In progress.

208 -do- CAO/Con/ 40/2004 Construction of foundation &

substructure of Br. no.

80(9x12.20m) at Km. 115/11-

116/0 between Barhni -

Pachpherwa on well

foundation and construction

fo foundation substructure

super structure with PSC

girder of Br. no.

122(5x12.20m PSC girder) at

Km. 149/9-10 between

Gainsari - Tulsipur and Br.

W/Con/362/II/636/W-3

dt. 20.10.04

CAO/Con/GKP/809

dt-13.01.05/24.03.08

Rs.96428745/-

19.04.06 31.12.08 - Nov./09 Final

measurement

is in

progress.

Page 32: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

no. 128(5x12.20m PSC

girder) at Km. 152/14-15

between Tulsipur - Kawapur

including construction of Br.

no. 77 (3x6.10m PSC slab),

Br. no. 78 (3x6.10m PSC

slab), Br.no. 79(2x6.10m

slab) and Br. no. 81(1x3.66m

RCC Box) between Barhi -

Pachpherwa coming on

permanent diversion of bridge

no. 80 in connection with

Gauge Conversion of

Gorakhpur - Gonda (loop).

209 -do- CAO/Con/ 82/2008

(1)

Construction of platforms,

signal buildings, P.P. shelter,

gate lodges and earthwork in

yards, rebuilding of minor

bridges and other

miscellaneous works between

Barhni (excluding) to

Gainsari(including) stations

in connection with gauge

conversion of Gorakhpur-

Gonda (loop) section of

Lucknow Division.

W/Con/362/II/1007/W-

3 (1) dt. 09.03.09

-

Rs.57621731/-

09.09.10 - - - In progress.

210 -do- CAO/Con/ 82/ 2008

(2)

Construction of platforms,

signal buildings, F.O.B., P.P.

shelter, gate lodges and

earthwork in yards, rebuilding

of minor bridges and other

miscellaneous works between

Gainsari (excluding) to

Tulsipur (including) stations

in connection with gauge

conversion of Gorakhpur -

Gonda (loop) section of

Lucknow Division.

W/Con/362/II/1007/ W-

3 (2) dt. 02.03.09

-

Rs.41381675/-

02.09.10 - - - In progress.

211 -do- CAO/Con/ 61/2008

(4)

Provision of office

accommodation XEN/Con.

SE/P.Way/Con and

SE/W/Con at Balrampur in

connection with Gauge

Conversion work of Barhni -

Gonda section of Lucknow

Division of N.E. Railway.

W/Con/362/II/987/ W-3

(4) dt. 15.12.08

Dy.CE/Con/GKP/03

dated 08.05.09

Rs.1981680/-

14.03.09 31.10.09 - - In progress.

212 -do- CAO/Con/ 82/2008

(4)

Construction of platforms,

gate lodges, signal buildings,

earthwork inyards and other

miscellaneous works such as

hand pump, low cost P.P.

shelter etc. between

Balrampur (excluding) to

Gonda (excl.) stations in

connection with gauge

conversion of Gorakhpur -

Gonda (loop) section in

Lucknow Division.

W/Con/362/II/1007/ W-

3 (4) dt. 23.03.09

Dy.CE/Con/GKP/04

dated 18.05.09

Rs.54452459/-

22.09.10 - - - In progress.

Page 33: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

213 -do- CAO/Con/ 40/2008

(3)

Hiring of 01 no. road vehicle

Tata Sumo/marshal/Bolero at

Gonda for inspection of

various ongoing works

(Gauge Conversion of

Barhni-Gonda & Bonda-

Bahraich section under

Dy.CE/Con/Gen/Gorakhpur.

W/Con/362/II/902/ W-3

(3) dt. 31.10.08

Dy.CE/Con/GKP/02

dated 01.05.09

Rs.330400/-

30.10.09 - - - In progress.

214 -do- CAO/Con/ 13/2009

(1)

Manufacturing, supplying and

stacking of 50mm nominal

size machine crushed stone

track ballast from

Dala/Billi/Jhansi/ Maihar

sources conforming to

R.D.S.O.’s specification of

June/04 with up to date

correction slips in Barhni

(excluding) to Gainsari

(including) including depot

supply at Gainsiri of Gonda -

Barhni section of Lucknow

Division of N.E. Railway in

connection with Gorakhpur -

Gonda (loop) Gauge

Conversion project including

loading of ballast in MG

hoppers & unloading ballast

in the section.

W/Con/362/II/1024/ W-

3 (1) dt. 15.09.09

-

Rs.137290000/-

15.03.11 - - - Yet to be

started.

215 -do- CAO/Con/ 13/2009

(2)

Manufacturing, supplying and

stacking of 50mm nominal

size machine crushed stone

track ballast from

Dala/Billi/Jhansi/ Maihar

sources conforming to

R.D.S.O.’s specification of

June/04 with up to date

correction slips in Gainsiri

(excluding) to Balrampur

(excluding) including depot

supply at Tulsipur of Gonda -

Barhni section of Lucknow

Division of N.E. Railway in

connection with Gorakhpur -

Gonda (loop) Gauge

Conversion project including

loading of ballast in MG

hoppers & unloading ballast

in the section.

W/Con/362/II/1024/ W-

3 (2) dt. 10.09.10

-

Rs.135630000/-

10.03.12 - - - Yet to be

started.

216 GD - BRK Gauge

Conversion project.

CAO/Con/ 99/07/(1) Construction of platforms,

gate lodges, signal buildings,

F.O.B., earthwork in yards,

rebuilding of minor bridges

and other miscellaneous

works between Gonda to

Bahraich (incl.) stations in

connection with gauge

conversion of Gonda -

Bahraich section in Lucknow

W/Con/362/II/914/ W-

3(5) dt. 30.07.08

CAO/Con/GKP/1127

dt. 30.01.09

Rs.83539591/-

29.01.10 - - - In progress.

Page 34: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

Division.

217 -do- CAO/Con/ 67/07/(5) Construction of bridge no. 9

(2x12.20m PSC Girder)

between Gangadham –

Bangai and bridge no. 27

(3x12.20m PSC Girder)

between Payagpur –

Yogenderdham on well

foundation on permanent

diversion in connection

Gauge Conversion work of

Gonda - Bahraich section of

Lucknow division

W/Con/362/II/922/ W-

3(5) dt. 26.02.08

CAO/Con/GKP/1102

dt. 25.08.08

Rs.40942402/-

25.05.09 25.12.09 - - In progress.

218 -do- CAO/Con/ 13/09/(5) Manufacturing, supplying and

stacking of 50mm nominal

size machine crushed stone

track ballast from

Dala/Billi/Jhansi/ Maihar

sources conforming to

R.D.S.O.’s specification of

June/04 with up to date

correction slips in Gonda

(excl.) to Payagpur including

yard @ 3500 cum in GDAM,

BGAN, BEU & PDR in

connection with Gonda-

Bahraich Gauge Conversion

project

W/Con/362/II/1024/ W-

3(5) dt. 03.8.09

-

Rs.99600000/-

03.02.11 - - - Yet to be

started.

Dy. CE/Con/HQ

219 BTT-BALR CAO/Con/14/07(1) Earth work and blanketing in

formation,construction of

minor bridges and oother

misc.work etc. bet. BTT-

BALR

W/con/362/II/880/W-3

(1) dt. 11.7.07

CAO/Con/GKP/1034

dt.30.1.08

Rs. 161369180/-

11.10.09 - - - Work in

progress

220 - CAO/Con/52/07(I) Construction of major bridge

no.133 at Km 456/12-13 on

well foundation between

Deoria Sadr and Baitalpur etc.

W/Con/362/II/880/W-3

(2) dt.11.10.2007

CAO/Con/GKP/1018

dt. 18.12.07

Rs. 19105028/-

08.9.08 31.7.09 - - -

221 BTT-ZRDE CAO/Con/32/07(3) Earth work and blanketing in

formation, construction of

minor bridges and other misc

work etc.

W/Con/362/II/879/W-3

(1) dt.20.7.07

CAO/Con/GKP/1067

dt. 27/28.3.08

Rs. 108350615/-

29.9.08 31.8.09 - - -

222 - CAO/Con/94/08(3) Linking of B.G.

Track,Transportation of

P.Way material & other misc

work bet. ZRDE-Bankatta

W/Con/247/HQ/02

Rs. 161369180/-

Dy.CE/Con/HQ/GKP

/05 dt. 21.7.09

Rs. 31425558.99

19.4.2010 - - - Work in

progress

223 -

CAO/Con/89/08(5) Construction of rake handling

platform at Mairwa station

W/Con/247/HQ/01 dt

18/19.2.09

Dy.CE/Con/HQ/GKP

/04 dt. 12.6.09

Rs. 26159100/-

18.8.09 - - - -

224 -

CAO/Con/48/06 Cnstruction of major bridges

bet. BTT-ZRDE.

W/Con/362/II/817/W-3

dt.17.2.07

CAO/Con/GKP/1016

dt.10.12.07

Rs. 80683107.70

11.8.08 31.5.09 - 15.10.09 Work

completed

225 - CAO/Con/34/08(3) Extension of New Office

building of CAO/Con Office

and provision of

Cycle/Scooter stand at

W/Con/362/II/964/W-3

(3) dt.02.9.08

Dy.CE/Con/HQ/CA-1

Rs. 4259450/-

01.1.2009 31.8.09 - - -

Page 35: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

Gorakhpur.

226 SRSF (CPR-ALY)

CAO/Con/93/07(3) Linking of B.G.Track on

permanent diversion for

major bridge of CPR-ALY

section.

W/Con/362/II/926/W-3

(3) dt. 25.1.08

CAO/Con/GKP/1059

dt. 26.3.08

Rs. 9901650/-

24.4.08 30.4.09 - 15.10.09 Work

completed

227 SRSF(BTT-ARJ) CAO/Con/39/05 Linking of B.G. track on

permanent diversion for

major bridges in Indara-Mau-

Aurihar section etc.

W/Con/362/II/782//W-3

dt. 26.12.05

CAO/Con/GKP/878

dt. 06.3.06

Rs. 21674610/-

25.10.06 30.4.08 - 15.10.09 Work

completed

Dy

CE/Con/LKO

228 CAO/Con/52/05 (1) Raising of platform No. 1 bet

CPA-FBD

W/Con/II/794/W-3

(1)/1170 dt. 05.04.06

CAO/Con/GKP/898

dt. 22.06.06

Rs.11409548.10

04.08.06 10.03.08 Under A/c

vetting

Oct. -09

229

CPA-FBD (G.C.)

CAO/Con/87/08 (2) Carting/shorting/ stacking of

PSC sleeper Rails and other

miscellaneous P-Way fitting

in between CPA-FBD section

at different places at SE/Con

P-Way store in connection

with CPA-FBD gauge

conversion project.

W/Con/II/1012/W-3 (2)

dt. 22.01.09

Dy. CE/Con/LJN/18

dt. 24.06.09

Rs.823570/-

21.04.09 31.03.10 In

progress

230 CAO/Con/04/06 (5) Unloading of stone ballast

from MG wagon and carting

of the same bet. MUR GD

W/Con/II/805/W-3

(1)/2507 dt. 14/17.07.06

CAO/Con/GKP/988

dt. 12.07.07

Rs.5586000/-

13.05.07 31.12.07 Final bill

under

preparatio

n

Dec.-09

231

MUR – GD

CAO/Con/57/08 Linking of Bg track manually

including dismantling BG

track wherever required

carting and stacking P. Way

materials etc. at GD yard.

W/Con/II/981/W-3 (4)

dt. 06.01.09

Dy. CE/Con/LJN/16

dt. 02.04.09

Rs.25072793.40

05.07.09 31.03.10 In

progress

132 CAO/Con/31/05 (5) Construction of passenger

platform signal building etc.

W/Con/II/668/W-3 (5)

dt. 30.01.06

CAO/Con/GKP/885

dt. 25.04.06

Rs.6954265/-

29.11.06 28.02.09 Measurem

ent is

being

recorded

Dec.-09

233 E/Work in filling and

supplying blanketing material

and construction Minor

bridges. Bet. BV (incl.) –

Babhanjotia (incl.) Km. 598

to 608.

CAO/Con/GKP/873

dt. 24.02.06

Rs.43294719.56

11.11.07 31.12.08 Variation

sanctione

d

Oct. -09

234 CAO/Con/31/05 (3) E/Work in filling and

supplying blanketing material

and construction Minor

bridges. Bet. MSW (excl.) –

MUR (incl.) Km. 618/0 to

628/0.

W/Con/II/668/W-3 (3)

dt. 09.05.06

CAO/Con/GKP/910

dt. 07.08.06

Rs. 48618560/-

08.03.07 30.06.08 Final bill

under

preparatio

n

Dec.-09

235 CAO/Con/36/06 (2) SKV welding of 52 Kg.

New/SH rail on GD – MUR

and MUR - BV

W/Con/II/839/W-3 (2)

dt. 22.12.06

CAO/Con/GKP/980

dt. 15.05.07

Rs. 9091220/-/-

21.08.07 31.10.09 In

progress

236

MUR - BVN

CAO/Con/33/07 (1) Linking of BG track

including dismantling of BG

track bet. BV (incl) – MSN

(excl.) km. 598/0 to 614/0.

W/Con/II/879/W-3 (1)

dt. 02.08.07

CAO/Con/GKP/1011

dt. 21.11.07

Rs. 14409636.25

01.02.08 15.06.09 Final bill

under

preparatio

n

Dec.-09

Page 36: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

237 CAO/Con/33/07 (2) Linking of BG track

including dismantling of BG

track bet. MSN (incl) to MUR

(excl.) km. 614/0 to 628/0.

W/Con/II/879/W-3 (2)

dt. 02.08.07

CAO/Con/GKP/1013

dt. 04.12.07

Rs. 13779901.25

02.12.07 31.03.09 In

progress

238 CAO/Con/38/07 Construction of duty room,

gateman and other misc.

works bet MUR –BV.

W/Con/II/900/W-3

(1)/3627

dt. 01.11.07

CAO/Con/GKP/1081

dt. 05.05.08

Rs. 2472085/-

30.04.08 31.03.09 Final bill

under

preparatio

n

March -

2010

239 CAO/Con/27/07 (4) Carrying out soil exploration

and investigation under

jurisdiction of Dy CE/Con/

LJN.

W/Con/II/891/W-3 (4)

dt. 07.08.07

CAO/Con/GKP/1094

dt. 16.07.08

Rs. 317176/-

06.02.08

30.11.08 Final bill

under

preparatio

n

Dec.-09

240 Construction of PSC girders

in superstructure of Br. O.

327 bet. LKNR – MSW.

W/Con/II/928/W-3

dt. 31.12.07

CAO/Con/GKP/1036

dt. 03/04.01.08

Rs.9912365/-

30.04.08 28.02.09 Final bill

under

preparatio

n

Dec.-09

241 CAO/Con/50/08 (3) Misc. leftover work in

Mankapur – Babhnan section

such as electrical sub station

building etc.

W/Con/II/980/W-3 (3)

dt. 23.09.08

Dy. CE/Con/LJN/14

dt. 25.02.09

Rs.7153205/-

22.11.08 31.10.09 In

progress

242 CAO/Con/51/08 (4) Linking of BG Track

manually including

dismantling BG track

wherever required, carting

and stacking P. way materials

etc. in connection with MUR

-BVN doubling.

W/Con/II/980/W-3 (4)

dt. 23.09.08

Dy. CE/Con/LJN/10

dt. 25.02.09

Rs.6260399.50

14.11.08 31.03.10 In

progress

243 Carting /collection of PSC

sleeper, Rails, miscellaneous,

P Way fitting and other

ancillary/left over works at

different stations/locations in

Dy. CE/Con/LJNs

Jurisdiction.

W/247/LJN/07

dt 08.06.09

Dy. CE/Con/LJN/19

dt. 30.06.09

Rs.1615886.06

07.10.09 - In

progress

244 CAO/Con/85/08 (1) Hiring of 01 (one) no. Road

vehicle Tata Sumo/Bolero or

Similar Road vehicle

in connection with patch

doubling.

W/Con/II/1010/W-3 (1)

dt. 21/22.01.09

Rs.288800/-

21.01.10 - In

progress

245 CAO/Con/20/07 (4) Construction of approach

embankment for new bridges

near existing bridge no. 391

bet. GHT – CKG.

W/Con/II/886/W-3

dt. 11.09.07

CAO/Con/GKP/1014

dt. 10.12.07

Rs.52623500/-

10.09.08 31.03.10 In

progress

246

Ghaghraghat –

Chaukaghat doubling

CAO/Con/41/07 Construction of new bridges

near existing bridge no. 391

bet. GHT – CKG

W/Con/II/901/W-3/310

dt. 31.01.08

CAO/Con/GKP/1071

dt. 31.03.08

Rs.296958500/-

03.08.09 31.01.10 In

progress

247 CAO/Con/66/07 (1) Misc. Work for freight

examination Pit & other

works at GD.

W/Con/II/867/W-3

(2)/4029

dt. 19.11.07

CAO/Con/GKP/1060

dt. 26.03.08

Rs.4662539/-

13.03.08 31.08.09 Final bill

under

preparatio

n

Dec.-09

248

GD Yard

CAO/Con/58/07 (2) Linking of BG/MG track and

other Misc. works in GD

Yard.

W/Con/II/905/W-3 (3)

dt. 14.11.07

CAO/Con/GKP/1021

dt. 31.12.07

Rs.1312990.70

13.01.08 30.06.08 In

progress

Page 37: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

249 CAO/Con/05/07 (1) Construction of signal

building at Bindaura &

Jahngirabad stations ad

construction of Cap office at

Gonda.

W/Con/II/874/W-3

(1)/2189

dt. 26.09.07

CAO/Con/GKP/1007

dt. 14.11.07

Rs.4530152/-

28.10.07 31.10.08 Final bill

under

preparatio

n

Dec.-09

250 CAO/Con/64/07 (1) Earthwork filling – supplying

blanketing materials and

Const. of Minor bridges bet.

BBK – Rafinagar (Km 730/0)

W/Con/II/920/W-3

(1)/4149

dt. 14.12.07

CAO/Con/GKP/1043

Dt 26.02.08

Rs.76570895/-

13.03.09 31.12.09 In

progress

251 CAO/Con/88/07 (1) Earthwork filling, supplying

blanketing materials and

Construction of Minor

bridges bet. Rafinagar (excl)

– BUW Km 730/0 Up to

BUW (incl).

W/Con/II/920/W-3

(2)/6789

dt. 25.02.08

CAO/Con/GKP/1084

dt. 22.05.8

Rs.66411625/-

24.05.09 31.12.09 In

progress

252 CAO/Con/76/07 (5) Construction of gate lodges,

quarters and other misc.

works in connection with

patch doubling work in

Barabanki-Burhwal section

from Barabanki (incl.) to

Burhwal (incl.).

W/Con/II/917/W-3 (5)

dt. 31.03.08

CAO/Con/GKP/1089

dt. 19.06.08

Rs.13828758.22

30.12.08 15.11.09 In

progress

253 CAO/Con/93/08 Construction of (i)Bridge

No.406 (10x9.15M) on well

foundation with PSC slab at

Km.730/5-6 .(ii) Br. No-396

(5x4.57)at Km.722/0-1with

RCC box, Br no.403

(5x6.1m) & 404(5x6.1m) on

well foundation with open

web steel girder at Km.728/1-

3 & (iii) left over works of

Br. no. 327 in MUR – BNV

Section.

W/Con/II/5/W-3

dt. 10.02.09

Dy. CE/Con/LJN/15

dt. 26.03.09

Rs.49040587.68

09.02.10 - In

progress

254 CAO/Con/19/09 (2) Linking of B.G. track

Manually Km. 732/0 up to

BUW (incl) including yard.

W/Con/II//W-3/19/09

(2)

dt. 10.08.09

Rs.17684261.11

09.04.10 - In

progress

255 CAO/Con/19/09 (1) Linking of B.G. track

Manually Km. 732/0 up to

BBK (incl) including yard.

W/Con/II//W-3/19/09

(1)

dt. 10.08.09

Rs.18374430.05

09.04.10 - In

progress

256

BBK-BUW

CAO/Con/85/08 (2) Hiring of 02 (two) nos. Road

vehicle Tata Sumo/Bolero or

Similar Road vehicle in

connection with patch

doubling of GHT- CKG &

BBK-BUW project.

W/Con/II/1010/W-3

(2)/92

dt. 21/29.01.09

Dy. CE/Con/LJN/23

dt. 01.08.09

Rs.674780/-

21.01.10 - In

progress

257 Construction of 3rd running

line, Br. No. 76 & 77 at

Saraiya and Mahmudabad

bet. BUW – STP Section.

CAO/Con/GKP/981

dt. 15.05.07

Rs.4940615.85

25.06.07 15.08.08 Final bill

under

preparatio

n

Dec.-09

258

IIIrd running line on

BUW - STP

CAO/Con/33/06 (2) Construction of 3rd running

line at Tehsil Fatehpur &

Sundiyamau bet BUW – STP

sec.

W/Con/II/826/W-3 (2)

dt. 23.09.08

CAO/Con/GKP/970

dt. 26.03.07

Rs.4908581.15

06.06.07 31.12.08 Final bill

under

preparatio

n

Dec.-09

Page 38: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

259 CAO/Con/88/07 (2) Construction of signal

building, linking etc. at

SDAM, TFS, MMB on

BUW-STP section

W/Con/II/934/W-3 (2)

dt. 14.02.08

CAO/Con/GKP/1055

dt. 18.03.08

Orig. Rs. 4539903/-

Rev. Rs. 8514620/-

13.08.08 14.09.09 Final bill

under

preparatio

n

Dec.-09

260 CAO/Con/88/07 (1) Construction of signal

building, linking etc. at

Saraiya, Parsandi, Biswan on

BUW – STP section.

W/Con/II/934/674/W-3

(1)

dt. 25.02.08

CAO/Con/GKP/1130

dt. 31.03.09

Rs.4868379/-

24.08.08 31.12.09 In

progress

261 CAO/Con/28/08 (2) Alumino Thermit welding of

52 Kg/90R rails in SKV

Process with contractor’s

portion and other consumable

as approved by RDSO etc. on

Cess/in situ in connection

with traffic facilities work

bet. STP- BUW section &

other misc. project running

under Dy. CE/Con/LJN of

N.E. Railway.

W/Con/II/902/W-3

(2)/1429

dt. 28.07/25.08.08

Dy. CE/Con/LJN/11

dt. 01.08.09

Rs.3938550/-

04.05.09 31.12.09 In

progress

262 CAO/Con/27/08 (3) Manufacturing, supplying,

stacking & spreading of

50mm nominal size machine

crushed stone ballast as per

RDSO’s specification of

June-2004 with up to date

correction slips from private

quarry to Sudhiamau, Tehsil

Fatehpur, Mahmudabad,

Saraiya, Parsendi & Biswan

stations in Sitapur-Burhwal

section.

W/Con/II/959/W-3 (3)

dt. 30.07.08

Dy. CE/Con/LJN/17

dt. 06.04.09

Rs.7685000/-

29.09.08 31.12.09 In

progress

263 LJN Yard CAO/Con/17/08 Construction of high level

platform, washing apron,

extension of minor bridges,

track linking and other misc.

work in connection with yard

remodeling of Lucknow Jn.

phase-II in Lucknow division

of N.E.Railway.

W/Con/II/920/W-3 (3)

dt. 07.08.09

Dy. CE/Con/LJN/12

dt. 19.01.09

Rs.25757514/-

07.02.09 31.12.09 In

progress

Dy. CE/Con/NW

264 DMG-SWA CAO/C/18/ 2005(5) Earthwork from Ch.no.65.25

to 111.78 including Jagatbela

Yard and blanketing from Ch.

No.52.48 to 111.78 etc.

W/ Con/ 362/ II/ 664/

W-3(1) dt. 26.10.05

CAO/Con/GKP /864

dt.12.01.08

Rs.34269477/-

18.11.05 31.3.09 under

process

31.10.09

265 CAO/C/18/ 2005(2) Earthwork and blanketing

from Ch.111.38 to 176.74

including SWA Yard.

W/ Con/ 362/ II/ 664/

W-3(2) dt. 4.10.05

CAO/Con/GKP /850

dt.13.12.05

Rs.33902798.50

18.11.05. 31.3.09 under

process

31.10.09

266 CAO/C/14/ 2008(2) Manufacturing, supplying &

stacking of 65 mm maximum

size machinecrushed stone

ballast etc. bet. JTB-SWA.

W/ Con/ 362/ II/ 953/

W-3(2) dt. 5.9.08

Dy.CE/Con/NW /04

dt.16.02.09

Rs.24000000/-

2.11.08 30.9.09 Work is in

progress

267 CAO/C/85/ 2007(2) Linking of B.G. Track

between DMG-SWA

W/ Con/ 362/ II/ 876/

W-3(2) dt. 12.02.08

Dy.CE/Con /NW /12

dt.29.6.09

Rs.13560000/-

11.5.08 31.10.09 "

268 CAO/C/67/ 2008(1) Provision of pitching of

boulder bet. DMG-SWA

W/ Con/ 362/ II/ 991/

W-3(1) dt. 05.01.09

Dy.CE/Con /NW /03

dt.16.02.09

Rs.35004750/-

4.5.09 31.3.10 "

Page 39: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

269 CAO/C/77/ 2008(1) Const. of platform FOB, P.P.

shelter , earthwork bet. DMG

etc.

-do- 1062/ W-3(1) dt.

14.2.09

Dy.CE/Con /NW /09

dt.11.5.09

Rs.36443200/-

02.03.09 13.8.09 "

270 CAO/C/72/ 2008(1) Linking of B.G. Track

between DMG(ex.)-

SWA(ex.)

W/ Con/ 362/ II/

997/W-3(1) dt. 13.2.09

Dy.CE/C/NW/GKP/1

3 dt.08.09.2009

Rs.11565330/-

12.8.09 31.3.11 "

271 CAO/C/71/ 2008(3) Manufacturing, supplying &

stacking of 65 mm maximum

size machine crushed stone

ballast in Jagatbela Yard.

-do- 996/W-3(3) dt.

26.02.07

Dy.CE/Con /NW /11

dt.11.7.09

Rs.13560000/-

25.6.09 30.9.09 "

272 CAO/C/71/ 2008(2) Manufacturing, supplying &

stacking of 65 mm maximum

size machine crushed stone

ballast in Domingarh Yard.

W/ Con/ 362/ II/

996/W-3(2) dt. 27.03.09

Rs.11725000/- 26.7.09 - "

273 MND-BV CAO/C/29/ 2006(1) Earthwork in formation ,

supplying, laying &

compaction of blanketing

material etc.

'-do- 831/W-3(1) dt.

02.01.07

CAO/Con/GKP/ 953

dt.23.2.07

Rs.19129380/-

20.1.07 31.3.10 "

274 CAO/C/67/ 2007(2) Linking of B.G. track

manually between Bast (ex)

to TH(in.) km.569/6 to 586/0

LOA No. W/Con/

362/II/922/W-3(2)

dt.13.11.07

Rs. 21732442.50 12.3.08 31.5.10 "

275 CAO/C/67/ 2007(3) -do- between Tinich (ex.) to

BV(ex) km.586/0 to 598/14

between MND-BV Section.

'-do- 922/W-3(3) dt.

26.11.07

Dy.CE/Con/ NW/02

dt.16.2.09

Rs.24000000/-

9.4.08 31.10.09 "

276 CAO/C/67/ 2007(1) -do- between Km 554/9-10 to

569/6 between MND-BST

Section.

W/ Con/ 362/II/

924/W-3(1) dt.26.11.07.

Rs.18257397.50 9.4.08 "

277 CAO/C/11/ 2008(2) Manufacturing, supplying and

stacking of 65 mm stone

ballast etc. bet. 561/8-9 to

569/6

'-do- 922/W-3(2) dt.

04.07.08

CAO/Con/GKP/1116

dt.12.11.2008

Rs.15400000/-

25.8.08 31.3.09 Complet

ed

"

278 CAO/C/14/ 2008(4) -do- Km.569/6 to Km.580/6

Basti-Govindnagar -Tinich

'-do- 953/W-3(4) dt.

02.07.0

Dy.CE/Con/ NW/08

dt.01.05.09

Rs.28296000/-

2.1.09 30.9.09 Work in

progress "

279 MND-BV CAO/C/12/ 2009(2) -do- Km.569/6 to Km.591/0

Basti (ex)-Gaur (excl.)

W/Con/315/NW/

CAO/Con/12/09(2)

dt.29.8.09

Dy.CE/Con/ NW/14

dt.22.09.09

Rs.18650000/-

28.2.10 Work is in

progress.

280 CAO/C/04/ 2008(5) -do- Km.554/8-9 to

Km.561/8-9 bet. Munderwa-

Orwara.

W/ C/ 362/II/ 945/W-

3(5) dt.12.06.08

Dy.CE/Con/ NW/07

dt.20.3.09

Rs.18723690/-

18.8.09 31.10.09 "

281 CAO/C/04/ 2008(3) -do- Km.580/7 to Km.598/14

bet. Govindnagar-Tinich -

Gaur- BV

W/ C/ 362/II/ 943/W-

3(3) dt.21.4.08

Dy.CE/Con/NW/I

dt.09.01.09

Rs.46440000/-

15.7.08 31.12.09 "

282 CAO/C/07/ 2008(2) Construction of platform and

S&T building between ORW-

GAUR.

'-do- 956/W-3(2) CAO/Con/GKP/

1121 dt. 12.12.08

Rs.52271511/-

12.8.08 31.7.09 "

283 CAO/C/74/ 2007 (1) Supplying, laying and fixing

of 80 mm thick inter locking

CC pavers etc. between

DMG-NV.

W/ C/ 362/II/ 925/W-

3(1) dt.20.2.08

Dy.CE/Con/ NW/05

dt.21.02.09

Rs.10080640/-

20.2.09 31.12.09 "

284 CAO/C/06/ 2008 (3) Misc.work repairing of patch

doubling between MND-BV

and BST Rake handling.

-do- 1005/W-3

dt.09.03.09

Dy.CE/Con/ NW/10

dt.08.05.09.

Rs.22496316.73

8/9/2009 - "

285 CAO/C/71/ 2008 (1) Provision of Boulder Drain

by pitching & filling of

boulder on the approach of

Br. No.281

-do- 996/W-3 (1)

dt.23.1.09

Dy.CE/Con/ NW/06

dt.03.03.09

Rs.9448000/-

02.02.09 31.03.10 "

Page 40: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

286 CAO/C/01/ 2009 (4) Hiring of 1 no. road vehicle

for MND-BV

-do- 5/W-3 dt.24.03.09 -

Rs.281775/-

23.3.10 23.3.10 "

Dy. CE/Con/BSB

287 ARJ-JNU Gauge

Conversion

CAO/Con/38/ 04(1) Rebuilding of minor bridges

& widening of existing of

embankment from MG to BG

standard including earth work

in yard. Construction of

platform, etc. and other

miscellaneous work at

stations between Aunrihar to

Krakat (incl.) in Connection

with gauge conversion of

Aunrihar – Jaunpur section in

Varanasi.

W/Con/362/II/630/W-3

(1) dt. 20.10.04

CAO/Con/GKP/865

Dt. 16.01.06

Rs. 26556025/-

19.01.06 31.10.08 - - -

288 ARJ-JNU Gauge

Conversion

CAO/Con/38/ 04(2) Rebuilding of minor bridges

& widening of existing of

embankment from MG to BG

standard including earth work

in yard. Construction of

platform, etc. and other

miscellaneous work at

stations between Krakat

(excl.) to Jaunpur (excl.) in

connection with gauge

conversion of Aunrihar –

Jaunpur section in Varanasi.

W/Con/362/II/630/W-3

(2) dt. 20.10.04

CAO/Con/GKP/820

Dt. 10.05.05

Rs. 35670298/-

19.01.06 30.04.09 - - -

289 ARJ-JNU Gauge

Conversion

CAO/Con/12/06 Rebuilding of Bridge NO. 17

(3x12.20m) at Km. 27/4-5 on

permanent diversion with

PSC girders and wel

foundation including

blanketing on new

embankment etc. Bet. Dobhi

– Kerakat stations.

W/Con/362/II/814/W-3

dt. 07.11.08

CAO/Con/GKP/994

Dt. 28.08.07

Rs. 16979238/-

06.02.08 31.10.08 - - Work

terminated

290 Extension of washing

pit of manduadih

CAO/Con/27/ 05(1) Manufacturing and erection

of steel covered shed

including construction of

foundation. Examination pit ,

flooring drain and other misc.

work at Manduadih coaching

complex in connection with

Manuduadih – Extension of

sick link shed associated

facilities for maintenance of

A.C. coaches

W/Con/362/II/675/W-3

(1) dt. 12.01.06

CAO/Con/GKP/872

Dt. 22.02.06

Rs. 16822770/-

11.07.06 31.05.09 - - -

291 Construction of OFC

Hut bet Mau -

Shahganj

CAO/Con/41/ 05(2) Construction of S&T building

in connection with provision

of FM to FM Track

circulating & quad cable hut

at all crossing stations in Mau

– Shahganj stations in

Varanasi Division of N.E.

Railway.

W/Con/362/II/788/W-3

(2) dt. 16.03.06

CAO/Con/GKP/948

Dt. 19.01.06

Rs. 3397545/-

14.02.07 31.03.08 Work has

been

completed

& final

bill has

been paid.

- -

292 Construction of OFC

Hut and equipment

room bet ARJ-CPR

CAO/Con/53/ 05 Construction of OFC Hut and

equipment room at all

crossing stations in

W/Con/362/II/799/W-3

dt. 05.04.06

CAO/Con/GKP/948

Dt. 15.06.07

Rs. 4353910/-

03.03.07 29.09.08 Work has

been

completed

- -

Page 41: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

connection with provision of

4 quad cable in ARJ – CPR

stations.

contractor

is not

available

for sight

on final

bill.

293 Construction of 3rd

running line bet.

Varanasi – Allahabad

section.

CAO/Con/26/ 06(2) Linking of track & other

misc. in connection with

construction of third running

line at Raja Talab, Kachhawa

Road, Jangiganj and Saidabad

stations.

W/Con/362/II/828/W-3

(2) dt. 22.09.06

CAO/Con/GKP/966

Dt. 20.03.06

Rs. 7700131/-

18.03.07 30.09.07 - - -

294 Indara – Mau Patch

doubling work

CAO/Con/53/ 07(2) Construction of major bridge

no. 72 at Km. 65/14-15

between Indara and Mau

stations in connection with

patch doubling of Indara –

Mau section of Varanasi

Division of N. E. Railway.

W/Con/362/II/913/W-3

(1) dt. 12.11.07

CAO/Con/GKP/1038

Dt. 06.03.08

Rs. 43656576/-

10.01.09 15.11.09 - - -

295 Indara – Mau Patch

doubling work

CAO/Con/67/ 07(4) Earthwork and formation,

construction of minor bridges

and other misc. work such as

signal building, platform,

OFC Hut, fencing etc. bet.

Indara Jn. to Mau Jn.

W/Con/362/II/913/W-3

(1) dt. 13.11.07

CAO/Con/GKP/1040

Dt. 06.03.08

Rs. 44780308/-

11.02.09 31.12.09 - - -

296 ARJ-JNU Gauge

Conversion

CAO/Con/53/ 07(3) Transportation of PSC line

sleeper from sleeper

factory/stations yards to

various location such as level

crossing and station of

Aunrihar – Jaunpur section

including loading into

contractors own

vehicle/Tailor and unloading.

Transportation including

unloading of 90R /52 g

(New/Second Hand) rails

from Railway Wagons and

loading leading unloading

into yards/block sections of

ARJ – JNU section.

W/Con/362/II/913/W-3

(3) dt. 19.12.07

CAO/Con/GKP/1073

Dt. 15.04.08

Rs. 577320/-

18.08.08 30.04.09 - - -

297 ARJ-JNU Gauge

Conversion

CAO/Con/72/ 07(1) Manufacturing supplying &

stacking of machine crushed

track ballast from private

quarry in Dala/Billi range as

per RDSO’s specification of

June-2004 with up to date

correction slips along the

bank between Aunrihar

(including) to Km 15/0 on

ARJ-JNU section of N.E.

Railway.

W/Con/362/II/915/W-3

(1) dt. 07.01.08

CAO/Con/GKP/1074

Dt. 15.04.08

Rs. 14985000/-

06.07.08 31.03.09 Work has

been

completed

& final

bill has

been paid.

- -

298 ARJ-JNU Gauge

Conversion

CAO/Con/56/ 07(2) Manufacturing, supplying &

stacking of Machine crushed

ballast from private quarry in

Dala/Billi range as per

RDSO‘s specification June-

2004 with up to date

W/Con/362/II/915/W-3

(2) dt. 14.01.08

CAO/Con/GKP/1047

Dt. 04.03.08

Rs. 14910000/-

13.07.08 31.05.09 Work has

been

completed

& final

bill has

been paid.

- -

Page 42: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

correction slip along the bank

between Km. 15/0 to 30/0

bet. ARJ – LNU section of

N.E. Railway.

299 ARJ-JNU Gauge

Conversion

CAO/Con/56/ 07(3) Manufacturing, supplying &

stacking of Machine crushed

ballast from private quarry in

Dala/Billi range as per RDSO

‘s specification June-2004

with up to date correction slip

along the bank between Km.

30 to 45/0 bet. ARJ – JNU

section of N.E. Railway

W/Con/362/II/915/W-3

(3) dt. 14.01.08

CAO/Con/GKP/1046

Dt. 04.03.08

Rs. 15060000/-

13.07.08 30.09.09 - - -

300 ARJ-JNU Gauge

Conversion

CAO/Con/56/ 07(4) Manufacturing, supplying &

stacking of Machine crushed

ballast from private quarry in

Dala/Billi range as per

RDSO‘s specification June-

2004 with up to date

correction slip along the bank

between 45/0 to Jaunpur bet.

ARJ – JNU section of N.E.

Railway

W/Con/362/II/915/W-3

(4) dt. 14.01.08

CAO/Con/GKP/1072

Dt. 10.04.08

Rs. 15060000/-

13.07.08 15.11.09 - - -

301 Standard – III

interlocking work

bet. Varanasi –

Allahabad City

CAO/Con/37/ 07(2) Construction of signal

buildings and other

miscellaneous works at all

crossing stations in

connection with Standard III

work between Varanasi and

Allahabad City section in

Varanasi Division of N.E.

Railway.

W/Con/362/II/854/W-3

(2) dt. 08.08.07

CAO/Con/GKP/1080

Dt. 05.05.08

Rs. 4709065/-

31.12.07 30.06.09 - - -

302 Extension of washing

pit at Azamgarh

CAO/Con/55/ 07(4) Extension of B.G. Washing

pit of 90M length at

Azamgarh Railway station on

Varanasi Division of N.E.

Railway in connection with

the work of provision of

Coach maintenance facilities

at Azamgarh.

W/Con/362/II/913/W-3

(4) dt. 23.04.08

Dy CE/Con/BSB/07

Dt. 08.03.09

Rs. 5148035/-

22.10.08 31.10.09 - - -

303 ARJ-JNU Gauge

Conversion

CAO/Con/49/ 07(1) Balance work of platform,

gate lodges, signal building,

FOB, earthwork, rebuilding

of minor bridges and other

miscellaneous work between

Aunriahr _ Jaunpur section of

Varanasi Division of N.E.

railway.

W/Con/362/II/979/W-3

(1) dt. 06.11.08

Dy CE/Con/BSB/04

Dt. 02.02.10

Rs. 23389730/-

05.05.09 - - - -

304 Standard – III

interlocking work

bet. Varanasi –

Allahabad City

CAO/Con/72/ 08(2) Linking of track, points &

crossing along with other

miscellaneous works in

crossing station yards in

connection with Standard-III

interlocking work at

Daraganj, Jhusi, Ramnathpur,

Saidabad, Handiakhas and

Bhiti Station in Varanasi-

Allahabad City section of

W/Con/362/II/997/W-3

(2) dt. 07.01.09

Dy CE/Con/BSB/05

Dt. 08.03.09

Rs. 25614171/-

07.09.09 - - - -

Page 43: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

Varanasi Division of N.E.

Railway.

305 ARJ-JNU Gauge

Conversion

- Schedule of rates and

quantities for “Flash Butt

Welding 60Kg./52 Kg. and

90R rails at site using road

cum rail mobile Flash Butt

welding machine.

W/Con/275/II/362/FBW

P/W-3 dt. 01.08.06

CAO/Con/GKP/863

Dt.

10.01.06/01.08.06

Rs. 64125000/-

17.12.07 31.03.10 - - -

306 ARJ-JNU Gauge

Conversion

CAO/Con/39/ 08(2) Linking of track,

loading/leading/unloading of

various P-way materials, and

other miscellaneous works

between ARJ (incl.) - KCT

(incl.) stations in connection

with gauge conversion of

ARJ- JNU section in Varanasi

Division of N.E. Railway.

W/Con/362/II/969/W-3

(2) dt. 07.11.08

Dy CE/Con/BSB/09

Dt. 23.06.09

Rs. 60805772/-

06.08.09 31.03.10 - - -

307 ARJ-JNU Gauge

Conversion

CAO/Con/39/ 08(1) Linking of track,

loading/leading/unloading of

various P-way materials, and

other miscellaneous works

between KCT (excl.)-JNU

(excl.) stations in connection

with gauge conversion of

ARJ- JNU section in Varanasi

Division of N.E. Railway.

W/Con/362/II/969/W-3

(1) dt. 06.10.08

Dy CE/Con/BSB/10

Dt. 01.07.09

Rs. 42575440/-

05.07.09 31.03.10 - - -

308 Standard – III

interlocking work

bet. Varanasi –

Allahabad City

CAO/Con/67/ 08(2) Construction of RRI building

at Manduadih and other

miscellaneous works in

connection with Standard - III

interlocking work between

Varanasi and Allahabad City

section in Varanasi Division

of N.E. Railway.

W/Con/362/II/991/W-3

(2) dt. 12.02.09

Dy CE/Con/BSB/08

Dt. 06.05.09

Rs. 6121951/-

11.07.09 31.12.09 - - -

309 Standard – III

interlocking work

bet. Varanasi –

Allahabad City

CAO/Con/17/ 09(3) SKV welding of 52 kg. New

Rail 90 UTS and 52 kg./90R

(Second Hand) Rail 72 UTS

including supply of portion

and other consumable etc. on

cess/in situ between

Allahabad-Varanasi section

of Varanasi division in

connection traffic facility and

signaling works.

W/Con/247/Dy

CE/Con/BSB/17/09 (3)

dt. 17.06.09

-

Rs. 2490756/-

16.12.09 - - - -

310 ARJ-JNU Gauge

Conversion

CAO/Con/72/ 08(3) Alumino thermit Welding of

52 Kg. New Rails 90 UTS

and 52 Kg./90 R (Second

Hand) Rails 72 UTS by SKV

process including supply of

portion and other consumable

etc. on cess/in – situ between

Aunrihar - Jaunpur Railway

Stations in connection with

Gauge Conversion of

Aunrihar - Jaunpur Section

W/Con/247/Dy

CE/Con/BSB/ATW/AR

J-JNU/28 dt. 16..05.09

-

Rs. 8618700/-

15.11.09 - - - -

Page 44: SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF …€¦ · sub:- running/completed contracts/agreements of ner/construction organisation. as on 30.09.09

of Varanasi Division, N.E.

Railway.

311 ARJ-JNU Gauge

Conversion

CAO/Con/30/ 09 (4) Balance work of Construction

of platform, gate lodges,

F.O.B., earthwork for

diversion, blanketing -

rebuilding of minor bridges,

paver block and other

miscellaneous works between

Kerakat (Excl.) to Jaunpur

(Excl.) in connection with

gauge conversion of Aunrihar

-Jaunpur section in Varanasi

Division of N.E. Railway.

W/Con/247/Dy

CE/Con/BSB/30/09 (4)

dt. 24.07.09

-

Rs. 34559417/-

23.01.10 - - - -

312 Indara – Mau Patch

doubling work

CAO/Con/15/ 09(2) Linking of BG Track

manually including

dismantling BG track

wherever required, carting

and stacking P. way materials

etc. from different places to

Indara - Mau section and

other miscellaneous works at

Indara - Mau section in

connection with Indara - Mau

section doubling Patch Work

at Indara - Mau section .

W/Con/247/Dy

CE/Con/BSB/15/09 (2)

dt. 18.07.09

-

Rs. 9328521/-

17.01.10 - - - -

313 ARJ-JNU Gauge

Conversion

CAO/Con/28/ 09(2) Supplying & Stacking of 50

mm nominal size machine

crushed track ballast from

private quarry in Dala / Billi

range as per RDSO’s

specification June-2004 with

upto date correction slips

along the bank between Km.

10/0 to Km. 20/0, in Aunrihar

– Jaunpur section of Varanasi

Division, NE Railway.

W/Con/247/Dy

CE/Con/BSB/28/09

(2)/12 dt. 13.12.09

-

Rs. 9440400/-

14.09.09 13.12.09 - - -