su business expo-2015 - jonathan downey
TRANSCRIPT
4,000,000 Worldwide
With a drone can inspect 3X more in a day
One of the most dangerous jobs
Cell Tower Inspections
Millions of miles of transmission & distribution utility lines
Tree related outages are significant threats to the delivery of electricity
One of the largest maintenance expenses
Powerline Surveys
Enterprises require Solutions that…
Are reliable and repeatable
Are compliant and insurable
Require minimal training
Integrate with existing software & workflows
Scale in use cases, geography & time
Create actionable insights
Planning
• Job criteria
• Aircraft
• Sensors
• Location
• Operators
Approvals
• Manager
• Safety
• Insurance
• Aviation authority
Collection
• Field crews
• Service providers
Analysis
• Point clouds
• 3D models
• Structural
• Change detection
Integration
• EAM
• ERP
• GIS
• CAD
Distribution
• Reports
• Maps
Project Workflow
Where are there opportunities?Planning
• Job criteria
• Aircraft
• Sensors
• Location
• Operators
Approvals
• Manager
• Safety
• Insurance
• Aviation authority
Collection
• Field crews
• Service providers
Analysis
• Point clouds
• 3D models
• Structural
• Change detection
Integration
• EAM
• ERP
• GIS
• CAD
Distribution
• Reports
• Maps