Study Plan of Clearing Study Plan of Clearing Electrode Electrode at KEKB at KEKB Y. Suetsugu, H. Fukuma (KEK), Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) M. Pivi, W. Lanfa (SLAC) 2007/12/19 1 ILC DR Mini Work Shop (KEK) 18- 20 Dec.

Upload: samuel-ryan

Post on 21-Jan-2016

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

Study Plan of Clearing Electrode Study Plan of Clearing Electrode at KEKB at KEKB

Y. Suetsugu, H. Fukuma (KEK),Y. Suetsugu, H. Fukuma (KEK),

M. Pivi, W. Lanfa (SLAC)M. Pivi, W. Lanfa (SLAC)

2007/12/19 1ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 2: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

BackgroundBackground

• A possible solution to suppress electron cloud in magnets.– Drift space :Beam duct with antechamber

(photoelectrons) + TiN coating (Secondary electrons) + Solenoid will be OK.

• Experimental study on a clearing electrode using KEKB positron ring is planed, as a chain of ILC DR R&D study.

• Goal– Establish the technique of clearing electrode for ECI,

which is available for high current machine and with a low beam impedance.

– Demonstrate the effect on electron cloud formation.

2007/12/19 2ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 3: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

Clearing ElectrodeClearing Electrode

• Simulation (by L. Wang)

Gate Valve ate Valve

2007/12/19 3ILC DR Mini Work Shop (KEK)   18-20 Dec.

R-pipe=38mmbunch intensity=9.36e103.5 Bunch SpacingB = 0.75 T

max = 1.4

Electron densityin magnetic field

Electrode (+)

L. Wang et al, EPAC2006, p.1489

Page 4: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

Test planTest plan

• Install a test chamber with an electron monitor and a clearing electrode into a wiggler magnet of LER (Oho straight section).– At the most upstream side of wigglers

• Very weak SR

– Magnetic field: 0.75 T– Effective length: 346 mm– Aperture (height): 110 mm

Test chamber with antechambers

BeamGate Valve Gate Valve

Wiggler magnets

2007/12/19 4ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 5: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

Test ChamberTest Chamber

• Over all design of the test chamber

5

Electron Monitor Block

Electrode Block

Detachable Block

Feed-through

Magnet

Top view

Side view

2007/12/19 5ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 6: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

Monitor and electrodeMonitor and electrode

• Cross Section (concept)

Electrode [W] (~ +1 kV)

Collector (7 strips, w5 mm)

Cooling channel

Insulator [Al2O3](t~0.2 mm)

Grid (~ 1 kV)

Vacuum seal by metal O-ring Cooling Water paths

Shield

MonitorBlock

ElectrodeBlock

2 mm holesR47

Limited by magnet aperture

(w40, l440, t~0.1)

Beam

2007/12/19 6ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 7: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

Feed throughFeed through

• Copper bridge to connect feed-through and electrode was manufactured.

Metal screw

Ceramics screw

Electrode

Metalized head

Non-magnetism feed through

Copper

M4

M4

N-type connector2007/12/19 7ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 8: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

Features of the test chamberFeatures of the test chamber

• Strip type electrode.• Monitor and electrode are exchangeable.• Electron collectors are seven strips to

measure the spacial distribution.• Very thin electrode and insulator.

– Electrode: ~0.1 mm, Tungsten, by thermal spray.– Insulator: ~0.2 mm, Al2O3, by thermal spray.Small beam impedance.

• Water cooling just behind of the electrode.– Absorb dissipated power in the electrode and the

insulator.

2007/12/19 8ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 9: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

RF calculationRF calculation

• Model (By Mafia)

• Length = 2 m• 1/4 model• Electrode position = 195-625 mm (430mm)• Width = 40 mm• Mesh sizes = 0.5 x 0.1 x 0.4 mm• Bunch length = 6-8 mm• Electrode thickness = 0.2 mm• Alumina thickness = 0.2 mm • Alumina r =9.9• Port = 14 mm (o), 6 mm (i) (50) Embedded + Taper + Feed through

Pipe (1/4)

Electrode

Feed through

2007/12/19 9ILC DR Mini Work Shop (KEK)   18-20 Dec.

Taper

Page 10: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

RF calculationRF calculation

• Impedance(z//)• z = 20 mm (to calculate wakes for long distance)

• 0.5 mm electrode• 1.0 mm Al2O3

• 0.2 mm electrode• 0.2 mm Al2O3

Z// reduced to ~1/52007/12/19 10ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 11: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

RF calculationRF calculation

• Loss factor– k = 7×109 V/C, and Input power is ~ 150 W for 2

electrodes. (1.7 A @1389 b)

– Most of input power into electrode will be dissipated by electrode and chamber.

Loss

fac

tor

[V/C

]

Thickness of insulator and electrode [mm]

2007/12/19 11ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 12: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

RF calculationRF calculation

• Longitudinal impedance– Length is 440 mm to avoid resonance with RF

frequency.– a few

2007/12/19 12ILC DR Mini Work Shop (KEK)   18-20 Dec.

Frequency [Hz]

Z// [

]

500 MHz

Page 13: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

RF calculationRF calculation

• Voltage at feed through by MAFIA

at 1.7 A (1389 bunches),• Output voltage is VO ~ 600 V (If no resonance)

• Output power from feed-through PO ~ 60 W, if R=50 and no loss• Voltage between electrode and chamber is V ~ 12 V (If no resonance)

• z = 6 mm

Voltage at the end of port @ 1C

2007/12/19 13ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 14: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

Thermal calculationThermal calculation• Assumption

– Power loss in the electrode (insulator):• 100 W for 1.7 A, 1389 bunches

– Power loss on the electrode (copper):• 10 W for 1.7 A, 1389 bunches• From a formula

02/32

2

/24

)4/3('

Za

CIP

cz

b

(3/4) = 1.225

Ib = Bunch current [A]C = Circumference =3016 m

Z0 = 377z = bunch length = 6 mm

c = Conductivity= 1.8107 1/m (W) = 1a = radius = now 38 mm

For 1.7 A 1389 bunches,

P = P’13890.4 [m]0.5(one side) = 7.13 ~ 7 W

2007/12/19 14ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 15: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

Thermal calculationThermal calculation• Result

0.5 mm electrode1.0 mm Al2O3

Material Thermal

Conductivity [W/mm/K]

SUS 0.017

Al2O3 0.03

• Heat transfer coefficient between chamber and water = 0.01 W/mm2/K• Temperature of water = 25 degrees.

2007/12/19 15ILC DR Mini Work Shop (KEK)   18-20 Dec.

31.2 C

Page 16: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

Test scheduleTest schedule

• First step (from February, 2008)– Install outside of magnet (upstream side)– Check the heating of electrode– If possible, with electron monitor and Measurement

without magnet.• Second step

– Install into the wiggler magnet with electron monitor• Third step

– Groove surface, Rough surface, and other promising methods.

Beam

First stepSecond step

2007/12/19 16ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 17: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

ManufacturingManufacturing

• Machining and assembling are undergoing.

Monitor partOutput feed-through

2007/12/19 17ILC DR Mini Work Shop (KEK)   18-20 Dec.

Collector (strips)

Page 18: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

ManufacturingManufacturing

• Machining and assembling are undergoing.Flange Chamber

2007/12/19 18ILC DR Mini Work Shop (KEK)   18-20 Dec.

• Hot spray of Al2O3 and W: Next week

Page 19: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

ManufacturingManufacturing

• Hot spray of Al2O3 and insulation test (1kV)

2007/12/19 19ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 20: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

ManufacturingManufacturing

• Hot spray of tungsten (electrode)

2007/12/19 20ILC DR Mini Work Shop (KEK)   18-20 Dec.

For feed-through

Page 21: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

Power SupplyPower Supply

• Power supply for electrode (Fukuma-san)

2007/12/19 21ILC DR Mini Work Shop (KEK)   18-20 Dec.

Electrode

Resistance

1.5 kV,30 mA

Outside

Inside

(Equivalent in AC)Input impedance

102 104 106100

2040

60

80100

Page 22: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

SummarySummary

• Clearing electrode has been studied for a cure of EC in magnets.

• Manufacturing of test chamber is undergoing. • Thin electrode and insulator contribute to

decrease the impedance.• Input power into the electrode can be treated

by water cooling.• Beam test will start from next February

beginning with checking of heating.

2007/12/19 22ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 23: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

ReferencesReferences

2007/12/19 23ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 24: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

MaterialsMaterials

• Properties

Cu W Stainless Steel

(SUS304)

Al2O3

(96%)

Electric Conductivity [1/W/m]

5.8x107 1.8x107 1.4x106 -

Thermal conductivity [W/m/K]

400 150 15 24

Linear expansion coefficient [1/K]

1.7x10-5 4.4x10-6 1.7x10-5 6.4x10-6

Relative dielectric constant - - - 9.9

2007/12/19 24ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 25: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

StructureStructure

• Overall

2007/12/19 25ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 26: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

StructureStructure

• Chamber (aluminum alloy)

2007/12/19 26ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 27: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

StructureStructure

• Monitor block (stainless steel)

2007/12/19 27ILC DR Mini Work Shop (KEK)   18-20 Dec.

Page 28: Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec

StructureStructure

• Electrode block (stainless steel)

2007/12/19 28ILC DR Mini Work Shop (KEK)   18-20 Dec.