Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity Report WG A3.32 AR 2014 Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods for Condition assessment of T&D switchgear Convener: Nenad Uzelac (USA) Secretary: Christian Heinrich (GE) Year of Kick-off: Dec 2013 Number of Members: 27 Regular Members: 20 Corresponding Members: 6 CIRED Members: 1 Retiring Members: No retiring members New Members: All new members. See the list. A3-14(AG01)024-IWD

Upload: kelly-reynolds

Post on 02-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods

Study Committee A3 HIGH VOLTAGE EQUIPMENT

Working Group Activity Report WG A3.32 AR 2014 Page No.: 1

Activity Report 2014

WG A3.32 Non Intrusive methods for Condition assessment of T&D switchgear

Convener: Nenad Uzelac (USA)Secretary: Christian Heinrich (GE)

Year of Kick-off: Dec 2013

Number of Members: 27

Regular Members: 20

Corresponding Members: 6

CIRED Members: 1

Retiring Members: No retiring members

New Members:All new members. See the list.

A3-14(AG01)024-IWD

Page 2: Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods

Study Committee A3 HIGH VOLTAGE EQUIPMENT

Working Group Activity Report WG A3.32 AR 2014 Page No.: 2

Meetings:

• First meeting in Berlin (December 2013)

• Second meeting scheduled in Chicago (April 2014)

• Third meeting scheduled in Paris (August 2014)

• Fourth meeting to be scheduled in Q4 in Europe

Page 3: Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods

Study Committee A3 HIGH VOLTAGE EQUIPMENT

WG A3.32 AR 2012

Team:

• Good attendance at the first meeting – 16 members

• Expecting18 members for the 2nd meeting in Chicago.

• Expecting active participation from WG members.

TEAM:

• Diversified team from CIGRE (equipment manufacturers, utilities, universities). Number of young members!– Looking for additional MV utility members from South America, Europe and Middle

East

• Only one member from CIRED. No CIRED liaison has been nominated.

Working Group Activity Report Page No.: 3

Page 4: Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods

Study Committee A3 HIGH VOLTAGE EQUIPMENT

WG A3.32 AR 2014

Phase 1: Team building and data gathering phase (2014)

• Collected and in process of reviewing 50+ white papers on Condition assessment. Collected individual contributions from the team.

• Creating database of existing diagnostic methods. To compile all methods

• Created definition and categories for Non-Intrusive

Working Group Activity Report Page No.: 4

Work progress:

Page 5: Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods

Study Committee A3 HIGH VOLTAGE EQUIPMENT

WG A3.32 AR 2012

• Created CIGRE WG websitehttp://a3.cigre.org/WG-Area/WG-A3.32-Non-intrusive-methods-for-condition-assessment

• Created subfolders and tables for document control. Uploaded 50+ white papers and contributions

• Created bibliography and indexed all the documents.

Working Group Activity Report Page No.: 5

Work progress:

Page 6: Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods

Study Committee A3 HIGH VOLTAGE EQUIPMENT

WG A3.32 AR 2014

Work progress:

• Created 5 page Utility survey (T&D Switchgear Condition Assessment survey).

• Objective is to collect data from utilities around the world to better understand current condition assessment practices and future trends for condition assessment in Power Industry.

• What would be the best way to conduct the survey?

Working Group Activity Report Page No.: 6

Page 7: Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods

Study Committee A3 HIGH VOLTAGE EQUIPMENT

WG A3.32 AR 2014

• 2014 – Contributions / research– Technical Brochure outline– Chapter leads

• 2015– Continue contributions / testing / research – Rough draft of technical Brochure

• End of 2016– Complete technical brochure, Electra Paper, Tutorial

Working Group Activity Report Page No.: 7

Schedule:

Page 8: Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods

Study Committee A3 HIGH VOLTAGE EQUIPMENT

WG A3.32 AR 2014

• Executive Summary• Introduction• Type of condition assessment methods for T&D switchgear• Benefits of condition monitoring methods• Applications• Diagnostic / Design Switchgear

– Reliability – Proposed methods

• Future Trends• Conclusions / Recommendations

Working Group Activity Report Page No.: 8

Initial TB outline:

Page 9: Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods

Study Committee A3 HIGH VOLTAGE EQUIPMENT

Working Group Activity Report WG A3.32 AR 2014 Page No.: 9

Discussion points:

• Best practice for conducting the utility survey

• Liaison with CIRED. Reporting to CIRED.

• Recruiting MV utility members (through CIRED?)

• Reaching out to CIGRE B Technical Committee

• WG Posters in Paris?

Page 10: Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods

Study Committee A3 HIGH VOLTAGE EQUIPMENT

WG A3.32 AR 2014

Membershipwith approval of the last SC meeting

Working Group Activity Report Page No.: 10

Last Name First Name Country Company Status

1 Nenad Uzelac USA G&W Electric Convener

2 Kopejtko Petr Czech Eaton C

3 Arnold Jack USA National Instruments R

4 Livshitz Albert USA CE Power R

5 Benson Kip USA S&C R

6 Eichhoff Daniel Germany RWTH Aaachen University R

7 Miyamoto Takahiro Japan Mitshubishi R

8 Ito Takashi Japan Mitshubishi R

9 Deck Berhard Switzerland ABB R

10 Heinrich Christian Germany Siemens Secretary

11 Schuepferling Bernd Germany Siemens R

12 Fanget Alain France Alstom R

13 Roldan Jose-Lopez Australia Powerlink C

14 Pater Ryszard Canada Hydro-Quebec R

15 Poirier Sebastien Canada Hydro-Quebec R

16 MacLeod Roderick Jason USA Burns & McDonnell C

17 Fjeld Elin Norway Telemark University R

18 Prof. WANG Xiaohua China Xi’an Jiaotong University R

19 De John Johan Holland Eaton R

20 Cebekhulu Jabulani South Africa Eskom C

21 McCahey Colin Ireland ESBI Energy Innovation R

22 Iwasaki Shinya Japan Kansai Electric C

23 Milosevic Ana Serbia Nikola Tesla Institute R

24 Johan Smith Holland Delft University of Technology R

25 Sicker Robert USA First Energy R

26 Smeets Rene Holland Kema C

1 Venanzio Ferraro France Scheider CIRED