STS-134/ULF6 FD 04 Execute Package
MSG Page(s) Title
023B 1 - 14 FD04 Flight Plan Revision
024 15 FD04 Mission Summary
025 16 FD04 Transfer Message
026 17 - 25 STS-134/ULF6 QD Fam Ops
027A 26 - 27 STS-134/ULF6 FD4 EVA Deltas
028 28 - 30 ULF6 Comm Guidelines
029 31 DAP Load Update
030 32 H2O Ops Cue Card
031 -- FD04 PAO Event Summary - Google Moderator
032 -- FD04 PAO Event Summary - NPR/AP/Reuters/Fox News Radio
033 33 MHA Checkout
034A 34 Manually Mapping External USB Drive Letters
035 35 - 36 FD03 MMT Summary Approved by FAO:
T. Clancy Approved by OpsPlan: J. Kitchen
Last Updated: May 19 2011 1:53 AM GMT JEDI (Joint Execute package Development and Integration), v3.0
MSG 023B (27-0608B) - FD04 FLIGHT PLAN REVISION Page 1 of 14
Page 1 of 14, MSG 023B (27-0608B)
MSG INDEX 1 MSG NO. TITLE 2 023 FD04 Flight Plan Revision 3 024 FD04 Mission Summary 4 025 FD04 Transfer Message 5 026 STS-134/ULF6 QD Fam Ops 6 027 STS-134/ULF6 FD4 EVA Deltas 7 028 ULF6 Comm Guidelines 8 029 DAP Load Update 9 030 H2O Ops Cue Card 10 031 FD04 PAO Event Summary - Google Moderator 11 032 FD04 PAO Event Summary - NPR/AP/Reuter/Fox News Radio 12 033 MHA Checkout 13 034 Manually Mapping External USB Drive Letters 14 035 FD03 MMT Summary 15 16 1. Post-Sleep Cryo Config 17 18
For today's post-sleep cryo config, O2 tanks 2 & 5, and H2 tanks 2 & 4 will be active. 19 20 R1 O2,H2 MANF VLV TK2 (two) - OP (tb-OP) 21
22 2. Pre-Sleep Cryo Config 23
24
√MCC for deltas prior to configuring for pre-sleep. 25 26 For tonight's pre-sleep cryo config, manifold 1 will be closed with O2 tanks 1 & 5 and H2 27 tanks 1 & 4 active. 28 29 R1 O2,H2 TK1 HTRS A,B (four) - AUTO 30
TK2 HTRS A,B (four) - OFF 31 MANF VLV TK1 (two) - CL (tb-CL) 32
33 3. H2O Ops Cue Card 34 35
MSG 030 is your H2O Ops Cue Card for this mission. Note that a final stowage location 36 for CWC Fills #9 and subs is TBD. Once that information is finalized, we will have you 37 Pen and Ink the Cue Card. 38
39 4. Contingency DAP Actions during AMS Robotics 40 41
If contingency Shuttle attitude control is required during the AMS robotics operations, for 42 the AMS INTERMEDIATE POSITION (ROBO:1.210 AMS HANDOFF AND INSTALL 43 Step 5.1) and subsequent positions, perform DAP LOAD UPDATE (MSG 029) prior to 44 use of Shuttle attitude control. 45
46 5. NLP Termination 47 48
Spanky - We moved the NLP TERMINATION (ASSY OPS, PAYLOADS) a little earlier in 49 the timeline to maximize the science, based on Mark's activation time reported FD2. 50 Please give us a call if you need to do this procedure earlier or later, since we have a 51 ground control experiment to operate also. 52
1
MSG 023B (27-0608B) - FD04 FLIGHT PLAN REVISION Page 2 of 14
Page 2 of 14, MSG 023B (27-0608B)
6. IENOS Sensor Deployment 1 2
Roberto - For the IENOS OPERATIONS (ASSY OPS, PAYLOADS) activity to deploy the 3 IENOS sensors in the US Lab, please note that the air vents to be avoided are located 4 along the overhead. Please place the sensors along the deck to meet the 2m avoidance 5 constraint. 6
7 7. STORRM Comments 8 9
Drew - The STORRM team would like to thank you for your excellent detailed 10 descriptions and timely responses to the STORRM issues that were seen during 11 rendezvous! Although the team had limited visibility into the data, what we saw has us 12 very excited. The data will be extremely useful and we will be retrieving data over the 13 next 4 to 5 days. We will also be working on the unexplained issues seen yesterday to 14 prepare for re-rendezvous, and will inform you if any changes to operations are needed. 15
We were, however, able to recreate the SSV video problem reported during yesterday's 16 operations. If the screen to the laptop is closed prior to the Windows software starting, 17 the desktop is sent to the S-Video out port and is downlinked via SSV. If the screen is 18 reopened, it will be blank as you described. The workaround will be to leave the screen 19 open until Windows is fully booted. 20
21 8. FD04 EVA Updates 22 23
Mark, Drew, Spanky and Taz, 24 25 We have three products for your reference during your timelined EVA related activities 26 today. 27 28
1. MSG 27- 0601 (134-021) IR Body Camera Positions provides descriptions of 29 possible body positions for discussion during IR Camera Tag up. 30
31 2. MSG 27-0592 (134-026) STS-134/ULF6 QD Fam Ops is an overview for the QD 32
FAM OPS activity on MS1, MS3, and MS4 and for reference, if needed, during 33 Procedure Review. 34 35
3. MSG 27-0603 (134-027) STS-134/ULF6 FD4 EVA Deltas contains updates for 36 today’s EVA activities and a reminder for Mark about the Metox Canister plan for 37
FD5. The message will be reviewed during Procedure Review. 38 39 9. MHA IFM 40 41
Due to problems with the flight deck MHA, an IFM may be required in preparation for 42 EVA 1, to swap the flight deck MHA with the middeck MHA. Pending the results of the 43 MHA Checkout (MSG 033), you may be called to perform the MHA Removal From 44 Middeck Ceiling IFM called out at MET 2/22:45. The IFM will be uplinked at a later time, 45 as we are still reviewing it. 46 47
10. REPLACE PAGES 2-10 AND 2-12, AND 3-32 THROUGH 3-41. 48
2
FLT PLN/134/FLIGHT
FD04
NO
[I]
NO U
NISO
LATE
D EX
ERCI
SE [
MT X
LATE]
MARK
BOX
SPAN
KY
ROBE
RTO
DREW
TAZ
[A]
NO E
XERC
ISE
[AMS
UNB
ERTH
][B
] NO
EXE
RCIS
E [D
OUBL
E GR
APPL
E][C
] NO
EXE
RCIS
E [A
MS I
NSTA
LL]
[D]
NO U
NISO
LATE
D EX
ERCI
SE [
1ST
THRU 3RD STAGE CAPUTRE]
[E] NO UNISOLATED EXERCISE [UMA MATING]
REPLANNED
2-10
S T S 1 3 4 K U ISS
01
0203
0405
0607
0809
1011
12GMT 05/
19/11 (139)
12
1314
1516
1718
1920
2122
23003/00
MET
Day 002
CDR
SLEE
PMEAL
EXERCISE
I M U
X F E R
U P D A T
S S V - 2
P A O
E V E N T
0 2 T E R M
POST SLEEP
M D D K #
C W C # 2
I N I T
C W C # 2
T E R M
C W C
X F E R
MDDK XFER
C W C # 1
I N I T
C W C # 1
T E R MMDDK XFER
POST
SLEEP
M H A
PLT
SLEE
PSSRMS
AMS
INSTAL
LMEAL
POST SLEEP
P A O
E V E N T
L O G
SSRMS
AMS
GRPL
AMS
RLS
P/TV06
C A P T U R E
C A P T U R E
U M A
M A T E
L I M P
D E M A T E
B R A K E
C C R R M V
POST SLEEP
M H A
MHA
RMVL
MS1
SLEE
P
E V A
T O O L
C O N F I G
E_LK PREP
POST SLEEP
MEAL
EXERCISE
R E B A *
R E B A
C / O
P A O
E V E N T
AMS
PGSC
DEACT
W L E S
B A T T
I N S T L
QD FAM
OPS
POST SLEEP
S S C
S E T U P
NLP
VACC
TERM
E V A I R
C A M E R A
T A G U P
MS2
SLEE
PAMS
UNBERTH
& H/O
POST SLEEP
MEAL
EXERCISE
M C I U *
L O GMDDK XFER
AMS
GRPL
A M S
U N G R P L
MDDK XFER
P / T V 0 8
A M S
V I A B L E
A C T
I E N O S
S / U
P L Y B K
MHA
RMVL
MS3
SLEE
PAMS
UNBERTH
& H/O
E V A
T O O L
C O N F I G
MEAL
E_LK PREP
POST SLEEP
AMS
GRPL
A M S
U N G R P L
QD FAM
OPS
P/TV06
E V A I R
C A M E R A
T A G U P
MS4
SLEE
PSSRMS
AMS
INSTAL
LMEAL
EXERCISE
POST SLEEP
P A O
E V E N T
SSRMS
AMS
GRPL
AMS
RLS
POST SLEEP
VERIF
EMU
SIZE
QD FAM
OPS
C A P T U R E
L I M P
C A P T U R E
U M A
M A T E
D E M A T E
B R A K E
E V A I R
C A M E R A
T A G U P
L O G
CH 2
OCA
CH 3
AMS
TV
EXER
CISE
[I]
[A]
[B]
[C]
[D]
[E]
DAY/NIGHT
ORBIT
4041
4243
4445
4647
48
TDRS
W E Z
TDRS
AVAIL
BIAS -XLV -ZVV
ORB ATT
#STATUS CHECK
*INSTALL
*FILTER CK
NOTES
2-10
FD04
NO
[I]
NO U
NISO
LATE
D EX
ERCI
SE [
MT X
LATE]
MARK
BOX
SPAN
KY
ROBE
RTO
DREW
TAZ
[A]
NO E
XERC
ISE
[AMS
UNB
ERTH
][B
] NO
EXE
RCIS
E [D
OUBL
E GR
APPL
E][C
] NO
EXE
RCIS
E [A
MS I
NSTA
LL]
[D]
NO U
NISO
LATE
D EX
ERCI
SE [
1ST
THRU 3RD STAGE CAPUTRE]
[E] NO UNISOLATED EXERCISE [UMA MATING]
REPLANNED
S T S 1 3 4 K U ISS
01
0203
0405
0607
0809
1011
12GMT 05/
19/11 (139)
12
1314
1516
1718
1920
2122
23003/00
MET
Day 002
CDR
SLEE
PMEAL
EXERCISE
I M U
X F E R
U P D A T
S S V - 2
P A O
E V E N T
0 2 T E R M
POST SLEEP
M D D K #
C W C # 2
I N I T
C W C # 2
T E R M
C W C
X F E R
MDDK XFER
C W C # 1
I N I T
C W C # 1
T E R MMDDK XFER
POST
SLEEP
M H A
PLT
SLEE
PSSRMS
AMS
INSTAL
LMEAL
POST SLEEP
P A O
E V E N T
L O G
SSRMS
AMS
GRPL
AMS
RLS
P/TV06
C A P T U R E
C A P T U R E
U M A
M A T E
L I M P
D E M A T E
B R A K E
C C R R M V
POST SLEEP
M H A
MHA
RMVL
MS1
SLEE
P
E V A
T O O L
C O N F I G
E_LK PREP
POST SLEEP
MEAL
EXERCISE
R E B A *
R E B A
C / O
P A O
E V E N T
AMS
PGSC
DEACT
W L E S
B A T T
I N S T L
QD FAM
OPS
POST SLEEP
S S C
S E T U P
NLP
VACC
TERM
E V A I R
C A M E R A
T A G U P
MS2
SLEE
PAMS
UNBERTH
& H/O
POST SLEEP
MEAL
EXERCISE
M C I U *
L O GMDDK XFER
AMS
GRPL
A M S
U N G R P L
MDDK XFER
P / T V 0 8
A M S
V I A B L E
A C T
I E N O S
S / U
P L Y B K
MHA
RMVL
MS3
SLEE
PAMS
UNBERTH
& H/O
E V A
T O O L
C O N F I G
MEAL
E_LK PREP
POST SLEEP
AMS
GRPL
A M S
U N G R P L
QD FAM
OPS
P/TV06
E V A I R
C A M E R A
T A G U P
MS4
SLEE
PSSRMS
AMS
INSTAL
LMEAL
EXERCISE
POST SLEEP
P A O
E V E N T
SSRMS
AMS
GRPL
AMS
RLS
POST SLEEP
VERIF
EMU
SIZE
QD FAM
OPS
C A P T U R E
L I M P
C A P T U R E
U M A
M A T E
D E M A T E
B R A K E
E V A I R
C A M E R A
T A G U P
L O G
CH 2
OCA
CH 3
AMS
TV
EXER
CISE
[I]
[A]
[B]
[C]
[D]
[E]
DAY/NIGHT
ORBIT
4041
4243
4445
4647
48
TDRS
W E Z
TDRS
AVAIL
ORB ATT
BIAS -XLV -ZVV
NOTES
#STATUS CHECK
*INSTALL
*FILTER CK
3
FLT PLN/134/FLIGHT
FD04
10.2
DPRS
ISS Airlock Campout at 10.2 PSI
NO
MARK
BOX
SPAN
KY
ROBE
RTO
DREW
TAZ
[F] NO UNISOLATED EXERCISE [MT XLATE]
REPLANNED
2-12
S T S 1 3 4 ISS
13
1415
1617
1819
2021
2223
05/20
GMT 05/
19/11 (139)
003/00
0102
0304
0506
0708
0910
1112
MET
Day 003
CDR
SLEEP
MASK
PB/TOOL
CONFIG
EVA
PROC
RVW
PRE SLEEP
PRE SLEEP
P A O
E V E N T
0 2 T E R M
STS
O2 P
/BCO
NFIG
P R E S L P
O M S ^
PMC
A/G
PLT
SLEEP
EVA
PROC
RVW
EXER
CISE
PRE SLEEP
P R L A
P R E C R D L
D A P
MS1
SLEEP
EVA
PROC
RVW
EVA
TOOL
CONF
IGPRE SLEEP
MS2
SLEEP
EVA
PROC
RVW
X F E R
B R I E F
X F R B R F
P R E PPRE SLEEP
P R E C R D L
MDDK
XFER
B I O K I S *
M D D K #
MS3
SLEEP
MASK PB/TOOL
CONFIG
PRE SLEEP
PRE
SLEEP
EVA
PROC
RVW
EVA
TOOL
CONF
IG
MS4
SLEEP
EVA
PROC
RVW
MASK PB/TOOL
CONFIG
PRE
SLEEP
PRE SLEEP
EVA
TOOL
CONF
IG
P A O
E V E N T
♣
EXER
CISE
NO UNISOLATED EX [F]
DAY/NIGHT
ORBIT
4849
5051
5253
5455
56
TDRS
W E Z
TDRS
AVAIL
BIAS -XLV -ZVV
ORB ATT
♣VER
IF E
MU S
IZE
^ACCUM REPRESS
*ACT
2#STATUS CHECK
NOTES
2-12
FD04
10.2
DPRS
ISS Airlock Campout at 10.2 PSI
NO
MARK
BOX
SPAN
KY
ROBE
RTO
DREW
TAZ
[F] NO UNISOLATED EXERCISE [MT XLATE]
REPLANNED
S T S 1 3 4 ISS
13
1415
1617
1819
2021
2223
05/20
GMT 05/
19/11 (139)
003/00
0102
0304
0506
0708
0910
1112
MET
Day 003
CDR
SLEEP
MASK
PB/TOOL
CONFIG
EVA
PROC
RVW
PRE SLEEP
PRE SLEEP
P A O
E V E N T
0 2 T E R M
STS
O2 P
/BCO
NFIG
P R E S L P
O M S ^
PMC
A/G
PLT
SLEEP
EVA
PROC
RVW
EXER
CISE
PRE SLEEP
P R L A
P R E C R D L
D A P
MS1
SLEEP
EVA
PROC
RVW
EVA
TOOL
CONF
IGPRE SLEEP
MS2
SLEEP
EVA
PROC
RVW
X F E R
B R I E F
X F R B R F
P R E PPRE SLEEP
P R E C R D L
MDDK
XFER
B I O K I S *
M D D K #
MS3
SLEEP
MASK PB/TOOL
CONFIG
PRE SLEEP
PRE
SLEEP
EVA
PROC
RVW
EVA
TOOL
CONF
IG
MS4
SLEEP
EVA
PROC
RVW
MASK PB/TOOL
CONFIG
PRE
SLEEP
PRE SLEEP
EVA
TOOL
CONF
IG
P A O
E V E N T
♣
EXER
CISE
NO UNISOLATED EX [F]
DAY/NIGHT
ORBIT
4849
5051
5253
5455
56
TDRS
W E Z
TDRS
AVAIL
ORB ATT
BIAS -XLV -ZVV
NOTES
♣VER
IF E
MU S
IZE
^ACCUM REPRESS
*ACT
2#STATUS CHECK
4
FLT PLN/134/FLIGHT
04
MARK
BOX
SPAN
KY
UPLINK
β21+ Mask
Box 40,
41,43
FD04 EZ ACTIVITIES:
√O
CAC Filter
√M
DDK Duct Screen
TE
PC S
tatu
s Ch
eck:
V
erif
y di
spla
y is
bac
klit
Hard reboot: STS-2(WINDECOM),
S
TS-3
(KFX
) &
STS-
4(RP
OP)
NO UNISOLATED
EXERCISE
[MT XLATE]
REPLANNED
REPLANNED
3-32
STS-
134/
ULF6
FD
01:00
02:00
03:00
04:00
GMT
Date
05/19
(139)
12:00
13:00
14:00
15:00
16:00
MET
Day 00
2W
EZ
T D R S
~~
~
D / N
O R B 4 0 4 1 4 2 4 3
~ ~B I A S - X L V - Z V VA T TCDR
SLEE
P
~
POST
-SLE
EP A
CTIV
ITY
(OR
B OP
S, C
REW
SYS)
√HUM
SEP
S FO
R H2
O AC
CUMU
LATION
PLT
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
SLEEP LOGBOOK (SDBI 1634)
MS1
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS) EXERCISE
~
~
NOTES
3-32
04
MARK
BOX
SPAN
KY
UPLINK
β21+ Mask
Box 40,
41,43
FD04 EZ ACTIVITIES:
√O
CAC Filter
√M
DDK Duct Screen
TE
PC S
tatu
s Ch
eck:
V
erif
y di
spla
y is
bac
klit
Hard reboot: STS-2(WINDECOM),
S
TS-3
(KFX
) &
STS-
4(RP
OP)
NO UNISOLATED
EXERCISE
[MT XLATE]
REPLANNED
REPLANNED
STS-
134/
ULF6
FD
01:00
02:00
03:00
04:00
GMT
Date
05/19
(139)
12:00
13:00
14:00
15:00
16:00
MET
Day 00
2W
EZ
T D R SD / N
O R B 4 0 4 1 4 2 4 3
A T T ~ ~B I A S - X L V - Z V V
CDR
~
SLEE
P
POST
-SLE
EP A
CTIV
ITY
(OR
B OP
S, C
REW
SYS)
√HUM
SEP
S FO
R H2
O AC
CUMU
LATION
PLT
~
SLEEP
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
SLEEP LOGBOOK (SDBI 1634)
MS1
~
SLEEP
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
EXERCISE
~
NOTES
5
FLT PLN/134/FLIGHT
04
NO UNISOLATED
EXERCISE
[MT XLATE]
ROBERTO
DREW
TAZ
REPLANNED
REPLANNED
3-33
STS-
134/
ULF6
FD
Ku Ch
01:00
02:00
03:00
04:00
GMT
Date
05/19
(139)
12:00
13:00
14:00
15:00
16:00
MET
Day 00
2W
EZ
T D R S ~~
~
D / N
O R B 4 0 4 1 4 2 4 3
~ ~B I A S - X L V - Z V VA T TMS2
SLEE
P
~
POST
-SLE
EP A
CTIV
ITY
(OR
B OP
S, C
REW
SYS)
~
SLEE
P LO
GBOO
K (S
DBI 1634)
MS3
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
MS4
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
SLEEP LOGBOOK (SDBI 1634)
2 O C A~ ~
3 A M S~ ~
~
NOTES
3-33
04
NO UNISOLATED
EXERCISE
[MT XLATE]
ROBERTO
DREW
TAZ
REPLANNED
REPLANNED
STS-
134/
ULF6
FD
Ku Ch
01:00
02:00
03:00
04:00
GMT
Date
05/19
(139)
12:00
13:00
14:00
15:00
16:00
MET
Day 00
2W
EZ
T D R SD / N
O R B 4 0 4 1 4 2 4 3
A T T ~ ~B I A S - X L V - Z V V
MS2
~
SLEE
P
~
POST
-SLE
EP A
CTIV
ITY
(OR
B OP
S, C
REW
SYS)
SLEE
P LO
GBOO
K (S
DBI 1634)
MS3
~
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS4
~
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
SLEEP LOGBOOK (SDBI 1634)
2 ~ ~O C A
3 ~ ~A M S
~
NOTES
6
FLT PLN/134/FLIGHT
04
A Ref. STS-134 CONSUMABLES TRACKING (CC)
MARK
BOX
SPAN
KY
NO EXERCISE
[AMS UNBERTH
TO SRMS AT
HOVER POS'N]
NO UNISOL
EXERCISE
NO EXERCISE
[MNVR TO
INSTALL
THRU 1st
STAGE
CAPTURE]
B Do not disconnect the LRU from
the serial port on RPOP 2
NO EXERCISE
[DOUBLE
GRAPPLE]
REPLANNED
C Procedure Variables:
PAS Site [N] = 2
Initframe PPL ID [H] = 00002
Speed of latch in
1st stage = 450 rpm
2nd stage = 225 rpm
3rd stage = 450 rpm
3-34
STS-
134/
ULF6
FD
05:00
06:00
07:00
08:00
GMT
Date
05/19
(139)
16:00
17:00
18:00
19:00
20:00
MET
Day 00
2W
EZ
T D R S
~~
~
D / N
O R B 4 3 4 4 4 5
~ ~B I A S - X L V - Z V VA T TCDR
IMU
STAR
OF
OPPO
RTUN
ITY
ALIGN (ORB OPS,GNC)
DAIL
Y TR
ANSF
ER L
IST
UPDA
TE R
ef.
Tran
sfer
Lis
t &
MSG 025
CGBA
STA
TUS
CHK; G
LACI
ER STATUS CHK (CC)
SHUT
TLE/
ISS
H2O
CONT
AINE
R FILL (HC)
(OR
B OP
S, E
CLS) P
erfo
rm CWC FILL #2
Ref
. MS
G 03
0
TRAN
SFER
OPS
Ref
. Tr
ansf
er L
ist
& MS
G 025
SHUT
TLE/
ISS
H2O
CONT
AINE
R FILL (HC)
(OR
B OP
S, E
CLS) P
erfo
rm CWC FILL #1
Ref
. MS
G 03
0
SHUT
TLE/
ISS
H2O
CONT
AINE
R FILL (HC)
(OR
B OP
S, E
CLS)
Per
form
FIL
L TE
RMIN
ATIO
N
TRAN
SFER
OPS
Ref
. Tr
ansf
er L
ist
& MS
G 025
~
POST
-SLE
EP A
CTIV
ITY
(OR
B OP
S, C
REW
SYS)
MHA
CHEC
KOUT
Ref
. MS
G 03
3
PLT
ROBO: 1.210 AMS HANDOFF AND INSTALL
Steps 5-8.4
EXERCISE CONSTRAINT
Ref. MSG 023 Item 4
ROBO: 1.210 AMS HANDOFF AND INSTALL
Steps 1-4
EXERCISE CONSTRAINT
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES)
OPS, Item 3
ROBO:1.210 AMS HANDOFF AND INSTALL Step 8.5
EXERCISE CONSTRAINT
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MHA CHECKOUT
Ref. MSG 033
S&M: 1.911 PAS NORMAL MATE
Steps 6-10 EXERCISE CONSTRAINT C
MS1
EXERCISE
~
ISS EVA SYS:1.307 REBA INSTALLATION/REMOVAL
INSTALLATION A
ISS EVA SYSTEMS: 1.403 REBA POWERED
HARDWARE CHECKOUT
Perform for EMUs 3004 and 3005
AMS PGSC DEACT
(ASSY OPS, PAYLOADS) ~
WLES RNDZ TOOLS C/O PREP (ORB OPS, WLES) B
ISS EVA SYSTEMS: 1.515 EMU
METOX/LIOH/BATTERY REPLACEMENT
Ref: STS-134 CONSUMABLES TRACKING CC
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
NLP TERMINATION (ASSY OPS, PAYLOADS)
Terminate Vaccine GAPs A-P
Ref. MSG 023, Item 5
~
NOTES
3-34
04
A Ref. STS-134 CONSUMABLES TRACKING (CC)
MARK
BOX
SPAN
KY
NO EXERCISE
[AMS UNBERTH
TO SRMS AT
HOVER POS'N]
NO UNISOL
EXERCISE
NO EXERCISE
[MNVR TO
INSTALL
THRU 1st
STAGE
CAPTURE]
B Do not disconnect the LRU from
the serial port on RPOP 2
NO EXERCISE
[DOUBLE
GRAPPLE]
REPLANNED
C Procedure Variables:
PAS Site [N] = 2
Initframe PPL ID [H] = 00002
Speed of latch in
1st stage = 450 rpm
2nd stage = 225 rpm
3rd stage = 450 rpm
STS-
134/
ULF6
FD
05:00
06:00
07:00
08:00
GMT
Date
05/19
(139)
16:00
17:00
18:00
19:00
20:00
MET
Day 00
2W
EZ
T D R SD / N
O R B 4 3 4 4 4 5
A T T ~ ~B I A S - X L V - Z V V
CDR
IMU
STAR
OF
OPPO
RTUN
ITY
ALIGN (ORB OPS,GNC)
DAIL
Y TR
ANSF
ER L
IST
UPDA
TE R
ef.
Tran
sfer
Lis
t &
MSG 025
CGBA
STA
TUS
CHK; G
LACI
ER STATUS CHK (CC)
SHUT
TLE/
ISS
H2O
CONT
AINE
R FILL (HC)
(OR
B OP
S, E
CLS) P
erfo
rm CWC FILL #2
Ref
. MS
G 03
0
TRAN
SFER
OPS
Ref
. Tr
ansf
er L
ist
& MS
G 025
SHUT
TLE/
ISS
H2O
CONT
AINE
R FILL (HC)
(OR
B OP
S, E
CLS) P
erfo
rm CWC FILL #1
Ref
. MS
G 03
0
SHUT
TLE/
ISS
H2O
CONT
AINE
R FILL (HC)
(OR
B OP
S, E
CLS)
Per
form
FIL
L TE
RMIN
ATIO
N
~
TRAN
SFER
OPS
Ref
. Tr
ansf
er L
ist
& MS
G 025
POST
-SLE
EP A
CTIV
ITY
(OR
B OP
S, C
REW
SYS)
MHA
CHEC
KOUT
Ref
. MS
G 03
3
PLT
ROBO: 1.210 AMS HANDOFF AND INSTALL
Steps 5-8.4
EXERCISE CONSTRAINT
Ref. MSG 023 Item 4
ROBO: 1.210 AMS HANDOFF AND INSTALL
Steps 1-4
EXERCISE CONSTRAINT
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES)
OPS, Item 3
ROBO:1.210 AMS HANDOFF AND INSTALL Step 8.5
EXERCISE CONSTRAINT
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MHA CHECKOUT
Ref. MSG 033
S&M: 1.911 PAS NORMAL MATE
Steps 6-10 EXERCISE CONSTRAINT C
MS1
~
EXERCISE
ISS EVA SYS:1.307 REBA INSTALLATION/REMOVAL
INSTALLATION A
ISS EVA SYSTEMS: 1.403 REBA POWERED
HARDWARE CHECKOUT
Perform for EMUs 3004 and 3005
~
AMS PGSC DEACT
(ASSY OPS, PAYLOADS)
WLES RNDZ TOOLS C/O PREP (ORB OPS, WLES) B
ISS EVA SYSTEMS: 1.515 EMU
METOX/LIOH/BATTERY REPLACEMENT
Ref: STS-134 CONSUMABLES TRACKING CC
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
NLP TERMINATION (ASSY OPS, PAYLOADS)
Terminate Vaccine GAPs A-P
Ref. MSG 023, Item 5
~
NOTES
7
FLT PLN/134/FLIGHT
04
ROBERTO
DREW
TAZ
NO UNISOL
EXERCISE
NO EXERCISE
[MNVR TO
INSTALL
THRU 1st
STAGE
CAPTURE]
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
NO EXERCISE
[AMS UNBERTH
TO SRMS AT
HOVER POS'N]
NO EXERCISE
[DOUBLE
GRAPPLE]
REPLANNED
D DIGITAL VIA VTR
(CUE CARD, DIGITAL PLA
YBACK)
C/L CAMR from GMT 138/10:11-10:16
KU TDRW (16:19-16:47)
C Procedure Variables
: PAS Site [N] = 2
Initframe PPL ID [H
] = 00002
Speed of latch in
1st stage = 450 rp
m 2nd stage = 225 rp
m 3rd stage = 450 rp
m
3-35
STS-
134/
ULF6
FD
Ku Ch
05:00
06:00
07:00
08:00
GMT
Date
05/19
(139)
16:00
17:00
18:00
19:00
20:00
MET
Day 00
2W
EZ
T D R S ~~
~
D / N
O R B 4 3 4 4 4 5
~ ~B I A S - X L V - Z V VA T TMS2
AMS
UNBE
RTH
AND
HAND
OFF
(PD
RS,
AMS
NOMI
NAL)
EXE
RCIS
E CO
NSTR
AINT
POST
-SLE
EP A
CTIV
ITY
(OR
B OP
S, C
REW
SYS)
~
L17
Chec
k MC
IU f
ilte
r sc
reen
TRAN
SFER
OPS
Ref
. Tr
ansf
er L
ist
& MS
G 025
~
AMS
GRAP
PLE
(PD
RS,
AMS
NOMI
NAL)
AMS
UNGR
APPL
E AN
D VI
EWIN
G (
PDRS
, AM
S NO
MINA
L) E
XERC
ISE
CONS
TRAI
NT
P/TV
08 A
MS (
PHOT
O/TV
, SC
ENES)
OPS
VIAB
LE O
PERA
TION
S (
ASSY
OPS
, PA
YLOA
DS)
Ste
p 1
Ref
. Tr
ansf
er L
ist:
Res
upply Item 30.5
IENO
S OP
ERAT
IONS
(AS
SY O
PS,
PAYL
OADS)
Ste
p 1,
Ref
. MS
G 02
3 It
em 6
DOCK
ING
PLAY
BACK D
MS3
AMS UNBERTH AND HANDOFF
(PDRS, AMS NOMINAL)
EXERCISE CONSTRAINT
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
AMS GRAPPLE
(PDRS, AMS NOMINAL)
AMS UNGRAPPLE AND VIEWING
(PDRS, AMS NOMINAL)
EXERCISE CONSTRAINT
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES)
OPS, Item 3
~
MS4
ROBO: 1.210 AMS HANDOFF AND INSTALL
Steps 5-8.4
EXERCISE CONSTRAINT
Ref. MSG 023 Item 4EXERCISE
~
ROBO: 1.210 AMS HANDOFF AND INSTALL
Steps 1-4
EXERCISE CONSTRAINT
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
ROBO:1.210 AMS HANDOFF AND INSTALL Step 8.5
EXERCISE CONSTRAINT
S&M: 1.911 PAS NORMAL MATE
Steps 6-10 EXERCISE CONSTRAINT C
2 O C A~ ~
3 A M S~ T V ~
~
NOTES
3-35
04
ROBERTO
DREW
TAZ
NO UNISOL
EXERCISE
NO EXERCISE
[MNVR TO
INSTALL
THRU 1st
STAGE
CAPTURE]
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
NO EXERCISE
[AMS UNBERTH
TO SRMS AT
HOVER POS'N]
NO EXERCISE
[DOUBLE
GRAPPLE]
REPLANNED
D DIGITAL VIA VTR
(CUE CARD, DIGITAL PLA
YBACK)
C/L CAMR from GMT 138/10:11-10:16
KU TDRW (16:19-16:47)
C Procedure Variables
: PAS Site [N] = 2
Initframe PPL ID [H
] = 00002
Speed of latch in
1st stage = 450 rp
m 2nd stage = 225 rp
m 3rd stage = 450 rp
m
STS-
134/
ULF6
FD
Ku Ch
05:00
06:00
07:00
08:00
GMT
Date
05/19
(139)
16:00
17:00
18:00
19:00
20:00
MET
Day 00
2W
EZ
T D R SD / N
O R B 4 3 4 4 4 5
A T T ~ ~B I A S - X L V - Z V V
MS2
AMS
UNBE
RTH
AND
HAND
OFF
(PD
RS,
AMS
NOMI
NAL)
EXE
RCIS
E CO
NSTR
AINT
~PO
ST-S
LEEP
ACT
IVIT
Y (
ORB
OPS,
CRE
W SY
S)
L17
Chec
k MC
IU f
ilte
r sc
reen
~
TRAN
SFER
OPS
Ref
. Tr
ansf
er L
ist
& MS
G 025
AMS
GRAP
PLE
(PD
RS,
AMS
NOMI
NAL)
AMS
UNGR
APPL
E AN
D VI
EWIN
G (
PDRS
, AM
S NO
MINA
L) E
XERC
ISE
CONS
TRAI
NT
P/TV
08 A
MS (
PHOT
O/TV
, SC
ENES)
OPS
VIAB
LE O
PERA
TION
S (
ASSY
OPS
, PA
YLOA
DS)
Ste
p 1
Ref
. Tr
ansf
er L
ist:
Res
upply Item 30.5
IENO
S OP
ERAT
IONS
(AS
SY O
PS,
PAYL
OADS)
Ste
p 1,
Ref
. MS
G 02
3 It
em 6
DOCK
ING
PLAY
BACK D
MS3
AMS UNBERTH AND HANDOFF
(PDRS, AMS NOMINAL)
EXERCISE CONSTRAINT
~POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
AMS GRAPPLE
(PDRS, AMS NOMINAL)
AMS UNGRAPPLE AND VIEWING
(PDRS, AMS NOMINAL)
EXERCISE CONSTRAINT
~
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES)
OPS, Item 3
MS4
ROBO: 1.210 AMS HANDOFF AND INSTALL
Steps 5-8.4
EXERCISE CONSTRAINT
Ref. MSG 023 Item 4EXERCISE
~
ROBO: 1.210 AMS HANDOFF AND INSTALL
Steps 1-4
EXERCISE CONSTRAINT
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
ROBO:1.210 AMS HANDOFF AND INSTALL Step 8.5
EXERCISE CONSTRAINT
S&M: 1.911 PAS NORMAL MATE
Steps 6-10 EXERCISE CONSTRAINT C
2 ~ ~O C A
3 ~ A M S ~T V
~
NOTES
8
FLT PLN/134/FLIGHT
04
MARK
BOX
SPAN
KY
TFL 184
NO UNISOLATED
EXERCISE
[1ST THRU
3RD STAGE
CAPTURE]
AMS PGSC DEACT
(ASSY OPS, PAYLOADS)
TRAN
SFER
OPS
Ref
. Tr
ansf
er L
ist
& MS
G 025
NO UNISOLATED
EXERCISE
[UMA MATING]
REPLANNED
E 1.104 SET UP ORBITER SSC
(ASSY OPS, ACT & C/O
) Ref. Xfer List:
Return Items 727, 727.1, 727.2, 727.3
MANUALLY MAPPING EXTERNAL USB DRIVE
Ref. MSG 034
C Procedure Variables:
PAS Site [N] = 2
Initframe PPL ID [H] = 00002
Speed of latch in
1st stage = 450 rpm
2nd stage = 225 rpm
3rd stage = 450 rpm
S&M: 1.911 PAS NORMAL MATE
Steps 15-17 C EXERCISE CONSTRAINT
Note: UMA Mate occurs after SSRMS
Umbilical release
3-36
STS-
134/
ULF6
FD
09:00
10:00
11:00
12:00
GMT
Date
05/19
(139)
20:00
21:00
22:00
23:00
00:00
MET
Day 00
2W
EZ
T D R S
~~ ~~
D / N
O R B 4 5 4 6 4 7 4 8
~ ~B I A S - X L V - Z V VA T TCDR
MEAL
EXER
CISE
SSV
OUTR
ATE
- 2
PUBL
IC A
FFAI
RS EVENT
ISS
S &
Ku A
VAIL
: 21:15-21:32
JPM
: Ma
rk/B
ox/S
panky/Taz/Ron
R
ef.
MSG
031
JOIN
T OP
S:3.
128
O2 X
FER
TO HI P AND LO P O2 TANKS
Ste
p 3.
Gro
und
will
per
form step 3.5.
~
SHUT
TLE/
ISS
H2O
CONT
AINE
R FILL (HC)
(OR
B OP
S, E
CLS)
Per
form
FIL
L TE
RMIN
ATIO
N
Tran
sfer
CWC
s to ISS
~
PLT
MEAL
PUBLIC AFFAIRS EVENT
ISS S & Ku AVAIL: 21:15-21:32
JPM: Mark/Box/Spanky/Taz/Ron
Ref. MSG 031
ROBO: 1.220 AMS RELEASE AND MANEUVER
TO MT TRANSLATION CONFIG
ROBO:1.210 AMS HANDOFF AND INSTALL Step 8.7
ROBO:1.210 AMS HANDOFF AND INSTALL Step 8.6
CSS: 1.111 CUPOLA CREW RESTRAINT OPS Step 6
MHA REMOVAL FROM MIDDECK CEILING
Ref. MSG 023 Item 9
S&M: 1.911 PAS NORMAL MATE
Steps 11-14 C
EXERCISE CONSTRAINT
MS1
EVA 1 TOOL CONFIGURATION
(EVA, TIMELINES)
Ref.
STS-134 CONSUMABLES TRACKING (CC)
Ref. MSG 027
~
ISS EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP
Retrieve 1" Kapton tape for use in Airlock
MEAL
PUBLIC AFFAIRS EVENT
ISS S & Ku AVAIL: 21:15-21:32
JPM: Mark/Box/Spanky/Taz/Ron
Ref. MSG 031
~
QD FAM OPS
Ref. MSG 026
EVA IR CAMERA TAGUP via S/G 2
Ref. MSG 021
SET UP ORBITER SSC E
~
NOTES
3-36
04
MARK
BOX
SPAN
KY
TFL 184
NO UNISOLATED
EXERCISE
[1ST THRU
3RD STAGE
CAPTURE]
AMS PGSC DEACT
(ASSY OPS, PAYLOADS)
TRAN
SFER
OPS
Ref
. Tr
ansf
er L
ist
& MS
G 025
NO UNISOLATED
EXERCISE
[UMA MATING]
REPLANNED
E 1.104 SET UP ORBITER SSC
(ASSY OPS, ACT & C/O
) Ref. Xfer List:
Return Items 727, 727.1, 727.2, 727.3
MANUALLY MAPPING EXTERNAL USB DRIVE
Ref. MSG 034
C Procedure Variables:
PAS Site [N] = 2
Initframe PPL ID [H] = 00002
Speed of latch in
1st stage = 450 rpm
2nd stage = 225 rpm
3rd stage = 450 rpm
S&M: 1.911 PAS NORMAL MATE
Steps 15-17 C EXERCISE CONSTRAINT
Note: UMA Mate occurs after SSRMS
Umbilical release
STS-
134/
ULF6
FD
09:00
10:00
11:00
12:00
GMT
Date
05/19
(139)
20:00
21:00
22:00
23:00
00:00
MET
Day 00
2W
EZ
T D R SD / N
O R B 4 5 4 6 4 7 4 8
A T T ~ ~B I A S - X L V - Z V V
CDR
MEAL
EXER
CISE
SSV
OUTR
ATE
- 2
PUBL
IC A
FFAI
RS EVENT
ISS
S &
Ku A
VAIL
: 21:15-21:32
JPM
: Ma
rk/B
ox/S
panky/Taz/Ron
R
ef.
MSG
031
~JO
INT
OPS:
3.12
8 O2
XFE
R TO
HI P AND LO P O2 TANKS
Ste
p 3.
Gro
und
will
per
form step 3.5.
SHUT
TLE/
ISS
H2O
CONT
AINE
R FILL (HC)
(OR
B OP
S, E
CLS)
Per
form
FIL
L TE
RMIN
ATIO
N
Tran
sfer
CWC
s to ISS
~
PLT
MEAL
PUBLIC AFFAIRS EVENT
ISS S & Ku AVAIL: 21:15-21:32
JPM: Mark/Box/Spanky/Taz/Ron
Ref. MSG 031
ROBO: 1.220 AMS RELEASE AND MANEUVER
TO MT TRANSLATION CONFIG
ROBO:1.210 AMS HANDOFF AND INSTALL Step 8.7
ROBO:1.210 AMS HANDOFF AND INSTALL Step 8.6
CSS: 1.111 CUPOLA CREW RESTRAINT OPS Step 6
MHA REMOVAL FROM MIDDECK CEILING
Ref. MSG 023 Item 9
S&M: 1.911 PAS NORMAL MATE
Steps 11-14 C
EXERCISE CONSTRAINT
MS1
~
EVA 1 TOOL CONFIGURATION
(EVA, TIMELINES)
Ref.
STS-134 CONSUMABLES TRACKING (CC)
Ref. MSG 027
ISS EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP
Retrieve 1" Kapton tape for use in Airlock
MEAL
PUBLIC AFFAIRS EVENT
ISS S & Ku AVAIL: 21:15-21:32
JPM: Mark/Box/Spanky/Taz/Ron
Ref. MSG 031
~
QD FAM OPS
Ref. MSG 026
EVA IR CAMERA TAGUP via S/G 2
Ref. MSG 021
SET UP ORBITER SSC E
~
NOTES
9
FLT PLN/134/FLIGHT
04
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES) OPS, Item 3
ROBERTO
DREW
TAZ
NO UNISOLATED
EXERCISE
[1ST THRU
3RD STAGE
CAPTURE]
NO UNISOLATED
EXERCISE
[UMA MATING]
REPLANNED
C Procedure Variables:
PAS Site [N] = 2
Initframe PPL ID [H] = 00002
Speed of latch in
1st stage = 450 rpm
2nd stage = 225 rpm
3rd stage = 450 rpm
S&M: 1.911 PAS NORMAL MATE
Steps 15-17 C EXERCISE CONSTRAINT
Note: UMA Mate occurs after SSRMS
Umbilical release
3-37
STS-
134/
ULF6
FD
09:00
10:00
11:00
12:00
GMT
Date
05/19
(139)
20:00
21:00
22:00
23:00
00:00
MET
Day 00
2W
EZ
T D R S ~ ~
~
~
D / N
O R B 4 5 4 6 4 7 4 8
~ ~B I A S - X L V - Z V VA T TMS2
MEAL
EXER
CISE
TRAN
SFER
OPS
Ref
. Tr
ansf
er L
ist
& MS
G 025
~
TRAN
SFER
OPS
Ref
. Tr
ansf
er L
ist
& MS
G 025
~
MHA
REMO
VAL
FROM
MID
DECK
CEILING
Ref
. MS
G 02
3 It
em 9
MS3
EVA 1 TOOL CONFIGURATION
(EVA, TIMELINES)
Ref.
STS-134 CONSUMABLES TRACKING (CC)
Ref. MSG 027
~
MEAL
ISS EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP
Retrieve 1" Kapton tape for use in Airlock
QD FAM OPS
Ref. MSG 026
~
EVA IR CAMERA TAGUP via S/G 2
Ref. MSG 021
MS4
MEAL
PUBLIC AFFAIRS EVENT
ISS S & Ku AVAIL: 21:15-21:32
JPM: Mark/Box/Spanky/Taz/Ron
Ref. MSG 031
ROBO: 1.220 AMS RELEASE AND MANEUVER
TO MT TRANSLATION CONFIG
Verify EMU 3005 sizing
Ref. STS-134 NOMINAL EMU SIZING
(EVA, EMU CONTINGENCY PROCS)
Install two wrist mirrors from Outside
Pocket of MO-2 bag s/n 1010
~
QD FAM OPS
Ref. MSG 026
ROBO:1.210 AMS HANDOFF AND INSTALL Step 8.7
ROBO:1.210 AMS HANDOFF AND INSTALL Step 8.6
EVA IR CAMERA TAGUP via S/G 2
Ref. MSG 021
S&M: 1.911 PAS NORMAL MATE
Steps 11-14 C
EXERCISE CONSTRAINT
~
NOTES
3-37
04
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES) OPS, Item 3
ROBERTO
DREW
TAZ
NO UNISOLATED
EXERCISE
[1ST THRU
3RD STAGE
CAPTURE]
NO UNISOLATED
EXERCISE
[UMA MATING]
REPLANNED
C Procedure Variables:
PAS Site [N] = 2
Initframe PPL ID [H] = 00002
Speed of latch in
1st stage = 450 rpm
2nd stage = 225 rpm
3rd stage = 450 rpm
S&M: 1.911 PAS NORMAL MATE
Steps 15-17 C EXERCISE CONSTRAINT
Note: UMA Mate occurs after SSRMS
Umbilical release
STS-
134/
ULF6
FD
09:00
10:00
11:00
12:00
GMT
Date
05/19
(139)
20:00
21:00
22:00
23:00
00:00
MET
Day 00
2W
EZ
T D R SD / N
O R B 4 5 4 6 4 7 4 8
A T T ~ ~B I A S - X L V - Z V V
MS2
MEAL
EXER
CISE
~TR
ANSF
ER O
PS R
ef.
Tran
sfer
Lis
t &
MSG 025
~
TRAN
SFER
OPS
Ref
. Tr
ansf
er L
ist
& MS
G 025
MHA
REMO
VAL
FROM
MID
DECK
CEILING
Ref
. MS
G 02
3 It
em 9
MS3
~
EVA 1 TOOL CONFIGURATION
(EVA, TIMELINES)
Ref.
STS-134 CONSUMABLES TRACKING (CC)
Ref. MSG 027
MEAL
ISS EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP
Retrieve 1" Kapton tape for use in Airlock
QD FAM OPS
Ref. MSG 026
~
EVA IR CAMERA TAGUP via S/G 2
Ref. MSG 021
MS4
MEAL
PUBLIC AFFAIRS EVENT
ISS S & Ku AVAIL: 21:15-21:32
JPM: Mark/Box/Spanky/Taz/Ron
Ref. MSG 031
ROBO: 1.220 AMS RELEASE AND MANEUVER
TO MT TRANSLATION CONFIG
~
Verify EMU 3005 sizing
Ref. STS-134 NOMINAL EMU SIZING
(EVA, EMU CONTINGENCY PROCS)
Install two wrist mirrors from Outside
Pocket of MO-2 bag s/n 1010
QD FAM OPS
Ref. MSG 026
ROBO:1.210 AMS HANDOFF AND INSTALL Step 8.7
ROBO:1.210 AMS HANDOFF AND INSTALL Step 8.6
EVA IR CAMERA TAGUP via S/G 2
Ref. MSG 021
S&M: 1.911 PAS NORMAL MATE
Steps 11-14 C
EXERCISE CONSTRAINT
~
NOTES
10
FLT PLN/134/FLIGHT
04
MARK
BOX
SPAN
KY
JOIN
T OP
S:3.
128
O2 X
FER
TO HI P AND LO P O2 TANKS
Ste
p 3.
Gro
und
will
per
form step 3.5.
NO UNISOLATED
EXERCISE
[MT XLATE]
UPLINK
β21+Mask
Box 40,41,42
REPLANNED
E C
3 O
MS ENG LEFT - ARM/PRESS (Wait 5 Seconds)
- OFF
3-38
STS-
134/
ULF6
FD
13:00
14:00
15:00
16:00
GMT
Date
05/19
(139)
00:00
01:00
02:00
03:00
04:00
MET
Day 00
3W
EZ
T D R S
~
~~
D / N
O R B 4 8 4 9 5 0
~ ~B I A S - X L V - Z V VA T TCDR
ISS
EVA
SYST
EMS:
1.2
06 1
0.2 PSIA CAMPOUT
MASK
PRE
BREA
THE MC
C-H
performs steps 1, 19
~
EVA
1 PR
OCED
URE
REVIEW
Ref
. EV
A 1
BRIE
FING CARD
(
EVA,
TIM
ELINES)
Ref
. MS
G 02
6, M
SG 027
PRE-
SLEE
P AC
TIVI
TY (
ORB
OPS,
CRE
W SY
S)
PUB
LIC
AFFA
IRS EVENT
ISS
S &
KU
AVAI
L: 00:54-01:37
JP
M: M
ark/
Taz/Cady
Ref.
MSG
032
~
JOIN
T OP
S: 3
.121
PRE
BREA
THE USING
SHUT
TLE
O2 S
ETUP
(PO
ST O
2 XFER)
Ste
ps 1
-4,
Gro
und
will
per
form
ste
ps 1.7 and 4.15
PRE-
SLEE
P AC
TIVI
TY (
ORB
OPS, CREW SYS)
L OM
S AC
CUMU
LATO
R RE
PRES
S E
L9
PS A
UD A
/G 1
,2 (
two)
- OFF
PRIV
ATE
MEDI
CAL
CONF
EREN
CEPr
ivat
e Co
nfer
ence
via
A/G 2
PLT
EVA 1 PROCEDURE REVIEW
Ref. EVA 1 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 026, MSG 027
EXERCISE
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
PRLA CLOSE
(ORB OPS, PRLA)
AMS VIEWING TO PRECRADLE
(PDRS, AMS NOMINAL)
DAP UPDATE Ref. MSG 029
MS1
EVA 1 PROCEDURE REVIEW
Ref. EVA 1 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 026, MSG 027
EVA 1 TOOL CONFIGURATION
(EVA, TIMELINES)
Ref.
STS-134 CONSUMABLES TRACKING (CC)
Ref. MSG 027
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
~
NOTES
3-38
04
MARK
BOX
SPAN
KY
JOIN
T OP
S:3.
128
O2 X
FER
TO HI P AND LO P O2 TANKS
Ste
p 3.
Gro
und
will
per
form step 3.5.
NO UNISOLATED
EXERCISE
[MT XLATE]
UPLINK
β21+Mask
Box 40,41,42
REPLANNED
E C
3 O
MS ENG LEFT - ARM/PRESS (Wait 5 Seconds)
- OFF
STS-
134/
ULF6
FD
13:00
14:00
15:00
16:00
GMT
Date
05/19
(139)
00:00
01:00
02:00
03:00
04:00
MET
Day 00
3W
EZ
T D R SD / N
O R B 4 8 4 9 5 0
A T T ~ ~B I A S - X L V - Z V V
CDR
~IS
S EV
A SY
STEM
S: 1
.206
10.
2 PSIA CAMPOUT
MASK
PRE
BREA
THE MC
C-H
performs steps 1, 19
EVA
1 PR
OCED
URE
REVIEW
Ref
. EV
A 1
BRIE
FING CARD
(
EVA,
TIM
ELINES)
Ref
. MS
G 02
6, M
SG 027
PRE-
SLEE
P AC
TIVI
TY (
ORB
OPS,
CRE
W SY
S)
PUB
LIC
AFFA
IRS EVENT
ISS
S &
KU
AVAI
L: 00:54-01:37
JP
M: M
ark/
Taz/Cady
Ref.
MSG
032
~
JOIN
T OP
S: 3
.121
PRE
BREA
THE USING
SHUT
TLE
O2 S
ETUP
(PO
ST O
2 XFER)
Ste
ps 1
-4,
Gro
und
will
per
form
ste
ps 1.7 and 4.15
PRE-
SLEE
P AC
TIVI
TY (
ORB
OPS, CREW SYS)
L OM
S AC
CUMU
LATO
R RE
PRES
S E
L9
PS A
UD A
/G 1
,2 (
two)
- OFF
PRIV
ATE
MEDI
CAL
CONF
EREN
CEPr
ivat
e Co
nfer
ence
via
A/G 2
PLT
EVA 1 PROCEDURE REVIEW
Ref. EVA 1 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 026, MSG 027
EXERCISE
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
PRLA CLOSE
(ORB OPS, PRLA)
AMS VIEWING TO PRECRADLE
(PDRS, AMS NOMINAL)
DAP UPDATE Ref. MSG 029
MS1
EVA 1 PROCEDURE REVIEW
Ref. EVA 1 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 026, MSG 027
~EVA 1 TOOL CONFIGURATION
(EVA, TIMELINES)
Ref.
STS-134 CONSUMABLES TRACKING (CC)
Ref. MSG 027
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
NOTES
11
FLT PLN/134/FLIGHT
04
ROBERTO
DREW
TAZ
ISS EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT
MASK PREBREATHE MCC-H performs steps 1, 19
ISS EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT
MASK PREBREATHE MCC-H performs steps 1, 19
NO UNISOLATED
EXERCISE
[MT XLATE]
REPLANNED
Verify EMU 3005 sizing: See pg. 3-37
3-39
STS-
134/
ULF6
FD
13:00
14:00
15:00
16:00
GMT
Date
05/19
(139)
00:00
01:00
02:00
03:00
04:00
MET
Day 00
3W
EZ
T D R S ~
~
~
D / N
O R B 4 8 4 9 5 0
~ ~B I A S - X L V - Z V VA T TMS2
EVA
1 PR
OCED
URE
REVIEW
Ref
. EV
A 1
BRIE
FING CARD
(
EVA,
TIM
ELINES)
Ref
. MS
G 02
6, M
SG 027
TRAN
SFER
BRI
EF C
all
down
sta
tus
to M
CC via A/G2
TRAN
SFER
BRI
EF P
REP
Coo
rdin
ate
with
tra
nsfe
r counterparts
PRE-
SLEE
P AC
TIVI
TY (
ORB
OPS,
CRE
W SY
S)
~
AMS
VIEW
ING
TO P
RECR
ADLE
(PD
RS,
AMS
NOMI
NAL)
TRAN
SFER
OPS
Ref
. Tr
ansf
er L
ist
& MS
G 025
~
BIOK
IS O
PERA
TION
S (
ASSY
OPS
, PA
YLOA
DS)
Step 3
CGBA
STA
TUS
CHK; G
LACI
ER STATUS CHK (CC)
MS3
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EVA 1 PROCEDURE REVIEW
Ref. EVA 1 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 026, MSG 027
EVA 1 TOOL CONFIGURATION
(EVA, TIMELINES)
Ref.
STS-134 CONSUMABLES TRACKING (CC)
Ref. MSG 027
~
MS4
EVA 1 PROCEDURE REVIEW
Ref. EVA 1 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 026, MSG 027
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EVA 1 TOOL CONFIGURATION
(EVA, TIMELINES)
Ref. STS-134 CONSUMABLES TRACKING (CC)
Ref. MSG 027
PUBLIC AFFAIRS EVENT
ISS S & KU AVAIL: 00:54-01:37
JPM: Mark/Taz/Cady
Ref. MSG 032
~
~
NOTES
3-39
04
ROBERTO
DREW
TAZ
ISS EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT
MASK PREBREATHE MCC-H performs steps 1, 19
ISS EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT
MASK PREBREATHE MCC-H performs steps 1, 19
NO UNISOLATED
EXERCISE
[MT XLATE]
REPLANNED
Verify EMU 3005 sizing: See pg. 3-37
STS-
134/
ULF6
FD
13:00
14:00
15:00
16:00
GMT
Date
05/19
(139)
00:00
01:00
02:00
03:00
04:00
MET
Day 00
3W
EZ
T D R SD / N
O R B 4 8 4 9 5 0
A T T ~ ~B I A S - X L V - Z V V
MS2
EVA
1 PR
OCED
URE
REVIEW
Ref
. EV
A 1
BRIE
FING CARD
(
EVA,
TIM
ELINES)
Ref
. MS
G 02
6, M
SG 027
TRAN
SFER
BRI
EF C
all
down
sta
tus
to M
CC via A/G2
TRAN
SFER
BRI
EF P
REP
Coo
rdin
ate
with
tra
nsfe
r counterparts
~
PRE-
SLEE
P AC
TIVI
TY (
ORB
OPS,
CRE
W SY
S)
AMS
VIEW
ING
TO P
RECR
ADLE
(PD
RS,
AMS
NOMI
NAL)
~TR
ANSF
ER O
PS R
ef.
Tran
sfer
Lis
t &
MSG 025
BIOK
IS O
PERA
TION
S (
ASSY
OPS
, PA
YLOA
DS)
Step 3
CGBA
STA
TUS
CHK; G
LACI
ER STATUS CHK (CC)
MS3
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EVA 1 PROCEDURE REVIEW
Ref. EVA 1 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 026, MSG 027
~EVA 1 TOOL CONFIGURATION
(EVA, TIMELINES)
Ref.
STS-134 CONSUMABLES TRACKING (CC)
Ref. MSG 027
MS4
EVA 1 PROCEDURE REVIEW
Ref. EVA 1 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 026, MSG 027
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EVA 1 TOOL CONFIGURATION
(EVA, TIMELINES)
Ref. STS-134 CONSUMABLES TRACKING (CC)
Ref. MSG 027
PUBLIC AFFAIRS EVENT
ISS S & KU AVAIL: 00:54-01:37
JPM: Mark/Taz/Cady
Ref. MSG 032
~
~
NOTES
12
FLT PLN/134/FLIGHT
04
CREW
WAK
E AT
03/
13:3
0
UPLINK
β21+Mask
Box 40,41,46
MARK
BOX
SPAN
KY
REPLANNED
3-40
STS-
134/
ULF6
FD
17:00
18:00
19:00
20:00
GMT
Date
05/19
(139)
04:00
05:00
06:00
07:00
08:00
MET
Day 00
3W
EZ
T D R S
~
~~
D / N
O R B 5 1 5 2 5 3
~ ~B I A S - X L V - Z V VA T TCDR
SLEE
P
~
ISS
EVA
SYST
EMS:
1.2
06 1
0.2 PSIA CAMPOUT
MASK
PRE
BREA
THE MC
C-H
performs steps 1, 19
~
PRE-
SLEE
P AC
TIVI
TY (
ORB
OPS,
CRE
W SY
S)
PLT
SLEEP
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
MS1
SLEEP
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
NO UNISOLATED
EXERCISE
[MT XLATE]
~
NOTES
3-40
04
CREW
WAK
E AT
03/
13:3
0
UPLINK
β21+Mask
Box 40,41,46
MARK
BOX
SPAN
KY
REPLANNED
STS-
134/
ULF6
FD
17:00
18:00
19:00
20:00
GMT
Date
05/19
(139)
04:00
05:00
06:00
07:00
08:00
MET
Day 00
3W
EZ
T D R SD / N
O R B 5 1 5 2 5 3
A T T ~ ~B I A S - X L V - Z V V
CDR
~
SLEE
P
~IS
S EV
A SY
STEM
S: 1
.206
10.2 PSIA CAMPOUT
MASK
PRE
BREA
THE MC
C-H
performs steps 1, 19
PRE-
SLEE
P AC
TIVI
TY (
ORB
OPS,
CRE
W SY
S)
PLT
~
SLEEP
~PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS1
~
SLEEP
~PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~ NO UNISOLATED
EXERCISE
[MT XLATE]
NOTES
13
FLT PLN/134/FLIGHT
04
CREW
WAK
E AT
03/
13:3
0
ROBERTO
DREW
TAZ
NO UNISOLATED
EXERCISE
[MT XLATE]
REPLANNED
3-41
STS-
134/
ULF6
FD
17:00
18:00
19:00
20:00
GMT
Date
05/19
(139)
04:00
05:00
06:00
07:00
08:00
MET
Day 00
3W
EZ
T D R S ~
~
~
D / N
O R B 5 1 5 2 5 3
~ ~B I A S - X L V - Z V VA T TMS2
SLEE
P
~
PRE-
SLEE
P AC
TIVI
TY (
ORB
OPS,
CRE
W SY
S)
~
MS3
SLEEP
~
ISS EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT
MASK PREBREATHE
MCC-H performs steps 1, 19
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS4
SLEEP
~
ISS EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT
MASK PREBREATHE
MCC-H performs steps 1, 19
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
NOTES
3-41
04
CREW
WAK
E AT
03/
13:3
0
ROBERTO
DREW
TAZ
NO UNISOLATED
EXERCISE
[MT XLATE]
REPLANNED
STS-
134/
ULF6
FD
17:00
18:00
19:00
20:00
GMT
Date
05/19
(139)
04:00
05:00
06:00
07:00
08:00
MET
Day 00
3W
EZ
T D R SD / N
O R B 5 1 5 2 5 3
A T T ~ ~B I A S - X L V - Z V V
MS2
~
SLEE
P
~PR
E-SL
EEP
ACTI
VITY
(OR
B OP
S, C
REW
SYS)
MS3
~
SLEEP
~ISS EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT
MASK PREBREATHE
MCC-H performs steps 1, 19
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS4
~
SLEEP
~ISS EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT
MASK PREBREATHE
MCC-H performs steps 1, 19
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
NOTES
14
MSG 024 - FD04 MISSION SUMMARY
END OF PAGE 1 OF 1, MSG 024
Good Morning Endeavour!!!! 1 2 Thanks for the great rendezvous yesterday!!!! 3 4 We are excited about working with you today to install AMS! 5 6 YOUR CURRENT ORBIT IS: 187 X 183 NM 7 8 NOTAMS - 9 10
EDW - EDW 22L/04R IN USE. EDT 22R/04L EMERGENCY DAY USE ONLY. 11 EDW - LAKEBED RWYS RED. 12 NOR - LAKEBED RWYS GREEN. 13 NTU - RWY 05R/23L CLSD. 14 FFA - NOT USABLE. IN CARETAKER STATUS. 15 LAJ - RWY WIDTH REDUCED TO 154' - EAST SIDE OF RWY CLSD. 16 BEN - NOT USABLE. NOT SUPPORTED. 17 IKF - NOT USABLE. NO AGREEMENT 18
19 NEXT 2 PLS OPPORTUNITIES: 20 21 EDW22 ORB 48 – 3/00:10 SKC 7 240/10P16 22 EDW22 ORB 64 – 4/00:34 SKC 7 220/05P08 23 24 OMS TANK FAIL CAPABILITY: 25 26 NO 27 28 LEAKING OMS PRPLT BURN: 29 30 L or R OMS LEAK: ALWAYS BURN RETROGRADE 31 32 OMS QUANTITIES(%) (POST Ti) 33 34 L OMS OX = 33.23 R OMS OX = 34.28 35 FU = 33.24 FU = 33.95 36 37 FOR CURRENT QTYS, SUBTRACT INCN’T COUNTER 38 39 DELTA V AVAILABLE: 40 41 OMS 345 FPS 42 ARCS (TOTAL ABOVE QTY1) 47 FPS 43 44 TOTAL IN THE AFT 392 FPS 45 46 ARCS (TOTAL ABOVE QTY2) 80 FPS 47 FRCS (ABOVE QTY 1) 32 FPS 48 49 AFT QTY 1 82 % 50 AFT QTY 2 44 % 51 52
15
MSG 025 ‐ FD04 TRANSFER MESSAGE
END OF PAGE 1 OF 4, MSG 025
Good morning Roberto & Mark! 1 2 Great job getting all the big bags over to Station yesterday and thanks for getting the other 3 items done as well. 4 5 The Transfer List Excel file, FD04_Transfer_List_STS134.xls, is located on the KFX 6 machine in C:\OCA-up\transfer (and available via the PGSC homepage). 7 8 For ISS, the Transfer List Excel file, FD04_Transfer_List_STS134.xls, is located in K:\OCA-9 up\transfer. 10 11
Reminder 12
Sometimes the Crew Support locker, MA16N contains some goodies for the ISS 13 Crew. The Transfer Team doesn’t know the contents of that locker, but just a 14 reminder to check there for anything you may want to give to the ISS crew. 15
16 FD4 Choreography 17
Resupply Item 12 (MF57G - PAYLOADS MISC/CD STOWAGE CASE) 18
Roberto: Resupply Item 30.5 (VIABLE) (timelined) 19
Ron & Alexander: Resupply Item 9 & Return Item 735 (RSP Swap) (timelined) 20
Spanky: Return Item 727, 727.1, 727.2, 727.3 (ISS SSC 20, 120GB Hard Drive & 21 Cable, Bose Headset) (timelined) 22
Cady: Return Item 732 (NLP Cells Stow Bag) (timelined) 23
Paolo: Return Item 733 (EDV samples) (timelined) 24 25 Change Pages 26
Please incorporate changes as follows: 27 28 In the Transfer List RESUPPLY tab: 29 Replace page 4 30 31 In the Transfer List RETURN tab 32 Replace pages 1, 6 33
34 Change Details 35
Item 21.1: Deleted incorrect serial number. Since this item returns to ISS and is 36 crew pref, serial number is not required. 37
38 Item 401: Added constraint to not transfer bag until samples are taken. Not all 39
samples were able to be taken before docking, so will have to be added 40 to timeline after docking. 41
42 Item 405: Added constraint to not transfer the bag until FD6. Since Paolo will add a 43
harddrive to this bag on FD6, it is best if the bag is not transferred until 44 the harddrive is added. 45
46 Item 727.3: Deleted incorrect serial number. Since this item returns to ISS and is 47
crew pref, serial number is not required. 48 49 50
16
Pag
e 1
of 9
, 27-
0592
(M
SG
026
)
27-0
592
(MS
G 0
26)
ST
S-1
34/U
LF6
QD
Fam
Ops
P
age
1of
9
On-
Orb
it Q
D T
rain
er
QD
Ref
resh
er In
form
atio
n
17
Pag
e 2
of 9
, 27-
0592
(M
SG
026
)
27-0
592
(MS
G 0
26)
ST
S-1
34/U
LF6
QD
Fam
Ops
P
age
2of
9
Onb
oard
Flu
id Q
D T
rain
ing
Ove
rvie
w
•Re
view
har
dwar
e
•Q
D N
omen
clat
ure
(dam
age
to lo
ok fo
r)
•N
omin
al u
sage
QD
Blo
ck S
teps
•Co
ntin
genc
y to
ols
(inst
alla
tion
and
usag
e)
18
Pag
e 3
of 9
, 27-
0592
(M
SG
026
)
27-0
592
(MS
G 0
26)
ST
S-1
34/U
LF6
QD
Fam
Ops
P
age
3of
9
Onb
oard
Flu
id Q
D T
rain
ing
Har
dwar
e•
Har
dwar
e Cu
rren
t Loc
atio
ns–
1.0
CTB
QD
Trai
ner S
/N 1
258
–D
eplo
yed
in A
/L•
QD
Boa
rd -
3 m
ale
QD
s (1
.5”,
1.0
”, 0
.75”
) •
Shun
t jum
per
-has
1.0
”fem
ale
QD
•1.
0” Q
RT/F
ID G
auge
•1.
0” C
ap –
no t
hrea
ds o
n Q
Dbo
ard
•0.
25”
BDT
-no
fem
ale
.25”
QD
–EV
A2
Tool
s M
esh
bag
•0.
75”/
1.0”
Bai
l Dri
ve L
ever
(Boo
mer
ang)
•
1.0”
But
ton
Dep
ress
Too
l/A
nti-K
ickb
ack
Tool
QD
Boa
rd
•Pa
nel C
over
Req
dfo
r QD
Boa
rd–
A 1
6” x
41”
Alu
min
um p
anel
pro
vide
s w
orks
pace
and
Vel
cro
atta
chm
ent
poin
ts (P
/N
SEG
3310
7639
-301
)–
Ther
e is
a p
anel
dep
loye
d in
NO
D2
and
poss
ibly
oth
ers
depl
oyed
els
ewhe
re–
IMS
show
s so
me
stow
ed in
NO
D1O
4_A
FT
(bet
wee
n ZS
Rsh
ell a
nd in
sert
)
•Pl
ease
retu
rn a
ll ha
rdw
are
to s
ame
loca
tions
as
foun
d w
hen
com
plet
e w
ith O
BT
19
Pag
e 4
of 9
, 27-
0592
(M
SG
026
)
27-0
592
(MS
G 0
26)
ST
S-1
34/U
LF6
QD
Fam
Ops
P
age
4of
9
Mal
e O
uter
Hou
sing
Mal
e Sl
eeve
Mal
e St
op P
lug
Mal
e Se
cond
ary
Stop
Plu
g Se
al, b
ehin
d w
hich
is th
e M
ale
Prim
ary
Stop
Plu
g Se
al
(sea
ls a
re e
ither
uni
form
or n
ot re
ally
vi
sibl
e)
Mal
e Q
D
Mal
eSt
op P
lug
Mal
e se
cond
ary
stop
plu
g se
al
Mal
e pr
imar
y st
op p
lug
seal
Mal
e sl
eeve
Prim
ary
slee
ve s
eal
Seco
ndar
ysl
eeve
sea
l M
ale
Inne
r / O
uter
Hou
sing
Sea
l
20
Pag
e 5
of 9
, 27-
0592
(M
SG
026
)
27-0
592
(MS
G 0
26)
ST
S-1
34/U
LF6
QD
Fam
Ops
P
age
5of
9
Lock
ing
Fing
ers
Fem
ale
stop
pl
ug
Fem
ale
Out
er H
ousi
ngIn
ner S
pool
Fem
ale
Seco
ndar
y Sp
ool S
eal
(exp
osed
por
tion
of s
eal i
s no
t re
ally
vis
ible
)
Fem
ale
Prim
ary
Spoo
l Sea
l, be
hind
whi
ch is
the
Fem
ale
Prim
ary
Stop
Plu
g Se
al (s
eals
ar
e ei
ther
uni
form
or n
ot re
ally
vi
sibl
e)
Det
ents
Fem
ale
QD
Fem
ale
stop
pl
ug
Fem
ale
Seco
ndar
y Sp
ool S
eal
Prim
ary
Spoo
l Sea
lPr
imar
ySt
op p
lug
Seal
Prim
ary
aft
Spoo
l Sea
lSe
cond
ary
aft
Spoo
lSe
al
21
Pag
e 6
of 9
, 27-
0592
(M
SG
026
)
27-0
592
(MS
G 0
26)
ST
S-1
34/U
LF6
QD
Fam
Ops
P
age
6of
9
Dam
aged
QD
Exa
mpl
es•
Gal
ling
•M
ale
Slee
ve S
ticki
ng O
pen
•Se
al d
amag
e
•Re
tain
ing
Wire
Bac
ked
Out
Slee
ve is
stu
ck o
pen
Stop
plu
g se
als
are
expo
sed
whe
n m
ale
slee
ve fa
ils to
clo
se
Uns
eate
d Se
al
nom
inal
22
Pag
e 7
of 9
, 27-
0592
(M
SG
026
)
27-0
592
(MS
G 0
26)
ST
S-1
34/U
LF6
QD
Fam
Ops
P
age
7of
9
BLO
CK
A –
DEM
ATE
QD
1.√S
ide-
load
s2.
Pul
l bac
k re
leas
e ri
ng –
dem
ate
3.√F
wd
band
not
vis
ible
4.√F
OD
–bo
th s
ides
BLO
CK
B –
MAT
E Q
D1.
√FO
D –
both
sid
es2.
√But
ton
up, c
olla
r loc
ked
(1" o
nly)
3.√F
wd
band
not
vis
ible
4.√S
ide-
load
s5.
Mat
e Q
D6.
√Fw
d ba
nd v
isib
le7.
Sna
pbac
k, P
ull,
Gap
che
cks
8.C
lose
boo
tie (
as r
eqd)
BLO
CK
C –
OPE
N V
ALVE
1.√S
ide-
load
s2.
Unl
ock
colla
r (1"
onl
y)3.
Dep
ress
but
ton,
mov
e ba
il fw
d4.
√Aft
ban
d vi
sibl
e√B
utto
n up
5.Lo
ck c
olla
r (1
" on
ly)
6.C
lose
boo
tie (
as r
eqd)
BLO
CK
D –
CLO
SE V
ALVE
1.√A
ft ba
nd v
isib
le2.
Unl
ock
colla
r (1"
onl
y)3.
√Det
ent b
utto
n up
& d
epre
ssib
le4.
√Sid
e-lo
ads
5.M
ove
bail
fwd
forc
eful
ly; w
hile
de
pres
sing
but
ton,
mov
e ba
il af
t6.
√Fw
d ba
nd v
isib
le
7.√D
eten
t but
ton
up8.
Lock
col
lar
(1"
only
)9.
Clo
se b
ootie
(as
req
d)
M2-
ATA M
3-Ve
nt
M1-
Fill
A50
0 Ve
nt P
anel
23
Pag
e 8
of 9
, 27-
0592
(M
SG
026
)
27-0
592
(MS
G 0
26)
ST
S-1
34/U
LF6
QD
Fam
Ops
P
age
8of
9
0.25
” BD
T In
stal
latio
n an
d Re
mov
al0.
25”
BDT
Inst
alla
tion
and
Rem
oval
on
Mat
ed/
Valv
e O
pen
QD
1. V
erify
that
the
BDT
plun
ger
is fu
lly re
trac
ted
2. S
quee
ze B
DT
hand
les
to o
pen
the
BDT
jaw
s an
d pl
ace
the
BDT
on to
p of
the
QD
, fw
d of
bai
l han
dle
3. R
elea
se h
andl
es fo
r th
e ja
ws
to c
lose
and
lo
ck o
nto
the
QD
4. V
erify
pro
per
hard
doc
k•
Perf
orm
pul
l and
tug
test
√H
andl
e po
sitio
n m
arks
are
vis
ible
(h
andl
es fu
lly o
ut)
√Kn
ob c
an ro
tate
CW
1 fu
ll tu
rn5.
Rot
ate
BDT
knob
CW
until
full
trav
el is
re
ache
d or
bai
l han
dle
mot
ion
obse
rved
•If
no b
ail h
andl
e m
otio
n ob
serv
ed,
cycl
e ba
il af
t•
Wai
t 10
sec
for
full
vent
ing
to o
ccur
6. P
ush
bail
forw
ard
7. R
otat
e BD
Tkn
ob C
CWto
har
d st
op8.
Squ
eeze
BD
Tha
ndle
s to
ope
n th
e ja
ws
and
rem
ove
the
BDT
Ops
Con
stra
ints
• T
he
BD
Tm
ust
be
teth
ere
d a
t all
time
s•
The
BDT
shal
l not
be
left
on
a Q
D
whe
n no
t in
use
• C
yclin
g th
e BD
Tkn
ob is
a o
ne-
hand
ed o
pera
tion
due
to k
ick
back
lo
ad a
nd p
inch
poi
nt c
once
rns
Ops
Not
es•
Sta
tus
Ind
ica
tor
line
un
de
r th
e
kno
b w
ill c
orr
esp
on
d to
sym
bo
ls
ind
ica
ting
bu
tton
‘up
’ (p
lun
ge
r fu
lly r
etr
act
ed
) a
nd
bu
tton
‘d
ow
n’
• O
rien
tatio
n:
‘QD
FW
D’ a
rro
w
po
ints
tow
ard
s th
e Q
D m
atin
g
inte
rfa
ce•
3/8
” sq
ua
re d
rive
inte
rfa
ce is
in
teg
rate
d in
to th
e k
no
b fo
r u
se
with
ext
ern
al t
oo
ls t
o p
rovi
de
a
dd
itio
na
l to
rqu
e, o
r fo
r a
pp
lyin
g
torq
ue
-lim
ited
inp
ut c
ap
ab
ility
• E
VA
ove
rrid
e b
olts
ma
y b
e
use
d to
dis
con
ne
ct th
e B
DT
fro
m th
e Q
D in
the
eve
nt o
f a
co
ntin
ge
ncy
24
Pag
e 9
of 9
, 27-
0592
(M
SG
026
)
27-0
592
(MS
G 0
26)
ST
S-1
34/U
LF6
QD
Fam
Ops
P
age
9of
9
1.0”
AKT
/BD
T In
stal
latio
n an
d Re
mov
al1.
0” B
DT
Inst
alla
tion
and
Rem
oval
on
Mat
ed/
Valv
e O
pen
QD
1. V
erify
AKT
is re
ady
for u
se2.
Ins
tall
AKT
on Q
D√
Capt
ure
poin
ts -
bail
boss
es (2
)•
Perf
orm
pul
l and
tug
test
3. V
erify
BD
Tis
read
y fo
r use
•Cy
cle
BDT
plun
ger;
leav
e fu
lly re
trac
ted
√Te
ther
is n
ot in
the
way
4. I
nsta
ll BD
Tal
ong
eith
er A
KTgu
ide
rout
e•
Perf
orm
pul
l and
tug
test
5. U
se fi
nger
tip to
rque
onl
y, tu
rn B
DT
knob
CW
until
indi
cato
r is
in-b
etw
een
the
‘2’ a
nd ‘3
’ po
sitio
ns•
If no
bai
l han
dle
mot
ion
obse
rved
, cyc
le b
ail
aft •W
ait 1
0 se
c fo
r ful
l ven
ting
to o
ccur
6. P
ush
bail
full
forw
ard
7. R
otat
e BD
Tkn
ob C
CWto
har
d st
op8.
Dep
ress
har
d do
ck le
ver
and
rem
ove
BDT
9. D
epre
ss A
KTla
tche
s an
d re
mov
e AK
T
Ops
Not
es•
QD
lock
ing
co
llar
mu
st b
e in
un
lock
ed
p
osi
tion
• S
tatu
s In
dic
ato
r o
n th
e B
DT
kno
b h
as
thre
e li
ne
s w
hic
h c
orr
esp
on
d to
the
bu
tto
n
be
ing
fully
re
tra
cte
d (1
) a
nd
the
bu
tto
n
be
ing
de
pre
sse
d (2
& 3
)•
3/8
” sq
ua
re d
rive
inte
rfa
ce is
inte
gra
ted
in
to th
e k
no
b fo
r u
se w
ith e
xte
rna
l to
ols
to
pro
vid
e a
dd
itio
na
l to
rqu
e, o
r fo
r a
pp
lyin
g
torq
ue
-lim
ited
inp
ut c
ap
ab
ility
Ops
Con
stra
ints
• T
he
AK
Tis
an
acc
ep
tab
le te
the
r po
int f
or
the
BD
T•
Th
e B
DT
sha
ll n
ot b
e le
ft o
n a
QD
wh
en
no
t in
use
• C
yclin
g th
e B
DT
kno
b is
a o
ne
-ha
nd
ed
op
era
tion
d
ue
to k
ick
ba
ck lo
ad
an
d p
inch
po
int c
on
cern
s•
All
ha
nd
s, e
qu
ipm
en
t ho
oks
, te
the
rs, e
tc. m
ust
re
ma
in c
lea
r o
f th
e b
ail
ha
nd
le p
ath
• T
he
6 in
wo
bb
le s
ock
et m
ust
be
use
d w
ith th
e P
GT
wh
en
ap
ply
ing
ad
diti
on
al t
orq
ue
to th
e B
DT
kno
b•
Th
e B
DT
is li
mite
d to
1 h
ou
r e
xpo
sure
tim
e o
uts
ide
o
f th
erm
al b
ag
on
EV
A
25
27-0603A (MSG 027A) – STS-134/ULF6 FD4 EVA Deltas Page 1 of 3
Page 1 of 3, 27-0603A (MSG 027A)
Mark, Drew, Spanky and Taz, 1
2
It’s great to see you guys on ISS! We’re looking forward to getting ready for EVA 1! 3
4
We have a few deltas for FD4 activities: 5
EVA IR Camera Tagup 6
1) Drew, Spanky, Taz - The NBL run went well yesterday. MSG 27-0601 (134-021) 7
IR Camera Body Positions contains some photos from the run. A tagup for all 8
three of you with the EVA team is scheduled just after your midday meal to 9
discuss these results and your comments. 10
11
QD Fam Ops: 12
2) Drew, Spanky, Taz - MSG 27-0592 (134-026) STS -134/ULF6 QD Fam Ops 13
contains a short QD refresher to use during your QD FAM OPS activity today. 14
15
EMU Size Verification: 16
3) Taz - once you complete verifying EMU 3005’s sizing, please get two wrist 17
mirrors from the Ziploc bag in the outside pocket of M-02 bag S/N 1010, and 18
install them on your suit. Your Sizing diagram (bubble person) is in STS-134 19
NOMINAL EMU SIZING (EVA, EMU CONTINGENCY PROCS), page FS 12-29. 20
21
EVA 1 Tool Config: 22
4) Drew, Spanky, Taz - Please use the ISS 85’ STs with ID #s 23 and 26 to build 23
your Safety Tether Packs during EVA1 Tool Config. 24
25
EVA 1 Procedure Review: 26
5) Drew, Spanky, Taz - Good news it looks like we might not have to shunt arrays in 27
the case of a PCU failure. On page FS 7-11, update the PCU inhibit as follows: 28
Was: 29
PCU (PHALCON: Prior to Egress) 30
NOTE 31
PCUs may require up to a 1-hr warmup period before they are operational 32
33
MCC-H 1. √PCUs (two) operational in discharge mode and one of the 34
following: 35
a. CCS PCU EVA hazard control FDIR enabled 36
b. No more than two arrays unshunted and oriented < 105º from 37
velocity vector 38
If one or both PCUs failed 39
2. No more than two arrays unshunted and oriented < 105º from 40
velocity vector 41
Is: 42
PCU (PHALCON: Prior to Egress) 43
NOTE 44
PCUs may require up to a 1-hr warmup period before they are operational 45
46
26
27-0603A (MSG 027A) – STS-134/ULF6 FD4 EVA Deltas Page 2 of 3
Page 2 of 3, 27-0603A (MSG 027A)
MCC-H 1. √PCUs (two) operational in discharge mode and one of the 1
following: 2
a. CCS PCU EVA hazard control FDIR enabled 3
b. Only allowed arrays unshunted and oriented < 105º from 4
velocity vector 5
If one or both PCUs failed 6
2. Only allowed arrays unshunted and oriented < 105º from 7
velocity vector 8
9
6) Drew, Spanky, Taz - The connector to J1 of the P4 EWIS connectors actually 10
contains power connections, thus an inhibit is required before the connector 11
demate when retrieving the P3/P4 NH3 jumper. Please make the following 12
additions to EVA 1 (EVA, TIMELINES): 13
a. Page FS 7-12, add the following to the EVA 1 Inhibit Pad: 14
P4 EWIS connector (PHALCON: Prior to Egress) 15
MCC-H 1. RPCM P42A_A RPC8 – Open, Close 16
Command Inhibited 17
b. Page FS 7-28, IV column step 1, make the following changes: 18
WAS: 1. Verify inhibits in place 19
√Port SARJ locked at 50° 20
(No inhibit required for P4 EWIS) 21
IS: 1. Verify inhibits in place 22
√Port SARJ locked at 50° 23
√P4 EWIS Inhibited 24
c. Page FS 7-47, update “EVA Connectors” block 25
WAS: 26
EVA Connectors: 27
Harness Function EWIS Connectors J1 and J2
Data
28
29
IS: 30
EVA Connectors: 31
Harness Function EWIS Connectors J1 and Data J2 to P2/TAA1 J2 EWIS Connector J1 to P4/TAA1 J1
Power
7) Spanky, Taz - On page FS 7-26, Taz BRTs later than what’s in the procedures, 32
so please add pen & ink to move step 4 after step 7. Also Taz can complete step 33
12 immediately after step 7 or as written. 34
8) Spanky - On page FS 7-35, add note to EV3 step 45 “Only if P3/P4 Connectors 35
complete” 36
27
27-0603A (MSG 027A) – STS-134/ULF6 FD4 EVA Deltas Page 3 of 3
Page 3 of 3, 27-0603A (MSG 027A)
9) Spanky - On page FS 7-36, make the following change to EV3 step 61 1
WAS: If not completed, wire tie P4 cable…… 2
IS: If not completed, mate EWC P3/P4 Connectors as written in steps 3
33-38 and wire tie P4 cable…. 4
10) Drew, Spanky - the photo reminder on page FS 7-37 is for the vent tool extension 5
kink only if you see anything significant and if have time. 6
7
We have a heads up for FD5 and FD07: 8
Metox Canisters: 9
11) Mark - As we talked pre-flight, the Metox canisters used in the Airlock to support 10
10.2 psia ops will remain in the A/L CCAA during the EVA. Instead of nominally 11
removing the canisters during EMU Prebreathe, we'll remove them in Post EVA 12
for EVAs 1 and 2 only. 13
We will add a reminder in the flight plan call out. 14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
28
27-0606 (MSG 028) ULF6 Comm Guidelines Page 1 of 2
Page 1 of 2, 27-0454C (MSG 020C)
Split Sleep Shift Communication Adjustments 1
2
The following Communications Loop Management plan was developed to protect 3
crew members’ sleep periods as a result of the split sleep schedule of the Station 4
and Shuttle crews. 5
6
1. To protect the Node 2 sleep zone, the ground will remove all Node 2 ATUs 7
from public calls from the start of Shuttle crew sleep through Station crew 8
sleep. 9
10
2. To protect the SM sleep zone, the ground will inhibit voice uplink as follows: 11
a. On FD 3 prior to docking, S/G 1 uplink will be inhibited during the 12
Station crew sleep period. They will be awake by the time the big loop 13
is established. 14
b. On FD 4 through wake-up on FD 10, S/G 2 uplink will be inhibited 15
during the Station crew sleep period. 16
i. The nominal comm panel configuration will protect S/G 1 voice 17
from waking the crew in the SM. 18
c. To prevent waking up the crew in the SM, do not use S/G 2 onboard 19
during Station crew sleep unless it has been configured for a 20
scheduled PMC/PFC. 21
22
3. To allow use of S/G 1 in the USOS when the Shuttle crew is sleeping, the 23
ground will un-tie the ‘Big Loop’. From the start of Shuttle crew sleep until the 24
start of Station crew sleep, the ground will temporarily remove UHF from 25
public call 1. 26
d. During this timeframe the ground is prime to re-establish the ‘Big Loop’ 27
if needed. If LOS, ISS crew adds UHF to public call 1. 28
i. Reference {US SODF; C&T: 2. Nominal: 2.2 Audio; 2.213 29
Audio Subsystem Configuration for UHF Ops}; steps 3, 7 only 30
4. We will not plan to have morning DPCs on EVA days 31
5. At the start of the mission, the morning DPC on non-EVA days will be based 32
on Dima, Paolo and Cady’s wake time. At this time, we may also call up any 33
changes to the plan that have been coordinated since the uplink of OSTPV 34
and the Daily Summary. All ISS crew members will be scheduled for these 35
when possible. 36
6. Ron will not have a separate morning DPC coincident with Shuttle wake 37
times; coordination of changes will be voiced up real time as necessary. 38
7. To protect the A/L sleep zone during campout periods, the ground will remove 39
all A/L ATUs from public calls from the start of Shuttle crew sleep through 40
Shuttle Crew wake. 41
42
43
44
29
27-0606 (MSG 028) ULF6 Comm Guidelines Page 2 of 2
Page 2 of 2, 27-0454C (MSG 020C)
General Comm Guidelines updated to reflect the above: 1
2
Due to the dynamic volume and nature of calls anticipated on this mission, we would 3
like to start with these general guidelines and then manage calls real-time by moving 4
to alternate loops as circumstances warrant. 5
Big picture: 1. The Big Loop, when available, should be used for calls requiring broad team
awareness. It is also used for EVA and Robotics handoffs. For calls that need to also be broadcast to the Russian segment, consider multicast on both loops (Big loop + S/G2) since the big loop is not configured in the Service Module.
2. Shuttle only and Station only calls will be made on the respective A/G 2 or S/G 2 loops when possible. Note that when those loops are privatized, there will be some calls on the big loop that would otherwise not be. The teams will determine whether the call can wait.
3. For some Shuttle Payloads, calls will be answered by Shuttle CAPCOM until the payload is installed on ISS. At that time, Payload support transfers to Huntsville. Paycom will be enabled to respond on either S/G 2 or A/G 2. Affected payloads are:
• AMS • Glacier (transfer FD 9) • Double Cold Bags (Paycom will take all calls)
MYCO samples will be collected on both vehicles (Shuttle crew supported by ACO on A/G 2, ISS crew supported by JAXA on S/G2).
4. When making calls to two parties, “and” and “from” can help reduce awkwardness. Example: “Airlock and Houston, from Endeavor…” also, the smoothest replies preserve the same order: “Airlock Copies,” “Houston copies.” More important than the order is that both parties respond in some way.
5. Transfer tagups (with Mark and/or Roberto) and Stowage tagups (with Box and/or Roberto) will be scheduled at the end of the day on A/G 2 and be supported from the WFCR.
6. To help CAPCOMs with who should reply, please specify A/G or S/G rather than “On 2.” Adding the topic is helpful, such as “for Double Cold Bags.”
7. Pre-coordination of Shuttle PAO events will occur on A/G 2. Pre-coordination of Station PAO events will occur on different loops depending on the time of day.
6
30
MSG 029 - DAP LOAD UPDATE
END OF PAGE 1 OF 1, MSG 029
To update the flight specific DAPs with the AMS on SSRMS in the intermediate position 1 through undock mass properties, perform the following: 2 3
GNC 20 DAP CONFIG 4
5 Permanent Edit DAP A11 with CNTL ACC 9 6 ITEM 3+11 EXEC 7 ITEM 68+9 EXEC 8 ITEM 5 EXEC 9 10 Permanent Edit DAP A12 with CNTL ACC 9 11 ITEM 3+12 EXEC 12 ITEM 68+9 EXEC 13 ITEM 5 EXEC 14 15 Permanent Edit DAP B12 with CNTL ACC 9 16 ITEM 4+12 EXEC 17 ITEM 68+9 EXEC 18 ITEM 5 EXEC 19 20 Permanent Edit DAP B13 with CNTL ACC 9 21 ITEM 4+13 EXEC 22 ITEM 68+9 EXEC 23 ITEM 5 EXEC 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
31
INIT
TER
M
CW
C F
ill N
o.R
ecor
d S
/N U
sed
Dis
infe
ct
QD
s
Min
eral
S
yrin
ge K
it R
ef: K
it Ta
ble
Rep
ort C
WC
S
/N to
MC
CA
g B
ioci
de K
it R
ef: K
it Ta
ble
TER
M a
t M
ET:
Cap
Wat
er
Tran
sfer
H
ose
Ver
ify
Labe
l In
Win
dow
Gre
en
Gre
en
1
004
1
021
1
043
1
051
1
069
1
077
1
085
1
089
(Not
e E
)
JPM
1A5
G
reen
Tran
sfer
To:
Sam
ple/
Pur
ge K
itR
ef: K
it Ta
ble
G
reen
Gre
en
G
reen
NO
D2O
23.
0 C
TB S
/N 1
016
(Not
e C
)
4
100
8
103
0
105
0
106
4
107
3
108
1
52
S/N
101
0
S/N
101
0
S/N
101
0
1 3
CW
C F
ILL
S←
Fill
Dur
atio
n ~5
2 m
inut
es
→
CW
CIn
itial
Loc
atio
n
S/N
101
0
S/N
100
3
G
reen
S/N
100
3
11
S/N
100
3
S/N
100
3
S/N
100
3
8
1
086
(Not
e E
)
6
7
G
reen
9
10
G
reen
G
reen
S/N
100
3
G
reen
S/N
100
3
S
/N 1
003
12
(Nt
D)
TBD
Gre
en
CW
C F
ill
No
tes:
PW
R F
ILL
SA
.R
ough
han
dlin
g m
ay c
ause
leak
age.
B.
Fill
each
CW
C fo
r 52
min
or T
erm
CW
C F
ill on
MC
C c
all.
PW
R N
o.P
WR
S/N
C.
Som
e C
WC
s m
ay s
till c
onta
in re
sidu
al w
ater
. P
rior t
o fil
ling,
repo
rt if
CW
C h
as a
sig
nific
ant a
mou
nt o
f res
idua
ls.
1
1018
D.
2
1025
E.
Bel
ieve
d to
be
in C
TB S
/N 1
016.
If n
ot, s
houl
d be
nea
rby
in N
OD
2O2.
310
26F
.H
2O O
ps J
ettis
on S
tow
age
Bag
(JS
B) o
rigin
ally
in B
ag H
then
tem
p st
owed
4
1007
near
Gal
ley
on F
D2.
P
WR
Fil
l N
ote
s:
A.
Do
not d
etac
h P
WR
(EM
U H
2O R
echa
rge
Bag
) QD
rest
rain
t dur
ing
PW
R o
ps.
B.
Prio
r to
fillin
g, in
spec
t PW
R in
let a
nd o
utle
t hos
e lin
es.
Rep
ort a
ny o
bser
vabl
eK
it T
ab
le
scr
atch
es/d
amag
e to
MC
C.
S/N
C.
H2O
Ops
Jet
tisio
n S
tow
age
Bag
(JS
B) o
rigin
ally
in B
ag H
then
tem
p st
owed
n
ear G
alle
y on
FD
2.
D.
H2O
Rec
harg
e M
esh
Bag
orig
inal
ly lo
cate
d in
PM
M in
fron
t of t
he A
ft 2
rack
,
but
may
be
in N
ode
1 du
ring
EVA
supp
ort.
Alte
rnat
e lo
catio
ns in
clud
e:
A/L
1D1_
A1
and
A/L
1D2_
Beh
ind
Clo
seou
t
Sam
ple/
Pur
ge K
it(n
o pl
anne
d H
2O O
p us
e)10
03H
2O O
ps J
SB
(n
ear G
alle
y, N
ote
F)
H2O
Ops
JS
B
(nea
r Gal
ley,
Not
e F)
A/L
1D1_
A1
H2O
Rec
harg
e M
esh
Bag
(Not
e D
)
A/L
1D2_
Beh
ind
Clo
seou
tA
/L1D
1_A
2
Shu
ttle
Mid
deck
(B
ag H
)
1001
NO
D2O
23.
0 C
TB S
/N 1
016
H2O
Ops
JS
B
(nea
r Gal
ley)
Min
eral
Syr
inge
Kit
(no
plan
ned
use)
Ag
Bio
cide
Kit
Kit
Initi
al L
ocat
ion
Und
ock
Loca
tion
1003
NO
D2O
23.
0 C
TB S
/N 1
016
H2O
Ops
JS
B
(nea
r Gal
ley)
H2O
Ops
JS
B (n
ear G
alle
y, N
ote
C)
Initi
al S
tow
age
Loca
tion
A/L
1D1_
A2
Fina
l Sto
wag
e Lo
catio
n
A/L
1D1 _
A1
or A
2
Shu
ttle
Mid
deck
(B
ag H
)A
g B
ioci
de K
it10
10
S
/N 1
003
(Not
e D
)13
(Not
e D
)
S/N
100
3
Gre
en
G
reen
H2O
Rec
harg
e M
esh
Bag
(Not
e D
)
14(N
ote
D)
Thes
e C
WC
Fills
will
occu
r onl
y if
suffi
cien
t wat
er is
ava
ilabl
e.
STS‐134/U
LF6
MS
G 0
30 -
H2O
OP
S C
UE
CA
RD
EN
D O
F P
AG
E 1
OF
1, M
SG
030
32
MSG 033 - MHA CHECKOUT
END OF PAGE 1 OF 1, MSG 033
MHA Checkout 1 2 To troubleshoot the MHA we would like you to test the remaining capability of all 3 ports, 3 specifically the listen capability of the J1 and J2 ports. These ports will provide the voice 4 that will be recorded on the WVS V10s on EVA days. In the long term, understanding the 5 remaining capabilities of the MHA will affect the forward plan for entry comm. 6 7 Please perform the following steps to test the FD MHA capabilities: 8 9
1. MHA is plugged into the MS CCU 10 11
2. MS COMM CCU PRW - OFF 12 13
3. MS ATU ICOM A - T/R 14 15
4. MS SPKR PWR - OFF 16 17
5. Plug HIU/VLHS into J1 port of MHA 18 19 6. MS COMM CCU PRW - ON 20
21 7. Have a crew member listen for ICOM A on J1 port with HIU/VLHS while the other 22
crew member transmits on ICOM A from an alternate ATU 23 24
8. Have crew member listen for ICOM A from an alternate ATU while the MS ATU 25 crew member attempts a call on ICOM A from the VLHS/HIU 26 27
9. MS COMM CCU PWR- OFF 28 29
10. Repeat steps 4-9 for the J2 port and J3 port 30 31
11. MS SPKR PWR - SPKR 32 33
12. MS COMM CCU PWR - ON 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
33
27-0240A (MSG 034A) – Manually Mapping External USB Drive LettersPage 1 of 1
Page 1 of 1, 27-0240A (MSG 034A)
Objective:1To manually map a drive letter to a T61p 120GB USB Hard Drive if Windows does not 2automatically map a drive letter.3
4Procedure:5
1. �120GB USB Hard Drive connected and powered67
2. Right-Click ‘My Computer’89
3. sel ‘Manage’1011
Computer Management1213
4. sel ‘Disk Management’ (left pane)1415
5. Right-click ‘External HDD’ (or similar, right pane)1617
6. sel ‘Change Drive Letter and Paths…’1819
Change Drive Letter and Paths for XXXXXXXXX2021
7. sel ‘Add’2223
Change Drive Letter and Paths2425
8. ‘Assign the following drive letter:’2627
9. sel Drive Letter (crew preference)2829
10. sel ‘OK’3031
11. Close Computer Management3233
12. Check drive accessible in Windows Explorer.34353637383940414243444546474849
34
MSG 035 (27-0615) - FD03 MMT SUMMARY Page 1 of 2
Page 1 of 2, MSG 035 (27-0615)
Congratulations on a excellent Rendezvous and Docking. The ISS team is very happy that 1 you have arrived. 2 3 The MMT met today to review the orbiter systems and mission progress. 4 5 Endeavour continues to perform exceptionally well and the teams are not working any 6 systems issues. 7 8 The LESS/RCC team has completed review of the FD2 inspection data and the RCC has 9 been cleared for Entry. As for the Tile inspection, the ET doors have been verified closed 10 and there are no protruding GAP fillers. The DAT team has identified seven tile areas of 11 interest as shown in the diagram below. The three yellow boxes (001 tiles) are the sites that 12 the team continues to assess depth dimensions via photogrammetric analysis. The MMT will 13 review the DAT assessment tomorrow in support of whether any additional dimensional 14 information on these three sites are required for the standard thermal analysis which is 15 performed for all damage locations. The Flight Control Team is being proactive regarding 16 timeline and is developing procedures for focused inspection if that becomes a required 17 activity on FD6. 18 19 You guy are doing great! 20 21
22 23 24 25 26 27 28 29
30
35
MSG 035 (27-0615) - FD03 MMT SUMMARY Page 2 of 2
Page 2 of 2, MSG 035 (27-0615)
Below are photos of the three yellow box areas: 1 2 3
4 Size of damage: L 3.28” x W 2.34” + .15” 5
6
7 Size of damage: L 5.9” x W 1.23” + .15” Size of damage: L 6.52” x W 2.232” + .15” 8
9 10 11 12 13