APARTMENT VIDA VIEW Jl. Boulevard - Panakukkang, Makassar SCHEDULE STRUKTUR No Judul Gambar Referensi Gambar jumlah Item Prosentase 1. November 2013 2. Desember 2013 3. Januari 2014 4. Februari 1 2 3 4 5 6 7 8 9 10 11 12 13 14 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Struktur Zona 1 Tower dan Podium A 1 Denah Pile Cap dan Tie Beam (Zona.A) ST-04-01A 1 0.67% 2 Tabel Penulangan Tie Beam (Zona.A) ST-04-01A 1 0.67% 3 Detail dan Potongan Pilecap PC.1, PC.1A & PC.2 ST-04-02A 1 0.67% 4 Detail dan Potongan Pilecap PC.1, PC.3 & PC.8 ST-04-02A 1 0.67% 5 Detail dan Potongan Pilecap PC.10 ST-04-02A 1 0.67% 6 Detail dan Potongan Pilecap PC.2A, PC.6 & PC.7 ST-04-03A 1 0.67% 7 Detail dan Potongan Pilecap PC.12A & PC.22 ST-04-03A 1 0.67% 8 Detail dan Potongan Pilecap PC.26 ST-04-03A 1 0.67% 9 Detail dan Potongan Pilecap PC.4A, PC.5, PC.3A & ST-04-03B 1 0.67% 10 Detail dan Potongan Pilecap PC.7A & PC.10A ST-04-03B 1 0.67% 11 Detail dan Potongan Pilecap PC.8A & PC.8B ST-04-03B 1 0.67% 12 ST-04-03C 1 0.67% 13 Detail dan Potongan Pilecap PC.27 ST-04-03C 1 0.67% 14 Detail dan Potongan Pilecap PC.30 ST-04-03C 1 0.67% 15 Detail dan Potongan Pilecap PC.152 ST-04-03D 1 0.67% 16 Detail dan Potongan Pilecap PC.22A ST-04-03A 1 0.67% 17 Detail Sambungan Tie Beam ke Pilecap ST-04-03A 1 0.67% 18 Denah Kolom Lt.Ground s/d Lt.2 Tower dan Podium ST-04-04-A 1 0.67% 19 Denah Kolom Lt.3 s/d Lt.6 Tower dan Podium A ST-04-04-A 1 0.67% 20 Denah Kolom Lt.7 s/d Lt.12 Tower dan Podium A ST-04-04-A 1 0.67% 21 Denah Kolom Lt.15 s/d Lt.20 Tower dan Podium A ST-04-04-A 1 0.67% 22 Denah Kolom Lt.21 s/d Lt.23 Tower dan Podium A ST-04-04-A 1 0.67% 23 Denah Kolom Lt.25 s/d Lt.27 Tower dan Podium A ST-04-04 1 0.67% 24 Denah Kolom Lt.28 s/d Lt.33 Tower dan Podium A ST-04-04 1 0.67% 25 Denah Kolom Lt.35 s/d Lt.Atap Tower dan Podium A ST-04-04 1 0.67% 24 Tabel Penulangan Kolom Lt Ground s/d Lt 6 (Zona ST-04-04 1 0.67% 25 Tabel Penulangan Kolom Lt 7 s/d Lt 20 (Zona.A) ST-04-04 1 0.67% 26 Tabel Penulangan Kolom Lt 21 s/d Lt 28 (Zona.A) ST-04-04 1 0.67% 27 Tabel Penulangan Kolom Lt 28 s/d Lt Atap(Zona.A) ST-04-04 1 0.67% 28 Detail Kolom K1 ST-04-24 1 0.67% 29 Detail Kolom KL ST-04-25 1 0.67% 30 Detail Kolom K2 ST-04-26 1 0.67% 31 Detail Kolom K3 ST-04-27 1 0.67% 32 Detail Kolom K4, K5, K6 ST-04-28 1 0.67% 33 Detail Shearwall ST-04-22 1 0.67% 34 Denah Lantai Ground Floor Zona A ST-04-06 1 0.67% 35 Lantai ground Floor Potongan -1, 2 & Detail (Zona A) ST-04-06 1 0.67% 36 Lantai ground Floor Potongan -A & B (Zona A) ST-04-06 1 0.67% 37 Lantai ground Floor Potongan -C & D (Zona A) ST-04-06 1 0.67% 38 Lantai ground Floor Potongan -E & F (Zona A) ST-04-06 1 0.67% 39 Denah Balok Lantai P1 GFL. +3.550 (Zona A) ST-04-05 1 0.67% 40 Denah Balok Lantai. 1 GFL. 4.950 (zona A) ST-04-05 1 0.67% 41 Section-1 & 2 Balok (Zona A) ST-04-05 1 0.67% 42 Section-3 & 4 Balok (Zona A) ST-04-05 1 0.67% 43 Section-5 Balok (Zona A) ST-04-05 1 0.67% 44 Tabel Penulangan Balok Podium Lt.1 s/d Lt.3 (Zona. A) ST-04-21 1 0.67% 45 Tabel Penulangan Balok Podium Lt.5 s/d Lt.7 (Zona. A) ST-04-21 1 0.67% 46 Tabel Penulangan Balok Tower Lt.1 s/d Lt.3 (Zona. A) ST-04-21A 1 0.67% 47 Tabel Penulangan Balok Tower Lt.5 s/d Lt.7 (Zona. A) ST-04-21A 1 0.67% 48 Tabel Penulangan Balok Tower Lt.8 s/d Lt.12 (Zona. A) ST-04-21B 1 0.67% 49 Tabel Penulangan Balok Tower Lt.1 5s/d Lt.19 (Zona. A) ST-04-21B 1 0.67% 50 Tabel Penulangan Balok Tower Lt.20s/d Lt.25 (Zona. A) ST-04-21C 1 0.67% 51 Tabel Penulangan Balok Tower Lt.26 s/d Lt.30 (Zona. A) ST-04-21C 1 0.67% 52 Tabel Penulangan Balok Tower Lt.31 s/d Lt.35 (Zona. A) ST-04-21D 1 0.67% 53 Tabel Penulangan Balok Tower Lt.36 s/d Lt.Atap (Zona. ST-04-21D 1 0.67% 54 Tabel Penulangan Balok Parkiran ST-04-20D 1 0.67% 55 Potongan Memanjang Balok Lt. P1 (1of5) ST-04-05 1 0.67% 56 Potongan Memanjang Balok Lt. P1 (2of5) ST-04-05 1 0.67% 57 Potongan Memanjang Balok Lt. P1 (3of5) ST-04-05 1 0.67% 58 Potongan Memanjang Balok Lt. P1 (4of5) ST-04-05 1 0.67% 59 Potongan Memanjang Balok Lt. P1 (5of5) ST-04-05 1 0.67% 60 Denah Plat Lt. P1 (UG) GFL. +3.550 ST-04-06A 1 0.67% 61 Detail 1 Plat Lt.P1 (UG) GFL. +3.550 ST-04-06A 1 0.67% 62 Detail Plat Lt.P1 (UG) GFL. +3.550 ST-04-06A 1 0.67% 63 Potongan Memanjang Balok Lt. 1 (1of5) ST-04-05a 1 0.67% 64 Potongan Memanjang Balok Lt. 1 (2of5) ST-04-05a 1 0.67% 65 Potongan Memanjang Balok Lt. 1 (3of5) ST-04-05a 1 0.67% 66 Potongan Memanjang Balok Lt. 1 (4of5) ST-04-05a 1 0.67% 67 Potongan Memanjang Balok Lt. 1 (5of5) ST-04-05a 1 0.67% 68 Denah Plat Lt. P1 ST-04-30 1 0.67% 69 Detail Pembesian Plat Tower (Zona A) ST-04-30 1 0.67% 70 Detail Pembesian Plat Tower (Zona A) ST-04-30 1 0.67% 71 Detail Pembesian Plat Podium (Zona A) ST-04-31 1 0.67% 72 Denah Balok Lt. P2 ST-04-07 1 0.67% 73 Denah Plat Lt. P2 ST-04-07 1 0.67% 70 Detail Pembesian Plat Tower (Zona A) ST-04-30 1 0.67% 71 Denah Lt. 2 ST-04-08 1 0.67% 72 Denah Lt. 3 ST-04-09 1 0.67% 73 Denah Lt. 5 ST-04-10 1 0.67% 74 Denah Lt. 6 ST-04-11 1 0.67% 75 Denah Lt. 7 ST-04-12 1 0.67% 76 Denah Lt. 8-15 ST-04-13 1 0.67% 77 Denah Lt. 16-21 ST-04-14 1 0.67% 78 Denah Lt. 22-28 ST-04-15 1 0.67% 79 Denah Lt. 29 - Atap ST-04-16 1 0.67% 80 Pitlift ST-04-16A 1 0.67% 81 Denah Tangga #1 ST-04-40 1 0.67% 82 Potongan Tangga #1 ST-04-40 A 1 0.67% Detail dan Potongan Pilecap PC.12 & Detail Samb.Tie Beam ke Pilecap

Upload: danang-rahadian

Post on 28-Dec-2015

25 views

Category:

Documents


3 download

DESCRIPTION

shopdrawing

TRANSCRIPT

Page 1: Struktur Shopdrawing Schedule

APARTMENT VIDA VIEWJl. Boulevard - Panakukkang, MakassarSCHEDULE STRUKTUR

No Judul Gambar Referensi Gambar jumlah Item Prosentase1. November 2013 2. Desember 2013 3. Januari 2014 4. Februari 2014

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

Struktur Zona 1 Tower dan Podium A1 Denah Pile Cap dan Tie Beam (Zona.A) ST-04-01A 1 0.67%

2 Tabel Penulangan Tie Beam (Zona.A) ST-04-01A 1 0.67%

3 Detail dan Potongan Pilecap PC.1, PC.1A & PC.2 ST-04-02A 1 0.67%

4 Detail dan Potongan Pilecap PC.1, PC.3 & PC.8 ST-04-02A 1 0.67%

5 Detail dan Potongan Pilecap PC.10 ST-04-02A 1 0.67%

6 Detail dan Potongan Pilecap PC.2A, PC.6 & PC.7 ST-04-03A 1 0.67%

7 Detail dan Potongan Pilecap PC.12A & PC.22 ST-04-03A 1 0.67%

8 Detail dan Potongan Pilecap PC.26 ST-04-03A 1 0.67%

9 Detail dan Potongan Pilecap PC.4A, PC.5, PC.3A & PC ST-04-03B 1 0.67%

10 Detail dan Potongan Pilecap PC.7A & PC.10A ST-04-03B 1 0.67%

11 Detail dan Potongan Pilecap PC.8A & PC.8B ST-04-03B 1 0.67%

12 ST-04-03C 1 0.67%

13 Detail dan Potongan Pilecap PC.27 ST-04-03C 1 0.67%

14 Detail dan Potongan Pilecap PC.30 ST-04-03C 1 0.67%

15 Detail dan Potongan Pilecap PC.152 ST-04-03D 1 0.67%

16 Detail dan Potongan Pilecap PC.22A ST-04-03A 1 0.67%

17 Detail Sambungan Tie Beam ke Pilecap ST-04-03A 1 0.67%18 Denah Kolom Lt.Ground s/d Lt.2 Tower dan Podium A ST-04-04-A 1 0.67%19 Denah Kolom Lt.3 s/d Lt.6 Tower dan Podium A ST-04-04-A 1 0.67%20 Denah Kolom Lt.7 s/d Lt.12 Tower dan Podium A ST-04-04-A 1 0.67%21 Denah Kolom Lt.15 s/d Lt.20 Tower dan Podium A ST-04-04-A 1 0.67%22 Denah Kolom Lt.21 s/d Lt.23 Tower dan Podium A ST-04-04-A 1 0.67%23 Denah Kolom Lt.25 s/d Lt.27 Tower dan Podium A ST-04-04 1 0.67%24 Denah Kolom Lt.28 s/d Lt.33 Tower dan Podium A ST-04-04 1 0.67%25 Denah Kolom Lt.35 s/d Lt.Atap Tower dan Podium A ST-04-04 1 0.67%24 Tabel Penulangan Kolom Lt Ground s/d Lt 6 (Zona.A) ST-04-04 1 0.67%25 Tabel Penulangan Kolom Lt 7 s/d Lt 20 (Zona.A) ST-04-04 1 0.67%26 Tabel Penulangan Kolom Lt 21 s/d Lt 28 (Zona.A) ST-04-04 1 0.67%27 Tabel Penulangan Kolom Lt 28 s/d Lt Atap(Zona.A) ST-04-04 1 0.67%28 Detail Kolom K1 ST-04-24 1 0.67%29 Detail Kolom KL ST-04-25 1 0.67%30 Detail Kolom K2 ST-04-26 1 0.67%31 Detail Kolom K3 ST-04-27 1 0.67%32 Detail Kolom K4, K5, K6 ST-04-28 1 0.67%33 Detail Shearwall ST-04-22 1 0.67%

34 Denah Lantai Ground Floor Zona A ST-04-06 1 0.67%

35 Lantai ground Floor Potongan -1, 2 & Detail (Zona A) ST-04-06 1 0.67%

36 Lantai ground Floor Potongan -A & B (Zona A) ST-04-06 1 0.67%

37 Lantai ground Floor Potongan -C & D (Zona A) ST-04-06 1 0.67%

38 Lantai ground Floor Potongan -E & F (Zona A) ST-04-06 1 0.67%

39 Denah Balok Lantai P1 GFL. +3.550 (Zona A) ST-04-05 1 0.67%

40 Denah Balok Lantai. 1 GFL. 4.950 (zona A) ST-04-05 1 0.67%

41 Section-1 & 2 Balok (Zona A) ST-04-05 1 0.67%

42 Section-3 & 4 Balok (Zona A) ST-04-05 1 0.67%

43 Section-5 Balok (Zona A) ST-04-05 1 0.67%

44 Tabel Penulangan Balok Podium Lt.1 s/d Lt.3 (Zona. A) ST-04-21 1 0.67%

45 Tabel Penulangan Balok Podium Lt.5 s/d Lt.7 (Zona. A) ST-04-21 1 0.67%

46 Tabel Penulangan Balok Tower Lt.1 s/d Lt.3 (Zona. A) ST-04-21A 1 0.67%

47 Tabel Penulangan Balok Tower Lt.5 s/d Lt.7 (Zona. A) ST-04-21A 1 0.67%

48 Tabel Penulangan Balok Tower Lt.8 s/d Lt.12 (Zona. A) ST-04-21B 1 0.67%

49 Tabel Penulangan Balok Tower Lt.1 5s/d Lt.19 (Zona. A) ST-04-21B 1 0.67%

50 Tabel Penulangan Balok Tower Lt.20s/d Lt.25 (Zona. A) ST-04-21C 1 0.67%

51 Tabel Penulangan Balok Tower Lt.26 s/d Lt.30 (Zona. A) ST-04-21C 1 0.67%

52 Tabel Penulangan Balok Tower Lt.31 s/d Lt.35 (Zona. A) ST-04-21D 1 0.67%

53 Tabel Penulangan Balok Tower Lt.36 s/d Lt.Atap (Zona. A) ST-04-21D 1 0.67%

54 Tabel Penulangan Balok Parkiran ST-04-20D 1 0.67%55 Potongan Memanjang Balok Lt. P1 (1of5) ST-04-05 1 0.67%56 Potongan Memanjang Balok Lt. P1 (2of5) ST-04-05 1 0.67%57 Potongan Memanjang Balok Lt. P1 (3of5) ST-04-05 1 0.67%58 Potongan Memanjang Balok Lt. P1 (4of5) ST-04-05 1 0.67%59 Potongan Memanjang Balok Lt. P1 (5of5) ST-04-05 1 0.67%60 Denah Plat Lt. P1 (UG) GFL. +3.550 ST-04-06A 1 0.67%61 Detail 1 Plat Lt.P1 (UG) GFL. +3.550 ST-04-06A 1 0.67%62 Detail Plat Lt.P1 (UG) GFL. +3.550 ST-04-06A 1 0.67%63 Potongan Memanjang Balok Lt. 1 (1of5) ST-04-05a 1 0.67%64 Potongan Memanjang Balok Lt. 1 (2of5) ST-04-05a 1 0.67%65 Potongan Memanjang Balok Lt. 1 (3of5) ST-04-05a 1 0.67%66 Potongan Memanjang Balok Lt. 1 (4of5) ST-04-05a 1 0.67%67 Potongan Memanjang Balok Lt. 1 (5of5) ST-04-05a 1 0.67%68 Denah Plat Lt. P1 ST-04-30 1 0.67%69 Detail Pembesian Plat Tower (Zona A) ST-04-30 1 0.67%70 Detail Pembesian Plat Tower (Zona A) ST-04-30 1 0.67%71 Detail Pembesian Plat Podium (Zona A) ST-04-31 1 0.67%72 Denah Balok Lt. P2 ST-04-07 1 0.67%73 Denah Plat Lt. P2 ST-04-07 1 0.67%70 Detail Pembesian Plat Tower (Zona A) ST-04-30 1 0.67%71 Denah Lt. 2 ST-04-08 1 0.67%72 Denah Lt. 3 ST-04-09 1 0.67%73 Denah Lt. 5 ST-04-10 1 0.67%74 Denah Lt. 6 ST-04-11 1 0.67%75 Denah Lt. 7 ST-04-12 1 0.67%76 Denah Lt. 8-15 ST-04-13 1 0.67%77 Denah Lt. 16-21 ST-04-14 1 0.67%78 Denah Lt. 22-28 ST-04-15 1 0.67%79 Denah Lt. 29 - Atap ST-04-16 1 0.67%80 Pitlift ST-04-16A 1 0.67%81 Denah Tangga #1 ST-04-40 1 0.67%82 Potongan Tangga #1 ST-04-40 A 1 0.67%

Detail dan Potongan Pilecap PC.12 & Detail Samb.Tie Beam ke Pilecap

Page 2: Struktur Shopdrawing Schedule

83 Detail Pembesian Tangga #1 ST-04-40 B 1 0.67%84 Denah Tangga #3 ST-04-42 1 0.67%85 Potongan Tangga #3 ST-04-42A 1 0.67%86 Detail Pembesian Tangga#3 ST-04-42B 1 0.67%87 Denah Tangga #5 & 6 ST-04-44 1 0.67%88 Potongan Tangga #5 & 6 ST-04-44 1 0.67%89 Detail Pembesian Tangga#5 & 6 ST-04-44 1 0.67%90 Denah Tangga #Ruko Type 1 ST-04-45 1 0.67%91 Potongan Tangga #Ruko Type 1 ST-04-45A 1 0.67%92 Detail Pembesian Tangga# Type 1 ST-04-45B 1 0.67%93 Denah Tangga #Ruko Type 2 ST-04-45 1 0.67%94 Potongan Tangga #Ruko Type 2 ST-04-45A 1 0.67%95 Detail Pembesian Tangga# Type 2 ST-04-45B 1 0.67%96 Denah Tangga #Ruko Type 3 ST-04-45 1 0.67%97 Potongan Tangga #Ruko Type 3 ST-04-45A 1 0.67%98 Detail Pembesian Tangga# Type 3 ST-04-45B 1 0.67%99 Denah Tangga #Ruko Type 4 ST-04-45 1 0.67%

100 Potongan Tangga #Ruko Type 4 ST-04-45A 1 0.67%101 Detail Pembesian Tangga# Type 4 ST-04-45B 1 0.67%102 Denah Tangga #Ruko Type 5 ST-04-45 1 0.67%103 Potongan Tangga #Ruko Type 5 ST-04-45A 1 0.67%104 Detail Pembesian Tangga# Type 5 ST-04-45B 1 0.67%105 Denah Tangga #Ruko Type 6 ST-04-45 1 0.67%106 Potongan Tangga #Ruko Type 6 ST-04-45A 1 0.67%107 Detail Pembesian Tangga# Type 6 ST-04-45B 1 0.67%108 Denah dan Detail Kolam Renang Dewasa (Tower) ST-04-37 1 0.67%109 Denah dan Detail Kolam Renang Anak ST-04-38 1 0.67%110 Denah dan Detail Canopy Barat ST-04-45 1 0.67%111 Denah Canopy Atap Tower A ST-04-47 1 0.67%112 Denah dan Detail Gondola ST-04-50 1 0.67%113 Denah Atap Mahkota Elv.Dasar Atap & Elv.+3.6 &Elv/4,169 ST-04-51 1 0.67%114 Denah Mahkota Elev. +5.612, +6.524 & +7.254 ST-04-51A 1 0.67%115 Denah Mahkota Elev. +8.117, +9.112 & +10.397 ST-04-51B 1 0.67%116 Denah Mahkota Elev. +12.266, +15.251 & +16.424 ST-04-51C 1 0.67%117 Denah Mahkota Elev. +17.117, +17.782 & +17.830 ST-04-51D 1 0.67%118 Denah Mahkota Elev. +17.898, +18.103 & +18.276 ST-04-51E 1 0.67%119 Denah Mahkota Elev. +18.374 ST-04-51F 1 0.67%120 Denah dan Potongan Crown ST-04-52 1 0.67%121 Denah dan Potongan Crown ST-04-52A 1 0.67%122 Denah dan Potongan Crown ST-04-52B 1 0.67%123 Denah dan Potongan Crown ST-04-52C 1 0.67%124 Denah dan Potongan Crown ST-04-52D 1 0.67%125 Denah dan Potongan Crown ST-04-52E 1 0.67%126 Denah dan Potongan Crown ST-04-52F 1 0.67%127 Denah dan Potongan Crown ST-04-52G 1 0.67%128 Denah dan Potongan Crown ST-04-52H 1 0.67%129 Detail R.Sampah dan Car Wash ST-04-66 1 0.67%130 Detail Tiang Bendera ST-04-67 1 0.67%

Struktur Zona 1, Gedung Parkir1 Denah Pile Cap dan Tie Beam Gedung Parkir ST-04-18 1 0.67%2 Denah Lt. GF - Lt. 3 Gedung Parkir ST-04-19 1 0.67%3 Denah Atap Gedung Parkir ST-04-20 1 0.67%4 Denah, Pot dan Detail Ramp Gedung Parkir ST-04-21 1 0.67%5 Denah dan Detail Ramp Utama ST-04-37 1 0.67%

Struktur Zona 1, Ruang M.E.P1 Denah dan Detail GWT ST-05-01 1 0.67%2 Denah dan Detail GWT ST-05-02 1 0.67%3 Denah dan Detail Core Lift ST-05-03 1 0.67%4 Denah dan Detail Core Lift Parkir ST-05-04 1 0.67%

Struktur Zona 1, Infrastruktur1 Site Plan Drainase ST-06-01 1 0.67%2 Elevasi Saluran ST-06-02 1 0.67%3 Detail dan Potongan saluran 1 ST-06-03 1 0.67%4 Detail dan Potongan saluran 2 ST-06-04 1 0.67%5 Tabel Drainase ST-06-05 1 0.67%

JUMLAH 150 100.00%

PROGRES PER PEKAN 0.67% 1.00% 1.00% 1.00% 1.00% 1.33% 1.67% 2.33% 2.67% 3.00% 3.67% 4.00% 4.80% 5.33% 5.67%

AKUMULATIF PROGRES PER PEKAN 0.67% 1.67% 2.67% 3.67% 4.67% 6.00% 7.67% 10.00% 12.67% 15.67% 19.33% 23.33% 28.13% 33.47% 39.13%

REALISASI PER BULANAKUMULATIF REALISASI PER BULAN

Page 3: Struktur Shopdrawing Schedule

4. Februari 2014 5 Maret 2014 6. April 2014 7. Mei 2014 8. Juni 2014Keterangan16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Page 4: Struktur Shopdrawing Schedule

5.67% 5.83% 6.00% 6.33% 6.17% 6.17% 5.50% 5.33% 5.33% 5.00% 3.00% 1.50% 1.33% 1.00% 0.83% 0.53% 0.50% 0.33% 0.17%

39.13% 44.97% 50.97% 57.30% 63.47% 69.63% 75.13% 80.47% 85.80% 90.80% 93.80% 95.30% 96.63% 97.63% 98.47% 99.00% 99.50% 99.83% 100.00%

Page 5: Struktur Shopdrawing Schedule

APARTMENT VIDA VIEWJl. Boulevard - Panakukkang, MakassarSCHEDULE STRUKTUR

No Judul Gambar Referensi Gambar1. Oktober 2013 2. November 2013 3. Desember 2013 4. Januari 2014 5. Februari 2014

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Struktur Zona 1 Tower dan Podium A1 Denah Pile Cap dan Tie Beam Tower dan Podium A ST-04-01-A

2 Detail dan Potongan Pile Cap 1 ST-04-02-A

3 Detail dan Potongan Pile Cap 2 ST-04-03-A

4 Denah Kolom Tower dan Podium A ST-04-04-A

5 Detail Kolom ST-04-29 s/d ST-04-33

6 Detail Shearwall ST-04-28

7 Detail Balok ST-04-23 s/d ST-04-27

8 Detail Pelat ST-04-34 s/d ST-04-37

9 Denah Lt. Dasar (GF) ST-04-05-A

11 Denah Lt. 1 (UG) el. +3.55 ST-04-06-A

12 Denah Lt. 1 (UG) el. +5.00 ST-04-06-A

13 Denah Lt. P1 ST-04-07-A

14 Denah Lt. 2 ST-04-08-A

15 Denah Lt. 3 ST-04-09-A

16 Denah Lt. 5 ST-04-10-A

17 Denah Lt. 6 ST-04-11-A

18 Denah Lt. 7 ST-04-12-A

19 Denah Lt. 8-15 ST-04-13-A

20 Denah Lt. 16-21 ST-04-14-A

21 Denah Lt. 22-28 ST-04-15-A

22 Denah Lt. 29 - Atap ST-04-16-A

23 Pitlift ST-04-17

24 Denah dan Detail Kolam Renang #1 ST-04-38 s/d ST-04-39

25 Denah dan Detail Kolam Renang #2 ST-04-43 s/d ST-04-44

26 Detail Tangga #1 ST-04-36 s/d ST-04-39

27 Detail Tangga #2 ST-04-38 s/d ST-04-39

28 Detail Tangga #3 ST-04-40 s/d ST-04-41

29 Detail Tangga #4 ST-04-42 s/d ST-04-43

30 Detail Tangga #5 ST-04-44

31 Detail Tangga Ruko #1 ST-04-45

32 Detail Kanopi Entrance Barat ST-04-45 s/d ST-04-46

33 Detail Kanopi Utara ST-04-46 s/d ST-04-47

34 Denah Kanopi Atap - Tower ST-04-47 s/d ST-04-49

35 Denah Gondola ST-04-49 & ST-04-51

36 Denah dan Potongan Crown ST-04-50 s/d ST-04-53

37 Detail Tempat Sampah dan Car Wash ST-04-54

38 Detail Tiang Bendera ST-04-55

Struktur Zona 1, Gedung Parkir39 Denah Pile Cap dan Tie Beam Gedung Parkir ST-04-18

40 Denah Lt. GF - Lt. 3 Gedung Parkir ST-04-19

41 Denah Atap Gedung Parkir ST-04-20

42 Denah, Pot dan Detail Ramp Gedung Parkir ST-04-21

43 Denah dan Detail Ramp Utama ST-04-37

Struktur Zona 1, GWT dan STP44 Denah GWT dan STP45 Detail Pelat Lantai, Dinding dan Atap

Arsitek Tower A dan Podium A46 Denah Lt. SB VV-1101

47 Denah Lt. Ground VV-1102

48 Denah Lt. 1 (UG) VV-1103

49 Denah Lt. P1 VV-1104

50 Denah Lt. 2 VV-1105

51 Denah Lt.3 VV-1106

52 Denah Lt. 5 VV-1107

53 Denah Lt. 6 VV-1108

54 Denah Lt. 7 VV-1109

55 Denah Typikal Tower A VV-1110

56 Denah Toproof Tower A VV-1111

57 Pola Lt. Ground VV-1401

58 Pola Lt. 1 VV-1402

Pola Lt. P1 VV-1403

59 Pola Lt. 2 VV-1404

60 Pola Lt. 3 VV-1405

61 Pola Lt. 5 VV-1406

62 Pola Lt. 6 VV-1407

63 Pola Lt. 7 VV-1408

64 Pola Lt. Typikal Tower A VV-1409

65 Plafon Lt. Ground VV-1501

66 Plafon Lt. 1 (UG) VV-1502

Plafon Lt. P1 VV-1503

67 Plafon Lt. 2 VV-1504

68 Plafon Lt. 3 VV-1505

69 Plafon Lt. 5 VV-1506

70 Plafon Lt. 6 VV-1507

71 Plafon Lt. 7 VV-1508