Page 1: Street and Local Roads Inspection and Acceptance of Alternative Pavements

Street and Local RoadsStreet and Local Roads

Inspection and Acceptance of Inspection and Acceptance of Alternative PavementsAlternative Pavements

Page 2: Street and Local Roads Inspection and Acceptance of Alternative Pavements

AlternativesAlternatives Pre-cast Concrete PavementPre-cast Concrete Pavement

Page 3: Street and Local Roads Inspection and Acceptance of Alternative Pavements

Precast Concrete PavementPrecast Concrete Pavement

Precast concrete pavement eliminates the need Precast concrete pavement eliminates the need for on-site cure time by using prefabricated for on-site cure time by using prefabricated concrete panels. The panels are made at a concrete panels. The panels are made at a specialized pre-casting facility ahead of time, then specialized pre-casting facility ahead of time, then hauled to the construction site and installed as hauled to the construction site and installed as needed. The result is a pavement that can be needed. The result is a pavement that can be opened to traffic almost immediately after panel opened to traffic almost immediately after panel installation, without compromising the durability installation, without compromising the durability and long-term performance of the pavementand long-term performance of the pavement

Precast concrete has long been a proven as Precast concrete has long been a proven as durable pavement, providing 30 years of service durable pavement, providing 30 years of service life or longer with minimal maintenance.life or longer with minimal maintenance.

Page 4: Street and Local Roads Inspection and Acceptance of Alternative Pavements

AlternativesAlternatives

Continuous Concrete PavementContinuous Concrete Pavement

Page 5: Street and Local Roads Inspection and Acceptance of Alternative Pavements

Continuous Concrete PavementContinuous Concrete Pavement

Benefits from using unreinforced concrete slabs are lower construction cost with the saving on mesh reinforcement and the potential for continuous pouring.

The contraction joints of unreinforced concrete slabs should be relatively maintenance free.

Page 6: Street and Local Roads Inspection and Acceptance of Alternative Pavements

AlternativesAlternatives

Roller Compacted Concrete PavementRoller Compacted Concrete Pavement

Page 7: Street and Local Roads Inspection and Acceptance of Alternative Pavements

Roller Compacted ConcreteRoller Compacted Concrete

Roller-compacted concrete, or RCC, takes its name from the construction method Roller-compacted concrete, or RCC, takes its name from the construction method used to build it. It's placed with conventional or high-density asphalt paving used to build it. It's placed with conventional or high-density asphalt paving equipment, then compacted with rollers.equipment, then compacted with rollers.

RCC has the same basic ingredient as conventional concrete: cement, water, and RCC has the same basic ingredient as conventional concrete: cement, water, and aggregates, such as gravel or crushed stone.aggregates, such as gravel or crushed stone.

But unlike conventional concrete, it's a drier mix—stiff enough to be compacted by But unlike conventional concrete, it's a drier mix—stiff enough to be compacted by vibratory rollers. Typically, RCC is constructed without joints. It needs neither vibratory rollers. Typically, RCC is constructed without joints. It needs neither forms nor finishing, nor does it contain dowels or steel reinforcing.forms nor finishing, nor does it contain dowels or steel reinforcing.

Withstands extremely heavy loads, no rutting.Withstands extremely heavy loads, no rutting. Will not deteriorate from spills of fuel or hydraulic leaks.Will not deteriorate from spills of fuel or hydraulic leaks. Will not soften when exposed to high temperatures. Will not soften when exposed to high temperatures. Open to traffic quickly. Open to traffic quickly. No special equipment needed.No special equipment needed. These characteristics make RCC simple, fast, and economical.These characteristics make RCC simple, fast, and economical.

Page 8: Street and Local Roads Inspection and Acceptance of Alternative Pavements

Continuously Reinforced Concrete Continuously Reinforced Concrete PavementPavement

Page 9: Street and Local Roads Inspection and Acceptance of Alternative Pavements

Continuously Reinforced Concrete Continuously Reinforced Concrete PavementPavement

Type of Portland cement concrete pavement Type of Portland cement concrete pavement reinforced with steel re-bars throughout its length reinforced with steel re-bars throughout its length

The use of continuous reinforcement generates The use of continuous reinforcement generates the random cracks in the pavement, while the random cracks in the pavement, while obviating the need for transverse contraction joints obviating the need for transverse contraction joints that appear prone to joint-related distresses and that appear prone to joint-related distresses and failures. The cracks can be held tightly by the failures. The cracks can be held tightly by the reinforcement and should be of no concern so reinforcement and should be of no concern so long as they are uniformly spaced, maintaining the long as they are uniformly spaced, maintaining the structural integrity of the pavement. structural integrity of the pavement.

The elimination of transverse contraction joints The elimination of transverse contraction joints can offer high riding quality can offer high riding quality

Page 10: Street and Local Roads Inspection and Acceptance of Alternative Pavements

InspectionsInspections

Pre-Construction MeetingPre-Construction Meeting

Permits Permits Maintenance of TrafficMaintenance of Traffic Lane closures/detoursLane closures/detours Progress schedule Progress schedule Required TransmittalsRequired Transmittals

Pavement designPavement design

Source of MaterialsSource of Materials Required inspections and Required inspections and

testingtesting

Page 11: Street and Local Roads Inspection and Acceptance of Alternative Pavements

Inspections and TestingInspections and Testing

SUBGRADESUBGRADE Proof roll subgradeProof roll subgrade Undercut any unsuitable or Undercut any unsuitable or

failing areas/stabilize failing areas/stabilize materials (if required)materials (if required)

Backfill of undercut area Backfill of undercut area with approved materialswith approved materials

Perform appropriate Perform appropriate moisture and density moisture and density testingtesting

Verify approved typical Verify approved typical section.section.

Page 12: Street and Local Roads Inspection and Acceptance of Alternative Pavements

Inspections and TestingInspections and Testing

SUB-BASESUB-BASE Proof roll Proof roll Remove/correct any Remove/correct any

undulating areas undulating areas Perform appropriate Perform appropriate

moisture and density moisture and density teststests

Verify approved typical Verify approved typical section section

Verify stone depthsVerify stone depths

Page 13: Street and Local Roads Inspection and Acceptance of Alternative Pavements

Inspections and TestingInspections and Testing

FORM WORKFORM WORK(if required)(if required)

Ensure forms are clean Ensure forms are clean and oiledand oiled

Ensure flanges are not Ensure flanges are not bentbent

Ensure forms are Ensure forms are sufficiently bracedsufficiently braced

Check vertical and Check vertical and horizontal alignment of all horizontal alignment of all formsforms

Perform depth checksPerform depth checks

Page 14: Street and Local Roads Inspection and Acceptance of Alternative Pavements

InspectionsInspections

CONCRETE PLACEMENTCONCRETE PLACEMENT

Prior to placement ensure Prior to placement ensure appropriate expansion jointsappropriate expansion joints

Testing for slump and airTesting for slump and airRate:Rate:

Make control/lab cylindersMake control/lab cylinders Ensure concrete is cured Ensure concrete is cured

properly and in accordance with properly and in accordance with approved method.approved method.

Verify temperatures, dispatch Verify temperatures, dispatch times, cold jointstimes, cold joints

Page 15: Street and Local Roads Inspection and Acceptance of Alternative Pavements

Inspections and TestingInspections and Testing

FINAL INSPECTIONSFINAL INSPECTIONS

Ensure all forms are removedEnsure all forms are removed Verify all laboratory cylinder Verify all laboratory cylinder

breaks are in compliancebreaks are in compliance Verify line and grade. Verify line and grade. Straight edge joints for Straight edge joints for

compliancecompliance Perform an overall visual Perform an overall visual

inspection of the pavement inspection of the pavement surface condition, condition of surface condition, condition of joint material etcjoint material etc