Strategies to Overcome Strategies to Overcome
Shortages of Crafts and Shortages of Crafts and
Maximize Field ProductivityMaximize Field Productivity
Bobby SinghBobby SinghPresidentPresident
Project AssuranceProject Assurance, , Houston, TexasHouston, Texas
Presentation FocusPresentation Focus
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
Industry’s Challenge to Overcome Craft Shortages Industry’s Challenge to Overcome Craft Shortages
Recent Turnaround ExperiencesRecent Turnaround Experiences
Some of Our Management WeaknessesSome of Our Management Weaknesses
Solutions to Overcome Craft ShortagesSolutions to Overcome Craft Shortages
Improving Craft ProductivityImproving Craft Productivity
TOP TEN LISTTOP TEN LIST
When a Company is NOT Managing When a Company is NOT Managing World-Class Projects and TurnaroundsWorld-Class Projects and Turnarounds
Contractor Alignment and Team Building Sessions Contractor Alignment and Team Building Sessions
are conducted after the turnaround completion.are conducted after the turnaround completion.
10
Achieving World-Class TurnaroundsAchieving World-Class Turnarounds
TOP TEN LISTTOP TEN LIST
When a Company is NOT Managing When a Company is NOT Managing World-Class Projects and TurnaroundsWorld-Class Projects and Turnarounds
Turnaround scheduling staff are frustrated due to the Turnaround scheduling staff are frustrated due to the
planning software’s limitation to schedule only planning software’s limitation to schedule only
1,000,0001,000,000 activities. activities.
9
Achieving World-Class TurnaroundsAchieving World-Class Turnarounds
TOP TEN LISTTOP TEN LIST
When a Company is NOT Managing When a Company is NOT Managing World-Class Projects and TurnaroundsWorld-Class Projects and Turnarounds
Reengineering is considered to be as-built drawings Reengineering is considered to be as-built drawings
after operations and process engineering groups after operations and process engineering groups
have made have made 10,000 MINOR10,000 MINOR scope improvements.scope improvements.
8
Achieving World-Class TurnaroundsAchieving World-Class Turnarounds
TOP TEN LISTTOP TEN LIST
When a Company is NOT Managing When a Company is NOT Managing World-Class Projects and TurnaroundsWorld-Class Projects and Turnarounds
Expedited and long-lead materials are found under Expedited and long-lead materials are found under
contractors’ trailers after the turnaround contractors’ trailers after the turnaround
completion.completion.
7
Achieving World-Class TurnaroundsAchieving World-Class Turnarounds
TOP TEN LISTTOP TEN LIST
When a Company is NOT Managing When a Company is NOT Managing World-Class Projects and TurnaroundsWorld-Class Projects and Turnarounds
Sole criteria for selecting qualified contractors is the Sole criteria for selecting qualified contractors is the
number of their memberships to golf clubs, burlesque number of their memberships to golf clubs, burlesque
bars and invitations to hunting and fishing trips.bars and invitations to hunting and fishing trips.
6
Achieving World-Class TurnaroundsAchieving World-Class Turnarounds
TOP TEN LISTTOP TEN LIST
When a Company is NOT Managing When a Company is NOT Managing World-Class Projects and TurnaroundsWorld-Class Projects and Turnarounds
Planning, Cost, Inspection and Safety staff are Planning, Cost, Inspection and Safety staff are
laid off to save turnaround costs and laid off to save turnaround costs and
improve company profits.improve company profits.
5
Achieving World-Class TurnaroundsAchieving World-Class Turnarounds
TOP TEN LISTTOP TEN LIST
When a Company is NOT Managing When a Company is NOT Managing World-Class Projects and TurnaroundsWorld-Class Projects and Turnarounds
WBS, PSM and HAZOP are perceived as the new Cable WBS, PSM and HAZOP are perceived as the new Cable
TV Channels on the information super-highway.TV Channels on the information super-highway.
4
Achieving World-Class TurnaroundsAchieving World-Class Turnarounds
TOP TEN LISTTOP TEN LIST
When a Company is NOT Managing When a Company is NOT Managing World-Class Projects and TurnaroundsWorld-Class Projects and Turnarounds
Company’s turnaround vision, executive mission Company’s turnaround vision, executive mission
statement and performance goals are written by statement and performance goals are written by
professional speech writers.professional speech writers.
3
Achieving World-Class TurnaroundsAchieving World-Class Turnarounds
TOP TEN LISTTOP TEN LIST
When a Company is NOT Managing When a Company is NOT Managing World-Class Projects and TurnaroundsWorld-Class Projects and Turnarounds
Progress status, schedule updates and cost Progress status, schedule updates and cost
forecasts are performed by local psychics, forecasts are performed by local psychics,
astrologers and tarot card readers.astrologers and tarot card readers.
2
Achieving World-Class TurnaroundsAchieving World-Class Turnarounds
TOP TEN LISTTOP TEN LIST
When a Company is NOT Managing When a Company is NOT Managing World-Class Projects and TurnaroundsWorld-Class Projects and Turnarounds
When a Manager says, “I have not read Bobby When a Manager says, “I have not read Bobby
Singh’s latest book Singh’s latest book
World-Class Turnaround Management.”World-Class Turnaround Management.”
1
Achieving World-Class TurnaroundsAchieving World-Class Turnarounds
Industry ChallengeIndustry Challenge
Cost and schedule performance of most Capital Projects and Cost and schedule performance of most Capital Projects and
Plant Turnarounds is being severely impacted by :Plant Turnarounds is being severely impacted by :
1.1. Shortages of qualified crafts Shortages of qualified crafts
2.2. Experienced supervisionExperienced supervision
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
Industry ChallengeIndustry Challenge
Poor performance on capital projects and Poor performance on capital projects and
turnarounds is further compounded by:turnarounds is further compounded by:
1.1. Poor field productivity Poor field productivity
2.2. Low actual tool timeLow actual tool time
3.3. New regulatory requirementsNew regulatory requirements
4.4. Integration with large capital projectsIntegration with large capital projects
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
On a typical construction the actual tool On a typical construction the actual tool
time on a 10-hour work shift time on a 10-hour work shift
Is less than 4 hoursIs less than 4 hours
Not an Encouraging Productivity StatisticsNot an Encouraging Productivity Statistics
Productivity – Tool TimeProductivity – Tool Time
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
How many of you folks have their Projects How many of you folks have their Projects
and Turnarounds results adversely and Turnarounds results adversely
impacted byimpacted by
Craft shortages and poor productivity?Craft shortages and poor productivity?
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
Some of Canada’s large tar sand projects have Some of Canada’s large tar sand projects have
experienced cost overruns of experienced cost overruns of
over over Billion DollarsBillion Dollars
due to craft shortages and poor field productivity.due to craft shortages and poor field productivity.
Past Performance ResultsPast Performance Results
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
Ethylene Turnaround in Houston AreaEthylene Turnaround in Houston Area
Planned crafts during turnaround:Planned crafts during turnaround: 2000 2000
Actual maximum number of craftsActual maximum number of crafts 12001200
* Turnaround scheduling started 24 months before the turnaround* Turnaround scheduling started 24 months before the turnaround
** 2 large mechanical contractors were selected for execution** 2 large mechanical contractors were selected for execution
Past Performance ResultsPast Performance Results
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
Large Turnaround in Lake CharlesLarge Turnaround in Lake Charles
Planned welders / pipe fitters craftsPlanned welders / pipe fitters crafts 124124
Actual welders provided by contractorActual welders provided by contractor 3131
* Other mechanical contractor was added to supplement primary contractors* Other mechanical contractor was added to supplement primary contractors
** Contractors started planning 18 months before the turnaround** Contractors started planning 18 months before the turnaround
Past Performance ResultsPast Performance Results
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
Ethylene Turnaround in Lake CharlesEthylene Turnaround in Lake Charles
Planned welders / pipe fitters craftsPlanned welders / pipe fitters crafts 112112
Actual crafts provided by contractorActual crafts provided by contractor 115115
* Multiple contractors were selected to execute turnaround work scope * Multiple contractors were selected to execute turnaround work scope
** Craft requirements and contracting strategy were developed 18 months ** Craft requirements and contracting strategy were developed 18 months
before the turnaroundbefore the turnaround
Past Performance ResultsPast Performance Results
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
During some recent large turnarounds and capital projects, the During some recent large turnarounds and capital projects, the
problems resulting from shortage of qualified crafts and poor problems resulting from shortage of qualified crafts and poor
productivity was so bad, that to help finish the work, the productivity was so bad, that to help finish the work, the
companies had to rely on:companies had to rely on:
Highly Experienced, Motivated Highly Experienced, Motivated
and Productive Crafts !!!and Productive Crafts !!!
Overcoming Craft Shortage ChallengeOvercoming Craft Shortage Challenge
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
Contracted Foreign Crafts from:Contracted Foreign Crafts from:
PhilippinesPhilippines
India India
CroatiaCroatia
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
Welcome to the new realities of Welcome to the new realities of
executing plant Projects and executing plant Projects and
Turnarounds in theTurnarounds in the
2121stst Century Century
Foreign Pools of Contracted LaborForeign Pools of Contracted Labor
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
Turnaround Management BenchmarkingTurnaround Management Benchmarking Key Performance AreasKey Performance Areas
100
80
60
40
20
Strategic Planning
Work ScopeManagement
ContractingStrategy
ManpowerPlanning
ProductivityImprovement
Leaders =
Industry Average =
Laggards =
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
%%
We Must Accept Our WeaknessesWe Must Accept Our Weaknesses
Owners’ planning resources and expertise are Owners’ planning resources and expertise are
limited and shrinkinglimited and shrinking
Most companies do not perform front-end planning Most companies do not perform front-end planning
to identify craft needs and develop craft procurement to identify craft needs and develop craft procurement
strategiesstrategies
Companies spend most efforts reacting and fighting Companies spend most efforts reacting and fighting
fires than up-front strategic planningfires than up-front strategic planning
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
We Must Accept Our WeaknessesWe Must Accept Our Weaknesses
Manpower plans and solutions are developed without Manpower plans and solutions are developed without
participation of contractors and consultantsparticipation of contractors and consultants
We We hopehope and sometimes and sometimes praypray for highest results for highest results
without mitigating the potential problems and without mitigating the potential problems and
implementing innovative approaches implementing innovative approaches
Past poor results have been tolerated without any Past poor results have been tolerated without any
consequencesconsequences
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
We have met the enemyWe have met the enemy
and theand the
enemy is us.enemy is us.
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
Start the planning early – 18 to 30 months before Start the planning early – 18 to 30 months before
the turnaroundthe turnaround
Start integrated planning with capital projects 24-Start integrated planning with capital projects 24-
36 months before turnaround date36 months before turnaround date
Strategic Planning – Recognize the challenges Strategic Planning – Recognize the challenges
early and identify innovative solutionsearly and identify innovative solutions
Steps Towards the Ultimate SolutionSteps Towards the Ultimate Solution
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
Identify 80% + Turnaround Work Scope 15-18 months before Identify 80% + Turnaround Work Scope 15-18 months before
the turnaround datethe turnaround date
Identify preliminary craft requirements 15-18 months before Identify preliminary craft requirements 15-18 months before
the turnaroundthe turnaround
Develop contracting strategies that reflect new market Develop contracting strategies that reflect new market
conditions – select contractors 12-15 months before the conditions – select contractors 12-15 months before the
turnaroundturnaround
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
Steps Towards the Ultimate SolutionSteps Towards the Ultimate Solution
Select multiple high performance contractorsSelect multiple high performance contractors
Do not overstretch contractors beyond their core Do not overstretch contractors beyond their core
strengths and capabilitiesstrengths and capabilities
Develop contractor contingency planning to quickly act Develop contractor contingency planning to quickly act
in case primary contractors could not perform in case primary contractors could not perform
Jointly develop craft procurement plansJointly develop craft procurement plans
Smart SolutionsSmart Solutions
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
Select specialty contractors for complex workSelect specialty contractors for complex work
Utilize fixed-fee and incentive contracting to create Utilize fixed-fee and incentive contracting to create
win-win and high-performance work environment win-win and high-performance work environment
Implement Implement Productivity Improvement PlanProductivity Improvement Plan in in
consultation with contractors and consultantsconsultation with contractors and consultants
Smart SolutionsSmart Solutions
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
More emphasis on pre-fabrication More emphasis on pre-fabrication
Modularization constructionModularization construction
Contractor alliances tied to performance baselineContractor alliances tied to performance baseline
Splitting the turnaround into smaller and Splitting the turnaround into smaller and
manageable work scope manageable work scope
Reliance on contracted pools of foreign laborReliance on contracted pools of foreign labor
Emerging New TrendsEmerging New Trends
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
Implement Implement Productivity Improvement PlansProductivity Improvement Plans
Establish realistic budgets Establish realistic budgets
Programs to seek only qualified crafts Programs to seek only qualified crafts
Efficient work / safety permits systemsEfficient work / safety permits systems
No smoking projects and turnaroundsNo smoking projects and turnarounds
Enforce discipline during breaks and quitting time Enforce discipline during breaks and quitting time
Productivity Improvement IdeasProductivity Improvement Ideas
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
Extensive planning and true look-ahead schedules for Extensive planning and true look-ahead schedules for
next 2-4 shiftsnext 2-4 shifts
Minimize changes to execution plansMinimize changes to execution plans
Have efficient safety meetingsHave efficient safety meetings
Eliminate wait time due to materials and equipment Eliminate wait time due to materials and equipment
delays delays
Productivity Improvement IdeasProductivity Improvement Ideas
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
Sadly, there is Sadly, there is nono Magic WandMagic Wand to overcome this problem. to overcome this problem.
Ultimate solutions is to take several small but smart steps: Ultimate solutions is to take several small but smart steps:
1.1. Set higher expectationsSet higher expectations
2.2. Start craft planning earlyStart craft planning early
3.3. Seek qualified staff and contractorsSeek qualified staff and contractors
4.4. Synergistic and efficient work environmentSynergistic and efficient work environment
ConclusionConclusion
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages
If all the above does not work, then call:If all the above does not work, then call:
Project Assurance.Project Assurance.
Questions and Answers Session !Questions and Answers Session !
ConclusionConclusion
Strategies to Overcome Craft ShortagesStrategies to Overcome Craft Shortages