Strategic Planning Workshop. Rhode Island Water Resources Board Water Availability An Overview of Water Supply and Water Resources May 5, 2011. Strategic Planning. Introduction Organizational Mission Plan Mission Past Studies and Investigations Workshops. Water Resources - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Strategic Planning Workshop

Rhode Island Water Resources BoardWater Availability

An Overview of Water Supply and Water ResourcesMay 5, 2011

Page 2: Strategic Planning Workshop

Strategic Planning

• Introduction

• Organizational Mission

• Plan Mission

• Past Studies and Investigations

• Workshops

Page 3: Strategic Planning Workshop

Water Resources

Major Public Water Supplies

Study Areas47 Existing

Interconnections

Page 4: Strategic Planning Workshop

Current Capacity

Water Supply Area(Supplemental Water Studies)

Total Capacity (Sources + Purchased Water)

(MGD)

Providence 83

Northern Rhode Island 42.5

East Bay Area 28.87

West Bay, Central and Southern 63.88

Richmond Water Supply System 0.87

Westerly Water Division 7.16

Block Island Water Company 0.29

TOTAL 226.57

Page 5: Strategic Planning Workshop

Groundwater and Surface

Water Resources

Page 6: Strategic Planning Workshop

• 7 basin studies• Watersheds (HUC 10

and 12)• Resource Inventory• Hydrology• Water budget• Summer Baseflow

– Subbasin level– By study area

(basin)Study Areas10 Digit HUC

WRB Inventory of Water Resources

Page 7: Strategic Planning Workshop

Watersheds

• Boundaries define surface water drainage to a point.

• Follow the highest ridgeline around the stream channels and meet at the lowest point, outflow.

• Vary in size• Watershed and basins are

interchangeable terms

Page 8: Strategic Planning Workshop

Resource Inventory

What the Glaciers Left Behind

•How do hydrology and geology impact our options?

•Interpreting and applying the studies

Page 9: Strategic Planning Workshop

Water BudgetTotal Precipitation

Basin StudyTotal

Precipitation (MGD)Blackstone 452.17

Woonasquatucket/Moshassuck 171.26

Pawtuxet/Quinebaug 692.20

East Narragansett Bay 289.50

West Narragansett Bay 270.04

Pawcatuck 715.20

South Coastal 135.20

Total Statewide 2,725.57

Page 10: Strategic Planning Workshop

Water BudgetTotal Water Resources

Basin StudyTotal Inflow/

Outflow (MGD)Blackstone 815.83

Woonasquatucket/Moshassuck 175.29

Pawtuxet/Quinebaug 723.10

East Narragansett Bay 292.10

West Narragansett Bay 455.30

Pawcatuck 723.10

South Coastal 136.40

Total Statewide 3,321.12

Page 11: Strategic Planning Workshop

Safe Yield

• RIGL 46-15.7-2 defines safe yield as a sustainable withdrawal that can be continuously supplied from a water source without adverse effects throughout a critical dry period with a one percent (1%) chance of occurrence, or one that is equivalent to the drought of record, whichever is worse.

Page 12: Strategic Planning Workshop

Safe YieldWater Use and Availability Studies

• Safe yield information for surface water reservoirs

–Based on drought of record

• Developing a methodology to determine groundwater safe yield

–Based on baseflow

Page 13: Strategic Planning Workshop

What is Baseflow ?

• The flow in a channel sustained from groundwater discharge in the absence of direct runoff.

• During most of the year, streamflow is composed of both groundwater discharge and runoff.

• When groundwater provides the entire flow of a stream, baseflow conditions exist.

• Only that portion of flow attributable to baseflow was considered available for use.

• In some areas baseflow can be negative (losing streams).

Page 14: Strategic Planning Workshop

BaseflowWater Use and Availability Reports

• Estimate baseflow, gross yield, at the 25th, 50th, and 75th percentiles of baseflow – June, July, August, and September

• These estimates were made at the subbasin level but can be summarized by study area

• How much of baseflow is available for use?

Page 15: Strategic Planning Workshop

Why is Baseflow Important?

• Sustainable flow in the channel

• Temperature

• Biological considerations

• Water quality considerations

Page 16: Strategic Planning Workshop

Time of year and variations among years affect water availability

Page 17: Strategic Planning Workshop

Flow Standards

• Fixed flow standards–Aquatic Baseflow (ABF)–7Q10 –Natural 7Q10

• Variable flow standards and depletions–RI Aquatic Baseflow (RI-ABF)–RI Stream Depletion Methodology (RI-SDM)

Page 18: Strategic Planning Workshop

Aquatic Baseflow (ABF)

• Aquatic Base Flow, U.S. Fish and Wildlife Service

• Need at least 25 years of unregulated flow• DA at least 50 sq. mi.

– ABF is often lower than streamflow during August and September

• Example Forestdale gage – ABF = 38.8 ft3/s (25.1 Mgal/d) – 83.6-percent flow duration

Page 19: Strategic Planning Workshop

7Q10

• Definition

• The 7-day low flow

• Commonly used to assess the capacity of a river to carry pollutants.

• Example Forestdale gage –7Q10 = 11.9 ft3/s (7.9 Mgal/d)–99.5 percent flow duration (flow is lower 0 .5%)

Page 20: Strategic Planning Workshop

Natural 7Q10

• Theoretical 7-day low flow assuming little to no human effect on flows. –Forestdale, little difference between the 7Q10 and

the Natural 7Q10

• Flows downstream of an impoundments (reservoir)– the natural 7Q10 may < measured 7Q10

• Basin with heavy pumping and no impoundments – the natural 7Q10 > measured 7Q10

Page 21: Strategic Planning Workshop
Page 22: Strategic Planning Workshop

RI specific modifications to the US Fish and Wildlife Aquatic Base Flow (ABF) methodology to better represent the climate and streamflow conditions found in RI.

Page 23: Strategic Planning Workshop

How is RI-ABF Calculated?

• Forestdale in the Eastern Highlands data set

• DA for the Forestdale gage is 91.2 sq. mi. • To calculate the RI-ABF

– multiply DA by the RI-ABF flow values (table 5.1)

• Example Forestdale gage – June RI-ABF = 74.8 ft3/s (48.4 Mgal/d)– 65.6-percent flow duration

Page 24: Strategic Planning Workshop

DRAFT Stream Depletion Methodology (RIDEM, 2010)

1. Classification based on watershed and other characteristics

2. Links seasonal flow variations and ecology needs

3. Quantifies allowable stream flow depletions as a percentage of the natural 7Q10

Page 25: Strategic Planning Workshop
Page 26: Strategic Planning Workshop
Page 27: Strategic Planning Workshop

------------Percent Remaining----------Date Streamflow Mgal/d Baseflow Mgal/dJan-97 92.4 90.3Feb-97 91.9 91.1Mar-97 90.9 89.3Apr-97 95.2 92.9May-97 92.3 91.0Jun-97 86.8 86.6Jul-97 81.0 79.5Aug-97 83.2 79.5Sep-97 82.5 77.0Oct-97 79.1 73.5Nov-97 87.7 82.5Dec-97 84.6 81.9

Example Forestdale gage

Page 28: Strategic Planning Workshop

Conclusions

• Several Flow Standards have been considered in the past–  * ABF, 7Q10 and Natural 7Q10 

• More recent standards have evolved to mimic the natural hydrograph – *RI-ABF, DRAFT SDM methodology

• What standard will support future water supply, economic development and population needs?– * Alternate SDM, % of baseflow

Page 29: Strategic Planning Workshop

Policy Considerations

• Any use of ground water changes the subsurface and surface environment (that is, the water must come from somewhere).

• Public policy issue is to understand the tradeoffs between ground-water use and changes to the environment and set a threshold for what level of change becomes undesirable.

Page 30: Strategic Planning Workshop

Scituate Reservoir