Tracking No. 00.00.2011 1 Storm Damage Reduction Project Town of Kitty Hawk, North Carolina Coastal Planning & Engineering of North Carolina July 7, 2014 Ken Willson

Upload: nissim-hewitt

Post on 01-Jan-2016

30 views

Category:

Documents


0 download

DESCRIPTION

Storm Damage Reduction Project Town of Kitty Hawk, North Carolina Coastal Planning & Engineering of North Carolina July 7, 2014 Ken Willson. Outline:. Preliminary Overtopping Analysis: Identifying Problem Areas Recommended Actions Preliminary Design Concepts: Volumes - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

1

Storm Damage Reduction Project

Town of Kitty Hawk, North Carolina

Coastal Planning & Engineering of North Carolina

July 7, 2014

Ken Willson

Page 2: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

2

Outline:• Preliminary Overtopping Analysis:

Identifying Problem Areas Recommended Actions

• Preliminary Design Concepts:• Volumes

• Schedule Update:Environmental DocumentationEngineering DesignOffshore Sand Search

Page 3: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

3

1. To reduce the vulnerability of public infrastructure including NC 12, Town roads between NC 12 and U.S. Highway 158, and utilities to storm-induced erosion;

2. To reduce flooding experienced in many non-oceanfront areas throughout the Town during ocean over wash conditions, including portions of highway NC 12 and U.S. Highway 158; and

3. To reduce the vulnerability of homes within the Town that front the Atlantic Ocean and are exposed to wave events during nor’easters and other large storm events as well as natural erosional trends.

Goals of the Storm Damage Reduction Project

Page 4: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

4

• LiDAR Analysis

• Site Visit (Feb. 21, 2014)

• Management Action Alternatives:

– Uniform Dune Elevation

– Adding Material/Truck Haul

– Relocation of Parking Areas

– Raising Driveways/Parking Areas

– Modification to Public/Emergency Vehicle Beach Access

Preliminary Overtopping Analysis

Page 5: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

5

Preliminary Overtopping Analysis(Uniform Dune Elevation)

– Property owners should be advised to construct a continuous and uniform dune

– Adjacent property owners should coordinate to ensure uniformity

Page 6: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

6

Preliminary Overtopping Analysis(Adding Material/Truck Haul)

– Beach Push/Scraping can cause a loss of sand from adjacent areas– Case by case determination of best place for sand placement– Consider sand removed from road for use

Page 7: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

7

Preliminary Overtopping Analysis(Adding Material/Truck Haul)

– Beach Push/Scraping can cause a loss of sand from adjacent areas– Case by case determination of best place for sand placement– Consider sand removed from road for use

Page 8: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

8

Preliminary Overtopping Analysis(Relocation of Parking Areas)

– Spaces on west side of structures– Consider limiting parking to one or two cars– Consider incentives to limiting parking – Work with neighbors to provided parking to renters

Page 9: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

9

Preliminary Overtopping Analysis(Relocation of Parking Areas)

– Spaces on west side of structures– Consider limiting parking to one or two cars– Consider incentives to limiting parking – Work with neighbors to provided parking to renters

Page 10: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

10

Preliminary Overtopping Analysis(Raising Driveways/Parking Areas)

– Reconstruct driveway to follow adjacent dune contours– Consider incentives– Potential for adjacent property owners to work together

Page 11: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

11

Preliminary Overtopping Analysis(Raising Driveways/Parking Areas)

– Reconstruct driveway to follow adjacent dune contours– Consider incentives– Potential for adjacent property owners to work together

Page 12: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

12

Preliminary Overtopping Analysis(Raising Driveways/Parking Areas)

– Raising emergency vehicle beach access

Page 13: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

13

Preliminary Overtopping Analysis(Raising Driveways/Parking Areas)

– Raising emergency vehicle beach access

Page 14: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

14

Preliminary Overtopping Analysis(Modification to Public/Emergency Vehicle

Beach Access)

– Install timber walkover/drive-over structures at public/emergency vehicle access points.

Page 15: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

15

Preliminary Overtopping Analysis(Modification to Public/Emergency Vehicle

Beach Access)

Page 16: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

16

Preliminary Design

Concepts

Page 17: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

17

Storm Damage Reduction Project

Page 18: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

18

Design Beach

Storm Damage Reduction Project

Page 19: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

19

Constructed Beach Fill

Storm Damage Reduction Project

Page 20: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

20

Post-ConstructionAdjustment in 1-3 years

Storm Damage Reduction Project

Page 21: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

21

Advance Fill

Design Beach

Storm Damage Reduction Project

Page 22: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

22

Dune

+13.0 ft.

Loss of Advance Fill In 5-7 years

Design Beach

Storm Damage Reduction Project

Berm Width6.0 ft.

NAVD88

Page 23: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

23

Storm Damage Reduction Project

Page 24: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

24

Storm Damage Reduction Project

When structures are seaward of the dune, more sand is required toconstruct the design seaward of the structures.

Page 25: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

25

Storm Damage Reduction Project

When structures are seaward of the dune, more sand is required toconstruct the design seaward of the structures.

Built in front of structures

Berm Width6.0 ft.

NAVD88

Dune

+13.0 ft.

Design Beach

Page 26: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

26

Design Beach

Storm Damage Reduction Project

When structures are seaward of the dune, more sand is required toconstruct the design seaward of the structures.

Tie into existing dune

Berm Width6.0 ft.

NAVD88

Dune

+13.0 ft.

Page 27: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

27

ALTERNATIVE VOLUME (CY) DENSITY (CY/FT)

ALTERNATIVE 1 – Dune and Berm Design (20 ft. wide, 13 ft. high dune; 50 ft. wide, 6 ft. high berm (Tie into Existing Dune)

1,583,000 81.3

ALTERNATIVE 2 – Dune and Berm Design (20 ft. wide, 13 ft. high dune; 50 ft. wide, 6 ft. high berm (Seaward of Structures)

2,872,000 147.4

Page 28: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

28

Storm Damage Reduction Project

When structures are seaward of the dune, more sand is required toconstruct the design seaward of the structures.

Built in front of structures

Berm Width6.0 ft.

NAVD88

Dune

+13.0 ft.

Design Beach

Page 29: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

29

Storm Damage Reduction Project

Page 30: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

30

Storm Damage Reduction Project

When structures are seaward of the dune, more sand is required toconstruct the design seaward of the structures.

Built in front of structures

Berm Width6.0 ft.

NAVD88

Design Beach

Page 31: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

31

ALTERNATIVE VOLUME (CY) DENSITY (CY/FT)

ALTERNATIVE 1 – Dune and Berm Design (20 ft. wide, 13 ft. high dune; 50 ft. wide, 6 ft. high berm (Tie into Existing Dune)

1,583,000 81.3

ALTERNATIVE 2 – Dune and Berm Design (20 ft. wide, 13 ft. high dune; 50 ft. wide, 6 ft. high berm (Seaward of Structures)

2,872,000 147.4

ALTERNATIVE 2A – Dune and Berm Design (20 ft. wide, 13 ft. high dune – Where Needed; 50 ft. wide, 6 ft. high berm (Seaward of Structures)

2,707,000 138.9

Page 32: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

32

Storm Damage Reduction Project

50’ Berm Width6.0 ft.

NAVD88

Design Beach

Page 33: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

33

Storm Damage Reduction Project

Built in front of structures

50’ Berm Width6.0 ft.

NAVD88+13.0 ft.

Design Beach

20’ Dune Width

Page 34: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

34

Storm Damage Reduction Project

30’ Berm Width6.0 ft.

NAVD8810’ Dune

Width+12.0 ft.

Design Beach

Page 35: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

35

ALTERNATIVE VOLUME (CY) DENSITY (CY/FT)

ALTERNATIVE 1 – Dune and Berm Design (20 ft. wide, 13 ft. high dune; 50 ft. wide, 6 ft. high berm (Tie into Existing Dune)

1,583,000 81.3

ALTERNATIVE 2 – Dune and Berm Design (20 ft. wide, 13 ft. high dune; 50 ft. wide, 6 ft. high berm (Seaward of Structures)

2,872,000 147.4

ALTERNATIVE 2A – Dune and Berm Design (20 ft. wide, 13 ft. high dune – Where Needed; 50 ft. wide, 6 ft. high berm (Seaward of Structures)

2,707,000 138.9

ALTERNATIVE 3 - Berm Only (50 ft. wide, 6 ft. high berm 1,508,000 77.4

ALTERNATIVE 4 – Minimal Dune Design (10 ft. wide, 12 ft. high dune – Where Needed; 30 ft. wide, 6 ft. high berm (Seaward of Structures)

1,620,000 83.1

Page 36: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

36

Schedule Update

Page 37: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

37

Geotech Investigation

Preliminary Draft EA (August 29, 2014)

CONSTRUCTION (February 2016)

Bidding (11/2/15 – 12/1/15)

Environmental Documentation

EngineeringDesign

Public Comment on Draft EA(November 4 – December 3, 2014)

Final EA (March 3, 2015)

Submit Draft BA and EFH

(July 15, 2014)

Submit Final BA and EFH

(Sept 13, 2014)

1 – YearCoordination

BOEM/USACE/NMFS/USFWS

Submit Permit Applications(April 30, 2015)

Permits Issued (September, 2015)

Draft EA(November 3, 2014)

Page 38: Storm Damage Reduction Project Town of Kitty Hawk, North Carolina

Trac

king

No.

00.

00.2

011

38

Thank You!

Questions?

Ken Willson – [email protected]