SITE NAME : HAIPHONG II 2X300MW THERMAL POWER PLANT PROJECTCONTRACT NO. : HP.2999
PACKAGE NO. DESCRIPTION OF MATERIAL AS PER PACKING LIST RESULT OF INSPECTION REMARKSRECEIVED ACCEPTED LOCATION
1 HPU4-FKE-004 No Problem Storage Area "A"
2 HPU4-FKE-006 No Problem Storage Area "A"
3 HPU4-FHK-001 No Problem Storage Area "A"
4 HPU4-FHK-002 No Problem Storage Area "A"
SUMMARY AND CONCLUSIONS:
A. PARTICIPANTS SIGNATURE: NAME/SIGNATURE OF FUJI REPRESENTATIVE CONFIRMED BY HPJSC:
MC/ FES Tran Quang Huy, Hung
DEC Wei
IE Tiep
HEPEC
B. REFERENCES USED FOR UNPACKING INSPECTION
1. Packing List for package no. HPU4-FKE-004
2. Packing List for package no. HPU4-FKE-006
3. Packing List for package no. HPU4-FHK-001
4. Packing List for package no. HPU4-FHK-002
The items in the package were visually inspected for transport and storage damage.
UNPACKING INSPECTION REPORT (UIR)
INSPECTION REPORT NO.: HP2-STG#4-UIR-12-010DATE : DEC 13th, 2012
DATE OF RECEIPT : DATE : Dec. 13, 2012
ISSUING PARTY : MARUBENI CORPORATION
RECEIVING PARTY: DEC/HEPEC
WITNESSED BY: IE (OWNER'S REPRESENTATIVE
Sr. No.
QUANTITY
This is a case package with 166cmL x 219cmW x 272cmH (G/W=2300kg) containing the Turbine Protection panel
Please see attached packing list for detailed breakdown of
items including signatures of all parties (MC, DEC, HEPEC, and IE), & inspection notes for
the joint inspection and material acceptance/receiving.
This is a case package with 158cmL x 147cmW x 273cmH (G/W=840kg) containing the H2 supervising panel
This is a case package with 230cmL x 147cmW x 286cmH (G/W=1350kg) containing the Cubicle
This is a case package with 140cmL x 142cmW x 276cmH (G/W=600kg) containing the AVR Cubicle
Page 2 of 2
C. OBSERVATIONS
1. FOR PACKAGE NO. HPU4-FKE-004, HPU4-FKE-006 and HPU4-FHK-001, HPU4-FHK-002
D. CONCLUSIONS
Report Prepared by:
Roland Nicolas
MC Project Scheduler
Date: 20-Apr-23
These packs were inspected at December 13th, 2012 at open Storage Area "A".All items were corect and in good conditionAll the electrical panels were moved into the indoor ware house after visual inspection
The unpacking inspection for the above-mentioned packages was completed without any safety incident that occured during the lifting operation and no damage on materials/equipment being transferred. Generally, all of the parts appear in good physical condition after visual check-up. After inspection, all the electrical panels were moved to indoor warehouse.