Page 1 of 2 SITE NAME : HAIPHONG II 2X300MW THERMAL POWER PLANT PROJECT CONTRACT NO. : HP.2999 PACKAGE NO. DESCRIPTION OF MATERIAL AS PER PACKING LIST RESULT OF INSPECTION REMARKS RECEIVED ACCEPTED LOCATION 1 HPU4-FKE-004 No Problem Storage Area "A" 2 HPU4-FKE-006 No Problem Storage Area "A" 3 HPU4-FHK-001 No Problem Storage Area "A" 4 HPU4-FHK-002 No Problem Storage Area "A" SUMMARY AND CONCLUSIONS: A. PARTICIPANTS SIGNATURE: NAME/SIGNATURE OF FUJI REPRESENTATIVE CONFIRMED BY HPJSC: MC/ FES Tran Quang Huy, Hung DEC Wei IE Tiep HEPEC B. REFERENCES USED FOR UNPACKING INSPECTION 1. Packing List for package no. HPU4-FKE-004 2. Packing List for package no. HPU4-FKE-006 3. Packing List for package no. HPU4-FHK-001 4. Packing List for package no. HPU4-FHK-002 The items in the package were visually inspected for transport and storage damage. C. OBSERVATIONS 1. FOR PACKAGE NO. HPU4-FKE-004, HPU4-FKE-006 and HPU4-FHK-001, HPU4-FHK-002 UNPACKING INSPECTION REPORT (UIR) INSPECTION REPORT NO.: HP2-STG#4-UIR-12-010 DATE : DEC 13th, 2012 DATE OF RECEIPT : DATE : Dec. 13, 2012 ISSUING PARTY : MARUBENI RECEIVING PARTY: WITNESSED BY: IE (OWNER'S Sr. No. QUANTITY This is a case package with 166cmL x 219cmW x 272cmH (G/W=2300kg) containing the Turbine Protection panel Please see attached packing list for detailed breakdown of items including signatures of all parties (MC, DEC, HEPEC, and IE), & inspection notes for the joint inspection and material acceptance/receiving. This is a case package with 158cmL x 147cmW x 273cmH (G/W=840kg) containing the H2 supervising panel This is a case package with 230cmL x 147cmW x 286cmH (G/W=1350kg) containing the Cubicle This is a case package with 140cmL x 142cmW x 276cmH (G/W=600kg) containing the AVR Cubicle

Upload: roland-nicolas

Post on 03-Jan-2016

12 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: STG Unpacking Inspection Report010

Page 1 of 2

SITE NAME : HAIPHONG II 2X300MW THERMAL POWER PLANT PROJECTCONTRACT NO. : HP.2999

PACKAGE NO. DESCRIPTION OF MATERIAL AS PER PACKING LIST RESULT OF INSPECTION REMARKSRECEIVED ACCEPTED LOCATION

1 HPU4-FKE-004 No Problem Storage Area "A"

2 HPU4-FKE-006 No Problem Storage Area "A"

3 HPU4-FHK-001 No Problem Storage Area "A"

4 HPU4-FHK-002 No Problem Storage Area "A"

SUMMARY AND CONCLUSIONS:

A. PARTICIPANTS SIGNATURE: NAME/SIGNATURE OF FUJI REPRESENTATIVE CONFIRMED BY HPJSC:

MC/ FES Tran Quang Huy, Hung

DEC Wei

IE Tiep

HEPEC

B. REFERENCES USED FOR UNPACKING INSPECTION

1. Packing List for package no. HPU4-FKE-004

2. Packing List for package no. HPU4-FKE-006

3. Packing List for package no. HPU4-FHK-001

4. Packing List for package no. HPU4-FHK-002

The items in the package were visually inspected for transport and storage damage.

UNPACKING INSPECTION REPORT (UIR)

INSPECTION REPORT NO.: HP2-STG#4-UIR-12-010DATE : DEC 13th, 2012

DATE OF RECEIPT : DATE : Dec. 13, 2012

ISSUING PARTY : MARUBENI CORPORATION

RECEIVING PARTY: DEC/HEPEC

WITNESSED BY: IE (OWNER'S REPRESENTATIVE

Sr. No.

QUANTITY

This is a case package with 166cmL x 219cmW x 272cmH (G/W=2300kg) containing the Turbine Protection panel

Please see attached packing list for detailed breakdown of

items including signatures of all parties (MC, DEC, HEPEC, and IE), & inspection notes for

the joint inspection and material acceptance/receiving.

This is a case package with 158cmL x 147cmW x 273cmH (G/W=840kg) containing the H2 supervising panel

This is a case package with 230cmL x 147cmW x 286cmH (G/W=1350kg) containing the Cubicle

This is a case package with 140cmL x 142cmW x 276cmH (G/W=600kg) containing the AVR Cubicle

Page 2: STG Unpacking Inspection Report010

Page 2 of 2

C. OBSERVATIONS

1. FOR PACKAGE NO. HPU4-FKE-004, HPU4-FKE-006 and HPU4-FHK-001, HPU4-FHK-002

D. CONCLUSIONS

Report Prepared by:

Roland Nicolas

MC Project Scheduler

Date: 20-Apr-23

These packs were inspected at December 13th, 2012 at open Storage Area "A".All items were corect and in good conditionAll the electrical panels were moved into the indoor ware house after visual inspection

The unpacking inspection for the above-mentioned packages was completed without any safety incident that occured during the lifting operation and no damage on materials/equipment being transferred. Generally, all of the parts appear in good physical condition after visual check-up. After inspection, all the electrical panels were moved to indoor warehouse.