stephen fealty cv (jan 17)

5
STE File: Ste Unit 302 Thailand M: +66 8 EXEC A seaso constru experie level an leader implem last 5 ye KEY S PROF Apr 201 1 Year 1 Nov 201 2 Years Mar 201 2 Years Jul 2010 6 Years EPHE phen Fealty 2, Riverside C d. 82 493 8850 CUTIVE oned Proje ction indus ence as a Q nd extends I revel in entation of ears. SKILL S Pro Lea Pro Co An Loc Hig FESSION 5 – Present 10 Months 12 – Mar 20 5 Months 10 to Nov 20 9 Months 0 - Present 4 Months EN F y CV (Jan. 2 Condominiu 0 | E: stephe PROFILE ct Manage stry in the Quantity Sur s to Comm assembling f key proce ETS oject Manag adership/C oject Planni ost Control nalytical Thin cal Knowled gh Rise Con NAL EXP Proje Chian Proje Pand comp 15 Senio Thaila Cont Mana 012 Proje Mana Cont on th Mana Com Oper worki comp FEALT 2017) um, Chiang en.fealty@g E ement prof UK, Middle veyor. My e mercial Awa g strong co edures. Ope gement ommunicat ng nking dge struction PERIENC ct Manager ng Mai, Tha ct Manage dora’s new f pany’s expa or Project M and - Bangk racted to p ager on the ct Director ( agement C racted to p e River Proje aging Direct pany Ltd - B rating a sma ing under c panies. TY 1 | 5 g Mai-Lamp gmail.com fessional wi e East and experience areness and ore project erated and tion Skills CE r – Pandora ailand er and Clien factory faci ansion prog anager (Co kok, Thailan provide the e MahaNakh (Consultant Co. Ltd. - Ban provide the ect. tor (Owner) Bangkok, Th all consultan onsultancy hun Road, N th over 30 d South Ea in Project M d Quality A t teams an run a sma Team Risk Qua Con Tend Dive Valu a Production t’s Represe lity in Lamp gramme. onsultant) d services of S hon Project t) – Cornerst ngkok, Thail services of P ) – Fidelitas M hailand ncy firm and agreemen Print Da Nong Hoi, C years' exp ast Asia, w Manageme Assurance. A nd setting ll consultan m Building Manageme ality Manage tract Negot der Manage ersity ue Engineeri ns Co. Ltd. ntative for a hun, under Archetype Senior Proje . tone and Project Dire Manageme d currently ts with PM ate: January Chiang Mai, perience wi with extensi ent is at the As a natur the directi ncy business ent ement tiation ement ing a the ect ector ent y 5, 2017 , 50000, ithin the ve past e highest al team ion and s for the

Upload: stephen-fealty

Post on 15-Jan-2017

15 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Stephen Fealty CV (Jan 17)

STE

File: Ste

Unit 302Thailand

M: +66 8

EXECA seasoconstruexperielevel anleader implemlast 5 ye

KEY S

PROFApr 201

1 Year 1

Nov 201

2 Years

Mar 201

2 Years

Jul 2010

6 Years

EPHE

phen Fealty

2, Riverside Cd.

82 493 8850

CUTIVE oned Projection indus

ence as a Qnd extendsI revel in entation of

ears. SKILL S

Pro Lea Pro Co An Loc Hig

FESSION5 – Present

10 Months

12 – Mar 20

5 Months

10 to Nov 20

9 Months

0 - Present

4 Months

EN F

y CV (Jan. 2

Condominiu

0 | E: stephe

PROFILEct Managestry in the

Quantity Surs to Commassembling

f key proce

ETS oject Managadership/Coject Planniost Control nalytical Thincal Knowledgh Rise Con

NAL EXP Proje

Chian

ProjePandcomp

15 SenioThaila

ContMana

012 ProjeMana

Conton th

ManaCom

Operworkicomp

FEALT

2017)

um, Chiang

en.fealty@g

E ement prof

UK, Middlerveyor. My e

mercial Awag strong coedures. Ope

gement ommunicatng

nking dge struction

PERIENCct Managerng Mai, Tha

ct Managedora’s new fpany’s expa

or Project Mand - Bangk

racted to pager on the

ct Director (agement C

racted to pe River Proje

aging Directpany Ltd - B

rating a smaing under cpanies.

TY

1 | 5

g Mai-Lamp

gmail.com

fessional wie East andexperience areness andore projecterated and

tion Skills

CE r – Pandora

ailand

er and Clienfactory faciansion prog

anager (Cokok, Thailan

provide the e MahaNakh

(ConsultantCo. Ltd. - Ban

provide the ect.

tor (Owner)Bangkok, Th

all consultanonsultancy

hun Road, N

th over 30 d South Ea in Project Md Quality At teams an run a sma

Team Risk Qua Con Tend Dive Valu

a Production

t’s Represelity in Lamp

gramme.

onsultant) – d

services of Shon Project

t) – Cornerstngkok, Thail

services of P

) – Fidelitas Mhailand

ncy firm and agreemen

Print Da

Nong Hoi, C

years' expast Asia, wManageme

Assurance. And setting ll consultan

m Building Manageme

ality Managetract Negot

der Manageersity ue Engineeri

ns Co. Ltd. –

ntative for ahun, under

Archetype

Senior Proje.

tone and

Project Dire

Manageme

d currently ts with PM

ate: January

Chiang Mai,

perience wiwith extensient is at theAs a naturthe directi

ncy business

ent ement tiation ement

ring

a the

ect

ector

ent

y 5, 2017

, 50000,

ithin the ve past

e highest al team ion and s for the

Page 2: Stephen Fealty CV (Jan 17)

STE

File: Ste

Jan 200

1 Years

Dec 200

1 Years

Sep 200

1 Years

Aug 200

5 Years

Jan 199

3 Years

Apr 199

2 Years

Mar 199

5 Years

Sep 198

4 Years

PROJPANDORAProductwas tointroducto achie

MAHANARitz Carretail/F&

EPHE

phen Fealty

09 to Feb 20

3 Months

07 to Jan 20

2 Months

06 to Dec 20

4 Months

01 to Sep 20

2 Months

98 to Mar 20

3 Months

95 to Jan 19

10 Months

90 to Apr 19

2 Months

85 to Mar 19

7 Months

JECTS/AA PRODUCTIOtions (manu provide acing automeve gold lev

AKHON, (2012rlton operat&B facility. T

EN F

y CV (Jan. 2

010 ProjeThaila

Set-uPM a

009 SenioMinh

EstabTowe

007 QA/QCity,

In chof the

006 DirecBang

Numeoperaconcphase

001 DepuJedd

Quanmajo

98 EstimThaila

Estimestimteam

995 SupeLtd. (

990 EstimBelfa

ACCOMN FACILITY, C

ufacturing da new fac

mation, whilsvel LEED ce

2-2015) – Ated condomThe project

FEALT

2017)

ct and Deveand - Bangk

p and estabnd Business

or Project M City, Vietna

blished the Per and ICON

QC and QS MVietnam

arge of the e C&S contr

ctor – Cornegkok, Thailan

erous projecation of Cor

ception, throes, tenderin

uty Project Mah, Saudi A

ntity Surveyor Telecomm

ator Managand limited

ating Manamating procem.

rintendent Enow Laing O

ator – Charst, United Ki

MPLISHMCHIANG MAI, division of Paility that e

st providing ertification.

n award wiminium, Edi boasts, incl

TY

2 | 5

elopment Dkok, Thailan

blished the s Developm

anager - Aram

PM operatioN D3.

Manager –

Quantity Suractor.

erstone Mannd

cts for the Prnerstone. Dough Consung, construc

Manager – SArabia

or and Depmunications

ger/Proposa – Bangkok,

ager with thedures and

Estimator – JO’Rourke) –

rles Brand Ltingdom

MENTS (2015-2016)andora). A

embarked o a conduciv inning multition Hotel, lude the ta

Director – Ad

Bangkok ofent.

rchetype Vi

ons on the S

TOA Corpo

urveying an

nagement C

Project ManDrive projecultant engagction and ha

Saudi Weim

uty Project Project king

al Coordinat Thailand

e responsib establishing

John Laing – Belfast, Un

td. (Part of t

) – A first gr project at oon refining ve work env

i-use develomechanicallest tower i

Print Da

rchetype

ffice and ra

etnam – Ho

Saigon M&C

oration – Cầ

nd QA/QC t

Co. Ltd. -

agement cts from initiagement, deandover.

er & Tracthe

Manager ogdom wide

tor – Mivan

bility for setting an estima

Constructioited Kingdo

the Kier Gro

reen field veover USD 60 and streavironment.

opment conal parking syn Thailand

ate: January

an the

o Chi

C

n Thơ

teams

al esign

e Ltd,

on a e.

ng up ating

on Co. om

oup) -

enture for P0M, Pandoramlining proThe building

nsisting of hystem and (77 Stories)

y 5, 2017

Pandora ra’s goal ocesses, g stands

high end top end and the

Page 3: Stephen Fealty CV (Jan 17)

STE

File: Ste

Thai ProBangko

THE RIVELand, ththe lowswimmientranc(BANGKO

M&C TOrise builcompothe othe

OMON I facility w

WEST BAWater adistributand Macontrac

TEP-6 TEManag60 newbuildingtelecom

OTHERS

EDUCDATES

1983 to

1975 to

Others

BIO-

EPHE

phen Fealty

operty awaok.

R CONDO ANhis consists o

wer tower ong pools a

ce. The proOK)” and the

OWER (SAIGONding right onent at theer side of th

THERMAL POWwith TOA Co

ANGKOK WATand Ch. Kartion networanagers in ct requireme

LECOMMUNICer), for Sau

w telephonegs, satellitmmunicatio

CARREFOUR STHE RARCHADFRASER SUITESTRIUMPH MOTCUTTING EDGTRIUMPH AVIATHE LAKES, BaOAKWOOD, BTRIUMPH MOTNORTHSHORE

CATIONLO

1985 BB

1982 St

TeOC

-DATA Nationality

EN F

y CV (Jan. 2

ard “BEST LU

ND VUE MALof two towe

of 42 storiesand sky gaoject receive “BEST CON

N ONE TOWERon the banke base with he tower.

WER PLANT (2orporation w

TER TREATMENTrnchang JVrk. Directly aensuring th

ents.

CATION UPGRAdi Wiemer &e exchangee stationsns provider

Shopping MDAMRI - Ritz CS, BANGKOK, (TORCYCLES, F

GE for Raja FATION SERVICEangkok for RBangkok, (2TORCYCLES, F

E, Pattaya fo

N OCATION

elfast Colleelfast

t. Columba

endering anOGL Course Computer Es

– Dual, bot

FEALT

2017)

XURY CONDO

LL, (2010-201ers of luxurys. The projeardens, togved Thai PrDO DEVELOPM

R), (2007-200k of Saigon R residential

006-2007) – within the E

T PLANT (200V. A USD 100and indirecthat proced

ADE (TEP-6), (& Trachte Les and mos, contain Lucent Tec

Mall, (2001-2Carlton Hote(2003) – 32 Sactory III, (2ashions, (20

E ASIA, (2005Raimon Lan2005) – 7 Stoactory IV (2

or Raimon La

ge of Techn

nnus High, C

nd Estimatin in Quality Astimating – C

h British and

TY

3 | 5

O DEVELOPME

12) – The flay residential ect is compgether withroperty awaMENT (THAILAN

09) – A 42 stRiver, Ho Ch unit above

ConstructioPC Contrac

02-2003) – 0m water tretly in controures are es

(1998-2001) Ltd. the maiodification pnerised exchnologies I

002) Samutel (2002), ofStorey Servic2004) – New006) – Servic5-2006) – 8,0nd (2004) - Lorey Service2005) – Newand (2005)

nology,

Co. Down, U

ng – CITB Assurance ACITB

d Irish passp

ENT 2014” a

agship proj units (857 u

plete with t a 4 story ards for “BND)”, in 2012

tory with 5 shi Minh Citye on one sid

on of a 330ct team run

Quality Asseatment plaol of the QAstablished a

- Senior Quin turnkey sprogram toxchanges nternationa

Prakan, Thaffice, retail ace apartme

w 20,000 m2 ce Apartme000m2 CleanLuxury Reside Apartmenw 65,000 m2

- 28 Storey

LEVEL

HNC - Survey

UK “O” le

Auditing (ISO

ports

Print Da

and the larg

ect of the units), one toop class fa shopping EST LUXURY C2. story basem, Vietnam. I

de and prim

Megawatt by Mitsubis

surance Maant, two sto

A responsibiland mainta

antity Surveub-contrac

o over 200 etc., tog

al Inc.

ailand. and privateents, circa Ufacility, circ

ents, circa USn Factory, cential Condts, circa USDfacility, circLuxury Cond

Building anying Studies

vels

O 9000)

ate: January

gest media

developer ower 71 sto

acilities, incmall at th

CONDO DEVE

ment multi-uIt consists o

me office sp

t power genshi Heavy In

anager for orage reserv

ity of 40+ Enained to sa

eyor (Actingctor to provi

existing exgether wi

e condominUSD18M ca USD 4M

SD 3M circa USD 5.5dos, circa UD 16M

ca USD 13M dos – USD 2

nd Quantity

y 5, 2017

a wall in

Raimon ories and luding 5

he main ELOPMENT

use high-f a retail

pace on

nerating dustry.

Thames voirs and ngineers

atisfy the

g Project ide over

xchange th the

ium.

5M SD 24M

1M

Page 4: Stephen Fealty CV (Jan 17)

STE

File: Ste

REFE

EPHE

phen Fealty

DoB – 14 OStatus – MaClean UK D

RENCESMr. Richard|E: rcb@co|M: +66 81 Mr. Pierre-J|E: pierre-je|M: +84 913Mr. Lars R. N|E: lars.n@p|M: +66 63

EN F

y CV (Jan. 2

ctober 1963arried with twDriving Licen

S d C Bell, Maornerstonem 906 8907

Jean MALGOean.malgou3 904 983 Nielsen, Vicpandora.ne 474 0987

FEALT

2017)

3 (52 Years Owo dependnse.

naging Diremgmnt.com

OUYRES, Geuyres@arche

e Presidentet

TY

4 | 5

Old) dent childre

ector; Corne

eneral Direcetype-grou

, General M

n and two g

erstone Man

ctor; Archetyp.com

Manager; Pa

Print Da

grown up c

nagement C

ype Group.

andora Prod

ate: January

hildren.

Co., Ltd.

ductions, La

y 5, 2017

amphun.

Page 5: Stephen Fealty CV (Jan 17)

STE

File: Ste

PAST

EPHE

phen Fealty

T PROJE

EN F

y CV (Jan. 2

ECTS FEALT

2017)

TY

5 | 5 Print Daate: Januaryy 5, 2017