stephen fealty cv (jan 17)
TRANSCRIPT
STE
File: Ste
Unit 302Thailand
M: +66 8
EXECA seasoconstruexperielevel anleader implemlast 5 ye
KEY S
PROFApr 201
1 Year 1
Nov 201
2 Years
Mar 201
2 Years
Jul 2010
6 Years
EPHE
phen Fealty
2, Riverside Cd.
82 493 8850
CUTIVE oned Projection indus
ence as a Qnd extendsI revel in entation of
ears. SKILL S
Pro Lea Pro Co An Loc Hig
FESSION5 – Present
10 Months
12 – Mar 20
5 Months
10 to Nov 20
9 Months
0 - Present
4 Months
EN F
y CV (Jan. 2
Condominiu
0 | E: stephe
PROFILEct Managestry in the
Quantity Surs to Commassembling
f key proce
ETS oject Managadership/Coject Planniost Control nalytical Thincal Knowledgh Rise Con
NAL EXP Proje
Chian
ProjePandcomp
15 SenioThaila
ContMana
012 ProjeMana
Conton th
ManaCom
Operworkicomp
FEALT
2017)
um, Chiang
en.fealty@g
E ement prof
UK, Middlerveyor. My e
mercial Awag strong coedures. Ope
gement ommunicatng
nking dge struction
PERIENCct Managerng Mai, Tha
ct Managedora’s new fpany’s expa
or Project Mand - Bangk
racted to pager on the
ct Director (agement C
racted to pe River Proje
aging Directpany Ltd - B
rating a smaing under cpanies.
TY
1 | 5
g Mai-Lamp
gmail.com
fessional wie East andexperience areness andore projecterated and
tion Skills
CE r – Pandora
ailand
er and Clienfactory faciansion prog
anager (Cokok, Thailan
provide the e MahaNakh
(ConsultantCo. Ltd. - Ban
provide the ect.
tor (Owner)Bangkok, Th
all consultanonsultancy
hun Road, N
th over 30 d South Ea in Project Md Quality At teams an run a sma
Team Risk Qua Con Tend Dive Valu
a Production
t’s Represelity in Lamp
gramme.
onsultant) – d
services of Shon Project
t) – Cornerstngkok, Thail
services of P
) – Fidelitas Mhailand
ncy firm and agreemen
Print Da
Nong Hoi, C
years' expast Asia, wManageme
Assurance. And setting ll consultan
m Building Manageme
ality Managetract Negot
der Manageersity ue Engineeri
ns Co. Ltd. –
ntative for ahun, under
Archetype
Senior Proje.
tone and
Project Dire
Manageme
d currently ts with PM
ate: January
Chiang Mai,
perience wiwith extensient is at theAs a naturthe directi
ncy business
ent ement tiation ement
ring
–
a the
ect
ector
ent
y 5, 2017
, 50000,
ithin the ve past
e highest al team ion and s for the
STE
File: Ste
Jan 200
1 Years
Dec 200
1 Years
Sep 200
1 Years
Aug 200
5 Years
Jan 199
3 Years
Apr 199
2 Years
Mar 199
5 Years
Sep 198
4 Years
PROJPANDORAProductwas tointroducto achie
MAHANARitz Carretail/F&
EPHE
phen Fealty
09 to Feb 20
3 Months
07 to Jan 20
2 Months
06 to Dec 20
4 Months
01 to Sep 20
2 Months
98 to Mar 20
3 Months
95 to Jan 19
10 Months
90 to Apr 19
2 Months
85 to Mar 19
7 Months
JECTS/AA PRODUCTIOtions (manu provide acing automeve gold lev
AKHON, (2012rlton operat&B facility. T
EN F
y CV (Jan. 2
010 ProjeThaila
Set-uPM a
009 SenioMinh
EstabTowe
007 QA/QCity,
In chof the
006 DirecBang
Numeoperaconcphase
001 DepuJedd
Quanmajo
98 EstimThaila
Estimestimteam
995 SupeLtd. (
990 EstimBelfa
ACCOMN FACILITY, C
ufacturing da new fac
mation, whilsvel LEED ce
2-2015) – Ated condomThe project
FEALT
2017)
ct and Deveand - Bangk
p and estabnd Business
or Project M City, Vietna
blished the Per and ICON
QC and QS MVietnam
arge of the e C&S contr
ctor – Cornegkok, Thailan
erous projecation of Cor
ception, throes, tenderin
uty Project Mah, Saudi A
ntity Surveyor Telecomm
ator Managand limited
ating Manamating procem.
rintendent Enow Laing O
ator – Charst, United Ki
MPLISHMCHIANG MAI, division of Paility that e
st providing ertification.
n award wiminium, Edi boasts, incl
TY
2 | 5
elopment Dkok, Thailan
blished the s Developm
anager - Aram
PM operatioN D3.
Manager –
Quantity Suractor.
erstone Mannd
cts for the Prnerstone. Dough Consung, construc
Manager – SArabia
or and Depmunications
ger/Proposa – Bangkok,
ager with thedures and
Estimator – JO’Rourke) –
rles Brand Ltingdom
MENTS (2015-2016)andora). A
embarked o a conduciv inning multition Hotel, lude the ta
Director – Ad
Bangkok ofent.
rchetype Vi
ons on the S
TOA Corpo
urveying an
nagement C
Project ManDrive projecultant engagction and ha
Saudi Weim
uty Project Project king
al Coordinat Thailand
e responsib establishing
John Laing – Belfast, Un
td. (Part of t
) – A first gr project at oon refining ve work env
i-use develomechanicallest tower i
Print Da
rchetype
ffice and ra
etnam – Ho
Saigon M&C
oration – Cầ
nd QA/QC t
Co. Ltd. -
agement cts from initiagement, deandover.
er & Tracthe
Manager ogdom wide
tor – Mivan
bility for setting an estima
Constructioited Kingdo
the Kier Gro
reen field veover USD 60 and streavironment.
opment conal parking syn Thailand
ate: January
an the
o Chi
C
n Thơ
teams
al esign
e Ltd,
on a e.
ng up ating
on Co. om
oup) -
enture for P0M, Pandoramlining proThe building
nsisting of hystem and (77 Stories)
y 5, 2017
Pandora ra’s goal ocesses, g stands
high end top end and the
STE
File: Ste
Thai ProBangko
THE RIVELand, ththe lowswimmientranc(BANGKO
M&C TOrise builcompothe othe
OMON I facility w
WEST BAWater adistributand Macontrac
TEP-6 TEManag60 newbuildingtelecom
OTHERS
EDUCDATES
1983 to
1975 to
Others
BIO-
EPHE
phen Fealty
operty awaok.
R CONDO ANhis consists o
wer tower ong pools a
ce. The proOK)” and the
OWER (SAIGONding right onent at theer side of th
THERMAL POWwith TOA Co
ANGKOK WATand Ch. Kartion networanagers in ct requireme
LECOMMUNICer), for Sau
w telephonegs, satellitmmunicatio
CARREFOUR STHE RARCHADFRASER SUITESTRIUMPH MOTCUTTING EDGTRIUMPH AVIATHE LAKES, BaOAKWOOD, BTRIUMPH MOTNORTHSHORE
CATIONLO
1985 BB
1982 St
TeOC
-DATA Nationality
EN F
y CV (Jan. 2
ard “BEST LU
ND VUE MALof two towe
of 42 storiesand sky gaoject receive “BEST CON
N ONE TOWERon the banke base with he tower.
WER PLANT (2orporation w
TER TREATMENTrnchang JVrk. Directly aensuring th
ents.
CATION UPGRAdi Wiemer &e exchangee stationsns provider
Shopping MDAMRI - Ritz CS, BANGKOK, (TORCYCLES, F
GE for Raja FATION SERVICEangkok for RBangkok, (2TORCYCLES, F
E, Pattaya fo
N OCATION
elfast Colleelfast
t. Columba
endering anOGL Course Computer Es
– Dual, bot
FEALT
2017)
XURY CONDO
LL, (2010-201ers of luxurys. The projeardens, togved Thai PrDO DEVELOPM
R), (2007-200k of Saigon R residential
006-2007) – within the E
T PLANT (200V. A USD 100and indirecthat proced
ADE (TEP-6), (& Trachte Les and mos, contain Lucent Tec
Mall, (2001-2Carlton Hote(2003) – 32 Sactory III, (2ashions, (20
E ASIA, (2005Raimon Lan2005) – 7 Stoactory IV (2
or Raimon La
ge of Techn
nnus High, C
nd Estimatin in Quality Astimating – C
h British and
TY
3 | 5
O DEVELOPME
12) – The flay residential ect is compgether withroperty awaMENT (THAILAN
09) – A 42 stRiver, Ho Ch unit above
ConstructioPC Contrac
02-2003) – 0m water tretly in controures are es
(1998-2001) Ltd. the maiodification pnerised exchnologies I
002) Samutel (2002), ofStorey Servic2004) – New006) – Servic5-2006) – 8,0nd (2004) - Lorey Service2005) – Newand (2005)
nology,
Co. Down, U
ng – CITB Assurance ACITB
d Irish passp
ENT 2014” a
agship proj units (857 u
plete with t a 4 story ards for “BND)”, in 2012
tory with 5 shi Minh Citye on one sid
on of a 330ct team run
Quality Asseatment plaol of the QAstablished a
- Senior Quin turnkey sprogram toxchanges nternationa
Prakan, Thaffice, retail ace apartme
w 20,000 m2 ce Apartme000m2 CleanLuxury Reside Apartmenw 65,000 m2
- 28 Storey
LEVEL
HNC - Survey
UK “O” le
Auditing (ISO
ports
Print Da
and the larg
ect of the units), one toop class fa shopping EST LUXURY C2. story basem, Vietnam. I
de and prim
Megawatt by Mitsubis
surance Maant, two sto
A responsibiland mainta
antity Surveub-contrac
o over 200 etc., tog
al Inc.
ailand. and privateents, circa Ufacility, circ
ents, circa USn Factory, cential Condts, circa USDfacility, circLuxury Cond
Building anying Studies
vels
O 9000)
ate: January
gest media
developer ower 71 sto
acilities, incmall at th
CONDO DEVE
ment multi-uIt consists o
me office sp
t power genshi Heavy In
anager for orage reserv
ity of 40+ Enained to sa
eyor (Actingctor to provi
existing exgether wi
e condominUSD18M ca USD 4M
SD 3M circa USD 5.5dos, circa UD 16M
ca USD 13M dos – USD 2
nd Quantity
y 5, 2017
a wall in
Raimon ories and luding 5
he main ELOPMENT
use high-f a retail
pace on
nerating dustry.
Thames voirs and ngineers
atisfy the
g Project ide over
xchange th the
ium.
5M SD 24M
1M
STE
File: Ste
REFE
EPHE
phen Fealty
DoB – 14 OStatus – MaClean UK D
RENCESMr. Richard|E: rcb@co|M: +66 81 Mr. Pierre-J|E: pierre-je|M: +84 913Mr. Lars R. N|E: lars.n@p|M: +66 63
EN F
y CV (Jan. 2
ctober 1963arried with twDriving Licen
S d C Bell, Maornerstonem 906 8907
Jean MALGOean.malgou3 904 983 Nielsen, Vicpandora.ne 474 0987
FEALT
2017)
3 (52 Years Owo dependnse.
naging Diremgmnt.com
OUYRES, Geuyres@arche
e Presidentet
TY
4 | 5
Old) dent childre
ector; Corne
eneral Direcetype-grou
, General M
n and two g
erstone Man
ctor; Archetyp.com
Manager; Pa
Print Da
grown up c
nagement C
ype Group.
andora Prod
ate: January
hildren.
Co., Ltd.
ductions, La
y 5, 2017
amphun.
STE
File: Ste
PAST
EPHE
phen Fealty
T PROJE
EN F
y CV (Jan. 2
ECTS FEALT
2017)
TY
5 | 5 Print Daate: Januaryy 5, 2017