step rate injectivity testing at surface solutions
TRANSCRIPT
![Page 2: Step Rate Injectivity Testing at Surface Solutions](https://reader036.vdocuments.mx/reader036/viewer/2022073118/55ab43b71a28abbd0e8b476d/html5/thumbnails/2.jpg)
Why?
To satisfy AER Directive 065 for
submission for disposal well applications.
To determine maximum wellhead injection
pressure.
To review if a well is suitable for disposal
injection.
Identify optimal rates vs. pressures.
![Page 5: Step Rate Injectivity Testing at Surface Solutions](https://reader036.vdocuments.mx/reader036/viewer/2022073118/55ab43b71a28abbd0e8b476d/html5/thumbnails/5.jpg)
STEP Test setupFluid is pumped at increasing but constant rates.
Meant to enter the formation at a certain pressure level.
![Page 6: Step Rate Injectivity Testing at Surface Solutions](https://reader036.vdocuments.mx/reader036/viewer/2022073118/55ab43b71a28abbd0e8b476d/html5/thumbnails/6.jpg)
To determine if well is suitable for injection.
Turbine and data setup
![Page 7: Step Rate Injectivity Testing at Surface Solutions](https://reader036.vdocuments.mx/reader036/viewer/2022073118/55ab43b71a28abbd0e8b476d/html5/thumbnails/7.jpg)
Remote AccessAll SSI equipment is portable for testing on remote locations.
![Page 9: Step Rate Injectivity Testing at Surface Solutions](https://reader036.vdocuments.mx/reader036/viewer/2022073118/55ab43b71a28abbd0e8b476d/html5/thumbnails/9.jpg)
Safety Overview
Surface Solutions is committed to
maintaining a high standard in health and
safety. All company specific orientations
and standard PPE requirements.
Along with:
BC First Aid
Alberta Safety Council ATV training
Bear Awareness (Enform)
![Page 11: Step Rate Injectivity Testing at Surface Solutions](https://reader036.vdocuments.mx/reader036/viewer/2022073118/55ab43b71a28abbd0e8b476d/html5/thumbnails/11.jpg)
www.SurfaceSolutions.ca
Mike Beck
Business Development Manager
Mark Jickling – Northern Sales
Gil Kleven – Calgary Sales
GRANDE PRAIRIE - HEAD OFFICE
RED DEER | ESTEVAN | CALGARY