Stefan Moeller
XES Status [email protected]
FAC Review – April 16, 2006
X-Ray Endstation Systems (XES) Status
Stefan Moeller
Stefan Moeller
XES Status [email protected]
FAC Review – April 16, 2006
Outline
Recent Developments
Status
Milestones
Plan for rest of FY07
Summary
Stefan Moeller
XES Status [email protected]
FAC Review – April 16, 2006
Recent Developments:
Effects of new LCLS baseline scheduleProvide a basic AMO instrument for 4a (3/09)
Add enhanced functionality for 4b (3/10)Provide controls infrastructure to enable operation of NEH for 4aPhase controls capabilities e.g. data storage, high level applicationsDelay systems/procurements related to Tunnel and Far Hall
PPS, ControlsXES Laser system delayedCornell Detector schedule not affected
Stefan Moeller
XES Status [email protected]
FAC Review – April 16, 2006
AMO Instrument
Scientific goals defined Physics Requirements finalized (PRD 12/06) Instrument components are identified (SCR 12/06) Working towards Preliminary Design Review (5/07) AMO controls requirements defined (CDR 4/07) ESDs of components in 5/07New baseline plan was reviewed with AMO science group
Stefan Moeller
XES Status [email protected]
FAC Review – April 16, 2006
AMO Instrumentation Overview
Differential pumpingFocusing opticsHigh field physics chamberDiagnostics ChamberMolecule/Cluster Imaging ApparatusHigh Field LaserControls
Stefan Moeller
XES Status [email protected]
FAC Review – April 16, 2006
AMO Plan
PDR in 5/07
FDR 10/07
Start procurements 6/07
Receive 3/08
Installation 5/08
Basic experimental capabilities ready for first light (8/08)
Full AMO apparatus complete 3/10
AMO Controls on same schedule
Stefan Moeller
XES Status [email protected]
FAC Review – April 16, 2006
Cornell 2D DetectorOver half way through the project (Start 1/05)LDAC Review #4 for CY06 (Feb. 05-06, 2007) Good review, on scheduleNext review in fall 07 (mid term review)Submitted full-lot 190x190 pixel ASIC and diodeReceive full lot prototype in 09/07Design full scale read out (FPGA), data transfer and storageDesigns on tiling and packaging are being developed
Stefan Moeller
XES Status [email protected]
FAC Review – April 16, 2006
Controls
2x per week meetings of the XES/LUSI Controls group
CDR 4/07 AMO experimental controls
AMO control hard ware components defined
Data acquisition and detector controlsSLAC in house CE module solution
Data storageSCCS BaBar model
see talk by B. Sass
Stefan Moeller
XES Status [email protected]
FAC Review – April 16, 2006
XES/LUSI Architecture
Robert C. SassXES Conceptual Design Review
April 10 2007 5
SCCS
XES Hutch
DetectorInstrument(s)
Hutch IOCs &Instruments
X-Ray Transport to Diagnostics & Next Hutch
EthernetFast DAQData
DetectorControl
Anywhere
LCLS DataRetrieval
eXperimental End Station System Overview
EPICS Archive
MPG/LCLS Event Generator
Linac & LCLS Control GUI
MCC Main Control Room
Linac/LCLSInjector
Linac
InjectorUndulator
X-RayBeam
EVR Hardware Triggers
XESprivatesubnet
DataAcquisition
Subsystem(s)
XES Controller
Experimenter
LCLSAnalysis / Viewing
SLAC WAN
EventReceiver
Channel AccessGateway
Visual Data Monitor
120Hz IOC
120 Hz ArchiveEngine
120
Hz
Bea
m L
ine
Dat
a
120 Hz Beam Line & Timestamp Data (dedicated Ethernet)
XTOD
SLAC WAN
Mac
hin
e P
rote
ctio
n (
MP
S)
EELOG
EELOG
Beam LineProcessor
OtherDatabases
DAQArchive
SlowInstrument
Archive
XESData
Cache
FastInstrument
Archive
ExperimentSpecific IOCs &
InstrumentsMPS
MPS
DigitizedData
Channel Access
Stefan Moeller
XES Status [email protected]
FAC Review – April 16, 2006
Other XES activities
Biweekly meeting of the LUSI-LCLS interface working group
Rebaseline of XES schedule to be finalized soon
PPS stopper design is progressing
Safety review process has started with SOC
Stefan Moeller
XES Status [email protected]
FAC Review – April 16, 2006
XES L3 Milestones
Level 3
FY07LDAC Mid-Project Review 2D Detector 4/07CT: Network Final Design Review 5/07CT: AMO Exp. Control Final Design Review 9/07
FY08Ready for Installation in NEH 10/072D Detector Production Start 12/07XES Laser Final Design Review 2/08Electron Dump Stopper certified 2/08Start XES Commissioning 3/08Award XES Laser System 4/08CT: AMO Exp. Control Complete 7/08AMO Mech./Vacuum Installation complete 9/08
FY09CT: Complete Network Installation 10/08XES Laser Operating in NEH 12/08Complete Acceptance Tests of Detectors 1/09
Stefan Moeller
XES Status [email protected]
FAC Review – April 16, 2006
6 Month Look AheadXES Management:
Finalize Rebaseline ScheduleXES Controls: (LCLS Controls)
Start Preliminary Design phaseXES Laser: (LCLS Lasers)
Delayed: Specify Laser, Diagnostics and TransportAMOS
PDR 5/07FDR 11/07Start procurements 6/07
PPS Stoppers and Shielding: (delayed)PRD PPS in signing stageESD and Design of Photon stoppersElectron beam dump stoppers
Cornell Detector:Bump bonding ASIC to diodeDelivery of full lot proto to SLAC (9/07)Design read out electronic and data handling
Stefan Moeller
XES Status [email protected]
FAC Review – April 16, 2006
Summary
XES is responding to new LCLS baseline plan
Controls design for XES has started, tight schedule
On track for delivering a basic AMO station for experiments for first light
2D Detector program at Cornell is on schedule
Started Safety Review process for x-ray areas