Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today! FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander March 2015 1

Upload: andrea-cook

Post on 08-Jan-2018

225 views

Category:

Documents


0 download

DESCRIPTION

Replace Cooling Tower (Building 2320) Supports the cooling system for the entire ENJJPT Squadron Ops Building 12 years old and beyond economical repair…normal service life is 7 – 9 years Rated RED by installation’s civil engineer “Most likely of any cooling tower at Sheppard AFB to go inoperable at any time.” No feasible work around if failure occurs during the peak summer heat periods 3

TRANSCRIPT

Page 1: Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander

Steering Committee 69

“Training and Developing Tomorrow’s NATO Air Warriors Today!”

FY15 Wing Commander

Projects

Colonel Gregory KeetonWing Commander

March 2015

1

Page 2: Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander

CurrentDescription EstimateAircraft Paint Barn Renovation $2,000KTOTAL $2,000K

Alternative FY15 ProjectsReplace Cooling Tower (Building 2320) $500KAircraft Composite Maintenance Clean Room (Building 2320) $380KTaxiway J Shoulder Repair $450KRepair and Upgrade Electrical Systems, Shop Areas (Building 2320) $210KRepair Electrical Distribution Hangar 2406 $200KReplace Roof Hangar 2402 $260KTOTAL $2,000K

FY15 Wing CC Projects(Alternative Proposal)

2

Page 3: Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander

Replace Cooling Tower(Building 2320)

• Supports the cooling system for the entire ENJJPT Squadron Ops Building• 12 years old and beyond economical repair…normal service life is 7 – 9 years• Rated RED by installation’s civil engineer

• “Most likely of any cooling tower at Sheppard AFB to go inoperable at any time.”• No feasible work around if failure occurs during the peak summer heat periods

3

Page 4: Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander

Composite Clean Room

Advanced Composite Clean Room

Zero particle “clean” room needed to accomplish repair to composite fiberglass and carbon fiber aircraft panels and components• New T-38 flight controls• New T-38 -33 wing panels

• T-6 flight controls and engine cowling panels

Without clean room, maintenance and repairs or composite components is not authorized which would require shipping components for repair or purchasing new components

4

Page 5: Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander

Taxiway J Shoulder Repair

• Existing shoulders must be repaired• Originally installed in 1959• Adjacent to T-6 power check pads and ENJJPT ramp• Asphalt surface is brittle, crumbling and creating FO• No longer maintainable…“unsustainable”

• Existing shoulder width reduced from 50’• 30’ width for east shoulder to Taxiway Kilo for emergency vehicle access from

the north fire station• 10’ width for west shoulder

• Shoulder area not repaved returned to sod

Page 6: Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander

Taxiway J Shoulder Repair

ENJJPT Ramp

T-6 Power Check Pad

North Fire

Station

Emergency Vehicle Access

AGE Storage

Page 7: Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander

Other

Repair and Upgrade Electrical Systems, Shop Areas (Building 2320)• Upgrade electrical panels and circuits to reduce partial outages

Repair Electrical Distribution Hangar 2406 (T-38 Phase Dock)• Provide additional outlets for T-38 maintenance• Replace worn out electrical panels which overheat during summer months

Replace Roof Hangar 2402 (Paint Barn)• Roof leaks during rain events in several locations within the paint room negatively impacting

aircraft painting operations

7

Page 8: Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander

QUESTIONS/COMMENTS

RAISE WARRIORS!!!8