steel parking slide show (compressed file)

41
Portland International Airport Parking Addition Portland, OR 3,300 spaces added Constructed in 1999 Steel frame with composite slab on metal deck

Upload: mstockmann

Post on 20-Jan-2015

2.492 views

Category:

Real Estate


1 download

DESCRIPTION

Several photos of successful steel parking structures are featured in this picture slide show. Specific facts are also captioned--including location, number of spaces, construction year, and structural system.

TRANSCRIPT

Portland International Airport Parking Addition

Portland, OR

3,300 spaces added

Constructed in 1999

Steel frame with composite slab on metal deck

Portland International Airport Parking Addition

Portland, OR

3,300 spaces added

Constructed in 1999

Steel frame with composite slab on metal deck

Legacy at Salmon Creek

Vancouver, WA

1,500 spaces

Constructed in 2004

Castellated steel beams with composite slab on metal deck

Burlington International Airport

Burlington, VT

1,140 spaces

Constructed in two phases— 1997 and 2003

Steel frame with pre-cast concrete double tee deck

Allegheny Hospital

Pittsburgh, PA

1,100 spaces

Constructed in 1985

Castellated steel beams with post-tensioned concrete deck

Inn of the Mountain Gods Hotel and Casino

Mescalero, NM

1,500 spaces

Constructed in 2006

Castellated steel beams with composite slab on metal deck

Inn of the Mountain Gods Hotel and Casino

Mescalero, NM

1,500 spaces

Constructed in 2006

Castellated steel beams with composite slab on metal deck

Inn of the Mountain Gods Hotel and Casino

Mescalero, NM

1,500 spaces

Constructed in 2006

Castellated steel beams with composite slab on metal deck

Harrisburg International Airport

Harrisburg, PA

3,200 spaces

Constructed in 2004

Galvanized steel frame with pre-cast concrete double tee deck

Harrisburg International Airport

Harrisburg, PA

3,200 spaces

Constructed in 2004

Galvanized steel frame with pre-cast concrete double tee deck

Newark International Airport Lot E Garage

Newark, NJ

3,300 spaces

Constructed in 2001

Steel frame with pre-cast concrete double tee deck

Jefferson at Lenox Park

Atlanta, GA

620 spaces

Constructed in 2000

Castellated steel beams with composite slab on metal deck

St. Vincent Hospital Garage Addition

Portland, OR

825 spaces

Constructed in 2005

Castellated steel beams with composite slab on metal deck

Winthrop University Hospital

Mineola, NY

680 spaces, Constructed in 2002

700 space vertical addition, Planned for 2009

Steel frame with post-tensioned concrete deck

Ruby Memorial Hospital Parking Addition

Morgantown, WV

100 spaces added

Constructed in 2007

Steel beams with post-tensioned concrete deck

Southern Gateway Garage

Lewiston, ME

370 spaces

Constructed in 2006

Steel frame with composite slab on metal deck

John F. Kennedy International Airport

Green Garage

New York, NY

1,800 spaces

Constructed in 2000

Steel frame with pre-cast concrete double tee deck

Bright House Networks

St. Petersburg, FL

675 spaces

Constructed in 2004

Castellated steel beams with composite slab on metal deck

Station Square

Pittsburgh, PA

800 spaces, Constructed in 1980

400 space vertical addition, Constructed in 1990

Castellated steel beams with post-tensioned concrete deck

Portland International Jetport

Portland, ME

1,200 spaces

Constructed in 2002

Galvanized steel frame with pre-cast concrete double tee deck

Clarkson Hospital Parking Garage

Omaha, NE

600 spaces

Constructed in 1979

Steel frame with post-tensioned concrete deck

Clarkson Hospital Parking Garage

Omaha, NE

600 spaces

Constructed in 1979

Steel frame with post-tensioned concrete deck

Manchester Airport Parking Garage

Manchester, NH

4,600 spaces

Constructed in 1999

Galvanized steel frame with pre-cast concrete double tee deck

Hard Rock Casino Garage

Hollywood, FL

2,300 spaces

Constructed in 2006

Castellated steel beams with composite slab on metal deck

Hard Rock Casino Garage

Hollywood, FL

2,300 spaces

Constructed in 2006

Castellated steel beams with composite slab on metal deck

Park Street Garage

Lewiston, ME

700 spaces

Constructed in 2004

Steel frame with composite slab on metal deck

Crickelwood Hill Apartments

Pittsburgh, PA

120 spaces

Constructed in 1974

Castellated steel beams with post-tensioned concrete deck

Duquesne University

Pittsburgh, PA

2,500 spaces

Constructed in 1986

Castellated steel beams with post-tensioned concrete deck

Northern Colorado Medical Center

Greeley, CO

760 spaces

Constructed in 2004

Galvanized steel frame with post-tensioned concrete deck

Northern Colorado Medical Center

Greeley, CO

760 spaces

Constructed in 2004

Galvanized steel frame with post-tensioned concrete deck

Station Place Garage

Portland, OR

IDEAS2 Award Winner 2006

400 spaces

Constructed in 2005

Steel frame with composite slab on metal deck

Station Place Garage

Portland, OR

IDEAS2 Award Winner 2006

400 spaces

Constructed in 2005

Steel frame with composite slab on metal deck

Tufts Health Plan

Watertown, MA

1,400 spaces

Constructed in 1997

Steel frame with pre-cast concrete double tee deck

Sabine Street Lofts

Houston, TX

550 spaces

Constructed in 2001

Castellated steel beams with composite slab on metal deck

Sabine Street Lofts

Houston, TX

550 spaces

Constructed in 2001

Castellated steel beams with composite slab on metal deck

Sands Bethworks Garage

Bethlehem, PA

3,300 spaces

Constructed in 2009

Galvanized castellated steel beams with post-tensioned concrete deck

Presbyterian University Hospital

Pittsburgh, PA

1,000 spaces

Constructed in 1985

Steel beams with post-tensioned concrete deck

Presbyterian University Hospital

Pittsburgh, PA

Office addition over existing garage, constructed in 1992

Chestnut Street Garage

Lewiston, ME

610 spaces

Constructed in 2002

Steel frame with composite slab on metal deck

Harrah’s/The Venetian Shared Parking Facility

Las Vegas, NV

4,250 spaces

Constructed in 2006

Steel frame with composite slab on metal deck

Harrah’s/The Venetian Shared Parking Facility

Las Vegas, NV

4,250 spaces

Constructed in 2006

Steel frame with composite slab on metal deck