Steam System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012

Upload: phungnhan

Post on 23-May-2018

219 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Steam System Balancing and Tuning

Building America Stakeholder Meeting

Austin, TX

Jayne Choi, Energy Analyst, CNT Energy

March 2, 2012

Page 2: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

PARR

Current collaboration with GTI as a part of the PARR Building America team−Steam Systems Balancing

and Tuning Study−Heating season 2011-2012

Page 3: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

BackgroundIn Chicago, heating is the focus of residential energy use

Of the 470,000 multifamily units in the Chicago region, at least 70,000 of those are steam heated

Old steam systems invariably suffer from imbalance− Tenants must use supplemental heat

or open their windows to cool their apartments during the heating season

Buildings are often overheated

Problem Statement

(CNT Energy)

Page 4: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Steam Heating

Steam heat was the best option for buildings constructed between 1900 and 1930

Boiler cycle of single pipe steam systems

Systems have been upgraded from coal to natural gas and many have undergone boiler replacement, but distribution systems remain largely the same

Not designed for efficiency(Peterson, 1985)

Page 5: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Problem Statement

Page 6: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Problem Statement

BackgroundContractors currently not commonly selling system balancing as a service or recommending it as a measure

Not tangible – often just requires time and dedication rather than expensive equipment replacements

Difficult to convince owners of its value− Balancing is a separate issue from boiler replacement− Natural gas is cheap, so it is not worth the time or effort

Page 7: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Problem Statement

Cost-effectiveness

Improving the balance of buildings provides− Opportunity for cost savings− Previous studies: 5-15%

energy savings, 2-5 year payback

− Increased resident comfort(Peterson, G., 1985)

Page 8: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Research Questions

How do steam balancing measures affect the temperature dynamics within units?

Will steam balancing affect the average length of boiler cycles?

How cost-effective are steam balancing measures?

Page 9: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Technical Approach

Steam balancing measures− Replacing radiator vents− Adding or upgrading main line air venting− Boiler controls (4-6 sensors, indoor averaging)

Page 10: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Technical Approach

Install steam balancing measures in 10 test buildings:

Single-pipe steam

15-30 units

Uneven heating throughout the building (based on observations from auditor, building manager, and/or tenants)

Boiler in good condition

Page 11: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

A single point of contact to provide multifamily building owners with access to:

Technical Assistance− Utility bill analysis− Energy assessment− Cost-effective energy-saving recommendations

Financing− Low-cost financing through our partner, the

Community Investment Corporation

Construction Oversight

Annual Performance Monitoring− Two years post-retrofit

Energy Savers Program

Page 12: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Technical Approach

Pre-Balancing Natural Gas Usage (For Heating) in Test Buildings

0

20

40

60

80

100

120

140

160

180

1 2 3 4 5 6 7 8 9 10

Buildings

Ene

rgy

Use

Int

ensi

ty

(kB

TU

/sq

ft/y

r)

(Data has been weather-normalized)

Page 13: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Technical Approach

Retrieve pre-upgrade measurements and data for monitoring− Structural data− Boiler information/pipe structure/condition of vents/type of existing controls− Temperature data from units− Boiler run-time data− Tenant survey/heat calls

Develop detailed scopes for steam balancing work to be done− Measures included replacing

radiator vents, adding or upgrading mainline air vents, and installing boiler controls

− Scopes included price breakdowns for each measure

Page 14: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Technical Approach

Oversee general contracting− Inspection of work/quality control− Boiler control settings

Collect post-upgrade data− Temperature data from units− Boiler run-time data− Tenant survey/heat calls

Utility bill analysis comparing pre-upgrade and post-upgrade heating fuel use

− Weather-normalized calculation of heating Energy Use Intensity (kBTU/sq ft/yr)

(http://www.onsetcomp.com/products/data-loggers/u10-003)

Page 15: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Project Status

Pre-upgrade measurements and data collected

Steam balancing measures installed in test buildings

Pre-upgrade data being analyzed

Post-upgrade data collected (in process)

Page 16: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Analysis

Temperature control and steam systems behavior (pre and post-measure comparisons):Data from temperature loggers used to determine temperature distribution in building

Temperature and boiler firing data used to determine average time for units to heat up

Boiler run-time data shows the average length of boiler cycles

Tenant comfort survey

Page 17: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Pre-Measure Data

Pre‐Upgrade Unit Temperatures in Test Building

64

66

68

70

72

74

76

78

80

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour

Tempe

rature (d

eg F)

3rd Flr, South Side

3rd Flr, North Side

2nd Flr, South Side

2nd Flr, North Side

1st Flr, South Side

1st Flr, North Side

Page 18: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Analysis

Cost-effectivenessAverage cost of balancing (radiator vents, mainline vents, boiler controls)

Natural gas savings− Determined from boiler run-time data and utility bill

analysis

Natural gas savings converted to financial savings

Calculation of simple paybacks from financial savings and measure costs

Page 19: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Analysis

Measure Costs

Main line vents

Radiator vents

Boiler controls

Average cost* $1,800 $3,700 $5,100

* Averages of measure costs from 10 test buildings

Page 20: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Summary

Project seeks to −Determine the cost-effectiveness of steam balancing

measures−Develop steam balancing as a viable energy efficiency

measure−Provide guidelines to deal with some of the current

barriers associated with steam balancing systems

Page 21: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Questions?

Page 22: Steam System Balancing and Tuning - US … System Balancing and Tuning Building America Stakeholder Meeting Austin, TX Jayne Choi, Energy Analyst, CNT Energy March 2, 2012 PARR Current

Jayne ChoiEnergy Analyst

CNT Energy, Chicago, [email protected]