status report on cjk ngn working group april 9, 2007 7 th cjk standard meeting taesang choi chairman...

12
Status report on Status report on CJK NGN Working CJK NGN Working Group Group April 9, 2007 7 th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group

Upload: kevin-oneal

Post on 19-Jan-2016

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Status report on CJK NGN Working Group April 9, 2007 7 th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group

Status report on Status report on CJK NGN Working GroupCJK NGN Working Group

April 9, 2007

7th CJK Standard Meeting

Taesang Choi

Chairman of CJK NGN Working Group

Page 2: Status report on CJK NGN Working Group April 9, 2007 7 th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group

8th CJK NGN Working Group Meeting 2

Objectives and Tasks of NGN-WGObjectives and Tasks of NGN-WG

• Objectives– Cooperation among CJK to promote and reflect the studies

on NGN requirements and solutions to the relevant International NGN standardization activities

• Tasks– Collect and exchange industry/standard information on NGN-

related activities of each country,– Identify key standard areas to provide end-to-end multimedia

services over future NGN,– Pursue maximum commonality of NGN-related standards,– Confirm interconnectivity and interoperability of NGN

through interoperability tests among interested parties

• Phased approach will be taken from the top to the bottom of above items.

Page 3: Status report on CJK NGN Working Group April 9, 2007 7 th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group

8th CJK NGN Working Group Meeting 3

Working method; Two level meetingsWorking method; Two level meetings

• Working group meeting– High level standard direction and selected major technical issues are

discussed to promote the CJK collaboration– The meeting is expected to be held as much as possible in conjunction

with the CJK meeting. Additional WG meetings can be held with permission by the CJK plenary

– The progress report will be made at the CJK plenary

• Ad hoc meeting by technical experts– Key specific technical issues are discussed among technical experts

who participate in the relevant ITU-T meeting– The meeting is held in the previous day of each NGN-related ITU-T

meeting to share the standards views among the CJK members to lead the discussion

– Also meet in the middle of each ITU-T NGN-GSI meeting if necessary to resolve any critical issues among CJK

Page 4: Status report on CJK NGN Working Group April 9, 2007 7 th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group

8th CJK NGN Working Group Meeting 4

NGN-WG Management structureNGN-WG Management structure

• Chairman: Mr. Taesang CHOI (TTA, Korea)• Vice Chairman: Mr. Naotaka MORITA (TTC, Japan)

• Vice Chairman: Ms. Duo LIU (CCSA, China)Duration; One-year term (July 2006 – June 2007)

Chairman

Vice-Chairmen

NGN-WG meeting Ad hoc meeting

Task groupTask group

Page 5: Status report on CJK NGN Working Group April 9, 2007 7 th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group

8th CJK NGN Working Group Meeting 5

Meeting historyMeeting history• WG meetings

– 1st CJK NGN WG Meeting (6 July 2004, Seoul, Korea) hosted by TTA (Plenary)– 2nd CJK NGN WG Meeting (11-12 November 2004, Tokyo, Japan) hosted by

ARIB/TTC– 3rd CJK NGN WG Meeting (28-29 March 2005, Tokyo, Japan) hosted by

ARIB/TTC (Plenary)– 4th CJK NGN Working Group Meeting(24 June 2005, Beijing, China) hosted by

CCSA– 5th CJK NGN Working Group Meeting(15-16 Dec 2005, Seoul, Korea) hosted by

TTA– 6th CJK NGN Working Group Meeting(10-11 April 2006, Hang Zhou, China)

hosted by CCSA (Plenary)– 7th CJK NGN Working Group Meeting(10-11 October 2006, Tokyo,Japan)

hosted by TTC – 8th CJK NGN Working Group Meeting(5-6 Feb 2007, Jeju, Korea) hosted by

TTA

• Ad hoc meetings– 16 Jul 2006 at Geneva for ITU-T NGN-GSI meeting– 21 October 2006 at Geneva for ITU-T NGN-GSI meeting– 7 January 2007 at Beijing for ITU-T NGN-GSI meeting

Page 6: Status report on CJK NGN Working Group April 9, 2007 7 th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group

8th CJK NGN Working Group Meeting 6

Key achievement of NGN-WGKey achievement of NGN-WG

• Agreement on the objectives of NGN-WG

• Agreement on the key tasks of NGN-WG

• Agreement on the organizational procedure of NGN-WG such as working method, rules for participants and contributions, guidelines of meeting host and publication

• Agreement on the setup of a new task group on NGN-Testbed and Phase 1 testing is completed

• Agreement on the setup of IPTV ad-hoc group and collaboration for co-authoring relevant contributions to FG IPTV meetings

• Agreement on CJK-NGN Ad-hoc meetings held before the ITU-T NGN-GSI meetings and Review of CJK contributions to NGN-GSI meetings and collaboration activities to support critical ones

• Agreement on collaboration for NGN Release 2 activities such as NGN R2 Requirements, Multicast, Mobility issues for NGN R2

Page 7: Status report on CJK NGN Working Group April 9, 2007 7 th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group

8th CJK NGN Working Group Meeting 7

Major topicsMajor topics• NGN Release 1 Issues

– NGN R1 Requirements– NGN R1 Architecture– NGN R1 Resource Admission Control Functions– NGN R1 Performance Monitoring for NGN

• NGN Release 2 Issues– NGN R2 Requirements– NGN Mobility– NGN Multicast– Home Networking

• IPTV Issues– CJK Harmonization on IPTV issues (e.g., Multicast, etc.)– FG IPTV activity Coordination

• CJK Test-bed Issue– Phase I: 2006 3rd/4th Quarter

• Network Connectivity• Scenarios 2 and 4 only• First Report/Demo during 9th CJK NGN Meeting (April 2007)

– Phase II: 2007 1st/2nd Quarter• Scenarios 1 and 3• Second Report/Demo during 10th CJK NGN Meeting (September or October 2007)

– Phase III: 2007 3rd/4th ~ 2008 1st/2nd Quarter• Scenario 5 ~ 7• Testing details will further be defined depending on the technology availability status• Third Report/Demo 11th CJK NGN Meeting

Page 8: Status report on CJK NGN Working Group April 9, 2007 7 th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group

8th CJK NGN Working Group Meeting 8

• NGN standard activities were initiated by Europeans

• But it was not enough to make global notification

• CJK involved in this area since the 1st JRG-NGN meeting at Munich, October 2003

• After joining CJK in ITU-T based activities including various Workshops, NGN standards became global issue

• Especially FG NGN group was launched at June 2004 based on the agreements which made at Beijing April 2004 among ITU-T Europe, North America and Asian Key members

• Since the launching of FG NGN, CJK members have become most important members with enormous contributions

• Recently CJK played a critical role to launch FG IPTV and is actively leading and contributing the activity

• In summary, CJK now has a key leading role for the global NGN standards

CJK contribution to NGN Global StandardsCJK contribution to NGN Global Standards

Page 9: Status report on CJK NGN Working Group April 9, 2007 7 th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group

8th CJK NGN Working Group Meeting 9

NGN Test-bed Task group in NGN Test-bed Task group in NGN-WGNGN-WG

• Key objectives of NGN-testbed

• - Building a common NGN technology testing infrastructure

• - Feasibility testing prior to NGN commercial deployment

• - Interoperability testing for NGN components

• - Providing NGN service development platform for inter-

• country issues

• - Cooperation with other international NGN related testbeds

• The CJK meeting endorsed on the launch of the NGN-testbed task group and high-level support for the testbed project

• Dr. Taesang Choi (TTA) was nominated to the NGN-testbed task leader

• Test-bed networks between Korea and China was first established in October 2006

• The first test to be performed is VoIP & MoIP over Call Server networks

• Phase I test was successfully completed in March 2007 between Korea (ETRI) and China(CATR)

• Phase II & III activities will be continued

Page 10: Status report on CJK NGN Working Group April 9, 2007 7 th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group

8th CJK NGN Working Group Meeting 10

Future meeting planFuture meeting plan

• Ad hoc meeting at ITU-T NGN-GSI on Sunday, April 15 in Geneva

• 10th NGN-WG meeting, Venue is TBD• 11th NGN-WG meeting, Venue is TBD

NGN-WG requests the CJK meeting to endorse the following meetings as the NGN-WG activities.

Page 11: Status report on CJK NGN Working Group April 9, 2007 7 th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group

8th CJK NGN Working Group Meeting 11

ConclusionsConclusions• NGN-WG agreed the objectives, the tasks and the organizational

procedure of the WG• CJK-NGN members contribute to the NGN global standards

activities in the NGN-GSI, SG11, and SG13 meetings and play a key role of the standards activities

• NGN-WG agreed to setup a new ad-hoc group on IPTV in NGN-WG and request strong support from the CJK members

• NGN-WG proposed future Ad hoc meeting and NGN-WG meeting plans before the next CJK meeting in 2008