status report of switzerland meetings seminars and...4 swiss aip change part 2 en-route, enr 1.1...
TRANSCRIPT
![Page 1: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/1.jpg)
1
Status Report of Switzerland
Marc Troller
CNS expert group, skyguide
Romano Germann
IFP expert group, skyguide
![Page 2: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/2.jpg)
2
Agenda
› Overview PBN Implementation Status
› Swiss AIP Change
› GNSS Interference Detection Method
Ground
Airborne
› Navigation Infrastructure / Procedure Planning
(Flight Plan Data Analysis)
![Page 3: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/3.jpg)
3
PBN Implementation Status in Switzerland
Zurich
Geneva
Lugano
Samedan
St. Gallen
Sion
Les Eplatures
Buochs
Berne
Dübendorf
Grenchen
Legend
In Operation
Project
Alpnach
Inselspital
Meiringen
Kantonsspital Luzern
"Apollinaire"
2 1
1 1
3 2
1 1
1
1
1
1
1
1
1
1
1
1
1
2
1 Emmen
![Page 4: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/4.jpg)
4
Swiss AIP Change
Part 2 En-route, ENR 1.1 General Rules
› Services are currently based on GPS (flight inspection/validation,
performance monitoring, legal recording, GNSS NOTAM)
› Interim solution published in the AIP:
› 4.4 Use of GNSS
GNSS may be used in the Swiss Airspace. Avionics receivers must be certified according ETSO (European
Technical Standard Orders) / TSO (Technical Standard Orders). Consequently, the supported GNSS constellation is
the NAVSTAR Global Positioning System (GPS) and the supported augmentation systems are the Aircraft Based
Augmentation System (ABAS) and, the European Geostationary Navigation Overlay Service (EGNOS) - the
European SBAS and the Ground-Based Augmentation System (GBAS).
› This will change in the future…
![Page 5: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/5.jpg)
5
GNSS Interference Detection – Process
› Reference: ICAO Electronic Bulletin EB2011/56 Interference to
Global Navigation Satellite System (GNSS) Signals
› Activity during implementation of new RNAV APCH:
- 7 day static monitoring on ground
- flight inspection (1 flight)
› Ground monitoring includes:
- GNSS receiver (1Hz recordings)
- Spectrum analyser (1 Hz recordings)
› Analysis includes:
- GNSS performance calculation
- GNSS Carrier-to-noise analysis
- Spectrum analysis
![Page 6: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/6.jpg)
GNSS Interference Detection – Results
6
![Page 7: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/7.jpg)
GNSS Interference Detection – Results LSZA
7
Animation 15 minutes
![Page 8: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/8.jpg)
GNSS Interference Detection - Airborne
› Project Helicopter Recording Random Flights
Cost efficient Quick Access Recorder (QAR) integration solution for
military Swiss Air Force and Swiss Air Rescue Service REGA (SAR-
helicopters)
8
![Page 9: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/9.jpg)
Project HRRF: Objectives
› Performance Analysis (protection levels, service availability)
› Carrier-to-Noise analysis (interference detection)
› Flight technical error determination (navigation system flight path vs.
desired flight path) if procedures are used
› Total system error determination for specific cases (use of additional
geodetic GNSS receiver)
› Specific analyses…
9
![Page 10: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/10.jpg)
10
Project HRRF: Aircraft Used
› For the data-recording modern helicopters are in use. These helicopters are
operated by the partner organizations REGA and Swiss Air Force.
› The following helicopter types are used:
› Swiss Air Force (SAF)
18 Helicopters Eurocopter type
EC635/135
› Swiss Air Rescue Service (REGA)
6 Helicopters Eurocopter
EC145 type,
11 Agusta / Westland AW109SP
(DaVinci)
![Page 11: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/11.jpg)
11
Installation on REGA Agusta Westland AW109 DaVinci
MiniQAR Installation
![Page 12: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/12.jpg)
Project HRRF: Project Status
Equipped:
› 3 Helicopters Eurocopter type EC635/135
› 2 Helicopters Eurocopter EC145
› 11 Agusta / Westland AW109SP (DaVinci)
Remaining helicopters will be equipped until end 2014
Data analysis just started…
12
![Page 13: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/13.jpg)
Project HRRF: Flight Track Analysis
13
![Page 14: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/14.jpg)
Navigation Infrastructure Planning / Flight Plan Data Analysis
› Plenty of possibilities for new procedures available
› Number of possible procedures limited (airspace complexity)
› Fleet equipment limited and different
› Existing navigation infrastructure often optimised for conventional
procedures
Flight plan data analysis to obtain fleet equipment
14
![Page 15: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/15.jpg)
Flight Plan Data Analysis
› Automated process to analyse FPL data
› Daily delivery of all FPL data
› Process to obtain:
- PBN capability information
- CNS equipment information
15
![Page 16: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/16.jpg)
16
![Page 17: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/17.jpg)
17
![Page 18: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/18.jpg)
Minimum Capability LSAZ
18
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Non-RNAV
RNAV 5
RNAV 1
Skyguide/OOLP_RG/TNP_MT
![Page 19: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/19.jpg)
19
![Page 20: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/20.jpg)
20
![Page 21: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/21.jpg)
21
RNP APCH to LNAV and LPV minima implemented
25.07.2013
![Page 22: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/22.jpg)
22
![Page 23: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/23.jpg)
23
![Page 24: Status Report of Switzerland Meetings Seminars and...4 Swiss AIP Change Part 2 En-route, ENR 1.1 General Rules ›Services are currently based on GPS (flight inspection/validation,](https://reader035.vdocuments.mx/reader035/viewer/2022071017/5fd04d4e9f3eec1a4a1d7ea3/html5/thumbnails/24.jpg)
Flight Plan Data Summary
› Powerful tool to get information on fleet equipage
› Data quality depends on operators to correctly fill FPL data
› Partly, PBN capability is mentioned in remark field
› Considerable amount of PBN capable flights found which did not
mark RNAV5 (either only RNP10 or RNAV1&RNP1&…)
24