Status of the FAIR Project. FAIR and GSI a short introduction FAIR technical, political and financial status Status of Work power converters. H.Ramakers/EET H.Welker/EET. 1. Status of the FAIR Project. FAIR and GSI a short introduction - PowerPoint PPT PresentationTRANSCRIPT
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
1
Status of the
FAIR Project
- FAIR and GSI a short introduction
- FAIR technical, political and financial status
-Status of Work power converters
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
2
Status of the
FAIR Project
- FAIR and GSI a short introduction
- FAIR technical, political and financial status
-Status of Work power converters
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
3
FAIR is:
- a sientific project
- a technical project
and
- a financial project
- a political project
FAIR and GSI a short introduction
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
4
Link: http://www.gsi.de/portrait/ueberblick_e.html
National research facility: GSI Heavy Ion Research Facility
Asssocciates: State of Hessen 10% Federal Republic of Germany 90%
Gesellschaft für Schwerionenforschung
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
5
Link: http://www.gsi.de/portrait/ueberblick_e.html
National research facility: GSI Heavy Ion Research Facility
Asssocciates: State of Hessen 10% Federal Republic of Germany 90%
GSI Helmholzzentrum für Schwerionenforschung GmbH
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
6
Link: http://www.gsi.de/fair/index_e.html
International research facility: FAIR
Asssocciates: Germany 75% (65% / 10%; Federal / Hessen) International partners 25%
Facility for Antiproton and Ion Research
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
7
SIS 100/SIS 300
CR/RESR NESR
HESRSFRS
SIS 18p-Linac
UNILACFRS/ESR
GSI:
-UNILAC
-Transfer Line
-SIS 18
-ESR
-FRS
-Beam lines
FAIR:
-Proton Linac
-SIS 100
-SIS 300
-Super Fragment Separator
-pbar
-Storage Rings
-Beam Transport System
- Experimental and Target Areas
Upgrade
components partly reused in FAIR
Status 2008 and the realization is based
on the concept of Inkind contribution
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
8
An international partner takes over a work package
in own technical and financial responsibility
according to the functional needs
and basic specifications of the work package
and the costs as listed in the cost book.
The concept of InKind-Contributions:
Because of this many administrative and political
Issues had to be solved in the last 2 years.
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
9
Status of the
FAIR Project
- FAIR and GSI a short introduction
- FAIR technical, political and financial status
-Status of Work power converters
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
10
- Because of an increase in cost for
- accelerators
- experiments
- civil engineering
the Modularized Start Version was defined
and agreed upon by the international partners.
Political and financial Status:
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
11
Module 0SIS 100 with connection to GSI accelerators
Module 1SIS 100 experiments areas
Module 2SFRS
Module 3p-linac, antiproton targert, CR, HESR
Modules 4 (NESR) and 5 (RESR) are not marked
Modularized Start Version of FAIR
Modules 0…3
Start of construction 2011Readiness for operation 2016
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
12
Political and financial status
-There are firm commitments of 16 international partners including Germany summing up to 1.1 Billion €.
-Recently announced commitments of more interested countries are not included in the sum.
Contracts are finalized and supposed to be signed in the third quarter of 2010.
FAIR GmbH is expected to be founded in the third quarter of 2010, too.
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
13
Technical status
- The modularized civil construction design is in an iterative loop to meet the financial limits as given by the Modularized Start Version.
- It will be finished in July 2010.
- This construction design is not the detailed final construction, but it defines the fundamental layout and later, major changes are not possible because of the German procedure for building projects funded by public authorities (ZBau).
An example for the actual iteration loop is the tunnel for the two accelerators SIS 100 and SIS 300 and the parallel tunnel for components, which should be close to the machine but do not have to be in the machine tunnel.
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
SIS 100/300 Paralleltunnel Created in the first ZBau-loop:
- Components are in non radiated area
- access to components while beam is on
- very short cables to the beam line
Thickness of radiation shielding is in discussion
Width of parallel tunnel is in discussion
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
Independent from the modifications due to the Modularized Start Version
there are more technical changes in the project since the status of 2008
An example for changes as mentioned above is the connection to the Electrical Power Grid.
Technical Status continued
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
16
GSI/FAIR Power Connection
External Power Distribution
Pulse power :
1 : 63 MVA
2 : 31.5 MVA
Common power
1 : 31.5 MVA
2 : 31.5 MVA
3 : 31.5 MVA
New transformers are marked red .
High voltage power supply system
200 MVA 200 MVA
220 kV
110 kV common 110 kV pulsed
31,5 MVA 63 MVA 31,5 MVA
Substation Urberach
Substation Leonhardstanne
Power plant
electricallyclose to GSI 220 kV
Generator B
Torquemesurement
20 kV
Public4 cables //each 300 CU
2 cables //each 300 CU
20 kV pulsed 1
2 cables //each 300 CU
31,5 MVA
20 kV
3 cables //each 150 CU
20 kV pulsed 2common 1 common 2
31,5 MVA
20 kV common 3
=AG =AF =AD =AI =AH=AA/=AB/=AC
SIS 18 SIS 100 SIS 300HEBT
2 cables //each 300 CU
20kV System
Common System GSI / FAIR
Finished July 2006
Electrical Power Grid : Status 2008
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
17
Increase of Common Power C2 to 63 MVA because:- all magnets of HESR are decided to be normal conducting- Dipols of CR-Ring are decided to be normal conducting
Electrical Power Grid : Status 2008 to 2010
63 MVA transformers are placed on the FAIR-site because: - reduction of number of transmission cables to the site
Decision to parallel the transformers PP1 and PP2 because:
- voltage fluctuations due to reactive power swings of 46 MVAr are reduced to 3.7%
- additional costs are very small
Increase of Pulse Power PP2 to 63 MVA because:- all magnets of HEBT are decided to be normal conducting- Transformers of PP1, PP2 and C2 are interchangeable- 3 Transformers of the same type 63 MVA do not cost much more
than 1 transformer 31,5 MVA and 2 transformers 63 MVA
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
18
GSI/FAIR Power Connection
External Power Distribution
Pulse power :
1 : 63 MVA
2 : 63 MVA
Common power
1 : 31.5 MVA
2 : 63 MVA
3 : 31.5 MVA
New transformers are marked red .
Electrical Power Grid : actual status
High voltage power supply system
200 MVA 200 MVA
220 kV
110 kV common 110 kV pulsed
31,5 MVA
63 MVA63 MVA
Substation Urberach
Substation Leonhardstanne
Power plantelectrically closeto GSI
220 kV
Generator B
Torquemessurement
20 kV common 1
20 kV-System
StorageRings
20 kV4x500 CU
=AA
1x15
0 A
L
31,5 MVA
20 kV common 3
=AB =AC =AF =AM
63 MVA
=AP =AH
=AD
SIS 18
common 2
Cryocommon system SIS 100/HEBT SIS 300/HEBT
GSI FAIR
1x15
0 A
L
2x15
0 A
L
2x50
0 C
U
1x30
0 C
U
1x30
0 C
U
1x30
0 C
U
Public
pulsed 1 pulsed 2
Two existing 20kV-lines of old P1 are reused for C1.
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
19
110 kV switchgear and 110kV/20kV transformers
GSI/FAIR Power Connection
locations on FAIR site
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
Horizontal Directional Drilling (HDD)
is in discussion
SubstationLeonhardstanne
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
21
Status of the
FAIR Project
- FAIR and GSI a short introduction
- FAIR technical, political and financial status
-Status of Work power converters
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
22
SIS 100/SIS 300
CR/RESR NESR
HESRSFRS
SIS 18p-Linac
UNILACFRS/ESR
Upgrade of UNILAC and SIS 18 Power Converters:
-Alvarez Quadrupole Power Converters
-SIS 18 Injection System
-SIS 18 Dipole Power Converter
-SIS 18 Corrector Power Converters
in operation, 18pcs
upgrade is ready for being ordered
in operation, 4pcs
in operation, 1pc
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
23H.Ramakers/EETH.Welker/EET
23
SIS 100/SIS 300
CR/RESR
NESR
HESR
SFRS
SIS 18
p-Linac
FAIR Power Converters :
-Linear Accelerator:
p-Linac
-Synchrotrons:
SIS100, SIS300
-Super Fragment Separator:
SFRS
-Storage Rings :
NESR, RESR, CR, HESR
-Beam Transport System:
13Tm, 18Tm, 100Tm, 300Tm
- Experimental and Target Areas
Operation:- p-Linac: DC, pulsed
- Synchrotrons : ramped, maximum cycling frequency 0.08 ...0.5 Hz
- Beam Transport : DC, pulsed, fast pulsed
Machine HEBT SFRS CR NESR p-Linac SIS 100 p-bar RESR HESR SIS300 Total
Power Converters 548 166 74 68 51 234 25 58 141 222 1587Quench Heaters 56 296 352HV-Power Systems 7 42
Power converters for Electron Coolers and Electron Ring are not included
Pieces Type VoltagePulse
CurrentPulse
DurationPulse
RepetitionDC
Current[µs] [Hz] [A]
1 HV-Cathode Power Converter -110 kV 60 A 100 5
1 HV-Modulator Power Converter 100 kV/-3 kV 20 mA 100 5
1 Cathode Filament Power Converter 15 V 26
1 Solenoid 1 Power Converter 20 V 20
1 Solenoid 2 Power Converter 375 V 20
1 Solenoid 3 Power Converter 94 V 20
Specifications for all power converters of modules 0…3 are in work.
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
24
- The Specifications consist of 3 parts:
- General Specification : legal and financial aspects, general rules
- Common Specification: special technical rules, general technical requirements,
for example ACU, environmental conditions
- Detailed specification: detailed technical description and parameters, interfaces
FAIR Power Converters :
in approval
in work
in work
These specifications refer to Technical Guidelines in approval
In the specifications it is demanded that the German Inkind contributions such as the ACU-system and the digital DCCT have to be used in a power converter.
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
25H.Ramakers/EETH.Welker/EET
25
- Power Converter Control:
FAIR Power Converters :
Pow er ConverterPower Converter Control
AD C Unit
C ontrol U nit
MultiFunction
Unit
Acquisition of up to 8 D igital Signals and Protection
Pulse L ogic for Power Part
including Protection
U SI 1
U SI 2
Si gnals forC ircuit B rea kersand Contactors
Firing P uls es
Powe r E lec tron ic S ta tus Signals
PowerPart
Fast Analogue Signa ls
In ter loc k S ignals
Sta tus S igna ls
C omma nd S ignals
Slow A nalogue S ignals
Acquisition of up to 4 An alogue Signals
Monito ring and Prote ction
U SB
4 x D AC
service and diagno sis co mp uter
Remote/Local Op eration
US
I Ca
sca
de
Sequence Control
Parameters
Mon ito ringSystem
Ex
pa
ns
ion
if ap
plic
ab
le
External Control System
Ba
ck
pla
ne
with
In
terfa
ce
Sy
ste
m, B
asic
I/O
Graphical Displ ay
H igh Sp eed A cquisition ofup to 4 Analogue Signals
and Protection C ircuitsFor example:
the load current
Further Special Function Modules
D igital Con trol Loop
US
I Co
ntro
l
U SI 3
Further Special Function Modules
U SI 6
Possible Expansions
The digital control algorithm is based on
analogue control strategies enhanced by the
possibilities of digital signal processing.
All parameters of the control algorithm can
be loaded and read by the external control
system.
ACU
Adaptive Control Unit ACU
- Multifunction unit
- control unit
- [ADC unit ]
German In-kind contribution
German In-kind contributionDCCT (with digital output)
ACU is second generation of digital control hardware and has been used in 18 Alvarez Power Converters and 23 M-Branch Power Converters
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
26H.Ramakers/EETH.Welker/EET
26
FAIR Power Converters :
Typical ACU application as running in GSI
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
27H.Ramakers/EETH.Welker/EET
27
FAIR Power Converters : Typical ACU application as running in GSI
Multi function
Unit MFU
Interlock and
Control Unit
ICU
ADC
Unit
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
28H.Ramakers/EETH.Welker/EET
28
FAIR Power Converters : Power Config Advanced
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
29H.Ramakers/EETH.Welker/EET
29
FAIR Power Converters :
Minimal possible application with special modules developed by the manufacturer of the power part
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
30H.Ramakers/EETH.Welker/EET
30
FAIR Power Converters :
One Multifunction Module can supply up to six power converters with analogue current regulation. (The Control Unit (ADC/DAC) is in work).
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
31H.Ramakers/EETH.Welker/EET
31
FAIR Power Converters :
Application in work with special Control & Interlock Modules for 12 pulse thyristor circuits with parallel active filter unit (PE)
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
32H.Ramakers/EETH.Welker/EET
32
Universal Serial Interface of ACU
9600 B/s to 20 MBit/s based on RS485
FAIR Power Converters :
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
33H.Ramakers/EETH.Welker/EET
33
FAIR Power Converters : Actual Available Documentation for Partners is in German
An English
Version will be
done.
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
34H.Ramakers/EETH.Welker/EET
34
FAIR Power Converters : Actual Available Documentation for Partners is in German
An English
Version will be
done.
Status of the FAIR-Project
2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010
H.Ramakers/EETH.Welker/EET
35H.Ramakers/EETH.Welker/EET
35
T H A N K Y O U
for
Y O U R A T T E N T A T I O N