Status of the FAIR-Project 2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010 H.Ramakers/EET H.Welker/EET 1 Status of the FAIR Project - FAIR and GSI a short introduction - FAIR technical, political and financial status -Status of Work power converters

Upload: pearl

Post on 04-Feb-2016

49 views

Category:

Documents


0 download

DESCRIPTION

Status of the FAIR Project. FAIR and GSI a short introduction FAIR technical, political and financial status Status of Work power converters. H.Ramakers/EET H.Welker/EET. 1. Status of the FAIR Project. FAIR and GSI a short introduction - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

1

Status of the

FAIR Project

- FAIR and GSI a short introduction

- FAIR technical, political and financial status

-Status of Work power converters

Page 2: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

2

Status of the

FAIR Project

- FAIR and GSI a short introduction

- FAIR technical, political and financial status

-Status of Work power converters

Page 3: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

3

FAIR is:

- a sientific project

- a technical project

and

- a financial project

- a political project

FAIR and GSI a short introduction

Page 4: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

4

Link: http://www.gsi.de/portrait/ueberblick_e.html

National research facility: GSI Heavy Ion Research Facility

Asssocciates: State of Hessen 10% Federal Republic of Germany 90%

Gesellschaft für Schwerionenforschung

Page 5: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

5

Link: http://www.gsi.de/portrait/ueberblick_e.html

National research facility: GSI Heavy Ion Research Facility

Asssocciates: State of Hessen 10% Federal Republic of Germany 90%

GSI Helmholzzentrum für Schwerionenforschung GmbH

Page 6: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

6

Link: http://www.gsi.de/fair/index_e.html

International research facility: FAIR

Asssocciates: Germany 75% (65% / 10%; Federal / Hessen) International partners 25%

Facility for Antiproton and Ion Research

Page 7: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

7

SIS 100/SIS 300

CR/RESR NESR

HESRSFRS

SIS 18p-Linac

UNILACFRS/ESR

GSI:

-UNILAC

-Transfer Line

-SIS 18

-ESR

-FRS

-Beam lines

FAIR:

-Proton Linac

-SIS 100

-SIS 300

-Super Fragment Separator

-pbar

-Storage Rings

-Beam Transport System

- Experimental and Target Areas

Upgrade

components partly reused in FAIR

Status 2008 and the realization is based

on the concept of Inkind contribution

Page 8: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

8

An international partner takes over a work package

in own technical and financial responsibility

according to the functional needs

and basic specifications of the work package

and the costs as listed in the cost book.

The concept of InKind-Contributions:

Because of this many administrative and political

Issues had to be solved in the last 2 years.

Page 9: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

9

Status of the

FAIR Project

- FAIR and GSI a short introduction

- FAIR technical, political and financial status

-Status of Work power converters

Page 10: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

10

- Because of an increase in cost for

- accelerators

- experiments

- civil engineering

the Modularized Start Version was defined

and agreed upon by the international partners.

Political and financial Status:

Page 11: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

11

Module 0SIS 100 with connection to GSI accelerators

Module 1SIS 100 experiments areas

Module 2SFRS

Module 3p-linac, antiproton targert, CR, HESR

Modules 4 (NESR) and 5 (RESR) are not marked

Modularized Start Version of FAIR

Modules 0…3

Start of construction 2011Readiness for operation 2016

Page 12: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

12

Political and financial status

-There are firm commitments of 16 international partners including Germany summing up to 1.1 Billion €.

-Recently announced commitments of more interested countries are not included in the sum.

Contracts are finalized and supposed to be signed in the third quarter of 2010.

FAIR GmbH is expected to be founded in the third quarter of 2010, too.

Page 13: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

13

Technical status

- The modularized civil construction design is in an iterative loop to meet the financial limits as given by the Modularized Start Version.

- It will be finished in July 2010.

- This construction design is not the detailed final construction, but it defines the fundamental layout and later, major changes are not possible because of the German procedure for building projects funded by public authorities (ZBau).

An example for the actual iteration loop is the tunnel for the two accelerators SIS 100 and SIS 300 and the parallel tunnel for components, which should be close to the machine but do not have to be in the machine tunnel.

Page 14: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

SIS 100/300 Paralleltunnel Created in the first ZBau-loop:

- Components are in non radiated area

- access to components while beam is on

- very short cables to the beam line

Thickness of radiation shielding is in discussion

Width of parallel tunnel is in discussion

Page 15: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

Independent from the modifications due to the Modularized Start Version

there are more technical changes in the project since the status of 2008

An example for changes as mentioned above is the connection to the Electrical Power Grid.

Technical Status continued

Page 16: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

16

GSI/FAIR Power Connection

External Power Distribution

Pulse power :

1 : 63 MVA

2 : 31.5 MVA

Common power

1 : 31.5 MVA

2 : 31.5 MVA

3 : 31.5 MVA

New transformers are marked red .

High voltage power supply system

200 MVA 200 MVA

220 kV

110 kV common 110 kV pulsed

31,5 MVA 63 MVA 31,5 MVA

Substation Urberach

Substation Leonhardstanne

Power plant

electricallyclose to GSI 220 kV

Generator B

Torquemesurement

20 kV

Public4 cables //each 300 CU

2 cables //each 300 CU

20 kV pulsed 1

2 cables //each 300 CU

31,5 MVA

20 kV

3 cables //each 150 CU

20 kV pulsed 2common 1 common 2

31,5 MVA

20 kV common 3

=AG =AF =AD =AI =AH=AA/=AB/=AC

SIS 18 SIS 100 SIS 300HEBT

2 cables //each 300 CU

20kV System

Common System GSI / FAIR

Finished July 2006

Electrical Power Grid : Status 2008

Page 17: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

17

Increase of Common Power C2 to 63 MVA because:- all magnets of HESR are decided to be normal conducting- Dipols of CR-Ring are decided to be normal conducting

Electrical Power Grid : Status 2008 to 2010

63 MVA transformers are placed on the FAIR-site because: - reduction of number of transmission cables to the site

Decision to parallel the transformers PP1 and PP2 because:

- voltage fluctuations due to reactive power swings of 46 MVAr are reduced to 3.7%

- additional costs are very small

Increase of Pulse Power PP2 to 63 MVA because:- all magnets of HEBT are decided to be normal conducting- Transformers of PP1, PP2 and C2 are interchangeable- 3 Transformers of the same type 63 MVA do not cost much more

than 1 transformer 31,5 MVA and 2 transformers 63 MVA

Page 18: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

18

GSI/FAIR Power Connection

External Power Distribution

Pulse power :

1 : 63 MVA

2 : 63 MVA

Common power

1 : 31.5 MVA

2 : 63 MVA

3 : 31.5 MVA

New transformers are marked red .

Electrical Power Grid : actual status

High voltage power supply system

200 MVA 200 MVA

220 kV

110 kV common 110 kV pulsed

31,5 MVA

63 MVA63 MVA

Substation Urberach

Substation Leonhardstanne

Power plantelectrically closeto GSI

220 kV

Generator B

Torquemessurement

20 kV common 1

20 kV-System

StorageRings

20 kV4x500 CU

=AA

1x15

0 A

L

31,5 MVA

20 kV common 3

=AB =AC =AF =AM

63 MVA

=AP =AH

=AD

SIS 18

common 2

Cryocommon system SIS 100/HEBT SIS 300/HEBT

GSI FAIR

1x15

0 A

L

2x15

0 A

L

2x50

0 C

U

1x30

0 C

U

1x30

0 C

U

1x30

0 C

U

Public

pulsed 1 pulsed 2

Two existing 20kV-lines of old P1 are reused for C1.

Page 19: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

19

110 kV switchgear and 110kV/20kV transformers

GSI/FAIR Power Connection

locations on FAIR site

Page 20: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

Horizontal Directional Drilling (HDD)

is in discussion

SubstationLeonhardstanne

Page 21: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

21

Status of the

FAIR Project

- FAIR and GSI a short introduction

- FAIR technical, political and financial status

-Status of Work power converters

Page 22: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

22

SIS 100/SIS 300

CR/RESR NESR

HESRSFRS

SIS 18p-Linac

UNILACFRS/ESR

Upgrade of UNILAC and SIS 18 Power Converters:

-Alvarez Quadrupole Power Converters

-SIS 18 Injection System

-SIS 18 Dipole Power Converter

-SIS 18 Corrector Power Converters

in operation, 18pcs

upgrade is ready for being ordered

in operation, 4pcs

in operation, 1pc

Page 23: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

23H.Ramakers/EETH.Welker/EET

23

SIS 100/SIS 300

CR/RESR

NESR

HESR

SFRS

SIS 18

p-Linac

FAIR Power Converters :

-Linear Accelerator:

p-Linac

-Synchrotrons:

SIS100, SIS300

-Super Fragment Separator:

SFRS

-Storage Rings :

NESR, RESR, CR, HESR

-Beam Transport System:

13Tm, 18Tm, 100Tm, 300Tm

- Experimental and Target Areas

Operation:- p-Linac: DC, pulsed

- Synchrotrons : ramped, maximum cycling frequency 0.08 ...0.5 Hz

- Beam Transport : DC, pulsed, fast pulsed

Machine HEBT SFRS CR NESR p-Linac SIS 100 p-bar RESR HESR SIS300 Total

Power Converters 548 166 74 68 51 234 25 58 141 222 1587Quench Heaters 56 296 352HV-Power Systems 7 42

Power converters for Electron Coolers and Electron Ring are not included

Pieces Type VoltagePulse

CurrentPulse

DurationPulse

RepetitionDC

Current[µs] [Hz] [A]

1 HV-Cathode Power Converter -110 kV 60 A 100 5

1 HV-Modulator Power Converter 100 kV/-3 kV 20 mA 100 5

1 Cathode Filament Power Converter 15 V 26

1 Solenoid 1 Power Converter 20 V 20

1 Solenoid 2 Power Converter 375 V 20

1 Solenoid 3 Power Converter 94 V 20

Specifications for all power converters of modules 0…3 are in work.

Page 24: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

24

- The Specifications consist of 3 parts:

- General Specification : legal and financial aspects, general rules

- Common Specification: special technical rules, general technical requirements,

for example ACU, environmental conditions

- Detailed specification: detailed technical description and parameters, interfaces

FAIR Power Converters :

in approval

in work

in work

These specifications refer to Technical Guidelines in approval

In the specifications it is demanded that the German Inkind contributions such as the ACU-system and the digital DCCT have to be used in a power converter.

Page 25: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

25H.Ramakers/EETH.Welker/EET

25

- Power Converter Control:

FAIR Power Converters :

Pow er ConverterPower Converter Control

AD C Unit

C ontrol U nit

MultiFunction

Unit

Acquisition of up to 8 D igital Signals and Protection

Pulse L ogic for Power Part

including Protection

U SI 1

U SI 2

Si gnals forC ircuit B rea kersand Contactors

Firing P uls es

Powe r E lec tron ic S ta tus Signals

PowerPart

Fast Analogue Signa ls

In ter loc k S ignals

Sta tus S igna ls

C omma nd S ignals

Slow A nalogue S ignals

Acquisition of up to 4 An alogue Signals

Monito ring and Prote ction

U SB

4 x D AC

service and diagno sis co mp uter

Remote/Local Op eration

US

I Ca

sca

de

Sequence Control

Parameters

Mon ito ringSystem

Ex

pa

ns

ion

if ap

plic

ab

le

External Control System

Ba

ck

pla

ne

with

In

terfa

ce

Sy

ste

m, B

asic

I/O

Graphical Displ ay

H igh Sp eed A cquisition ofup to 4 Analogue Signals

and Protection C ircuitsFor example:

the load current

Further Special Function Modules

D igital Con trol Loop

US

I Co

ntro

l

U SI 3

Further Special Function Modules

U SI 6

Possible Expansions

The digital control algorithm is based on

analogue control strategies enhanced by the

possibilities of digital signal processing.

All parameters of the control algorithm can

be loaded and read by the external control

system.

ACU

Adaptive Control Unit ACU

- Multifunction unit

- control unit

- [ADC unit ]

German In-kind contribution

German In-kind contributionDCCT (with digital output)

ACU is second generation of digital control hardware and has been used in 18 Alvarez Power Converters and 23 M-Branch Power Converters

Page 26: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

26H.Ramakers/EETH.Welker/EET

26

FAIR Power Converters :

Typical ACU application as running in GSI

Page 27: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

27H.Ramakers/EETH.Welker/EET

27

FAIR Power Converters : Typical ACU application as running in GSI

Multi function

Unit MFU

Interlock and

Control Unit

ICU

ADC

Unit

Page 28: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

28H.Ramakers/EETH.Welker/EET

28

FAIR Power Converters : Power Config Advanced

Page 29: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

29H.Ramakers/EETH.Welker/EET

29

FAIR Power Converters :

Minimal possible application with special modules developed by the manufacturer of the power part

Page 30: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

30H.Ramakers/EETH.Welker/EET

30

FAIR Power Converters :

One Multifunction Module can supply up to six power converters with analogue current regulation. (The Control Unit (ADC/DAC) is in work).

Page 31: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

31H.Ramakers/EETH.Welker/EET

31

FAIR Power Converters :

Application in work with special Control & Interlock Modules for 12 pulse thyristor circuits with parallel active filter unit (PE)

Page 32: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

32H.Ramakers/EETH.Welker/EET

32

Universal Serial Interface of ACU

9600 B/s to 20 MBit/s based on RS485

FAIR Power Converters :

Page 33: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

33H.Ramakers/EETH.Welker/EET

33

FAIR Power Converters : Actual Available Documentation for Partners is in German

An English

Version will be

done.

Page 34: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

34H.Ramakers/EETH.Welker/EET

34

FAIR Power Converters : Actual Available Documentation for Partners is in German

An English

Version will be

done.

Page 35: Status  of the  FAIR Project

Status of the FAIR-Project

2nd Workshop on Power Converters for Particle Accelerators (POCPA) Cern – Geneva / Swiss, 14th-16th June, 2010

H.Ramakers/EETH.Welker/EET

35H.Ramakers/EETH.Welker/EET

35

T H A N K Y O U

for

Y O U R A T T E N T A T I O N