Status of the FAIR Project
Boris SharkovBoris SharkovFAIR Scientific Director FAIR Scientific Director ((des.des.))
NuPECC Madrid 31.06.2010
Austria IndiaChina Finland France Germany Greece U KItaly Poland Slovakia Slovenia Spain SwedenRomania Russia Saudi Arabia
B. Sharkov 2
Research Communities at FAIR
100 m
Nuclear Structure & Astrophysicswith rare isotope beams, x10 000and excellent cooling
High EM Field (HI) _Fundamental Studies (HI & p)Applications (HI)
Plasma Physics: x600 higher target energy density 600kJ/g
Nuclear Matter Physics with35-45 GeV/u HI beams, x1000
Hadron Physicswith antiprotons of 0 - 15 GeV
Special Features:• 50ns Bunched beams• Electron cooling of secondary beams• SC magnets fast ramping• Parallel operation
SIS 100/300
HESR
SuperFRS
NESR
CBMHADES
FLAIRCR- RESR
Rare Isotope Production Target
AntiprotonProduction Target
B. Sharkov 3
Development of Project Staging
2003 Recommendation by WissenschaftsRat – FAIR Realisation in three stages
2005Entire Facility
Baseline Technical Report
2007Phase A
Phase B
SIS300
2009
Module 0
SIS100
Module 1
expt areas CBM/HADES and APPA
Module 2
Super-FRS
fixed target area
NuSTAR
Module 3
pbar facility, incl. CR for
PANDA,
options for NuSTAR
Module 4
LEB for NuSTAR, NESR for NuSTAR and APPA,
FLAIR for APPA
Module 5
RESR
nominal intensity for PANDA & parallel operation with NuSTAR and APPA
SIS18 Proton Beamline
Module 6
SIS300HESR Cooler
ER
Modularized Start Version
B. Sharkov 4
Rationale for new Modularized Start Version (WP) in 2009
a detailed cost estimate for CC presented by architectsa new cost estimate in 2009 for the accelerator complexDetailed list of site related construction
costs was worked outfirm commitments of FAIR Member States
Germany and State of Hesse announced to cover "site-dependent" construction costs outside FAIR project budget + 110 M€ + 110 M€ !!
Basic Criteria :
Outstanding research opportunities should be offered to all four scientific pillars of FAIR by the Modularized
Start Version
B. Sharkov 5
B. Sharkov 12
Module 3:High-energy antiprotons(p-linac, pbar-target, CR,HESR)
Module 2:Super-FRS
Module 1:Experimental areas
Module 0:SIS100 and connection to existing GSI accel.Module 4:
low energy RIB andlow energy antiprotons
Module 5:RESR storage ringP+ beamlineABM building
Modularized Start Version
B. Sharkov 13
PANDA
Science with the Modularized Start Version
CBM/HADES
NuSTAR
APPA
B. Sharkov 14
Cost Estimate Modules 0-3 (Price Basis 2005)
Total accelerator and personnel Modules 0 - 3 502
Total civil construction Modules 0 - 3 400
Experiment funding 78
FAIR GmbH personnel and running costs 47
Grand Total Modules 0 - 3 1027
all values in M€
B. Sharkov 15
Firm Commitments
FAIR Countries Total declared Contribution (k€)
Austria 5.000
China 12.000
Finland 5.000
France 27.000
Germany 705.000
Great Britain 8.000
Greece 4.000
India 36.000
Italy 42.000
Poland 23.740
Romania 11.870
Russia 178.050
Slovenia 12.000
Slovakia 6.000
Spain 19.000
Sweden 10.000
Total 1.104.660
Firm Commitments 1.038.660 not firm for the first batch
Kingdom of Saudi-Arabia signed the Declaration to contribute at least 1 %
Primeminister Putinsigned. Officially publicized last week.
Dear Colleagues,Dear Colleagues,We are happy to inform you that the Decree of the RussianWe are happy to inform you that the Decree of the RussianGovernment on Russian participation in FAIR project wasGovernment on Russian participation in FAIR project wasissued and published. Its number is 245-p of February 27, 2010. issued and published. Its number is 245-p of February 27, 2010. By this decision Russian Government approved the project of By this decision Russian Government approved the project of FAIR Convention with Russian contribution to FAIR construction in FAIR Convention with Russian contribution to FAIR construction in the amount of the amount of 178,05 MEuro178,05 MEuro (prices of January 2005) and authorized (prices of January 2005) and authorizedthe State Corporation “Rosatom” to be Russian Shareholder of FAIR Company.the State Corporation “Rosatom” to be Russian Shareholder of FAIR Company. Sincerely, O.Patarakin, P.Bogdanov. Sincerely, O.Patarakin, P.Bogdanov.
B. Sharkov 17
Finance Summary
Cost of Modularized Start Version = 1027 M€
Firm funding commitments of FAIR Partners = 1039 M€
Modularized Start Version secures a swift start within the current funding commitments
B. Sharkov 18
Evaluation Board 16 October 2009
1. The Modularized Start Version is the right way to proceed.
2. The project is more focussed and is in even better shape.
3. We should now start as soon as possible!
The Green Paper outlines The Green Paper outlines the paththe path to achieve this goal to achieve this goal
B. Sharkov 19
FAIR accelerator Work Packages
International Partner 1WP 1
International Partner 3WP 3
International Partner 2WP 2
International Partner nWP n
•
•
•
Consortium(represented by
Consortium Leader)
form
FAIR GmbH
Preparatory Phase R&D by GSI & Partner Institutes
B. Sharkov 21
IHEP Protvino
SIS300 magnets
Variable FrequencyCavities
BINP Novosibirsk
SIS100 rapidly cycling sc magnetsCEA / CNRS
NESR Electron Cooling
SIS18upgrade Program
h=2 acceleration cavity for faster ramping
Scrapers and NEG coating for pressure stabilization
Injection system for low charged state heavy ions
Charge separator for higher intensity and high quality beams
The SIS18upgrade program: Booster operation with low charge state heavy ions
Power grid connection
Acceleration of Intermediate Charge State Heavy Ions
Significant progress with Ta24+ and U27+ ions due to the upgrade program in comparison with 2001
Maximum beam energy about 200 MeV/u
B. Sharkov 24
Roadmap
Start of construction activities 2010/11 +1 year+1 year Schedule is driven by civil construction Aim for earliest commissioning of accelerators and respective experiments
Module Construction time (months)
Ready for installation
0 72 2015 / 16 1 28 2015 / 16 2 60 2016 3 60 2016
+1 year+1 year
+1 year
Road Map FAIR Site & Buildings
2009 201220112010 2013 201620152014
1 2 3 45
6
Handing in of preplanning documents to hbm
Clarification of user requirements Modularized Start Version (MSV)
Start revised preplanning for MSV
Expected approval of revised planning for MSV
Preparation of documents for building permit
Expected approval for (partial) building permit
Start site preparation (clearing trees)
Award contracts on civil construction work lot 1 … 4
Completion of civil construction work lot 1 … 4
Start installation of accelerators and detectors
1
2
3
4
5
6
7
7
9
8
10
9
10
8
2017
B. Sharkov 27
Building the FAIR GmbHBuilding the FAIR GmbH
Recruitment of key personnel:Recruitment of key personnel: Research Director In-Kind Coordinator Head of Sites and Buildings Legal and accounting staff Staff for the coordination of accelerators and experiments (Currently only contracts for 2010 possible (via GSI))
S Richter NN D. Krämer Z. Majka (NN)
Law Office Buildings GSI Acc Liason APPA
Human Ressources Technical Infrastructure Technical follow-up CBM Project Office
Projectadminsitration In-Kind Coordination NuSTAR Public Relations
Procurement/Contracts PANDA Internal Audit
Safety etc.
General Support
Finances, Controlling, and
Accounting
Management BoardChairperson of the Management Board: B. Sharkov
Managing Directors (=Geschäftsführer in the sense ot the GmbH)
Boris Sharkov, Simone Richter
Administration Department
Site & Buildings Departmement
Technical Department Research Department
B. Sharkov 28
Roadmap to foundation the FAIR companyRoadmap to foundation the FAIR company
01 02 03 04 05 06 07 08 09 10 11 12
2010 2011
1 2 3 4 5 6 7 8
1
2
3
4
5
6
8
7
KW1: Fertigstellung der Rechtsdokumente
KW8: Dokumente von Auswärtiges Amt an andere Außenministerien versandt
KW13: Alle Übersetzungen zurück beim Auswärtigen Amt
KW19: Alle offenen Fragen der Übersetzungen bilateral gelöst
KW22: Alle Rechtsdokumente in den fünf Vertragssprachen verfügbar
KW32: Formale Zustimmung aller Partnerländer
KW33: Übersetzerkonferenz – Translation conferenceTranslation conference
KW37: Formelle Unterzeichnung der Konvention
KW38: Gründung der FAIR GmbH
B. Sharkov 29
Conclusions
Based on recent cost estimates and firm commitments of FAIR Member States the Modularized Start Version is elaborated
Modules 0-3 ensure a physics programme that is unique, Modules 0-3 ensure a physics programme that is unique, competitive with great discovery potentialcompetitive with great discovery potential
All FAIR science communities can perform excellent physics from early on
The facility can be smoothly upgraded towards the full The facility can be smoothly upgraded towards the full version of FAIR (modules 4,5,6)version of FAIR (modules 4,5,6)
Setup of the international FAIR company proceeds in parallel
FAIR is gathering MOMENTUM ! FAIR is gathering MOMENTUM !
Board of FAIR Collaborations foundedBoard of FAIR Collaborations founded
• APPA, CBM, NuSTAR, PANDA: two representatives eachAPPA, CBM, NuSTAR, PANDA: two representatives each
• discuss common issues (e.g. research and funding)discuss common issues (e.g. research and funding)
• initiate joint activitiesinitiate joint activities
Contact your funding agencies! Contact your funding agencies!
Raise more money for your experiment !Raise more money for your experiment !
B. Sharkov 32