status of renewal of buildings 115 & 507 borge & erwin siesling

13
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling

Upload: bertram-harris

Post on 04-Jan-2016

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling

Status of renewal of Buildings 115 & 507

Borge & Erwin Siesling

Page 2: Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling

2

Present Status

Page 3: Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling

3

Status of the budget RequestPropose to merge the two Class C laboratories by extending building 115 and to bring the laboratory up to standards

JUSTIFICATIONElimination of the risk associated with the transport of radioactive sources across the Route Einstein from building 170 (ISOLDE experimental hall) to building 275 Reduction of the number of Class C type laboratories on the CERN site. This will enable better control of open source handling and minimize the operational costs for such laboratories.Confinement of all open source handling at ISOLDE within an adequately controlled perimeter.Upgrading of the present Class C laboratory in building 115 Moving the Class C laboratory from building 275 into the ISOLDE Facility perimeter will increase the available office space at CERN: the up-stair rooms in building 275 can be used again as offices - without being in conflict with radiation protection requirements. For the modification and extension of building 115 to Class C specifications

400kCHF for 2013In agreement with the Civil Engineering group at CERN, the work can start in January 2013 and be completed by the end of 2013.

SUBMITTED to Sigor Lettow September the 5th

Page 4: Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling

4

Page 5: Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling

5

1. Building 507 is in very bad stage. Profit for the shutdown to demolish and build a new one

User Facilities

Ceiling

Cracks on the

external wall

Broken external panels

Page 6: Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling

6

Replace the existing building 507 by a new building / modular cabins:

Ground floor (only accessible from within the surveyed area): - Labs and workshop

First floor (accessible from outside the surveyed area):- Data Acquisition rooms- Meeting room/Visitors Center- (Kitchen?)

Design study:Eliseo Perez-Duenas GS/SE

Page 7: Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling

7

Cost studies new B 507(508)Use of modular cabins instead of a full concrete building

Phase 1: estimate 160kSFr- dismounting the present building 30kSFr- construction permit- adapting the concrete foundation 130kSFr

Phase 2: estimate 520kSFr- (non-standard) modular cabins, interconnected and on 2 floors - total surface 435 m2

- not taken in account electrical installations, CV, Labo’s, etc.- Present Cooling and Ventilation was done by CERN in 1990.

We assume a cost similar to the one of Bat 115 of 70kSFr x 3 (bigger) = 210 SFrOne way to optimize the cost of CV is making a “confort” system for the full building (assumed by CERN) and dedicated CV for laser rooms pay by Experiments & ISOLDE Collaboration.

Advantages: - lower costs- fast construction ESTIMATED IN AROUND 4 months- flexible work floor

Page 8: Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling

8

Replace building 507

Replacing the existing building 507 by a new building - Ground floor (only accessible from within the surveyed area):

Page 9: Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling

9

2. Replacing the existing building 507 by a new building - First floor (accessible from outside the surveyed area):

Replace building 507

Page 10: Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling

10

Planned – Building distribution

Controlled access

Free access Controlled area

Page 11: Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling

11

1. Have a building in working conditions!

2. Due to regulations of RP, physicists cannot sit in the hall when HIE-ISOLDE LINAC is running. This prompts the need of a new distribution of top floor of Bat. 507, to accommodate DAQ rooms.

3. It has to be done during shut down, LS1, as the bottom floor allocates the laser for Atomic and Nuclear Physics Studies.

4. Open the ISOLDE Facility to visitors and General public which will not be allowed in the hall after LS1 due to safety regulations.

Why do we need to demolish and replace building 507?

All necessary studies has been done The project is ready for submission and approval

Identify a possible company, the one finishing HIE-ISOLDE Possible requirement of paying for extra CV for lasers room

Page 12: Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling

JUN 2013 NOV 2013 JUN 2014

Timeline

12

Physics with lasers

Demolishing existing buildingNew Floor + BarracksElectricity

Coling & ventilationCentral CV ± 3 degreesSpecial one for lasers in laser rooms

Page 13: Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling

13

Present Status

Both Department PH (Philippe Bloch) and BE ( Paul Collier) agree and support the need to demolish and re-built building 507

Luigi Scibile, Group Leader of GS-SE with the mandate“The Group is responsible to provide, to maintain in working conditions including their eventual operation and to renovate the civil engineering structures and infrastructures”

29 October 2012 (L. Scibile)We have included the refurbishment of the 507 (future 508) in the list of potential consolidation works for 2013.Probable decision at the end of November