status of our x-band klystrons€¦ · bucking coil to be installed before klystron assembly (given...
TRANSCRIPT
OUTLINE
Background Requirements Test results Future tests
Please note information is limited until Hitachi present results in SC conference in September this year
Background and ObjectivesWall plug to RF efficiency
Pushing modulator designers to decreaseRise time and fall time
Wasted energy!
Recent ongoing program to increase klystron efficiency
from ~44% to >>65%Reduces power requirements and cost of modulators
What about solenoid power consumption ?
Collaboration between CERN, KEK and Japanese Industry (Hitatchi)Plus input from SLAC and CPI
Acceptance test completed successfully at Hitachi15 February 2019
Normal conducting Bucking coil to be installed before klystron assembly(Given to CERN for tests by CPI)
• Magnet now at CERN• Will confirm magnetic
measurements in coming weeks• Waiting for ‘warm’ counter coil
• Collaboration with Scandiova• Removal of ‘warm’ solenoid
power supplies from Xbox2 modulator
• Integration of SC magnet interlocks and power supplies
• Integration of klystron with SC magnet and modulator
Full results will be presented in SC magnet conference in September
14 - 15 September 2019
Thank you for your attention