status of implementation: kwazulu-natal planning and development act (no. 6 of 2008)-pda
DESCRIPTION
STATUS OF IMPLEMENTATION: KWAZULU-NATAL PLANNING AND DEVELOPMENT ACT (NO. 6 OF 2008)-PDA. ILEMBE DISTRICT MUNICIPALITY 25 JUNE 2010. Content of the Presentation:. Introduction of the Region/ILembe Shared Services. Relations to the Locals- implementation process. Application Process Manual - PowerPoint PPT PresentationTRANSCRIPT
STATUS OF IMPLEMENTATI
ON: KWAZULU-NATAL PLANNING AND DEVELOPMENT ACT (NO. 6 OF
2008)-PDA
ILEMBE DISTRICT MUNICIPALITY25 JUNE 2010
Content of the Presentation: Introduction of the Region/ILembe Introduction of the Region/ILembe
Shared Services.Shared Services. Relations to the Locals- implementation Relations to the Locals- implementation
process.process. Application ProcessApplication Process ManualManual DelegationsDelegations TariffsTariffs
Introduction:The ILembe District has implemented Shared service The ILembe District has implemented Shared service department to facilitate the implementation of the PDA.department to facilitate the implementation of the PDA.
Chief Planner
Senior Planner Senior Planner
iLembe District
Municipality
Maphumulo Local
Municipality
Ndwedwe Local
Municipality
KwaDukusa Local
Municipality
Mandeni Local
Municipality
Performance Management
Specialist
GIS/InformationSpecialist
GIS Technicians Data/SystemAdministrator
DPSS Structural Options – Option 1
Planning / Performance
GIS Information Management
Chief Planner
Preparations I.T.O. ACT: Functional Planning forumFunctional Planning forum:- dealing with- :- dealing with-
Development Administration, PMS Shared service, Development Administration, PMS Shared service, Alignment with other sector departments and Alignment with other sector departments and information sharinginformation sharing
AlignmentAlignment :- :-
LUMS:- LUMS:- MandenMandeni:- Process of finalising the draft Scheme i:- Process of finalising the draft Scheme that covers the whole municipal areathat covers the whole municipal area
MaphumuloMaphumulo:- Process of finalising the scheme for :- Process of finalising the scheme for Maphumulo Town and establishment of TownMaphumulo Town and establishment of Town
NdwedweNdwedwe:-Preparation of Land Use Management :-Preparation of Land Use Management System (LUMS).System (LUMS).
KwaDukuzaKwaDukuza:-has a draft consolidation of the Schemes.:-has a draft consolidation of the Schemes.
Interaction with COGTA :- focused training on schemes.Interaction with COGTA :- focused training on schemes. Delegation TariffsTariffs
Application process: Pre-consultation meetingPre-consultation meeting ChecklistChecklist Developers guide to developmentDevelopers guide to development
Manual: Place flow diagram herePlace flow diagram here attached : - manualattached : - manual Guide for Roles and Responsibilities Guide for Roles and Responsibilities
(PDA)
Thank you!
Anton MeintjesTown Planning Specialist
032 947 9820
Nomfundo Thabethe [email protected]
Senior Planner032 456 8200
S’busiso DlamniChief Planner
032 947 9819071 875 0361
Renne Hulley Manager IDP and
Planning [email protected]
032 947 9801
Zafika Mazibuko Young
Professional Planner
032 947 9819071 875 0361