  • Shaukat Khan, Status of DELTA, ESLS 2013

    11Status of DELTA: Light Source and Short-Pulse Facility Shaukat Khan, Zentrum für Synchrotronstrahlung ESLS Nov 22 2013

  • Shaukat Khan, Status of DELTA, ESLS 2013

    2DELTA availablity

    IV.2011

    I. 2012

    II. 2012

    III. 2012

    IV. 2012

    I. 2013

    II. 2013

    III.2013

    91,7 % 94,7% 90,8 % 85,0 % 99,0 % 96,6 % 97,0 % 89,0 %

    average

    93,0 %

    DELTA parameters

    beam energy 1.5 GeVcircumference 115.2 mbeam current 130 / 20 mAhor. emittance 15 nm radbunch length 100 ps

  • Shaukat Khan, Status of DELTA, ESLS 2013

    3Beam lifetime(R. Floegel, M. Höner, M. Jebramcik, P. Hartmann, H. Huck, S. Khan, R. Molo, B. Riemann, D. Schirmer, G. Schmidt, G. Schünemann, M. Sommer, A. Strasser*, P. Towalski, T. Weis)

    beam lifetime at 100 mA 2005-2013

    Bachelor thesis M. Jebramcik 2013

    - multibunch operation: gas scattering dominates- single-bunch mode: Touschek and gas scattering

    - gas pressure ~ beam current (sync. rad. desorption)~ bunch current (local impedance effect?)

  • Shaukat Khan, Status of DELTA, ESLS 2013

    4Alignment of the storage ring(U. Berges, G. Dahlmann, T. Dybiona, B. Isbarn, B. Hippert, P. Kortmann, G. Pike**, H. Rast, G. Schmidt, T. Schulte-Eickhoff; **Faculty of Physics, TU Dortmund)

    verti

    cal d

    evia

    tion

    (mm

    )

    position along the ring (m)

    Vertical alignment

    - improved lifetime, injection efficiency- reduced radiation level

    Horizontal alignment planned

    - 180 reference panels for Taylor-Hobson spheres- 80 position encodes- cooling improved etc.

  • Shaukat Khan, Status of DELTA, ESLS 2013

    5Superconducting wiggler(P. Kortmann, G. Schmidt, S. Khan)

    Broken high-TC current feedthrough (2010):two spares delivered with > 2 years delay.

    Superconducting asymmetric wiggler

    - is ageing, no support from manufacturer- request for funding

    ... no asymmetry option

    ... higher field (7 T)

    ... more periods (~10)

    ... RF upgrade

  • Shaukat Khan, Status of DELTA, ESLS 2013

    6Injection

    New electron gun and kicker pulsers since 2011

    - flexibility in fill pattern: single-, multibunch, hybrid

    New prebuncher

    - linac current increased by 50%

    (significant contribution from bachelor students F. Frank & J. Schulze)

    (W. Brembt, F. Frank, P. Hartmann, J. Schulze, V. Kniss, T. Weis)

  • Shaukat Khan, Status of DELTA, ESLS 2013

    7StabilityFast orbit feedback

    - range 1 - 400 Hz- hardware completed- tests in January

    (P. Hartmann, S. Khan, B. Riemann, G. Schünemann, P. Towalski, T. Weis)

    Bunch-by-bunch feedback systems

    - damp longitudinal and transverse oscillations- accelerator studies and diagnostics

    ... wake field studies

    ... injection studies

    ... beam loss monitor

    (M. Höner, S. Khan, D. Teytelman/Dimtel Inc.)

    horizontal correctorvertical corrector

  • Shaukat Khan, Status of DELTA, ESLS 2013

    8Facility for ultrashort VUV and THz pulses

    Coherent harmonic generation (CHG)

    - laser-induced energy modulation in 1. undulator- converted to density modulation in a chicane- coherent radiation of harmonics in 2. undulator

    Echo-enabled harmonic generation (EEHG)

    - requires 3 undulators and 2 chicanes- more complex density modulation- higher harmonics, shorter wavelength

    (F. Bahnsen, L. Böttger, S. Cramm+, S. Döring++, J. Greve, N. Hiller&, V. Judin&, M. Höner, H. Huck, M. Huck, S. Khan, C. Mai, R. Molo,L. Plucinski+, J. Raasch++, A. Schick, C. Schneider+/++, M. Siegel&, P. Thoma&, P. Ungelenk; +FZ Jülich, ++U Duisburg-Essen, &KIT Karlsruhe)

    100 ps (33 mm)

    45 fs (15 m)

  • Shaukat Khan, Status of DELTA, ESLS 2013

    9Facility for ultrashort VUV and THz pulses

    laser lab withfs laser system

    new dedicated far-IR beamline

    VUV beamline (BL5)and pump-pulse beamline

    U250 undulator with new power supplies

    diagnostics at BL 4

  • Shaukat Khan, Status of DELTA, ESLS 2013

    10Facility for ultrashort VUV and THz pulses

    Status

    - 2011 seeding with 800 nm (4. harmonic: 200 nm seen)- 2012 seeding with 400 nm (5. harmonic: 80 nm seen)- goal: seeding with 267 nm (5. harmonic: 53 nm)

    Project boosted by rewiring the chicane

    - from s-shaped to u-shaped chicane- optimum density modulation and beyond

    calculations by undergraduate student J. Grewe,hardware G. Dahlmann et al.

  • Shaukat Khan, Status of DELTA, ESLS 2013

    11Facility for ultrashort VUV and THz pulses

    Status

    - 2011 seeding with 800 nm (4. harmonic: 200 nm seen)- 2012 seeding with 400 nm (5. harmonic: 80 nm seen)- goal: seeding with 267 nm (5. harmonic: 53 nm)

    Project boosted by rewiring the chicane

    - from s-shaped to u-shaped chicane- optimum density modulation and beyond

    calculations by undergraduate student J. Grewe,hardware G. Dahlmann et al.

  • Shaukat Khan, Status of DELTA, ESLS 2013

    12Facility for ultrashort VUV and THz pulses

    -20 0 20 400

    0.2

    0.4

    0.6

    delay (fs)

    visi

    bilit

    y

    Gated iCCD UV camera courtesyB. Schmidt, S. Wunderlich, DESY.

    Advantage of DELTA: ample beamtime

    - machine studies (10 weeks/y)- Fr after user operation (20 weeks/y)- even during user operation

    Short-term goals

    - reach and surpass previous achievements

    ACO: B. Girard et al., PRL 53 (1984), 2405UVSOR: M. Labat et al., PRL 101 (2008), 164803ELETTRA: E. Allaria et al., PRL 100 (2008), 174801

  • Shaukat Khan, Status of DELTA, ESLS 2013

    13Facility for ultrashort VUV and THz pulsesAdvantage of DELTA: ample beamtime

    - machine studies (10 weeks/y)- Fr after user operation (20 weeks/y)- even during user operation

    Short-term goals

    - reach and surpass previous achievements

    Gated iCCD UV camera courtesyB. Schmidt, S. Wunderlich, DESY.

    ACO: B. Girard et al., PRL 53 (1984), 2405UVSOR: M. Labat et al., PRL 101 (2008), 164803ELETTRA: E. Allaria et al., PRL 100 (2008), 174801

  • Shaukat Khan, Status of DELTA, ESLS 2013

    14Facility for ultrashort VUV and THz pulsesAdvantage of DELTA: ample beamtime

    - machine studies (10 weeks/y)- Fr after user operation (20 weeks/y)- even during user operation

    Short-term goals

    - reach and surpass previous achievements

    - first pump-probe experiments... pump and probe pulse on sample... timing within 1 ps ok

    600

    150

  • Shaukat Khan, Status of DELTA, ESLS 2013

    15Facility for ultrashort VUV and THz pulsesCoherent THz radiation

    - intense broadband 1 ps pulses- laser-electron and beam diagnostics- future pump-probe experiments

    InSb bolometer ~ 1 sNiN bolometer (KIT) 160 psYBCO bolometer (KIT) 20 ps

  • Shaukat Khan, Status of DELTA, ESLS 2013

    16Facility for ultrashort VUV and THz pulsesCoherent THz radiation

    - intense broadband 1 ps pulses- laser-electron and beam diagnostics- future pump-probe experiments

  • Shaukat Khan, Status of DELTA, ESLS 2013

    17Echo-enabled harmonic generation at DELTASupported by Helmholtz ARD initiative (FZ Jülich)

    - modulators: 2 short undulators- radiator: present U250 undulator- requires longer straight section- modified storage ring optics- additional undulator for "slicing"

    FLASH ORS design

  • Shaukat Khan, Status of DELTA, ESLS 2013

    18Echo-enabled harmonic generation at DELTA

    present layout:

    Diplom thesis, R. Molo:

    New layout, R. Molo:

    Supported by Helmholtz ARD initiative (FZ Jülich)

    - modulators: 2 short undulators- radiator: present U250 undulator- requires longer straight section- modified storage ring optics- additional undulator for "slicing"

  • Shaukat Khan, Status of DELTA, ESLS 2013

    19External activities(BMBF Verbundforschung)

    DESY Hamburg: sFLASH, ORS, EEHG

    (K. Hacker, S. Khan, R. Molo)

    HZB Berlin: novel injection scheme, RF for BERLinPro and BESSY VSR

    FZ Jülich and GSI: fast orbit measurement and correction

    (B. Isbarn, H. Rast, B. Riemamm, G. Schünemann, M. Sommer, P. Towalski, T. Weis)

  • Shaukat Khan, Status of DELTA, ESLS 2013

    20Accelerator physics in the master curriculum

    Bachelor-, Master- and PhD work

    Two-semester accelerator course

    - alternatively to solid-state and particle theory- comprises 2 h lecture

    1 h exercises1 h seminarfield trips

  • Shaukat Khan, Status of DELTA, ESLS 2013

    21

    Rektorat of TU Dortmund,Faculty of Physics, MEC, Kuratorium

    Users: FZ Jülich, ISAS e.V., Univ. Siegen, Wuppertal and more

    Tax payer:DFG, BMBF, MIWF NRW

    colleagues at DESY, FZJ, GSI, HZB, KIT and many others

    colleagues at TU Dortmund:machine, beamlines, workshops, administration

    Acknowledgements