status of application submitted for first time charging of grid … · 2019-01-24 · 4 765kv...

19
Under Scope of: WRLDC WRLDC NLDC WRLDC Intimation regarding anticipated charging of the line along with other documents List of elements to be charged and Element Rating details Single line diagram of the concerned sub stations, along with status of completion of each dia/bus/breakers List of SCADA points to be made available (as per standard requirement, RLDC would need all MW and MVAr data, voltage and frequency of all the buses, all the breaker and isolator positions, OLTC tap positions, Main‐1/Main‐2 Type and Location of Energy meters as per relevant CEA regulations Connection Agreement, wherever applicable along with all annexures Acknowledgement by WRLDC Request for charging of the new transmission element along with the summary of the undertakings being submitted Undertaking in respect of Protective systems Undertaking in respect of Telemetry and communication Undertaking in respect of Energy metering Undertaking in respect of Statutory clearances Provisional aprroval for charging to the Transmission Licencee after satifiying all submitted information 765KV Element details forwared to NLDC Request for issuance of successful trial operation Certificate Values of the concerned line flows and related voltages just before and after charging of the element Special Energy meter (SEM) Reading for the tria Output of Disturbance Recorders / Event Loggers Transmission Elements Issuing Certificate for successful completion of trial run of transmission element Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6 Format II Annexure-B1 :Format III Annexure-B2 :Format IIIA Annexure-B3: Format IIIB Annexure-B4 :Format IIIC Annexure-B5: Format IIID Format IV Annexure- A1-A6 ,B1-B5 Annexure-C1: Format V Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time Format VI (Certificate No) 1 765kv Bina and Gwlior 765kV S/c Bina-Gwalior Ckt-3 Applicable N/A 05/05/14 09:28hrs WRLDC/WR-II/001 2 765kv Indore pg 765kV S/c Indore (PG)-Vadodara (Charged as 400kv Indore(MP)-Asoj(Guj) ckt3 under contingent plan Applicable N/A 03/05/14 19:59hrs WRLDC/WR-II/002 3 765/400kv BDTCL (Bhopal 765kv) 400kv D/c MPPTCL Bhopal ckt-2 , 765/400 kv BDTCL Bhopal substation (400kv Bus-1 & 400kv Bus-2) Applicable N/A 29/06/14 11:40hrs, 29/06/14 15:35hrs&12:51hrs WRLDC/BDTCL/001 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) at Indore (PG) Applicable N/A 07/08/14 17:30hrs WRLDC/WR-II/009 5 400kv NAVSARI PG 500mva, 400/220kv ICT3 along with bay at Navsari Applicable N/A N/A 08/07/14 19:59hrs WRLDC/WR-II/004 6 765kv SASAN 765kv vind pg bays 702& 703 at SASAN Applicable N/A N/A N/A N/A N/A N/A 7 765kv AURANGABAD PG Aurangabad dhule bay (704)charging with associated equioments Applicable N/A N/A 27th May14 23:24hrs WRLDC/WR-I/040 8 765kv SOLAPUR 765 IR -Raichur solapur ckt2 charging Applicable N/A 30/06/14 14:45hrs POSOCO/NLDC/SO/1 9 765kv AURANGABAD PG Aurangabad warrdha ckt-1 & 2 and 765/400kv ICT 1 at Aurangabad end Applicable N/A WRLDC/WR-I/003 10 765kv WARDHA PG Wardha Aurangabad ckt-1 & 2 at WARDHA end Applicable N/A 11 400kv BDTCL (Bhopal 765kv) 400kv ,125MVAR BR at 400/765kv BDTCL Applicable N/A N/A N/A N/A 30/06/14 12:59hrs WRLDC/BDTCL/002 12 765kv BDTCL (Bhopal 765kv) ICT-1 at 400/765kv with main bay (703)at BDTCL BHOPAL & 765kv Bus-1 & Bus-2 BDTCL BHOPAL Applicable N/A 03/07/14 16:57hrs & 04/07/14 18:10hrs ,17:15hrs 13 400kv Gwalior 765kv 400kv 125MVAR BR at 765kv Gwalior substation Applicable N/A N/A N/A N/A 30/06/14 19:33hrs WRLDC/WR-II/003 14 765kv Dharamjaygarh ICT-1 at 765/400kv Dharamjaygarh Applicable N/A 07/07/14 22:59hrs WRLDC/WR-I/004 15 765kv Seoni Wardha Seoni 1 LR at Seoni End Applicable N/A N/A N/A 30/04/14 21:07hrs WRLDC/WR-I/001 16 765kv Dharamjaygarh ICT-2 at 765/400kv Dharamjaygarh Applicable N/A 17/06/14 17:05hrs WRLDC/WR-I/002 17 765kv BDTCL (Bhopal 765kv) 765KV Bhopal indore LR with main bay (701) Applicable N/A N/A N/A 23/07/14 19:35hrs WRLDC/BDTCL/003 18 400kv KSK LILO at Raipur-Raigarh ckt-4 Not Applicable N/A N/A N/A N/A N/A 18/07/14 22:00hrs Element Not covered under CERC Tariff Regulation 19 400kv BDTCL (Bhopal 765kv) 400kv D/c MPPTCL Bhopal ckt-1 Applicable N/A N/A 11/08/14 17:10hrs WRLDC/BDTCL/004 20 765kv Indore pg 765KV,240mvar BR-2 Applicable N/A N/A N/A 31/07/14 18:27HRS WRLDC/WR-II/006 21 400kv Itarsi PG 400KV ,125MVAR BR-1 Applicable N/A N/A N/A N/A 05/08/14 17:50hrs WRLDC/WR-II/007 22 400kv Sujalpur PG 400KV ,125MVAR BR-2 Applicable N/A N/A N/A N/A 31/07/14 12:05HRS WRLDC/WR-II/005 23 400kv Bhatapara 400kv,125MVAR BR Applicable N/A N/A N/A N/A 24/07/14 19:46hrs WRLDC/WR-I/005 24 765KV Dharamjaygarh IR 765KV Jarsiguda ckt-1 & 2 along with LR Applicable N/A 28/07/14 23:59hrs 29/07/14 16:00hrs POSOCO/NLDC/SO/2 25 765kv Satna 765kv statna Gwl ckt2 +LR Applicable N/A 04/08/14 15:22HRS WRLDC/WR-II/008 26 765/400KV Jabalpur Pool 400kv MB Power (Anuppur)-Jabalpur ckt1 & ckt2 (Idle charging from Jabalpur pool end) Applicable N/A N/A 06/08/14 19:07hrs, 19:40hrs WRLDC/WR-II/20 27 400KV KSK GT-4 (600MW) Synchronization Not Applicable N/A N/A N/A N/A N/A 11/08/14 16:00hrs Element Not covered under CERC Tariff Regulation 28 765/400KV Indore PG 765KV , 80MVAR SPARE BR -1 Applicable N/A N/A N/A N/A N/A N/A N/A Element charged in March14. 29 400KV Raigarh 125MVAR BR at 400KV Raigarh Applicable N/A N/A N/A N/A 30/07/14 19:30hrs WRLDC/WR-I/007 30 765/400kv AURANGABAD PG Auragabad-Phadke Line Bays with LR (charged as BR) Applicable N/A N/A 31/07/14 22:47hrs & 05/08/14 15:51hrs WRLDC/WR-I/006 31 400kv Kala PG LILO-2 of Navsari-Vapi at KALA (Test charging) Applicable N/A N/A 32 400KV JP NIGRI NIGRI-Satna 400kv D/C (quad) & Bus Reactor Not Applicable N/A N/A N/A N/A N/A Element Not covered under CERC Tariff Regulation 33 765/400kv SASAN GT-5 Back Charging Not Applicable N/A N/A N/A N/A 09/08/14 at 14:33 hrs Element Not covered under CERC Tariff Regulation 34 400kv GMR Energy GT-1 Charging at GMR RAIPUR Not Applicable Pending N/A N/A N/A N/A N/A Element Not covered under CERC Tariff Regulation 35 765/400kv Durg pooling 240MVAR Wardha-1 LR (Charged as Bus Reactor) Applicable N/A N/A N/A 19/08/14 at 16:41hrs WRLDC/WR-I/010 36 400KV Dhariwal PG 400/6.9 KV, 60 MVA Station Transformer -2 Not Applicable N/A N/A N/A N/A Element Not covered under CERC Tariff Regulation 37 765/400kv Aurangabad PG 765kV Wardha-1 Tie bay -714 Applicable N/A N/A Pending N/A Pending Elements not covered under CERC (Terms and Conditions of Tariff), 2014 Regulation Cl:5(2) will continue to be treated as per existing protocol i.e Consent of Reliability Coordinator Note: Abbreviation : N/A (Not Applicable) Status of Application submitted for First Time Charging of Grid Elements √ (Received at Aurangabad end) Check List Transmission Licencee Transmission Licencee Transmission Licencee 05/07/14 19:00hrs, 03/07/14 23:00hrs, 30/06/14 14:00hrs Station Name of Transmission Element Transmission Tariff regulatory compliance declaration as per clause 4.5(2) of CERC (Terms and Conditions of Tariff), 2014 Regulation 5(2) Sl.No. Voltage Level in kV

Upload: others

Post on 09-Aug-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

1 765kv Bina and Gwlior 765kV S/c Bina-Gwalior Ckt-3 Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 05/05/14 09:28hrs WRLDC/WR-II/001

2 765kv Indore pg765kV S/c Indore (PG)-Vadodara (Charged as 400kv

Indore(MP)-Asoj(Guj) ckt3 under contingent planApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 03/05/14 19:59hrs WRLDC/WR-II/002

3 765/400kv BDTCL (Bhopal 765kv)

400kv D/c MPPTCL Bhopal ckt-2 , 765/400 kv BDTCL Bhopal

substation (400kv Bus-1 & 400kv Bus-2)

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 29/06/14 11:40hrs, 29/06/14 15:35hrs&12:51hrs WRLDC/BDTCL/001

4 765kv Indore 765kv PG765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2)

at Indore (PG)Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 07/08/14 17:30hrs WRLDC/WR-II/009

5 400kv NAVSARI PG 500mva, 400/220kv ICT3 along with bay at Navsari Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/A √ √ √ √ 08/07/14 19:59hrs WRLDC/WR-II/004

6 765kv SASAN 765kv vind pg bays 702& 703 at SASAN Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/A N/A N/A N/A N/A

7 765kv AURANGABAD PGAurangabad dhule bay (704)charging with associated

equiomentsApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/A √ √ √ √ 27th May14 23:24hrs WRLDC/WR-I/040

8 765kv SOLAPUR 765 IR -Raichur solapur ckt2 charging Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 30/06/14 14:45hrs POSOCO/NLDC/SO/1

9 765kv AURANGABAD PGAurangabad warrdha ckt-1 & 2 and 765/400kv ICT 1 at

Aurangabad endApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ WRLDC/WR-I/003

10 765kv WARDHA PG Wardha Aurangabad ckt-1 & 2 at WARDHA end Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √

11 400kv BDTCL (Bhopal 765kv) 400kv ,125MVAR BR at 400/765kv BDTCL Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ N/A √ √ N/A √ 30/06/14 12:59hrs WRLDC/BDTCL/002

12 765kv BDTCL (Bhopal 765kv) ICT-1 at 400/765kv with main bay (703)at BDTCL BHOPAL

& 765kv Bus-1 & Bus-2 BDTCL BHOPALApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √

03/07/14 16:57hrs & 04/07/14 18:10hrs

,17:15hrs

13 400kv Gwalior 765kv 400kv 125MVAR BR at 765kv Gwalior substation Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ N/A √ √ N/A √ 30/06/14 19:33hrs WRLDC/WR-II/003

14 765kv Dharamjaygarh ICT-1 at 765/400kv Dharamjaygarh Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 07/07/14 22:59hrs WRLDC/WR-I/004

15 765kv Seoni Wardha Seoni 1 LR at Seoni End Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ N/A √ 30/04/14 21:07hrs WRLDC/WR-I/001

16 765kv Dharamjaygarh ICT-2 at 765/400kv Dharamjaygarh Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 17/06/14 17:05hrs WRLDC/WR-I/002

17 765kv BDTCL (Bhopal 765kv) 765KV Bhopal indore LR with main bay (701) Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ N/A √ 23/07/14 19:35hrs WRLDC/BDTCL/003

18 400kv KSK LILO at Raipur-Raigarh ckt-4 Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ N/A N/A N/A N/A N/A 18/07/14 22:00hrs Element Not covered under CERC Tariff Regulation

19 400kv BDTCL (Bhopal 765kv) 400kv D/c MPPTCL Bhopal ckt-1 Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/A √ √ √ √11/08/14 17:10hrs

WRLDC/BDTCL/004

20 765kv Indore pg 765KV,240mvar BR-2 Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ N/A √31/07/14 18:27HRS

WRLDC/WR-II/006

21 400kv Itarsi PG400KV ,125MVAR BR-1

Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ N/A √ √ N/A √05/08/14 17:50hrs

WRLDC/WR-II/007

22 400kv Sujalpur PG 400KV ,125MVAR BR-2 Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ N/A √ √ N/A √ 31/07/14 12:05HRS WRLDC/WR-II/005

23 400kv Bhatapara 400kv,125MVAR BR Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ N/A √ √ N/A √24/07/14 19:46hrs

WRLDC/WR-I/005

24 765KV Dharamjaygarh IR 765KV Jarsiguda ckt-1 & 2 along with LR Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √

28/07/14 23:59hrs 29/07/14 16:00hrs

POSOCO/NLDC/SO/2

25 765kv Satna 765kv statna Gwl ckt2 +LR Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √04/08/14 15:22HRS

WRLDC/WR-II/008

26 765/400KV Jabalpur Pool400kv MB Power (Anuppur)-Jabalpur ckt1 & ckt2 (Idle

charging from Jabalpur pool end)Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/A √ √ √ √

06/08/14 19:07hrs, 19:40hrs

WRLDC/WR-II/20

27 400KV KSK GT-4 (600MW) Synchronization Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ N/A N/A N/A N/A N/A 11/08/14 16:00hrs Element Not covered under CERC Tariff Regulation

28 765/400KV Indore PG 765KV , 80MVAR SPARE BR -1 Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ N/A N/A N/A N/A N/A Element charged in March14.

29 400KV Raigarh 125MVAR BR at 400KV Raigarh Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ N/A √ √ N/A √30/07/14 19:30hrs

WRLDC/WR-I/007

30 765/400kv AURANGABAD PG Auragabad-Phadke Line Bays with LR (charged as BR) Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ √ √

31/07/14 22:47hrs & 05/08/14 15:51hrs

WRLDC/WR-I/006

31 400kv Kala PG LILO-2 of Navsari-Vapi at KALA (Test charging) Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/A

32 400KV JP NIGRI NIGRI-Satna 400kv D/C (quad) & Bus Reactor Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ N/A N/A N/A N/A N/A Element Not covered under CERC Tariff Regulation

33 765/400kv SASAN GT-5 Back Charging Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ N/A N/A N/A N/A 09/08/14 at 14:33 hrs Element Not covered under CERC Tariff Regulation

34 400kv GMR Energy GT-1 Charging at GMR RAIPUR Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ Pending N/A N/A N/A N/A N/A Element Not covered under CERC Tariff Regulation

35 765/400kv Durg pooling 240MVAR Wardha-1 LR (Charged as Bus Reactor) Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ N/A √ 19/08/14 at 16:41hrs WRLDC/WR-I/010

36 400KV Dhariwal PG 400/6.9 KV, 60 MVA Station Transformer -2 Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ N/A N/A N/A N/A Element Not covered under CERC Tariff Regulation

37 765/400kv Aurangabad PG 765kV Wardha-1 Tie bay -714 Applicable √ √ √ √ N/A N/A Pending √ √ √ N/A √ Pending √

Elements not covered under CERC (Terms and Conditions of Tariff), 2014 Regulation Cl:5(2) will continue to be treated as per existing protocol i.e Consent of Reliability

Coordinator

Note:

Abbreviation : N/A (Not Applicable)

Status of Application submitted for First Time Charging of Grid Elements

√ (Received at Aurangabad end)

Check ListTransmission Licencee Transmission Licencee Transmission Licencee

05/07/14 19:00hrs, 03/07/14 23:00hrs,

30/06/14 14:00hrs

Station Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

Page 2: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

38 765/400kv Durg pooling 240MVAR Wardha-2 LR (Charged as Bus Reactor) Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ N/A √ 27/08/14 at 14:10hrs WRLDC/WR-I/009

39 765/400kv BDTCL (Bhopal 765kv) 1500mvar 765/400kv ICT-2 along with Bay 704,705,706 Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ ICT2 (706bay) Charged on 29th sep14 at 18:13hrs WRLDC/BDTCL/05

40 400kv Raipur LR of 400kv Bhadrawati-Raipur-Ckt3 Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ N/A √ 28/08/14 at 21:42hrs WRLDC/WR-I/008

41 765/400kv Aurangabad PG 765kV Wardha-2 Tie bay -711 Applicable √ √ √ √ N/A N/A √ √ √ √ N/A √ √ √ N/A N/A N/A N/A

42 400kv LANCO (Patadi)400kv DC TL from Lanco to Bilaspur & 2 no of main & tie

bays at BilaspurApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/A √ √ √ √

06/09/14 at 10:16hrs (ckt1) & 09/09/14 at

11:49hrs(ckt2)Pending

43 765/400kv Durg pooling 765kv Durg-Champa1 LR Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ N/A √ 24/05/14 at 18:36hrs WRLDC/WR-I/011

44 765/400kv Durg pooling 765kv Durg-Champa2+LR (upto Dharmjaygarh) Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 19/05/14 at 17:53hrs WRLDC/WR-I/014

45 400kv Vandana Vidhyut

Charging of ST-2 of Unit-2

Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA NA 25/09/14 at 18:10hrs Element Not covered under CERC Tariff Regulation

46 400kv JP Nigri

Charging of ST-2 of Unit-2

Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA NA 24/09/14 at 16:25hrs Element Not covered under CERC Tariff Regulation

47 765/400kv Aurangabad PG 765kV ICT-1 Main bay -703 Applicable √ √ √ √ N/A N/A RC Sent √ √ √ N/A √ RC sent √ NA NA NA NA

48 765/400kv Dharamjaygarh PG 765kV 330 MVAR (110x3) BR-1 Applicable √ √ √ √ N/A N/A √ √ √ √ N/A √ √ N/A √ √ N/A √ 31/03/2014 19:25hrs Certificate Not Required as charging date is Mar14

49 765/400kv Dharamjaygarh PG 765kV 330 MVAR (110x3) BR-2 Applicable √ √ √ √ N/A N/A √ √ √ √ N/A √ √ √ √ √ N/A √16/04/2014 19:30hrs

WRLDC/WR-I/012

50 765kv Indore 765kv PG 400kv Pitampur bay Ckt-1 at Indore (PG) Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/A √ √ √ √ 04/09/14 at 16:13hrs WRLDC/WR-II/010

51 765kv Bilaspur PG765KV,1-Ph (80MVAR) Spare Line Reactor at Bilaspur (

requested to taken into service with 765kv Seoni ckt2 LR at

Bilaspur)

Applicable √ √ √ N/A N/A N/A √ √ √ √ √ √ √ √ N/A N/A N/A N/A NLDC Consent given on 29th Nov14 N/A

52 400/220kv Pirana PG400KV,125MVAR BR at Pirana PG

Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ NA √ √ √ √ 02/10/14 at 19:36hrs WRLDC/WR-II/12

53 400/220kv Itarsi PG400KV, BR2 at Itarsi PG

Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ NA √ √ √ √ 13/10/14 at 15:44hrs WRLDC/WR-II/16

54 765/400KV Indore PG

765kv,240MVAR BHOPAL LR at Indore pg

Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ √ √ 03/10/14 at 20:08hrs WRLDC/WR-II/15

55 400kv DAMOH PG

400KV 125MVAR BR at Damooh

Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ NA √ √ √ √ 30th sep14 at 23:58hrs WRLDC/WR-II/13

56 765/400kv BDTCL BHOPAL

765KV 240 MVAR Jabalpur LR & BR at 765KV bhopal

Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ √ √

02/10/14 BR Charged & 06/10/14 at 16:44hrs Jblr

LR ChargedWRLDC/BDTCL/05

57 400kv RKM Powergen PVT. LTD (RKMPPL)400KV d/c RKM LILO Line connect with Raipur -Raigarh Ckt3

Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA NA10-10-2014 at 22:47hrs

Element Not covered under CERC Tariff Regulation

58 765/400kv WARDHA PG

Charging of 714 & 717 Tie bay at WARDHA

Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ NA NA NA NA

tie bay (714)charged on 04/10/14 18:30hrs & 717

chargerd on 13/10/14 at 15:43hrs

NA

59 400kv Jindal (Tamnaar)

charging of ST#3 of Unit 3

Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA NA 27/09/14 AT 17:38HRS Element Not covered under CERC Tariff Regulation

60 765/400kv Gwalior ss

765kv,240MVAR Satna 2 LR Charged as BR at Gwalior

Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ √ √ 28/09/14 AT 01:51HRS WRLDC/WR-II/011

61 765/400kv Aurangabad ss

400KV Boisar ckt-1 & 2 LR charged as Bus Reactor

Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ NA √ √ √ √29th sep14 at 21:51hrs (Boiser2) & 30th sep14

(Boisar1LR)WRLDC/WR-I/040

62 765/400kv Jabalpur Pool

765kv 240mvar Bina#3 Line Reactor with associated Bay at

Jabalpur pool (Bina-Jabalpur#3 Line pertaing to M/s Sterlite) Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ √ √ 03/10/14 at 23:26hrs WRLDC/WR-II/14

63 400kv Raipur PG

125MVAR Bus reactor (in dia with Raipur Pool-1)

Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ NA √ √ √ √ 30th sep14 at 18:23hrs WRLDC/WR-I/13

64 765/400kv Jabalpur Pool

765kv,240MVAR Bhopal Switchable LR of 765KV bhopal-

Jabalpur line along with Line bay equipment at Jabalpur Pool

SS (Line Pertaing to M/s Sterlite) Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ √ √ 18-10-2014 at 12:49hrs WRLDC/WR-II/17

65 765/400kv BDTCL Dhule

765kv BDTCL DULE-Aurangabad line along with LR

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 04/12/14 at 12:47hrs WRLDC/BDTCL/009

66 765/400kv BDTCL Dhule

400kv D/C TL from BDTCL DULE to Dule MS at BDTCL upto

Dead end Toower & 765kv BDTCL Dhule SS (ICT#1 & ICT#2)

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √05-12-2014 at 20:04hrs (ckt-1), at 17:25hrs (ckt-

2),at 11:16hrs (ICT-1),at 19:05hrs (ICT-2)WRLDC/BDTCL/007 & BDTCL //08

67 765/400kv Gwalior ss

765KV,240MVAR Jaipur#2 Switchable LR (as BR) along with

associated Bay equipment at Gwalior (through Tie bay 702

& Bus2)Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ √ √ 22/11/14 at 09:05hrs WRLDC/WR-II/024

Page 3: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

68 400kv Magarwada GIS (DAMAN)

LILO of Ckt#1 of Nav-Kala D/c Tr Line along with associated

Bay equipment at 400kv Magarwada GIS DAMAN

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 03-11-2014 AT 00:04HRS WRLDC/WR-II/021

69 400kv Magarwada GIS (DAMAN)

400/220KV ,315MVA ICT#1 & ICT#2 along with 220KV

associted bay equipment at Daman

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ICT-1 (07-11-2014 at 22:24hrs) & ICT-2 (07-11-

2014 at 21:23hrs)WRLDC/WR-II/021

70 765kv WARDHA PG

765KV,3*110MVAR Bus Reactor#2 atWardha ss

Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ N/A √ 01/11/14 at 19:45hrs WRLDC/WR-I/015

71 765kv Bina PG

765KV,240MVAR Jabalpur Bina #3 LR (as BR) with main &

tie bay at Bina ss Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ N/A √ 11-11-2014 at 18:08hrs WRLDC/WR-II/18

72 765kv WARDHA PG

765KV Wardha Raipur Ckt-1 and Ckt2 along with along with

associated bays at Wardha

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √Ckt-1 (15-11-2014 at 16:35hrs), Ckt-2 (15-11-2014

at 12:53hrs)WRLDC/WR-I/016

73 765kv Satna PG

765KV,240MVAR Vindhyachal #1 LR (as BR) with Main & tie

bay at Satna ss Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ √ √ 11-11-2014 at 18:35hrs WRLDC/WR-II/19

74 765kv BDTCL BHOPAL

765KV BHOPAL-INDORE LINE at BDTCL Bhopal (Indore end

bays (710,711 )was charged on dtd 3rd Oct14 along with

Bhopal LR at Indore end & BDTCL bays was already charged

on 23rd July14 along with Indore LR)

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 18-11-2014 at 22:48hrs WRLDC/BDTCL/06

75 400kv Magarwada GIS (DAMAN)

LILO Line of 400KV Navsari Kala ckt#2 along with associated

Bay equipment at 400kv Magarwada GIS DAMAN

Applicable N/A √ NA

76 400KV Solapur PG

400kV, 80 MVAR Line Reactor of Solapur- Karad Line at

Solapur substation Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ NA √ √ √ √ 24-11-2014 18:18HRS WRLDC/WR-I/034

77 400KV Jabalpur Pool

400kv ,125mvar Bus Reactor-2 (ALONG WITH MAIN BAY

404) at Jabalpur pool station Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ NA √ √ √ √ 29-12-2014 at 16:54hrs WRLDC/WR-II/025

78 765kv Jabalpur Pool

765kv,240mvar Jabalpur pool-Dharamjaygarh ckt-2 Line

Reactor along with main bay (810) at Jabalpur poolApplicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ √ √ 29/11/14 at 20:59hrs WRLDC/WR-II/023

79 765/400kv Sasan

Test charging of Bay 16 & Bay 17 of 765kv Dia 6

(Comprising ICT2 & GT6) at SASANNot Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ N/a N/a N/a N/a NLDC Consent given on 27th Nov14 Element Not covered under CERC Tariff Regulation

80 400/220kv Bachhau

400kv ,125mvar Bus Reactor-2 (ALONG WITH MAIN BAY

419(Bus-1) & Tie bay420) at Bachhau station Applicable √ √ √ √ N/a N/a √ √ √ √ √ √ √ N/a √ √ √ √ 01/12/14 at 17:53hrs WRLDC/WR-2/022

81 765kv Sasan

First time test charging of 765KV GT#6 (3*270MVA) at

SASANNot Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ N/a N/a N/a N/a NLDC Consent given on 2 DEC14 (02dec14) Element Not covered under CERC Tariff Regulation

82 400kv RKM Powergrn LTD

First time charging of GT#1 along with Bay equipment &

BR#1 along with bay equipment at RKM plant.Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ N/a N/a N/a N/a N/a 05-12-2014 Element Not covered under CERC Tariff Regulation

83 400kv Pune PG

First time charging of 420 KV Circuit breaker for Parli - I Line

Reactor switching at 400/220 KV Pune (Talegaon) (LR WAS

CHARGED EARLIOR)

Applicable

√ √ √ √ N/a N/a √ √ √ √ √ √ √ N/a √ N/a N/a √ 04-12-2014 at 17:58hrs WRLDC/WR-I/17

84 400kv Pune PG

First time charging of 420 KV Circuit breaker forAurangabad -

II Line Reactor switching at 400/220 KV Pune (Talegaon) (LR

WAS CHARGED EARLIOR)

Applicable

√ √ √ √ N/a N/a √ √ √ √ √ √ √ N/a √ N/a N/a √ 11-12-2014 at 14:08hrs WRLDC/WR-I/17

85 765/400kv BDTCL Dhule

First time charging of Vadodara LR as BR at BDTCL Dule ss Applicable

√ √ √ √ N/a N/a √ √ √ √ √ √ √ √ √ √ N/a √ 09-12-2014 at 18:31HRS WRLDC/BDTCL/008

86 400kv Pune PG

First time charging of 420 KV Circuit breaker for Parl - II Line

Reactor switching at 400/220 KV Pune (Talegaon) (LR WAS

CHARGED EARLIOR)

Applicable

√ √ √ √ N/a N/a √ √ √ √ √ √ √ N/a √ N/a N/a √ 09-12-2014 at 16:11hrs WRLDC/WR-I/17

86 400kv Pune PG

First time charging of 420 KV Circuit breaker for Aurangabad

- I Line Reactor switching at 400/220 KV Pune (Talegaon) (LR

WAS CHARGED EARLIOR)

Applicable

√ √ √ √ N/a N/a √ √ √ √ √ √ √ N/a √ N/a N/a √ 10-12-2014 at 19:42hrs WRLDC/WR-I/17

86 765/400kv Seoni PG

First time charging of 400kv 125MVAR Bus Reactor-1 at

Seoni

Applicable

√ √ √ √ N/a N/a √ √ √ √ √ √ √ N/a √ √ √ √ 11-12-2014 20:25hrs WRLDC/WR-I/036

87 765/400kv BDTCL DhuleFirst time charging of 400kv Future bays 410 ,411 (Tie Bay)

& 412 upto substation Gantry at BDTCL Dhule

Applicable

√ √ √ √ N/a N/a √ √ √ √ √ √ √ N/a N/a N/a N/a N/a charged on 02nd Feb15 na

88 765/400kv Jhabua Power Ltd /Jabalpur Pool

First time charging of of 413 (Jhabua-1 Main Bay) & 416

(Jhabua-2 Main Bay) Bays pertaining to Jhabua Power ltd at

Jabalupr Pool SS

Not Applicable √ √ √ √ N/a N/a √ √ √ √ √ √Reliability

consent

required

N/a Bay 416 charged on 16th Dec14 at 14:58hrs

89 400kv GMR Raipur First time charging of ST#2 (Station Transformer#2) at GMR

Raipur switchyardNot Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ N/a N/a N/a N/a N/a 16-12-2014

90 400kv Magarwada GIS (DAMAN)400kv,80MVAR BUS Reactor with associated bay equipment

at 400/200kv Magarwada GIS (DAMAN )SS

Applicable

√ √ √ √ N/a N/a √ √ √ √ √ √ √ √ √ √ √ √ 09/01/15 18:20 Hrs WRLDC/WR-II/027

REVISED REQUEST IS AWAITED FROM WR#2 REVISED REQUEST IS AWAITED FROM WR#2

Page 4: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

91 400kv MB Power Generating Station

First time charging of 400kv Bays of Station Transformaer

(ST), 125MVAR Bus Reactor,50Mvar Line Reactor 1 & LR2

and all tie bays at MB Power Switchyard

Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ N/a N/a N/a N/a N/a CHARGED na

92 765kv Satna PG765kV, 240MVAr Vchal # 2 LR (as Bus Reactor) with

associated bay equipment at 765kV Satna SS

Applicable

√ √ √ √ N/a N/a √ √ √ √ √ √ √ √ √ √ √ √ 12/01/15 at 19:35hrs WRLDC/WR-II/030

93 765kv Bina PG765kV, 240MVAr ,Bus Reactor#2 along with associated bay

equipment at 765kV Bina SS

Applicable

√ √ √ √ N/a N/aReliability

consent

required

√ √ √ √ √Reliability

consent

required

√ Standing Committee Clreance is required

94 400kv Boisar500MVA,400/220KV ICT along with associated 400kv &

220kv bay equipment at Boisar SS

Applicable

√ √ √ √ √ N/a √ √ √ √ √ √ √ N/a √ √ √ √ 31/12/14 at 21:50hrs WRLDC/WR-II/26

95 400KV Bahachau (PG) & Varsana (GETCO)

400KV ,Bhachau-Varsana Ckt-1 & 2 Trans Line with

associated Main & Tie Bay equipment at Bhachau PG &

Varsana (Getco) SS

Applicable

√ √ √ √ √ N/a √ √ √ √ √ √ √ N/a √ √ √ √Ckt-1 6th Jan 15 11:37Hrs & CKT-2 6th Jan15

12:19 HrsWRLDC/WR-II/31

96 400kv Boisar

400kv,80MVAR Arg-2 Line Reactor (Charged as Bus

Reactor) with associated bay equipment at 400/200kv

Boisar SS

Applicable

√ √ √ √ N/a N/a √ √ √ √ √ √ √ N/a √ √ √ √ Arg-2 LR Charged on 05th Jan15 WRLDC/WR-II/29

97 400kv RKM Powergrn LTD

First time charging of ST along with Bay equipment (06) at

RKM plant. Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ N/a N/a N/a N/a N/a Charged na

98 400KV Parli PG

400KV,125MVAR BR#2 at Parli pg Applicable

√ √ √ √ N/a N/a √ √ √ √ √ √ √ N/a √ √ N/a √ 08th Jan15 20:00 Hrs WRLDC/WR-I/018

99 400kv Boisar

400kv,80MVAR Arg-1 Line Reactor (Charged as Bus

Reactor) with associated bay equipment at 400/200kv

Boisar SS

Applicable

√ √ √ √ N/a N/a √ √ √ √ √ √ √ N/a √ √ N/a √ 9th Jan15 at 22:29hrs WRLDC/WR-II/028

100 765kv BDTCL Dhule765kv BDTCL Dhule -Vadodara PGCIL Line (charged upto

Gantry-Anti Theft)

Applicable

√ √ √ √ Pending N/aReliability

consent

required

101 765/400kv Aurangabad PG SS 429 Tie Bay of 400kv Bosar1-ICT1 at Aurangabad PG SS

Applicable

√ √ √ √ N/a N/a √ √ √ √ √ √ √ N/a N/a N/a N/a N/a Charged NA

102 765/400kv SASAN 765kv,240MVAR Sasan -Satna ckt#2 Line Reactor at Sasan

Applicable

√ √ √ √ N/a N/a √ √ √ √ √ √ √ √ Pending Pending Pending Pending Charged on 21/01/15

103 400kv MCCPLFirst time charging of GT & Synchronization of Generator at

MCCPL Swityard

Applicable

√ √ √ √ N/a N/a √ √ √ √ √ √ √ N/a N/a N/a N/a N/a Charged on 22/02/15 NA

104 400kv BalcoFirst time charging of GT-1 & Synchronization of Generator

at BALCO Switchyard

Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ N/a N/a N/a N/a N/a Charged on 22/02/15 NA

105 400kv JP NigiriFirst time charging of GT-2 & Synchronization of Generator

at JP Nigiri Switchyard

Not Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ N/a N/a N/a N/a N/a N/aFirst time charged on 11th Feb 18:38 but tripped at 23:51

Hrs on ecoflow low

106 400kV SPGCLFirst time charging of 400kV SPGCL-Kotra ckt I and II from

Kotra upto gantry of SPGCL

Not Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ N/a N/a N/a N/a N/a N/aCharged on 9th Feb 15 19:16 Hrs but tripped within

300ms on zone 2 b phase

107 765kV Pune GIS (Shikhrapur)First time charging of 400kV LILO of Pune Prli PG D/C at

Pune GIS, 400kV Pune GIS Parli I & II Line reactor

Applicable

√ √ √ √ √ N/a √ √ √ √ √ √ √ √ √ √ √ √ Charged on 24th Feb 2015 WRLDC/WR-I/020

108 765kV Pune GIS (Shikhrapur)First time charging of 765kV Bus reactor, 765kV/400kV ICT-1

and ICT-2

Applicable

√ √ √ √ √ N/a √ √ √ √ √ √ √ √ √ √ √ √ Charged on 25th Feb 2015 WRLDC/WR-I/019

109 765kV Pune GIS (Shikhrapur) First time charging of 765kV Solapur Pune S/C and LR

Applicable

√ √ √ √ √ N/a √ √ √ √ √ √ √ √ √ √ √ √ 1. 4th March 2015 2. 27th Feb 2015 WRLDC/WR-I/021

110 400kV Magarwada & KalaFirst time charging of 400kV Navsari-Daman-Kala-Vapi vkt II

(previously 400kV Vapi Navsari II)

Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ Na √ √ √ √ Charged on 27th Feb 2015 WRLDC/WR-II/032

111 400KV MBPOWER First time charging of GT-1 at MBPOWER

Not Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ Na Na Na Na Na

First time Charged on 4th March 15

Generator synchronised pon 19th March 2015

112 220kV Pirana PGFirst time charging of 220kV Pirana Barejadi ckt I & II Bays at

Pirana

Applicable

√ √ √ X X N/a √ √ √ √ √ √ √ Na √ √ √ √ Charged on 19th March 2015 17:58 Hrs & 18:23 Hrs WRLDC/WR-II/033

113 400kV Bhadrawati First time charging of 400kV/220kV ICT at Bhadrawati

Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ NA √ √ √ √ Charged on 17th Feb 2015 22:05 Hrs WRLDC/WR-I/022

114 220kV MagarwadaFirst time charging of 220kV Magarwada (PG)-Magarwada

(DD) D/C

Not Applicable

√ √ √ X √ N/A √ √ √ √ √ √ √ NA NA NA NA NA Charged on 17th March 2015 N/A

115 765kV Vindhyachal Pooling First time charging of 765kV Vindhyachal Pooling ICT 1 & 2

Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 31-03-2015 WRLDC/WR-II/034/385 ICT # 1 not charged

116 400kV Vindhyachal PoolingFTC of 400kV Vindhyachal Pooling Sasan ckt. 1 bays at

Vindhyachal Pooling

Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ NA √ √ √ √ 31-03-2015 WRLDC/WR-II/034/385

117 765kV Vindhyachal Pooling FTC of 765kV Vindhyachal Satna ckt. 1

Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 31-03-2015 WRLDC/WR-II/034/385

118 765kV Wardha, Aurangabad First time charging of 765kV Wardha Aurangabad ckt 3 & 4

Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ Charged on 30th March 2015 WRLDC/WR-I/022

119 400kV Solapur PGFTC of 400kV Solapur PG Solapur NTPC D/C upto Solapur

NTPC gantry

Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 01/04/15 00:01 Hrs 01/04/15 00:12 Hrs

120 400KV Jindal (Tamnaar) FTC of Charging of GT-4 and associated bays

Not Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ Na Na Na Na Na Charged on 26th March 2015 NA

121 765KV Vindhyachal Pooling FTC of 765 KV Vin -SASAN S/C

Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ partially

submittedCharged on 31st March 2015 WRLDC/WR-II/034/385

REVISED REQUEST RECEIVED FROM BDTCL Dhule, According 468th OCC charging

not to be allowed at 765kV voltage level

Page 5: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

122 765KV Bina PG FTC of 765 KV BR-2 at Bina

Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ N/A √ Charged on 30th March 2015 23:26 Hrs WRLDC/WR-II/033

123 765KV Durg pooling FTC of Durg-Kotra-III(Bypassing Champa)

Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ Deferred

124 400kV Jhabua Power Ltd.FTC of Jhabua gen. station through Jhabua Jabalpur Pooling

ckt. 2

Not Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ N/A N/A N/A N/A N/A

Charged on 25th April 2015

125 400kV GMR Raipur FTC of 125MVAR, 400kV Bus reactor

Not Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ N/A N/A N/A N/A N/A

Charged on 17th mApril 2015

Tripped on differential protectyion

126 765kV Aurangabad FTC of Line reactor of 765kV Wardha Aurangabad ckt. 4

Applicable

√ √ √ √ N/A N/A √ √ √ √ N/A √ √ √ √ √ √ √

Charged on 17th April 2015

WRLDC/WR-I/023

127 400kV KSKFTC of 32km portion of KSK RKM ckt. (KSK to Champa and

back)

Not Applicable

√ √ √ √ √ √ √ expected date of charging 15th May 2015

128 765kV Satna PGFTC of 765kV, 240 MVAR Bus reactor 2 at 765kV Satna PG

and associated bays (717 & 718)

Applicable

√ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ √ √ 23-06-2015 WRLDC/WR-II/039

129 765kV Jabalpur PoolingFTC of 765kV, 240 MVAR Bus reactor 1 at 765kV Jabalpur

Pooling and associated bays (801 & 802)

Applicable

√ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ √ √ 04-05-2015 WRLDC/WR-II/035

130 765kV Aurangabad PGFTC of 765kV Aurangabad Padghe ckt. II Tie bay (708) at

765kV Aurangbad station

Applicable

√ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ NA NA √ 02-05-2015 WRLDC/WR1/024

131 400kV SPGCL FTC of SPGCL station through 400kV SPGCL Kotra D/C

Not Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA NA 08-05-2015

Element Not covered under CERC Tariff Regulation

132 400kV SPGCL FTC of 355MVA, 400kV/20kV GT2 at SPGCL Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA NA 11-05-2015 20:18 Hrs Element Not covered under CERC Tariff Regulation

133 400kV Jhabua Power Ltd. FTC of 400kV Jhabua Jabalpur ckt. 1

Not Applicable

√ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA NA 09-05-2015

Element Not covered under CERC Tariff Regulation

134 400kV Jhabua Power Ltd. FTC of 60MVA ST at Jhabua Power

Not Applicable

√ √ √ √ √ √ √ √ √ √ √ NA NA NA NA NA

26-04-2015 00:43 Hrs

Element Not covered under CERC Tariff Regulation

135 765kV Sasan FTC of 765kV 240MVAR Bus reactor at Sasan

Not Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA

23/05/15 16:11 Hrs

Element Not covered under CERC Tariff Regulation

136 765kV BDTCL (Bhopal 765kv) FTC of 765kV Bhopal (BDTCL)-Jabalpur S/CApplicable

√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √08-06-2015 12:09 Hrs

WRLDC/BDTCL/010

FTC of Champa substation through 765kV Champa-Durg ckt.

I alongwith bays 701, 702, 703

Applicable

√ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √

28/05/2015 21:10 Hrs

Champa-Kotra S/C alongwith bays 704, 705, 706Applicable

√ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √29/05/2015 20:18 Hrs

138 765kV BDTCL Dhule FTC of 765kV Dhule Vadodara S/CApplicable

√ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 12-06-2015 WRLDC/BDTCL/011

138 400kV VSTPS VFTC of VSTPS IV-VSTPS V Tie lines & VSTPS III-VSTPS V Tie

lines

Not Applicable

√ √ √pending for communication

channel establishment√ √ √ √

pending for

communication

channel

establishment

√ √ √ 16-05-2015

FTC of 765kV/400kV Vadodara station:

1. 765kV Vadodara-Indore S/C, √ √ √ √ √ √ √ 06-06-2015

2. 765kV Vadodara-Dhule S/C, √ √ √ √ √ √ √ 12-06-2015

3. 765kV/400kV ICT # 1 & 2 √ √ √ √ √ √ √ 04-06-2015, 20-06-2015

4. 400kV Vadodara-Pirana ckt. 1 & 2 √ √ √ √ √ √ √ 27-06-2015, 31-05-2015

5. 400kV Vadodara-Asoj ckt. 1 & 2 √ √ √ √ √ √ √ 31-05-2015, 27-06-2015

141 765kV JTCL FTC of 765kV Jabalpur Pooling-Bina ckt. IIIApplicable

√ √ √ √ √ NA √ √ √ submitted earliersubmitted

earlier√ √ √ √ √ √ √ 30-06-2015 WRLDC/JTCL/01

FTC of Solapur NTPC station

1. Solapur NTPC-Solapur PG ckt. 1 √ √ 10-07-2015

2. 400kV Solapur NTPC bus 1 & 2 √ bus 1 √ bus 1 10-07-2015

3. 400kV/132kV ICT #1 √ √ 11-07-2015

143 400kV VSTPS V FTC of ST-13A (bay no. 433)

Not Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA NA 12-06-2015

Element Not covered under CERC Tariff Regulation

144 765kV Champa FTC of 765kV/400kV 1500MVA ICT # 1 at Champa

Applicable

√ √ √ √ Details in B-4 NA √ √ √ √ √ √ √ √ √ √ √ √ 11-06-2015 at 15:59hrs WRLDC/WR-I/027

145 765Kv/400Kv Vindhyachal Pooling FTC of 765kV/400kV/33kV ICT # 1 at Vindhyachal Pooling

Applicable

√ √ √ √ Details in B-4 NA √ √ √ √ √ √ √ √ √ √ √ √ 02-07-2015 at 20:17hrs WRLDC/WR-I/038

146 132kV/11.5kV Mauda FTC of ST # 3 at Mauda Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ NA √ √ √ √ 30-06-2015

Element Not covered under CERC Tariff Regulation

147 765kV Jabalpur Pooling FTC of 813 & 816 Main bays at Jabalpur pooling

Applicable

√ √ √ √ √ NA √ √ √ √ √ √ √ √Charged later (Row Entry: 152). This entry to be

considered as void

148 400kV TRN Energy FTC of 400kV TRN Energy-Tamnar D/C Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA NA 23-06-2015

Element Not covered under CERC Tariff Regulation

149 400kV TRN EnergyFTC of 400kV/6.9kV 50MVA Station Transformer at TRN

energy Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA NA 11-08-2015

Element Not covered under CERC Tariff Regulation

150 400kV VSTPS V FTC of 400kV/21.75kV 600MVA GT 13 at VSTPS V Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA NA 05-08-2015

Element Not covered under CERC Tariff Regulation

151 765kV Vindhyachal pooling FTC of 765kV Vindhyachal Pooling-Satna # 2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 09-08-2015 WRLDC/WR-II/041

152 765kV Jabalpur Pooling

FTC of 765kV Jablpur Pooling-Dharamjaygarh # 3 & 4 Line

reactors (240 MVAR) along with 813 & 816 main bay at

Jabalpur Pooling

Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 15-08-2015 WRLDC/WR-II/040

142 400kV Solapur NTPC

Not Applicable for

NTPC solapur ICT &

bays

√ √ √ √ √ √ √ √ √ √ √

765Kv/400Kv √ √140 Vadodara Applicable √ √ √ √ √ NA

137 765kV Champa WRLDC/WR-I/026

NA NA NA

NA NA Element Not covered under CERC Tariff Regulation

WRLDC/WR-II/036√ √

Page 6: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

153 765kV Gwalior FTC of 765kV Gwalior-Jaipur ckt. 1 & 2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ given by NL:DC √ √ √ √ √ 11-08-2015 to be given by NLDC

154 765kV Vindhyachal pooling FTC of 765kV 240 MVAR Bus reactor at Vindhyachal Pooling Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 22-08-2015 WRLDC/WR-II/042

155 400kV Vindhyachal poolingFTC of 765kV Vindhyachal pooling-Sasan # 2 & 400kV

Vindhyachal pooling-NTPC # 2Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 29-08-2015 WRLDC/WR-II/045 for sasan ckt2

156 765kV Jabalpur pooling FTC of 765kV Jabalpur pooling-Dharamjaygarh # 3 & 4 (JTCL) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √Ckt#3 ( 12/09/15 at 17:48hrs) & Ckt4 (13/09/15 at

00:04hrs)WRLDC/JTCL/02

157 400kv GMR Raipur First time charging of GT#2 (Generator Transformer#2) at

GMR Raipur switchyardNot Applicable √ √ √ √ √ √ √ √ √ √ √ √ Pending NA NA NA NA NA

158 765kV Dharamjaygarh PG

First time charging of 765kV 330MVAR Line reactor of 765kV

Dharamjaygarh-Jabalpur Pooling ckt. 3 at Dharamjaygarh &

765kV 330MVAR Line reactor of 765kV Dharamjaygarh-

Jabalpur Pooling ckt. 4 at Dharamjaygarh along with bay 724

& 727

Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 12-09-2015 ckt3 LR & 13/09/15 CKT4 LR WRLDC/WR-I/029

159 400kv Bachhau

First time charging of 400kV Bhachau-Essar # 1 Main & Tie

bays (414 & 415) & 400kV Bhachau-Essar # 2 Main & Tie

bays (417 & 418) at Bhachau

Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ NA √ √ √ √ 09-09-2015

CERTIFICATE WILL ISSUED ALONG WITH LINE CHARGING

160 765kv Aurangabad/SolapurFTC of 765kv Aurangabad Solapur DC at 765kV Aurangbad

station & LR s at Solapur end Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √

ckt#1 charged (5th oct15 at 07:00hrs) & ckt#2

(2nd oct15 at 18:50hrs)WRLDC/WR-I/032

161 765kv Vadodara GISFTC of 240MVAR ,765KV Bus Reactor along with associated

bay (707) equipmentApplicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 29-09-2015 WRLDC/WR-II/043

162 400kv BALCO FTC & synchronization of GT#3 at Balco Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ na na na na na 12-10-2015

163 765kv Dharamjaygarh PG

FTC of 330MVAR LRs along with Bay no 709 ,709R

,704,705,706,706 R for JBLR Ckr#1 & #2 at Dharamjaygarh

SS

Applicable

√ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ ckt-1 -15/10/15 & Ckt-2 -14/10/15 WRLDC/WR-I/029

164 765kv Dharamjaygarh PGFTC of Dharamjaygarh -Ranchi ckt2 (Anti theft charging)

along with 330MVAR LRs at Dharamjaygarh SS

Applicable

√ √ √ √ √ NA √ √ √ √ √ √ √ √ N/a N/a N/a N/a 12-10-2015

165 765kv Dharamjaygarh PGFTC of Dharamjaygarh -JBLR ckt2 (Anti theft charging) along

with 330MVAR LRs at Dharamjaygarh SS

Applicable

√ √ √ √ √ NA √ √ √ √ √ √ √ √ N/a N/a N/a N/a 08-10-2015 NA

166 400kv VSTPS-Pooling400kv Vchal Pool -Rihand ckt#1 at Vchal Pool SS only

(418bay)

Applicable

√ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 04-11-15 at 16:06hrs WRLDC/WR-II/046

167 400kv VSTPS-Pooling FTC of 400kv Vchal Pool -Rihand ckt#2 at Vchal Pool SS

Applicable

√ √ √ √ √ NA √ √ √ √ √ √NLDC Issued

via email ref

131015

√ √ √ √ √ 13-10-2015 at 10:57hrs POSOCO/NLDC/SO/07 dtd 26th Nov15

168 765kv Dharamjaygarh PGFTC of Dharamjaygarh -JBLR ckt 1& 2 (Complete Line) along

with 330MVAR LRs at Dharamjaygarh SS

Applicable

√ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 15/10/15 ckt1 & 14-10-2015 ckt2WRLDC/WR-II/044 (Request received from Jabalpur pool

ss) & LR Certificate (WRLDC/WR-I/029)

169 400kv VSTPS-Pooling FTC of 400kv Vchal Pool -VSTPS (NTPC) Ckt-1 at Vchal Pool SS

Applicable

√ √ √ √ √ NA √ √ √ √ √ √ √ NA √ √ √ √ 19-10-2015 WRLDC/WR-II/045

170 400kv RKM Powergrn LTD

First time charging of GT#2along with Bay equipment

(bay05) at RKM plant. Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ N/a N/a N/a N/a N/a 26-10-2015

171 400kv Solapur PG FTC of 500MVA 400KV ICT-3 At Solapur pg Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 31-10-15 at 19:41hrs WRLDC/WR-I/031

172 400kv Kolhapur PG

FTC of kolhapur PG ss • 400 KV GIS NEW Substation along

with Bays 401 to 412

• 400KV Kolhapur (PG)- Kolhapur( MSETCL) D/C Line

• 400 KV Kolhapur – Mapusa D/C line

• 400 KV Kolahpur – Kudgi D/C line (765KV Line planned to

be charged at 400kv level)

• 400 KV, 125 Mvar Bus Reactor

Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √

Charged on 8th Nov15 except 400 KV Kolahpur –

Kudgi D/C line

WRLDC/WR-I/030

173 765kv Kolhapur PG

FTC of 400 KV Kolahpur – Kudgi D/C line (765KV Line

planned to be charged at 400kv level)

• 400

Applicable √ √ √ √ √ NA √ √ √ √ √ √ NLDC Issued √ √ √ √ √ Ckt-1 Charged on 17th Nov15 & ckt2 0n 01/12/15 NLDC WILL ISSUE (Consent send to NLDC)

174 400kv Aurangabad Pg FTC of 426 Tie bay of Boisar-2 & ICT2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ NA NA NA NA NA 14-11-2015

175 400KV Dhariwal PG FTC of 80MVAR BR at dhariwal Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ NA NA NA NA NA 23-11-2015 at 14:04hrs

176 400KV Dhule MSETCLFT charging of 2x400KV Line Bays at 400KV Dhule Sub-

station(Dhule-Dhule (MS Bays)Not Applicable √ √ √ √ √ NA

Reliability

consent OK√ √ √ √ √

Reliability

consent OK NA NA NA NA NA WRLDC Mail dtd 28th Nov15

Charged

177 765kv Dharamjaygarh PGFTC of Dharamjaygarh -Ranchi ckt2 complete line along with

330MVAR LRs at Dharamjaygarh SS

Applicable

√ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ Charged on 24-12-15 16:39hrs

178 400kV TRN Energy Back charging of GT#1 at TRN energy Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA NA

Element Not covered under CERC Tariff Regulation

Page 7: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

179 400KV Dhule BDTCLFT charging of 400KV D/C Dhule BDTCL-Dhule MS Line at

400KV Dhule Sub-station Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ NA √ √ √ √ 15/01/16 ckt#1 20:38, ckt#2 23:36hrs WRLDC/BDTCL/012

180 400kv Bilaspur PG

400kv Essar bays along with LRs (Bay no: 409- Essar ckt#1

main bay, 411-Tie bay Essar ckt#2 & 412: Essar Ckt#2 Main

bay) at 765/400KV Bilaspur ss,Owned by Essar

Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ NA NA NA NA NA Bays Charged on 04/12/15 NA

181 400kv RAPP Transmission company ltdIdle charging for IR-400KV RAPP-Sujalpur PG ckt#1 Line (Line

is constructed by RAPP TR Compny Ltd (Sterlite) Applicable √ √ √ √ √ √ (TSA) √ √ √ √ √ √ √ √ √ √ √ √ Charged on 2/02/16 15:35HRS POSOCO/NLDC/SO/10

182 400kv Karamsad & Rajgarh SS400KV DC TL from Rajgarh to Karamsad (Constructed by

WRTG_Reliance) ; Bays at both ends owned by POWERGRID Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ NA √ √ √ √

ckt. 2 charged on 14.12.2015 at 10:31 hrs& Ckt#1

27.12.15 16:54hrs

WRLDC/RIL/001

183 400kv Bilaspur PG400kv Essar Ckt#1 Tie (408) bays at 765/400KV Bilaspur

ss,Owned by Bilaspur Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ NA Charged

184 765/400kv Vindhyachal PoolingSpare ICT :765/400kv ,15000mva Auto Transformer bank #1

-B phase Testing on ICT#1 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ Test Charged on 22/12/15

185 765/400kv Vindhyachal Pooling First time test charging of 765KV Single phase BR at Vin Pool Applicable √ √ √ √ √ NA √ √ √ √ √ √√ via mail dtd

31st Dec15√ NA NA NA NA

186 765/400kv Aurangabad ss400kv ,50MVAR LRs for Akola #1 & Akola #2 ckt at

Aurangabad Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ NA √ √ √ √ 03/01/16 at 11:06hrs, 04/01/16 19:37hrs WRLDC/WR-I/033

187 220 kv Nephaniya (Melkheda ) ss -MP FTC of New Nepania substation (LILO of Badod Bhanpura) Applicable pending pending √ pending pending NA Pending pending pending pending pending pending Pending

188 765/400kv NHPTL Bina Lab (National High Power Testing Lab) FTC of 401 & 702 bay at NHPTL Bina

NA

√ √ √ Not availble √ √ √ √ √ √ √ √ √ √ NA NA NA NACharged on 10/03/16, 401: 15:07HRS, 425bay :

14:07hrs ,702: 15:40hrsNA

189 400KV Koradi-II FTC of Koradi-II -Wardha Pg & Koradi-II-IEPL at Koradi-II

NA

√ √ √ √ √ NA √ √ √ √ √

State

Inspector

certificate is

pending for

Koradi2-IEPL

NA NA NA NA NA

190 220KV Bhanpura MPPTCLFirst time charging of Badod-Bhanpura & Badod-Bhanpura-

Modak

Applicable

√ √ √Data integrated upto SLDC

Indore√ NA ok √ √ √ √ √ Consent given √ NA NA NA NA Charged on Feb

191 400KV Koradi-II First time back charging of GTR of Unit-9 at Koradi-ii

Applicable

√ √ √ √ √ NA OK √ √ √ √ √ Consent Given NA NA NA NA NA

192 400KV MB Power Generating Station First time back charging of GT#2 at MB Power

Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA NA charged on 13/01/16 at 10:55pm (triped)

193 400kv BalcoFirst time charging of GT-4 & Synchronization of Generator

at BALCO Switchyard

Applicable

√ √ √ √ √ √ √ √ √ √ √ √ N/a N/a N/a N/a N/a Charged on 09/03/16 & COD on 13/03/16 NA

194 400kv Sujalpur400kV ,50MVAR Line Reactor of 400kv RAPP-Sujalpur ckt# 1

along with terminal equipment at 400KV Sujalpur PG SS

Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ charged on 31/01/16 at 23:00hrs WRLDC/WR-II/048

195 400kv Satna PG400kv,50mvar Line reactor for Vin-Satna ckt#3 (Testing of

new LR) at Stana

Applicable

Pending Pending Pending Pending Pending Pending

196 400kv RAPP Transmission company ltdIdle charging for IR-400KV RAPP-Sujalpur PG ckt#2 Line (Line

is constructed by RAPP TR Compny Ltd (Sterlite) Applicable √ √ √ √ √ √ (TSA) √ √ √ √ √ √ √ √ √ √ √ √ Charged On 26/02/16 22:13hrs POSOCO/NLDC/SO/15

197 765kv Vindhyachal Pooling Tie bay 711-52 of 765 KV bus Reactor at Vindhyachal PS Applicable √ √ √ √ √ NANLDC Consent

required√ √ √ √ √

NLDC Consent

required√

198 400kv Sujalpur400kV ,50MVAR Line Reactor of 400kv RAPP-Sujalpur ckt# 2

along with terminal equipment at 400KV Sujalpur PG SS

Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ Charged on 26/02/16 at 23:00hrs WRLDC/WR-II/048

199 400kv (Kansari) GUJRAT FTC of 400KV MUNDRA(APL)-KANSARI LINE AND 400KV

VARSANA-KANSARI

Applicable

Pending Pending √ Pending Pending NA Consent given Pending Pending Pending Pending √ Consent given Consent given NA NA NA NA Charged on 20-02-2016 NA

200 400kv MB Power Generating Station FTC and synchronization of Unit-2 at MB Power

Not Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA NA

201 400kv Bina PG400kv, 125MVAR 1-Phase Spare Reactor in place of already

charged 63MVAR BR in Bina

Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ NA √ √ √ √ Charged on 14/03/16 21:11hrs WRLDC/WR-II/49

202 400kv JPL FTC of 400KV JPL-PGCIL Tamnar Line-2 Ckt-3

Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA NA Charged on 09/03/16 at 18:03hrs

203 400kv Maudha NTPCFTC of 400KV bus Stage-II & III (Bus sectionalizer 3 &4,Bay

419 & 423)

Not Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ N/a N/a N/a N/a N/a Charged

204 400kv BalcoFirst time charging of GT-2 & Synchronization of Unit at

BALCO Switchyard

Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ N/a N/a N/a N/a N/a Charged

205 220kv Maharastra KALWA SLDC220kV Chithegan-Shendra D/C line by making LILO at our

Aurangabad PG SS.

Not Applicable

√ √ √ √ √ √Reliabilty

consent given√ √ √ √ √

Reliabilty

consent givenN/a N/a N/a N/a N/a

Shendra Charged on 19th March16 01:45hrs &

Chitgaon on 5th April16NA

206 400kv Vindhyachal Pool PG

First time charging of 414 & 417 tie bays of Rihand-I &

Rihand-II Feeder at Vindhyachal Pool PG SS

Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ N/a

Page 8: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

207 400kv Navsari PG & GETCO

Interconnection at Crossing point of one circuit of 400kv

Gandhar-Navsari(PG)#1 & 400KV Kosamba-Ukai #2 (GETCO).

Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ N/a N/a N/a N/a N/aKosamba-jhanor: 06/4/16 17:19 & Ukai-Navsari:

7/4/16 18:49hrs

208 400KV Raipur PG

Spliting of 400kV Raipur Bus through bus Sectionaliser into

two sections at a pt.between existing line bays pf

Chandrapur-1 & 2 and shifting of Chandrapur-2 & 3 line bays

from section Raipur-B to Raipur-A.

Applicable

√ √ √ √ √ √Consent given

by mail√ √ √ √ √

Consent given

by mailNA √ √ √ √ 24/06/14 10:28HRS WRLDC/WR-I035

209 765kv Champa Pooling

First time charging of 765/400kv ICT2, 240MVAR BR &

400KV 80MVAR BR at 765/400kv Champa Pooling SS

Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √24/03/16 ICT 14:44HRS & 765KV BR 12:06HRS &

400kv BR on 25/03/16 11:20HRSWRLDC/WR-1/038

210 21/400 kV Mauda Stage-2

First time charging of 21/400 kV GT#3 (Generator

Transformer#3) at Mauda STPP

Not Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ Na Na Na Na Na Last week of March16

211 765Kv/400Kv VSTPS -V

First time charging of 13 B Station Transformer at VSTPS

Stage-5

Applicable

√ √ √ √ √ √Consent given

by mail√ √ √ √ √

Consent given

by mailNa Na Na Na Na Charged in March16 NA

212 400kv PUNE Sikarpur GIS LILO of 400kV Pune(Talegaon) Aurangabad D/C at Pune GIS

Applicable

√ √ √ √ √ NA √ √ √ √ √ √ √ Na √ √ √ √Pune 3 & Pune 4 Charged on 1stApril16 & Arg 1 &

2 charged on 3rd April16 WRLDC/WR-I/039

213 400kv Vindhyachal Pool 400KV 63MVAR BR at Vin Pool Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ NA √ √ √ √ 19/03/16 at 19:25hrs WRLDC/WR-II/050

214 400kv Bachau

400kV , Anti-Theft charging Bhachau-Essar Ckt DC (Loc No:

82/0-4C/0) with 63MVAR Line reactor at 400kv Bhachau

Substation

Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ NA √ √ √ √Ckt#2 : 30March16 20:22hrs & Ckt#1 31/03/16

22:41hrsWRLDC/WR-II/052

215 400kv Bina PG Idle charging of 1200/400kv, 3*333MVA ICT Phase-II of

National Test Station at Bina SSNot Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ NA NA NA NA Charged on28March16

NA

216 765Kv/400Kv VSTPS -V

First time charging of 400kv 125mvar BR at VSTPS Stage-5 Applicable

√ √ √ √ √ NAmail on6th

April√ √ √ √ √

Consent given

on mailNa NA NA NA NA Charged

NA

217 400kv LARA NTPC

First time charging Bus-2, at 2*800MW NTPC LARA

Generating station

Not Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ Na NA NA NA NA Charged

NA

218 765/400kv NHPTL Bina Lab (National High Power Testing Lab)FTC of 701 & 702 bay at NHPTL Bina at No load (702bay was

charged earlior on 10th MARCH16)

Not Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA 701 Bay charged on 12th April16 NA

219 400KV KWPCL

Two nos. of 400kv bays of KWPCL at New Kotra Pooling

Station of POWERGRID & 400kv KWPCL-New Kotra Double

Circuit Transmission Line

Not Applicable

√ √ √ √ √ √ √ √ √ √ √ √Realibility

consent givenNA NA NA NA NA NA

220 400KV APCL

Two nos. of 400kv Main bays of APCL at New Kotra Pooling

Station of POWERGRID & 400kv APCL-New Kotra Double

Circuit Transmission Line along with bays and Bus1 &2 at

ACPL Switchyard

Not Applicable

√ √ √ √ √ √ √ √ √ √ √ √Realibility

consent givenNA NA NA NA NA NA Ckt#1 : 28April16,12:15hrs; Ckt#2 29April16 15:54hrs

221 400kv LARA NTPCFirst time charging Bus-1, Bay 401,402,403 at 2*800MW

NTPC LARA Generating station

Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ NA √ √ √ √02/05/16 18:29 Bay402, 18:35hrs Bus -1 &

bay401, 18:4hrs Bay403WRLDC/NTPC LARA/001

222 400kv Ektuni (Adani) 80 MVAR Bus Ractor with at Ektuni Not Applicable 27-05-2016 17:23 Adani (APML Maharashtra) element

223 765/400kv Aurangabad ss 400kv ,Aurangabad(PG) -Aurangabad(MS) dc Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ NA √ √ √ √ 28/04/14 at 00:48hrs, 27/04/14 23:00hrs WRLDC/WR-I/040

224 765/400kv Aurangabad ss 400kv ,125MVAR Bus Reactor Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ NA √ √ √ √ 28/04/14 at 20:52hrs WRLDC/WR-I/040

225 765/400kv KOTRA PG ss 400kv Kotra-Lara ckt#1 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ NA √ √ √ √ 02/05/16 at 18:35hrs WRLDC/WR-I/042

226 765/400kv KOTRA PG ss 400kv Kotra-Lara ckt#2 (Idle Charge) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ NA √ √ √ √ 03/05/16 at 17:05hrs WRLDC/WR-I/043

227 765/400KV Bina PGFTC of 400kV inter connector and 400kV Satna -3 extension

bay (407) of 1200kV Phase-II of NTS at Bina ss Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ na na na na 17/05/16 at 17:31hrs na

228 400KV Balco /DharamjaygarhFTC of Balco-Dharamjaygarh DC along with bay 415 & 418

(Main bay) at Dharamjaygrh Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ na na na na na

Ckt#2 charged : 14June16 11:24PM ,Ckt#1

16June16 11:23pmNA

229 400kv LARA NTPC

First time charging Dia 2 (Bay 404,405,406), Dia 4 (Bay

410,411,412),Bus#2 & ST#1 (No Load)at 2*800MW NTPC

LARA Generating station

Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ NA √ √ √ √Bus#2 (through Main Bay 403)charged :20/06/16

12:53hrs, ST#1 (No Load through 412 &411 & tie

Iso 410) 20/06/16 17:47hrs

WRLDC/NTPC LARA/002

230 400KV Khandwa- Indore FTC (Anti-Theft) of 400kV Khandwa Indore DC line Applicable √ √ √ √ √ Na √ √ √ √ √ √ NA 03-08-2016 Antitheft charging from Indore end

Page 9: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

231 220kv Raigarh (CS)-Budipadar lilo at Raigarh PGFTC of Raigarh (CS)-Budipadar lilo at Raigarh PG (Owner

CSPTCL & OPTCL)No Applicable √ (From CSPTCL) √ √ √ √ Na

√ (Through

Mail)√ √ √ √ √

Powergrid bays for LILO 207 & 208 already charged on

11/08/15 (Anti theft) . PG said that PLCC Comm is not

estabilished (Clarification awaited from CSPTCL)

232 400kv Indore PGFTC of Khandawa ckt#1 & ckt#2 Bays at Indore PG

(424(M),423 (T),422(F) & 427 (M),426(T),425(F))Applicable √ √ √ √ √ Na √ √ √ √ √ √ √ NA Charged

233 800KV HVDC Champa HVDC

FTC of 400KV AC Filter-A Type 125MVAR (CQ31), A Type

125MVAR (CQ11),BType 125MVAR (CQ12) through

457,458,459,460,461,462 bays at champa pooling ss

Applicable √ √ √ √ Na Na

234 400kv Khandawa PG

first time charging of 400kV Khandwa-Betul Ckt 1 line bays (

Main bay 424 )& 1 CT in Tie Bay 423-(Tie was already in

operation)

Applicable √ √ √ √ Na Na √ √ √ √ √ √ √ NA Charged on 19th July16

235 400kv KSKFTC of 400KV KSK-Champa ckt#2 along with bays

445,446,447,443,444 at champa pooling ss (De-LILO Ckt#2) Applicable √ √ √ √ √ √ √ NA

236 400kv Khandawa PG First time charging of 400kV Khandwa Indore DC line bays (

404,405,406,401,402,403) at Khandawa Applicable √ √ √ √ Na Na √ √ √ √ √ √ √ NA Charged

237 400kv Seoni PG765kv, 80 MVAr, 1 phase spare reactor at Seoni (to be used

as line reactor for 765 kV Seoni-Wardha-2 at Seoni end) Applicable √ √ √ √ Na Na √ √ √ √ √ √ √ √ Charged

238 400kv Aurangabad PG FTC of 405 TIE BAY (In dia with 400/220kv Aurangabad ss) Applicable √ √ √ √ Na Na √ √ √ √ √ √ √ NA Charged

239 400kv RKM Powergrn LTD

Two number of 400kV Bays (RKMPPL Line-1 Main Bay (Bay

438) & RKMPPL Line-2 Main Bay (Bay 439) owned by M/s

R.K.M Powergen Pvt Ltd and located at 765/400kv Bansia(

Kotra) Pooling station POWERGRID.

Applicable √ √ √ √ Na Na √ √ √ √ √ √ NA

240 220KV MSETCL220KV Bhugaon-Pusad LILO at PGCIL Deoli S/stn

(765/400/220KV WARDHA PG) NOT Applicable √ √ √ √ √ Na √ √ √ √ √ √

Realibility

consent givenNA NA NA NA NA Charged at 20:53pm on 25/08/16 Charged at 20:53pm on 25/08/16

241 400kv Khandawa PGFirst time Anti theft charging of 400kV Khandwa Betul Ckt 1

line at Khandawa end NOT Applicable √ √ √ √ √ Na √ √ √ √ √ √ √ NA NA NA NA NA 06-09-2016 20:16 hrs Antitheft charging

242 400kv Koradi-II  400/220kV, 500 MVA ICT-1 at Koradi II s/s NOT Applicable √ √ √ √ √ Na OK √ √ √ √ √Reliabilty

consent NA NA NA NA NA

243 400 kV Champa PoolingMain Bays (444,445) of 400 kV KSK-Champa 3&4 & other

associated KSK bays(442,443,446)at Champa Pooling

Station

Not Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a NA NA NA NA 15-Sep-16 N/a

244 400 kV Champa Pooling Bay 425 : Bus-sectionalizer bay of 400 kV Champa Bus-1B Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ N/a 15-09-2016 17:12 WRLDC/WR-1/042

245 400 kV Champa Pooling Bay 426 : Bus-sectionalizer bay of 400 kV Champa Bus-2B Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ N/a 15-09-2016 17:28 WRLDC/WR-1/042

246 400 kV KhandwaFirst time (Anti theft) charging of 400 kV Khandwa-Betul line-

2 (Bays 428 & 429) from Khandwa end up to Betul gantryApplicable √ √ √ √ √ Na √ √ √ √ √ √ √ N/a Yet to be submitted by WRTS-2 26-09-2016 13:06

Format-V not received from WRTS-2

247 765 kV Champa Pooling 765 kV Bus-2B & associated bays Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 28-09-2016 20:06 WRLDC/ WR-1/ 043

248 765 kV Champa Pooling 765 kV Bus-1B & associated bays Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 29-09-2016 21:08WRLDC/ WR-1/ 043

249 765/400 kV Champa Pooling1500 MVA, Champa ICT-6 & associated bays (No load

charging)Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 29-09-2016 23:53

WRLDC/ WR-1/ 043

250 765/400 kV Champa Pooling1500 MVA, Champa ICT-5 & associated bays (No load

charging)Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 30-09-2016 00:41

WRLDC/ WR-1/ 043

251 400 KSK Mahanadi 400 kV KSK-Champa-circuit-4 N/a √ √ √ √ √ NA √ √ √ √ √ √ √ N/a N/a N/a N/a N/a 04-10-2016 16:30 N/a

252 400 KSK Mahanadi 400 kV KSK-Champa-circuit-3 N/a √ √ √ √ √ NA √ √ √ √ √ √ √ N/a N/a N/a N/a N/a 04-10-2016 17:32N/a

253 400 Raigarh & Raipur 400 kV Raipur-Raigarh line-3 (LILO Removal at KSK) N/a LILO removed & the 400 kV Raipur-Raigarh line-3 charged N/a N/a N/a N/a N/a N/a N/a N/a N/a N/a N/a N/a N/a N/a 09-10-2016 13:52LILO Removal

254 400 Solapur(NTPC Ltd.)400 kV Solapur(NTPC)-Solapur(PGCIL) line-2 & associated

bays(416,417) from NTPC endN/a √ √ √ √ √ NA √ √ √ √ √ √ √ N/a N/a N/a N/a N/a 14-10-2016 13:10 Line was idle charged earlier from PGCIL solapur end.

255 400 kV Raigarh & Raipur 400 kV Raipur-Raigarh line-4 (LILO Removal at KSK) N/a LILO removed & the 400 kV Raipur-Raigarh line-4 charged N/a N/a N/a N/a N/a N/a N/a N/a N/a N/a N/a N/a N/a N/a 14-10-2016 22:51 LILO Removal

256 400 kV Raigarh 63 MVAr Line Reactor-1 of Rajgarh-SSP-1 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 18-10-2016 17:49 WRLDC/ WR-1/ 061

257 132 kV SCPL (ACBIL)80 MVA, 11/132 kV Generator Transformer - 2 & 50 MW

SCPL-unit-2N/a √ √ √ √ √ √ √ √ √ √ √ √ √ N/a 20-10-2016 17:20 N/a

258 400 kV Solapur(NTPC Ltd.)200 MVA, 400/132 kV Solapur(NTPC) ICT-2 & associated

baysN/a √ √ √ √ √ NA √ √ √ √ √ √ N/a 21-10-2016 14:09 N/a

259 400 kV Raigarh 63 MVAr Line Reactor-2 of Rajgarh-SSP-2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 21-10-2016 16:09 WRLDC/ WR-1/ 061

260 400 kV SKS Power (SPGCL) 355 MVA, 20/400 kV Generator Transformer -1 N/a √ √ √ √ √ √ √ √ √ √ √ √ √ N/a N/a N/a N/a N/a 26-10-2016 16:53 N/a

261 400 kV Champa HVDC A Type 125 MVAr Filter (COM1A+HACQ11) ie ACF-3 & bays

460 & 461Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 27-10-2016 19:51 C1-C4 yet to be received

262 400 kV Champa HVDCA Type 125 MVAr Filter (COM1A+HACQ31) ie ACF-1 & bays

457 & 458Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 27-10-2016 20:30 C1-C4 yet to be received

263 400 kV RKMPPL RKMPPL-Kotra line-1 with bay 438 N/a √ √ √ √ √ √ √ √ √ √ √ √ √ N/a N/a N/a N/a N/a 28-10-2016 13:14 N/a

264 400 kV RKMPPL RKMPPL-Kotra line-2 with bay 439 N/a √ √ √ √ √ √ √ √ √ √ √ √ √ N/a N/a N/a N/a N/a 28-10-2016 13:55 N/a

265 400kV TRN Energy Back charging of 400/24 kV GT#2 at TRN energy Not Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ NA NA NA NA NA 01-11-2016 00:00 Element Not covered under CERC Tariff Regulation

266 400 kV RAPP (NR) / Sujalpur(WR) 400 kV RAPP-Sujalpur line-1 (synchronisation & power flow) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 11-11-2016 18:35 NLDC Certificate No 28 dated 28.12.16 (Idle Chaging from Sujalpur done in Feb-16)

267 400 kV Champa HVDCA Type 125 MVAr Filter (COM1A+HACQ21) ie ACF-2 with bay

459Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 15-11-2016 14:44

268 400 kV RAPP (NR) / Sujalpur(WR) 400 kV RAPP-Sujalpur line-2 (synchronisation & power flow) Applicable √ √ √ √ 15-11-2016 16:47 NLDC Certificate No 29 dated 28.12.16 (Idle Chaging from Sujalpur done in Feb-16)

269 400 kV Champa HVDC B Type 125 MVAr Filter (COM1A+HACQ12) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 15-11-2016 17:38

270 400/220 Damoh (PGCIL) 500 MVA 400/220 kV Damoh ICT-3 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 16-11-2016 19:10 WRLDC / WR-2 / 62

271 400 Betul (PGCIL) 50 MVAR Line Reactor of Betul-Khandwa-1 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a Format-V not received from WRTS-2 26-11-2016 18:18 Charged from Khandwa to check healthiness

272 400 Betul (PGCIL) 50 MVAR Line Reactor of Betul-Khandwa-2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a Format-V not received from WRTS-2 04-12-2016 11:27

273 400 Pune(PG)/KhargharPune(PG)-Kharghar s/c (by bunching of Pune-Padghe &

Padghe-KhargharNot applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 05-12-2016 00:00

274 400 Dehgam(PGCIL) Bay 421( Wanakbori-2 main bay) Not Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ 09-12-2016 18:54 GETCO owned bays

275 765 Champa765 kV Champa-Dharamjaigad S/C (with bay 715 at

Champa)Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 14-12-2016 19:28 Certificate No-45/WR1

276 765/400 Champa Champa ICT-3 & associated bays(710,711,712,422) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 16-12-2016 21:53 WRLDC/WR-1/44

277 765/400 Champa Champa ICT-4 & associated bays(716,717,427) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 17-12-2016 22:14 WRLDC/WR-1/44

Page 10: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

278 400 Solapur (NTPC)Bay 403 (200 MVA,400/132 kV ICT-1 tie bay) & Bay 402

(Future bay)Not Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 23-12-2016 17:45

279 765 Champa 765 kV Champa-Durg PS line-2 with bay 704 at Champa Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 23-12-2016 19:30 Certificate No-45/WR1

280 400 Khandwa/Indore Khandwa-Indore-1 (Synchronisation & power flow) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 27-12-2016 12:23 Certificate No-63/WR-2

281 400 Khandwa/Indore Khandwa-Indore-2 (Synchronisation & power flow) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 29-12-2016 16:25 Certificate No-63/WR-2

282 400 Champa HVDC Converter transformer of HVDC Champa-Kurukshetra Pole-1 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ 29-12-2016 19:12

283 400 Boisar/MagarwadaBoisar-Magarwada (Part of Boisar -Navasari-1 From Kala

Tapping Point (45A/0) to Boisar )Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 29-12-2016 21:28 Certificate No-65/WR-2

284 400 Boisar/MagarwadaBoisar-Kala (Part of Boisar -Navasari-2 From Kala Tapping

Point (45A/0) to Boisar )Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 29-12-2016 21:28 Certificate No-65/WR-2

285 400 ChampaChampa-Kurukshetra HVDC Pole-1 (Open end charging for

OLT)Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ 30-12-2016 03:25

286 400 Indore 80 MVAr Line reactor of Indore-Khandwa-2 at Indore Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 30-12-2016 11:47 Certificate No-64/WR-2

287 400 Indore 80 MVAr Line reactor of Indore-Khandwa-1 at Indore Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 30-12-2016 19:35 Certificate No-64/WR-2

288 132/11.5kV NTPC Mauda Stage-2 90 MVA Station Transformer-4 N/a √ √ √ √ √ NA √ √ √ √ √ √ N/a N/a 30-12-2016 19:45

289 400 Koradi-II / Koradi-III Koradi-II - Koradi-III line-1 Not applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 31-12-2016 17:55 N/a

290 400 Vapi(PGCIL)Vapi-KAPP line-2 (Anti theft charging from Vapi(PG) with

bays-416&417) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 31-12-2016 23:13 Certificate No-66/WR-2

291 400 Alkud Alkud-Kolhapur S/C (LILO of Kolhapur(PG)-Solapur(PG)-1) Not applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 01-01-2017 18:53 N/a

292 400 Alkud 125 MVAR Alkud Bus-Reactor Not applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 01-01-2017 18:56 N/a

293 400/220 Alkud 500 MVA 400/220 kV ICT at Alkud Not applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 01-01-2017 18:57 N/a

294 400 Alkud Alkud-Solapur S/C (LILO of Kolhapur(PG)-Solapur(PG)-1) Not applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 01-01-2017 19:45 N/a

295 400 Vapi(PGCIL)Vapi-KAPP line-1 (Anti theft charging from Vapi(PG) with

bays 413&414)Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 17-01-2017 16:56 Certificate No-67/WR-2

296 400 Champa E type 157 MVAR filter(COM-1A+HACQ)-23 Applicable √ √ √ √ √ NA √ √ √ √ √ √ N/a N/a 31-01-2017 12:43

297 400 Champa E type 157 MVAR filter(COM-1A+HACQ)-24 Applicable √ √ √ √ √ NA √ √ √ √ √ √ N/a N/a 31-01-2017 15:10

298 400 Champa B type 125 MVAR filter(COM-1A+HACQ)-22 Applicable √ √ √ √ √ NA √ √ √ √ √ √ N/a N/a 31-01-2017 17:33

299 132 Dharni/Nepanagar Dharni-Nepanagar S/C (Radial line) N/a 10-02-2017 17:04

300 400 Koradi-II / Koradi-III Koradi-II - Koradi-III line-2 N/a √ √ √ √ √ NA √ √ √ √ √ √ N/a N/a 11-02-2017 23:40

301 400 Champa C type 165 MVAR filter(COM-1A+HACQ)-34 Applicable √ √ √ √ √ NA √ √ √ √ √ √ N/a √ 17-02-2017 12:16

302 400/220 Akola 315 MVA Akola ICT-2 N/a √ √ √ √ √ NA √ √ √ √ √ √ N/a N/a 18-02-2017 15:57

303 765 Durg Bay 824 & 823 (Main&Tie bays of Wardha-Durg ciucuit-4) Applicable √ √ √ √ √ NA √ √ √ √ √ √ N/a N/a 06-03-2017 22:39

304 400 Betul (PGCIL) 50 MVAR LR of Khandwa - Betul-2 @ Betul Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 09-03-2017 13:47 Certificate No 78WR2

305 400 Betul (PGCIL) 50 MVAR LR of Moud-Betul-1 at Betul Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 10-03-2017 18:04 Certificate No 78WR2

306 400 Betul (PGCIL) 50 MVAR LR of Moud-Betul-2 at Betul Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 10-03-2017 19:59 Certificate No 78WR2

307 765 Durg Bay 821 & 820 (Main & Tie bays of Wardha-Durg ciucuit-3) Applicable √ √ √ √ √ NA √ √ √ √ √ √ N/a N/a 11-03-2017 17:42Certificate No-32/NLDC/SO

308 800 Champa Champa-Kurukshetra HVDC Pole-1 (Trial Operation) Applicable √ √ √ √ √ NA IR Line (NLDC has certified Trial Operation) 12-03-2017 20:00

309 765 Wardha(PGCIL)330 MVAR LR of Durg-Wardha Line-3 at Wardha (bay-724R)-

Connected in Line-1 after awappingApplicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ 16-03-2017 23:18

310 765 Wardha(PGCIL)330 MVAR LR of Durg-Wardha Line-4 at Wardha (bay-721R)-

used in Durg-Wardha-2 after awappingApplicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ 16-03-2017 23:47

311 765 Wardha PGCILBay 724 (Main bay of Wardha-Durg ciucuit-1 after swapping

with ckt-4 at Wardha)Applicable √ √ √ √ √ NA √ √ √ √ √ √ N/a N/a √ √ √ √ 17-03-2017 23:17

Certificate No-50/WR1

312 765 Wardha PGCILBay 723 (Tie bay of Wardha-Durg ciucuit-1 afetr swapping

with ckt-4 at Wardha)Applicable √ √ √ √ √ NA √ √ √ √ √ √ N/a N/a √ √ √ √ 17-03-2017 23:21

Certificate No-50/WR1

313 765 Wardha PGCILBay 721 (Main bay of Wardha-Durg ciucuit-2 after swapping

with ckt-3 at Wardha)Applicable √ √ √ √ √ NA √ √ √ √ √ √ N/a N/a √ √ √ √ 17-03-2017 23:47 Certificate No-50/WR1

314 765 Wardha PGCILBay 720 (Tie bay of Wardha-Durg ciucuit-2 afetr swapping

with ckt-3 at Wardha)Applicable √ √ √ √ √ NA √ √ √ √ √ √ N/a N/a √ √ √ √ 17-03-2017 23:48 Certificate No-50/WR1

315 400/21 NTPC Mauda Stage-2 3x260 MVA Generator Transformer-4 (Bay 431,432) N/a √ √ √ √ √ NA √ √ √ √ √ √ N/a N/a 18-03-2017 09:58

316 400 Navasari(PGCIL) 400 kV KAPP-Navasari-1 (Antitheft charging from Navasari) Applicable √ √ √ √ √ NA √ √ √ √ √ √ N/a N/a √ √ √ √ 19-03-2017 09:59Certificate No-70WR2

317 400 Navasari(PGCIL) 400 kV KAPP-Navasari-2 (Antitheft charging from Navasari) Applicable √ √ √ √ √ NA √ √ √ √ √ √ N/a N/a √ √ √ √ 19-03-2017 09:59Certificate No-71WR2

318 765 Wardha240 MVAR LR of Wardha-Nizamabad-1 (swapped with Seoni-

Wardha-1)-Bay 725 at WardhaApplicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ 20-03-2017 23:16 Certificate No-47/WR1

319 765 Wardha240 MVAR LR of Wardha-Nizamabad-2 (swapped with Seoni-

Wardha-2)-Bay 710 at WardhaApplicable √ √ √ √ √ NA √ √ √ √ √ √ 20-03-2017 23:51

320 765 Wardha Bay 710 at Wardha for retermination of Seoni-Wardha-2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ 20-03-2017 23:51 Certificate No-48/WR1

321 220/6.6 KAPP(Kakrapar)-3&4 70 MVA Start-up Transformers-3A & 3B (KAPP-3&4) N/a √ √ √ √ √ √ √ √ √ √ √ N/a N/a 22-03-2017 12:16

322 400/220 Vadodara 500 MVA Vadodara ICT-1 (bays 404 & 201) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 22-03-2017 16:31 Certificate No-68/WR-2

323 400/220 Vadodara 500 MVA Vadodara ICT-2 (bays 403 &202) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 22-03-2017 18:28 Certificate No-68/WR-2

324 400 Chandrapur/Nanded Nanded -Parli-Line-1 N/a √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 24-03-2017 20:43

325 400 Chandrapur/Nanded Chandrapur(II)-Nanded -Line-1 N/a √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 24-03-2017 20:53

326 765 Durg 240 MVAR LR of Durg-Wardha Line-4 at Durg (bay 824) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ 24-03-2017 22:29 Certificate No-51/WR1

327 765 Durg/Wardha Durg-Wardha Line-4 (with bay 715 Wardha end) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ 24-03-2017 22:29 Certificate No-51/WR1

328 400 Betul (PGCIL)Betul-Mouda-1 (Antitheft charging from Betul) upto loc. AP

00/0 (86.24 kM)Applicable √ √ √ √ √ NA √ 25-03-2017 13:05

329 765 Gwalior(PGCIL)CB(713R) of 240 MVAR LR of Gwalior-Satna-1 at Gwalior (to

make it switchable)Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ 25-03-2017 13:43

330 400 Betul (PGCIL) 50 MVAR LR of Khandwa - Betul-1 @ Betul Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 25-03-2017 20:30 Certificate No 78WR2

331 400 Taptithanda 500 MVA, 400/220 kV, Taptithanda ICT-2 N/a √ √ √ √ NA √ √ √ √ √ N/a 26-03-2017 23:28

332 765 Durg 240 MVAR LR of Durg-Wardha Line-3 at Durg (bay 821) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ 29-03-2017 20:48 Certificate No-51/WR1

333 765 Durg/Wardha Durg-Wardha Line-3 (with bay 718 Wardha end) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 29-03-2017 20:48 Certificate No-51/WR1

334 765/400 Tamnar (PGCIL) 1500 MVA, 765/400 kV Tamnar ICT-4 (with Bays 714 & 429) Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 30-03-2017 01:35 Certificate No-46/WR1

335 765/400 Durg1500 MVA 765/400 kV, ICT-2 at Durg (With bays 805, 806,

405, 406)Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 30-03-2017 19:20 Certificate No-49/WR1

336 765 Wardha/Nizamabad765 kV Wardha-Nizamabad-line-1 (with 240 MVAR LR of

Wardha-Seoni-1)-Bay-701 at WardhaApplicable √ √ √ √ √ NA √ IR Line (NLDC to certify Trial Operation) 30-03-2017 22:14 NLDC Certificate-33 Dated 27.05.17

337 765 Wardha/Nizamabad765 kV Wardha-Nizamabad-line-2 (with 240 MVAR LR of

Wardha-Seoni-2) -Bay-704 at WardhaApplicable √ √ √ √ √ NA √ IR Line (NLDC to certify Trial Operation) 31-03-2017 02:44 NLDC Certificate-34 Dated 27.05.17

338 400 KSK Mahandi (KMPCL) 88 MVA 400/11.5 kV Station Transformer-1 (ST-1) N/a √ √ √ √ √ NA √ √ √ √ √ √ √ √ 03-04-2017 12:33

339 400/220 Solapur(PG)/Jeur 220 kV Solapur(PG)-Jeur (Part of 400 kV SolapurPG-Karad) N/a √ √ √ √ NA √ √ √ √ √ √ 03-05-2017 00:00It is part of 400KV Solapur-Karad line as temperory arrangement till Dec'17

340 400/220 Satna PG315 MVA Satna ICT-3 (in parallel to ICT-2 with common bay

as a contingency arrangement)Applicable √ √ √ √ √ NA √ √ √ √ √ √ N/a N/a √ √ √ √ 13-05-2017 18:00 Certificate No 72WR2

341 400 Vadodara GIS (PGCIL) 220 kV bays-203, 204,205,206,207 at Vadodara GIS Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 18-05-2017 15:57 Certificate No-74/WR-2

342 400 Chanranka/Veloda Charanka-Veloda circuit-1 N/a √ √ √ √ NA NA √ √ √ √ √ √ 23-05-2017 00:00

343 400 Chanranka/Veloda Charanka-Veloda circuit-2 N/a √ √ √ √ NA NA √ √ √ √ √ √ 23-05-2017 00:00

344 400 Veloda 125 MVAR Bus Reactor at Veloda N/a 23-05-2017 00:00

345 400/220 Veloda 500 MVA ICT-1 at Veloda (idle charging) N/a 23-05-2017 00:00

346 400 KAPP/Navasari(PG) KAPP(3&4)-Navasari-1 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 24-05-2017 15:00 Certificate No-75WR2

347 400 KAPP/Vapi(PG) KAPP(3&4)-Vapi-1 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 24-05-2017 15:00 Certificate No-75WR2

348 400 Vapi(PGCIL)/KAPP Vapi-KAPP line-1 (synchrinisation from both ends) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 24-05-2017 15:00 Certificate No-75//WR-2

349 400 Navsari(PGCIL)/KAPP Navasari-KAPP line-1 (synchrinisation from both ends) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 24-05-2017 15:00 Certificate No-75/WR-2

350 765 Jabalpur Pooling 765kV bay 819 of Jabalpur-Gadarwara-1at Jabalpur PS Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 24-05-2017 16:50 Certificate No-73/WR-2

351 765 Jabalpur Pooling 765kV bay 822 of Jabalpur-Gadarwara-2 at Jabalpur PS Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 24-05-2017 17:12 Certificate No-73/WR-2

352 400 Raita/Jagdalpur Raita-Jagdalpur-2(Anti Theft charging from Raita) N/a √ √ √ √ NA NA √ √ √ √ √ √ 26-05-2017 17:58

353 765 Jabalpur/Gadarwara Jabalpur-Gadarwara line-1 (idle Charging from Jabalpur) Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 02-06-2017 19:09

354 400 Khandwa(PGCIL) 50 MVAR LR of Khandwa - Betul-2 @ Khandwa Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 09-06-2017 18:23 Certificate No 76WR2

355 400 Khandwa(PGCIL) 50 MVAR LR of Khandwa - Betul-1 @ Khandwa Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 13-06-2017 20:57 Certificate No 76WR2

356 400 Mouda Stage-II 80 MVAR Bus Ractor with bay 430 N/a √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 20-06-2017 12:50

357 400/220 Varsana (GETCO) 315MVA Varsana ICT#4 NA √ √ NA 21-06-2017 21:04 N/A

358 400 Vapi(PGCIL)/KAPP Vapi-KAPP line-2 (synchrinisation from both ends) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 27-06-2017 17:30 Certificate No-77/WR-2

359 400 Navsari(PGCIL)/KAPP Navasari-KAPP line-2 (synchrinisation from both ends) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 27-06-2017 18:43 Certificate No-77/WR-2

360 800 Champa/Kurukshetra Champa-Kurushetra HVDC Pole-2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ NLDC-Nodal √ 05-07-2017 08:34 IR Line

361 400 Champa/LaraChampa-Lara line-1(Champa end bays 454,455,456-Isolator

& Lara end-bay 415)Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 19-07-2017 16:04

Certificate No 53WR1

362 400 Champa/LaraChampa-Lara line-2(Champa end bays 453,452,451-Isolator

& Lara end-bay 412)Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 19-07-2017 17:08

Certificate No 53WR1

363 220 Betul (PGCIL) Bay-205 (Bus-Coupler) at Betul PG Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 19-07-2017 22:48 Certificate No 84WR2

364 220 Betul (PGCIL) Bay-201 (Pandurna-MP line) at Betul PG Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 19-07-2017 23:06 Certificate No 84WR2

365 220 Betul (PGCIL) Bay-202(Sarni-MP line) at Betul PG Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 19-07-2017 23:07 Certificate No 84WR2

366 220 Damoh (PGCIL) Bay-211 of Damoh(PG)-Sagar-2 at Damoh(PG) Applicable √ √ √ √ NA NA √ √ √ √ √ √ √ N/a √ √ √ √ 25-07-2017 17:26 Certificate No-86WR2

367 400 Betul (PGCIL) 125 MVAR Betul Bus-Reactor with bays 404&405 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 25-07-2017 20:15 Certificate No 82WR2

368 400 Betul (PGCIL) Mouda-Betul line-1 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 25-07-2017 20:15 Certificate No 80WR2

Page 11: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

369 400 Betul (PGCIL) Betul-Khandwa line-2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 25-07-2017 20:15 Certificate No 80WR2

370 400/220 Itarsi PGCIL 500 MVA, Itarsi ICT-2 (with bays 414/208) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 26-07-2017 11:15 Certificate No 83WR2

371 220 Damoh (PGCIL) Bay-210 of Damoh(PG)-Damoh(MP)-3 at Damoh(PG) Applicable √ √ √ √ NA NA √ √ √ √ √ √ √ N/a √ √ √ √ 26-07-2017 18:11 Certificate No-86WR2

372 400 Betul (PGCIL) Betul-Khandwa line-1 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 27-07-2017 13:04 Certificate No 82WR2

373 765/400 Vindhyachal Pooling 1500 MVA 765/400 kV, ICT-3 at Vindhyachal PS Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 29-07-2017 17:01 Certificate No 79WR2

374 400 Betul (PGCIL) Mouda-Betul line-2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 02-08-2017 20:44 Certificate No 82WR2

375 400/20 Essar Mahan(EPMPL) 750 MVA 400/20kV Generator Transformer-2 N/a √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 03-08-2017 00:00

376 220 Betul (PGCIL) Bay-207 of Betul-Betul-1 at Betul PG Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 03-08-2017 16:18 Certificate No 81WR2

377 400/220 Betul (PGCIL) 315 MVA Betul ICT-1 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 03-08-2017 16:18 Certificate No 82WR2

378 220 Betul (PGCIL) Bay 207 of Betul(PGCIL)-Betul line-1 at Betul(PG) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 03-08-2017 16:18 Certificate No 81WR2

379 220 Betul (PGCIL) Betul(PGCIL)-Betul-line-1 (MPPTCL line) N/a 03-08-2017 16:18

380 220 Betul (PGCIL) Bay-208 of Betul-Betul-2 at Betul PG Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 03-08-2017 16:53 Certificate No 81WR2

381 220 Betul (PGCIL) Bay 208 of Betul(PGCIL)-Betul line-1 at Betul(PG) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 03-08-2017 16:53 Certificate No 81WR2

382 220 Betul (PGCIL) Betul(PGCIL)-Betul-line-2 (MPPTCL line) N/a 03-08-2017 16:53

383 220 Itarsi PGCILItarsi(PG)-Itarsi-2 (LILO of Iatarsi(MP)-Hoshangabad at

Itarsi(PG) with bay-203)Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 12-08-2017 14:57

Certificate No 85WR2

384 220 Itarsi PGCILItarsi(PG)-Hoshangabad-2(LILO of Iatarsi(MP)-Hoshangabad

at Itarsi(PG) with bay-206)Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 12-08-2017 14:57

Certificate No 85WR2

385 400 Solapur(PGCIL)Main bay(427) of Solapur(PG)-Solapur(NTPC)-3 at

Solapur(PG)Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 21-08-2017 18:13

Certificate No 55WR1

386 400 Solapur(PGCIL) Tie bay(426) of Solapur(PG)-Solapur(NTPC)-3 at Solapur(PG) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 21-08-2017 18:13Certificate No 55WR1

387 400 Solapur(PGCIL)Main bay(430) of Solapur(PG)-Solapur(NTPC)-4 at

Solapur(PG)Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 21-08-2017 18:13

Certificate No 55WR1

388 400/220 Betul (PGCIL) 315 MVA Betul ICT-2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 22-08-2017 14:37 Certificate No 87WR2

389 765 Aurangabad(PGCIL)Bay-713 & 3x80 MVAR Switchable Line Reactor of

Aurangabad-Solapur-1 @ AurangabadApplicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 23-08-2017 20:04 Certificate No 54WR1

390 765 Aurangabad(PGCIL)Bay-716 & 3x80 MVAR Switchable Line Reactor of

Aurangabad-Solapur-2 @ AurangabadApplicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 23-08-2017 21:38 Certificate No 54WR1

391 400 Bhadrawati HVDC 250 MVA,400/220/33 kV ICT-1 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 06-09-2017 14:00 Certificate No 56WR1

392 765 Jabalpur/Gadarwara Jabalpur-Gadarwara line-2 (Synchronisation) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 07-09-2017 12:47 Certificate No WRLDC/PWTL/01 (issued for Idle charging)

393 765 Jabalpur/Gadarwara Jabalpur-Gadarwara line-1 (Synchronisation) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 09-09-2017 18:05 Certificate No WRLDC/PWTL/01 (issued for Idle charging)

394 400 Jagdalpur(CSPTCL) 80 MVAR Line Reactor of Raita-1 charged as BR @ Jagdalpur N/a √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 10-09-2017 10:44

395 400/220 Jagdalpur(CSPTCL) 400/220 kV ICT-1 N/a √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 10-09-2017 11:13

396 765/132 NTPC Gadarwara3x85 MVA, 765/132 kV Transformer (IBT-1) Idle charging

from 765 kV side N/a √ √ √ √ √ NA √ √ √ √ √ √ √ √ √ √ √ √ 15-09-2017 13:45

397 765 Dharamjaigad/Jharsuguda330 MVAR Line Reactor of 765 kV Dharamjaigad-Jharsuguda-

4 at Dharamjaigad endApplicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ 19-09-2017 18:56

398 765 Dharamjaigad/Jharsuguda330 MVAR Line Reactor of 765 kV Dharamjaigad-Jharsuguda-

3 at Dharamjaigad endApplicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ 19-09-2017 20:33

399 400 Solapur(PGCIL)/Solapur(NTPC) Solapur(PGCIL)-Solapur(NTPC)-line-3 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 29-09-2017 23:00 Certificate No 57WR1

400 400 Solapur(PGCIL)/Solapur(NTPC) Solapur(PGCIL)-Solapur(NTPC)-line-4 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a √ √ √ √ 29-09-2017 23:00 Certificate No 57WR1

401 400 Aurangabad PG/ Boisar Aurangabad-Boisar-line-1 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 02-10-2017 07:31

402 400 Aurangabad PG/ Boisar Aurangabad-Boisar-line-2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 02-10-2017 16:28

403 400 Vindhyachal-IV (CWTL-bay) 400 kV main bay (410) of V'Chal-IV-V'Chal PS line-4 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 13-10-2017 11:36

404 765 Jabalpur(WR)/Orai(NR) Jabalpur-Orai line-2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ NLDC N/a 13-10-2017 18:00

405 220 Boisar(PG)/Nalasopara Boisar-Nalasopara line (reorientation of 220 kV Boisar(PG)-

Vasai line)N/a N/a 15-10-2017 16:23 N/a

406 400 Vindhyachal-IV (CWTL-bay) 400 kV main bay (403) of V'Chal-IV-V'Chal PS line-4 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 16-10-2017 00:00

407 400 Karad 125 MVAR Bus Reactor N/a √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 26-10-2017 21:10

408 400/220 Satna PG 500 MVA, 400/220/33 kV Satna ICT-3 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 27-10-2017 00:00

409 400 CGPL/Bachau CGPL-Bachau-line-4 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 27-10-2017 05:06

410 400 CGPL/Bachau CGPL-Bachau-line-3 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 27-10-2017 22:16

411 400 Bachua/Mansar Bachau-Mansar-line-1 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 28-10-2017 02:14

412 400 Bachau/Chorania Bachau-Chorania-line-1 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 28-10-2017 02:31

415 220 Magarwada/Ringanwada Magarwada-Ringanwada line-1 (idle charged) N/a √ √ √ √ √ NA √ √ √ √ √ √ √ 01-11-2017 16:20

416 400 Pirana PG / Nicole-2 (Torrent) Dehgam-Nicole(2) S/C line (LILO of Dehgam-Pirana-II at

NicoleApplicable √ √ √ √ √ NA √ √ √ √ √ √ √ 24-11-2017 20:52

417 400/222 Nicole-2 (Torrent) 315 MVA ICT-3 @ Nicole-2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ 29-11-2017 10:29

418 400/220 Nicole-2 (Torrent) 315 MVA ICT-1 @ Nicole-2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ 29-11-2017 12:40

419 400/221 Nicole-2 (Torrent) 315 MVA ICT-2 @ Nicole-2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ 29-11-2017 12:46

420 400 NTPC Solapur 80 MVAR Bus Reactor @ Solapur NTPC N/a √ √ √ √ √ NA √ √ √ √ √ √ √ 29-11-2017 19:57

421 220 Raipur PG Raipur-Doma s/c N/a 30-11-2017 20:09

422 400/220 NTPC Mouda 400/220 kV, 315 MVA ICT-3 N/a 15-12-2017 13:03

423 400 Boisar(PG)/MagarwadaBoisar-Magarwada-2 (after removal of Boisar-Kala & Kala-

Magarwada at Kala)Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ 23-12-2017 14:51

424 400 Kala (PG) Kala-Kudus-1 (Anti theft charging) from Kala Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ 27-12-2017 17:41

425 765 Padghe GIS (PG)/AurangabadAurangabad-Padghe(PG) line-2 with 240 MVAR line reactor

at both ends; bays-708,709 at Padghe(PG), 707 at

Aurangabad

Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ 27-12-2017 21:27

426 765 Padghe GIS (PG) 240 MVAR Bus Reactor @ Padghe Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ 27-12-2017 21:34

427 400 Chandrapur-II 50 MVAR Line Reactor of Nanded-line-1 N/a √ √ √ √ √ NA √ √ √ √ √ √ √ 28-12-2017 00:00

428 400 Chandrapur-II 50 MVAR Line Reactor of Nanded-line-2 N/a √ √ √ √ √ NA √ √ √ √ √ √ √ 28-12-2017 00:00

429 765/400 Padghe GIS (PG) 1500 MVA Padghe ICT-2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ 28-12-2017 00:04

430 765/400 Padghe GIS (PG) 1500 MVA Padghe ICT-1 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ 28-12-2017 01:07

431 765 Padghe GIS (PG) Tie bay 702 at Padghe Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ 28-12-2017 10:46

432 765 Padghe GIS (PG) Bay 707 at Padghe Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ 28-12-2017 11:20

433 765 Padghe GIS (PG) Bay 708 at Padghe Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ √ 28-12-2017 13:04

434 765 Indore(PG) Indore Spare Reactor (1-phase 80 MVAR) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ 28-12-2017 18:13

435 400 Padghe GIS / Kudus (M) Padghe-Kudus line-2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ 28-12-2017 21:02

436 400 Kala (PG)/Kudus(M) Kala-Kudus line-1 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ 29-12-2017 00:06

437 400 Kala (PG)/Kudus(M) Kala-Kudus line-2 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ 29-12-2017 01:11

438 400 Padghe GIS / Kudus (M) Padghe-Kudus line-1 Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ 29-12-2017 02:04

439 400/220/33 Kudus MSETCL 500 MVA Kudus ICT-1 N/a √ √ √ √ √ NA √ √ √ √ √ √ √ 29-12-2017 16:54

440 765 Padghe GIS (PG)/AurangabadAurangabad-Padghe(PG) line-1 with 240 MVAR line reactor

at both ends; bays-705,706 at Padghe(PG), 710 at

Aurangabad

Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ 29-12-2017 23:58

441 400 Veloda/Sankhari (GETCO) Vadavi-Veloda-s/c (LILO of Vadavi-Kansari-1) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ 30-12-2017 16:10

442 400 Veloda/Sankhari (GETCO) Kansari-Veloda-s/c (LILO of Vadavi-Kansari-1) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ 30-12-2017 17:45

443 400 Raigarh (PGCIL) Ragarh-Rourkela-4 LILO at Sundargarh(Jharsuguda) Applicable √ √ √ √ √ NA √ √ √ √ √ √ √ 31-12-2017 00:18

444 765 Jabalpur PS765kV 1x80MVAR switchable spare line reactor of 765kV

Jabalpur-Bina 1,2,3 & 765kV Jabalpur-Bhopal lines at

Jabalpur PS

N/a √ √ √ N/A N/A N/A √ √ √ √ √ √ √ 10-01-2018 17:34

445 400 Satna PG400/38.5kV 3x195MVA Coupling transformer with

associated 400kV bays at 765/400kV Satna SS√ √ √ N/A N/A N/A √ √ √ √ √ √ √ 31-01-2018 17:28

446 400 Talandge MSETCL400 kV, 125MVAR Bus Reactor (bay 414) at 400 kV

Talandage SS√ √ √ N/A N/A N/A √ √ √ √ √ √ √ 07-02-2018 17:45

447 765 Sasan UMPPTwo bays of Vindyachal PS - Sasan 765 kV S/C Line(bay

numbers 821,823) at 765kV Sasan UMPP.√ √ √ N/A N/A N/A √ √ √ √ √ √ √ 09-02-2018 19:09

448 765 JabalpurJabalpur-Orai line 1 and line 2 with tie bays 732 and 735 at

Jabalpur√ √ √ √ √ N/A √ √ √ √ √ √ √ √ 21-02-2018 00:00

449 765 Padghe 765/400kV Spare ICT and Spare Reactor at Padghe √ √ √ √ √ N/A √ √ √ √ √ √ √ 22-02-2018 00:00

450 765 Satna PG2x125MVAR MSR along with assocciated equipments at

765/400kV Satna S/S√ √ √ √ √ N/A √ √ √ √ √ √ √ √ 26-02-2018 20:28

451 400 Rajgarh63MVAR Switchable LR of 400kV Rajgarh-Khandwa-1 of bay

403R and bay at Rajgarh SS√ √ √ √ √ N/A √ √ √ √ √ √ √ 27-02-2018 14:09

452 220 Gwalior MP 220kV Gwalior MP - Gwlaior PGCIL √ √ √ √ √ N/A √ √ √ √ √ 15-03-2018 15:43

453 400 Kudus MSETCL Kudus 500MVA 400/220 ICT 2 at Kudus MSETCL S/S √ √ √ √ √ √ √ √ √ 15-03-2018 19:47

454 400 Jejuri MSETCL400kV Bays 409 Tie 410 Main for Hinjewadi & 412 Tie 413

Main for Koyna IV at 400kV Jejuri SS√ √ √ √ √ √ √ 15-03-2018 20:05

455 220 Bhanpura MPPTCL 220kV Badod Kota LILO at Bhanpura S/S √ √ √ √ √ N/A √ √ √ √ 16-03-2018 16:31

456 400 Vindhyachal PS 400kV Line from Vstps IV to Vindhyachal PGCIL 2nd line √ √ √ √ √ N/A √ √ √ √ √ √ 16-03-2018 17:14

457 400 Auranagabad Spare 1-Ph unit of 400/38.5kV Coupling Transformer along

with associated 400kV Bays at Aurangabad SS (STATCOM

Project)

√ √ √ √ √ √ √ √ √ 19-03-2018 00:00

458 765 Gadarwara NTPC BUS REACTOR 765kV 330MVAR √ √ √ √ √ √ √ √ √ 23-03-2018 18:04

459 400 REWA Vindhyachal-Rewa(Pooling )-1 √ √ √ √ √ √ √ √ √ √ √ 24-03-2018 00:00

460 400 REWA Rewa(Pooling )- Jabalpur-1 √ √ √ √ √ √ √ √ √ √ √ 24-03-2018 23:23

461 400 REWA BUS REACTOR 400kV 125MVAR √ √ √ √ √ √ √ √ √ √ √ 24-03-2018 23:29

462 765 ORAI765kV Jabalpur -Orai 1 and Jabalpur Orai 2 Ful load charging

along with 330MVAR Non switchable LR √ √ √ √ √ √ √ √ √ 25-03-2018 00:00

Page 12: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

463 400 REWA Sasan-Rewa (Pooling ) line-1 √ √ √ √ √ √ √ √ √ √ √ 25-03-2018 12:37

464 400 REWA Rewa(Pooling )- Jabalpur line-2 √ √ √ √ √ √ √ √ √ √ √ 25-03-2018 23:52

465 400 REWA Rewa (Pooling ) - 400/220kV 500MVA ICT-1 √ √ √ √ √ √ √ √ √ √ √ 27-03-2018 20:15

466 400 REWARewa (Pooling ) -400/220kV 500MVA ICT-2 idle charging

√ √ √ √ √ √ √ √ √ √ √ 27-03-2018 21:57

467 765 Orai/GwaliorOrai-Gwalior along with 240 MVAR non switchable LRs at

Orai and Gwalior ends (after 765kV Satna-Gwalior LILO at

Orai)

√ √ √ √ √ √ √ √ √ √ √ √ 29-03-2018 13:30

Certificate No NLDC/SO/41

468 765 Satna/OraiSatna-Orai s/c line with 240 MVAR switchable LR at Satna &

240 MVAR Non-switchable LR at Orai (after 765kV Satna-

Gwalior LILO at Orai)

√ √ √ √ √ √ √ √ √ √ √ √ 29-03-2018 17:17

Certificate No NLDC/SO/42

469 765 SolapurSolapur STATCOM Mechanically Swtichable Reactor 1

604Bay Mechanically Swtichable Reactor 2 605Bay at

765/400/220kV Solapur SS

√ √ √ √ √ √ √ √ √ 29-03-2018 21:47

470 765 SolapurMechanically Switchable Capaciotr (MSC) with Bay 603 at

Solapur STATCOM √ √ √ √ √ √ √ √ 30-03-2018 03:05

471 400 Chandrapur Chandrapur(II)-ICT-1 31-03-2018 00:00

472 400 Thaptitanda400/220kV 500MVA ICT at 400kV Thaptitanda SS MSETCL

IDLE CHARGE ONLY√ √ √ √ √ √ √ 31-03-2018 12:46

473 400 Jejuri MSETCL400kV 3x167MVA ICT-3 of MSETCL JEJURI SS (IDLE CHARGE

ONLY)√ √ √ √ √ √ √ √ √ 31-03-2018 18:31

474 400 Dharamjaygarh PG400kV Bay 414 (Tie Bay of Balco-Dharamjaygarh line-1) at

Dharamjaigarh endN/a √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 13-07-2017 22:00

475 400 Dharamjaygarh PG400kV Bay 417 (Tie Bay of Balco-Dharamjaygarh line-2) at

Dharamjaigarh endN/a √ √ √ √ √ NA √ √ √ √ √ √ √ N/a 13-07-2017 22:31

476 765 Warora3x110 MVAR Line Reactor of 765kV Warora-Gadarwara line-

1 as Bus Reactor at Warora(Main Bay 707)Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 14-07-2017 14:17 Certificate No WRLDC/PWTL/02

477 765 Warora3x110 MVAR Line Reactor of 765kV Warora-Gadarwara line-

2 as Bus Reactor at Warora(Main Bay 710)Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 14-07-2017 17:43 Certificate No WRLDC/PWTL/02

478 400 Essar Power MP SS400kV Mahan-Bilaspur line-1(Extension Ap14 to

AP44, upto 56.79km) Anti-theft charging from Mahan endApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 21-08-2017 12:08

479 400 Essar Power MP SS400kV Mahan-Bilaspur line-2(Extension Ap14 to

AP44, upto 56.79km) Anti-theft charging from Mahan endApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 21-08-2017 12:09

480 400 Champa400kV Bay 441 (Main Bay of KSK-Champa line 1) without

line at Champa SSApplicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ N/a √ √ √ √ 04-01-2018 13:30 Certificate No: WRLDC/WR-1-KSK/61

481 400 Champa400kV Bay 440 (Tie Bay of KSK-Champa line 1) without line

at Champa SSApplicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ N/a √ √ √ √ 04-01-2018 13:41 Certificate No: WRLDC/WR-1-KSK/61

482 400 Champa400kV Bay 439 (Isolator only) of KSK-Champa line 1 without

line at Champa SS√ √ √ √ N/A N/A √ √ √ √ √ √ √ N/a 04-01-2018 13:41

483 765 Jabalpur PS765kV, 1x110 MVAR spare line reactor of 765kV Jabalpur PS-

Orai 1&2 lines at Jabalpur PSN/a √ √ √ N/A N/A N/A √ √ √ √ √ √ √ √ √ √ √ √ 05-01-2018 16:07

484 400 Jejuri MSETCL400kV Bay 408 (Main bay of 3*167MVA, 400/220kV ICT-3)

at Jejuri MSETCL SS.N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 11-01-2018 19:07

485 401 Kudus MSETCL400kV Bay 409 (Main Bay of Kudus-Babhaleswar line-1) at

400kV Kudus S/SN/a √ √ √ N/A N/A N/A √ √ √ √ √ √ N/a 17-01-2018 15:43

486 400 Kudus MSETCL400kV Bay 408 (Tie Bay of Kudus-Babhaleswar line-1) at

400kV Kudus S/SN/a √ √ √ N/A N/A N/A √ √ √ √ √ √ N/a 17-01-2018 15:50

487 400kV Satna PG1x195MVA 400/38.5kV Spare Coupling Transformer at

Satna SSApplicable √ √ √ 31-01-2018 17:28

488 400 RKM Powergen PVT. LTD (RKMPPL)400 kV 1x50 MVAR Bus Reactor #2 along with bay 13 at

RKMPPLN/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 02-02-2018 10:42

489 400 Talandge MSETCL 400kV 125MVAR BR bay 414 at 400kV Talandage SS N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 07-02-2018 17:45

490 765 Satna PG125MVAR MSC along with assocciated equipments at

765/400kV Satna S/SApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 01-03-2018 13:12

491 400 RKM Powergen PVT. LTD (RKMPPL) GT4 RKMPPL N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 01-03-2018 17:54

492 765kV Solapur765kV Bay no 704 Mainbay of Parli Solapur line 1 at Solapur

SSApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 02-03-2018 13:10 Certificate No WRLDC/WR-1/62

493 400 Morena 400kV PGCIL Gwalior - Morena D/C lines at Morena SS N/a √ √ √ √ √ √ √ √ √ √ √ 05-03-2018 00:00

494 402 Vindhyachal PS401 kV Bay 428 (Main Bay of Vindhyachal(PS)-Vindhyachal

line-4)at 765kV Vindhyachal PSApplicable √ √ √ N/A N/A N/A √ √ √ √ √ √ √ N/a √ √ √ √ 15-03-2018 19:26 Certificate No: WRLDC/WR-2/91/441

495 403 Vindhyachal PS402 kV Bay 429 (Tie Bay of Vindhyachal(PS)-Vindhyachal line-

4)at 765kV Vindhyachal PSApplicable √ √ √ N/A N/A N/A √ √ √ √ √ √ √ N/a √ √ √ √ 15-03-2018 19:26 Certificate No: WRLDC/WR-2/91/441

496 400 Vindhyachal PS400 kV Bay 425 (Main Bay of Vindhyachal(PS)-Vindhyachal

line-3)at 765kV Vindhyachal PSApplicable √ √ √ N/A N/A N/A √ √ √ √ √ √ √ N/a √ √ √ √ 16-03-2018 17:10 Certificate No: WRLDC/WR-2/91/441

497 401 Vindhyachal PS400 kV Bay 426 (Tie Bay of Vindhyachal(PS)-Vindhyachal line-

3)at 765kV Vindhyachal PSApplicable √ √ √ N/A N/A N/A √ √ √ √ √ √ √ N/a √ √ √ √ 16-03-2018 17:10 Certificate No: WRLDC/WR-2/91/441

498 400 Aurangabad 400/38.5kV 585MVA Coupling Transformer along with bays

at Aurangabad S/S (STATCOM Project)Applicable √ √ √ √ N/A √ √ √ √ √ √ √ N/a 19-03-2018 13:04

499 400kV Kudus MSETCL 400/220 kv Spare ICT at Kudus SS N/a √ √ √ √ N/a 19-03-2018 19:10

500 400 Solapur MSETCL Lamboti/ Solapur 400kV 125MVAR Bus Reactor N/a √ √ √ √ √ √ √ √ √ N/a 20-03-2018 18:25

501 765 Gadarwara NTPC765kV Bus1 with 110x3 MVAR Bus reactor at NTPC

Gadarwara SubstationN/a √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 23-03-2018 15:00

502 220 Rewa PS400kV Rewa(pooling)-Sasan Transmission line with

associated bay equipment (Main:418, Tie:417) (Line IN from

400kV Vindhyachal-Jabalpur ckt-3)

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 26-03-2018 00:00 Certificate No: WRLDC/WR-2/95

503 220 Rewa PS400kV Rewa(pooling)-Vindhyachal Transmission line with

associated bay equipment (Main:421, Tie:420) (Line IN from

400kV Vindhyachal-Jabalpur ckt-4)

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 26-03-2018 00:00 Certificate No: WRLDC/WR-2/95

504 220 Rewa PS400kV Rewa(pooling)-Jabalpur-1 Transmission line with

associated bay equipment (Main:415, Tie:414) (Line Out

from 400kV Vindhyachal-Jabalpur ckt-3)

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 26-03-2018 00:00 Certificate No: WRLDC/WR-2/95

505 220 Rewa PS400kV Rewa(pooling)-Jabalpur-2 Transmission line with

associated bay equipment (Main:412, Tie:411) (Line Out

from 400kV Vindhyachal-Jabalpur ckt-4)

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 26-03-2018 00:00 Certificate No: WRLDC/WR-2/95

506 220 Rewa PS400kV, 125MVAR Bus Reactor along with associated bay

equipment(Main:416, Tie:417) at Rewa PSApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 26-03-2018 00:00 Certificate No: WRLDC/WR-2/95

507 220 Rewa PS220kV Bay 215 (of Rewa(pooling)-BarsaitaDesh line-1)

along with associated bay equipmentApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 26-03-2018 00:00 Certificate No WRLDC/WR-2/107

508 765 Satna PG 2x150MVAR STATCOM at 765/400kV Satna Applicable √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 27-03-2018 17:16 Certificate No: WRLDC/WR-2/94

509 400 Satna PG400kV Bay 430 ( Main Bay of 3*195MVA 400/38.5 kV

Coupling Transformer) at Satna SS (STATCOM Project)Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 27-03-2018 17:16

510 400 Satna PG400kV Bay 429 ( Tie Bay of 3*195MVA 400/38.5 kV Coupling

Transformer) at Satna SS (STATCOM Project)Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 27-03-2018 17:16

511 765 Jabalpur765kV Jabalpur-Orai Ckt 1 along with associated bays and

330MVAR line reactor at both endsApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 27-03-2018 20:00

Certificate No NLDC/SO/39

512 765 Jabalpur765kV Jabalpur-Orai Ckt 2 along with associated bays and

330MVAR line reactor at both endsApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 27-03-2018 20:00

Certificate No NLDC/SO/40

513 765kV Solapur765kV Bay no 701 Mainbay of Parli Solapur line 2 at Solapur

SSApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 28-03-2018 13:10 Certificate No WRLDC/WR-1/62

514 765 Gadarwara NTPC NTPC Gadarwara STPP bays 701 N/a √ √ √ √ √ √ √ √ √ √ √ √ √ 30-03-2018 11:13

515 765 Gadarwara NTPC NTPC Gadarwara STPP bays 702 N/a √ √ √ √ √ √ √ √ √ √ √ √ √ 30-03-2018 11:15

516 400 Shujalpur 400kV Bay 401R of 50MVAR LR of Bina-Shujalpur-1 with

associated Bay equipment at 400/220kV Shujalpur SS

Applicable √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 30-03-2018 16:47 Certificate No WRLDC/WR-2/101

517 400kV Aurangabad400kV (+/-) 300MVAR STATCOM along with 2x125MVAR

MSR and 1x125MVAR MSC along with associated 400kV

Bays at Aurangabad SS (STATCOM Project)

Applicable √ √ √ N/A √ √ √ √ √ N/a √ √ √ √ 30-03-2018 21:26 Certificate No WRLDC/WR-1/64

518 402 Kudus MSETCL400kV Bay 411 (Tie Bay of Kudus-Babhaleswar line-2) at

400kV Kudus S/SN/a √ √ √ N/A N/A N/A √ √ √ √ √ √ √ N/a 10-04-2018 17:09

519 403 Kudus MSETCL400kV Bay 412 (Main Bay of Kudus-Babhaleswar line-2) at

400kV Kudus S/SN/a √ √ √ N/A N/A N/A √ √ √ √ √ √ √ N/a 10-04-2018 17:19

520 765 Solapur150MVAR STATCOM1 601Bay and STATCOM2 602Bay and

Coupling transformer and AUx transformer 606 Bay at

Solapur SS

Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ 13-04-2018 12:45

521 765kV Solapur400/38.5kV 3x195MVA Coupling Transformer and its

associated bays(431 432 433 600) for STATCOM at

765/400/220kV Solapur PG S/S

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ 13-04-2018 12:45

522 765 Solapur PGSolapur MSC 603Bay STATCOM MSR1 604Bay MSR 2

605Bay at 765/400/220kV Solapur SSApplicable √ √ √ √ √ √ √ √ √ √ √ N/a 13-04-2018 12:45

Page 13: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

523 220 Vyankatpura 220kV line Vyankatpura Vadodara line-1 N/a √ √ √ √ √ N/A √ √ √ √ √ √ N/a 14-04-2018 18:12

524 220 Vyankatpura 220kV line Vyankatpura Vadodara line-2 N/a √ √ √ √ √ N/A √ √ √ √ √ √ N/a 14-04-2018 18:43

525 400 Bhopal 315MVA 400/220/33kV ICT-4 at Bhopal SS N/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 17-04-2018 17:21

526 400 Thaptitanda400kV Tie bays Bay no 414 and 417 at 400/220kV Thapti

Tanda SS N/a √ √ √ √ √ √ √ N/a 24-04-2018 00:00

527 765kV NEW Parli400 kV New Parli-Prali(old) line-2 (with bay 403 at New Parli)

Applicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 24-04-2018 02:00Certificate No WRLDC/PPTL/01

528 765kV NEW Parli765kV, 3x110 MVAR Bus Reactor with bay 703 at New Parli

Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 24-04-2018 02:02Certificate No WRLDC/PPTL/01

529 765kV NEW Parli400 kV New Parli-Prali(old) line-1 (with bay 406 at New Parli)

Applicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 24-04-2018 22:30Certificate No WRLDC/PPTL/01

530 220 Parli PG400kV Bays 420,421 of New Parli-Old Parli line-1 at Old Parli

S/sApplicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 24-04-2018 22:30

Certificate No WRLDCWR-1/67

531 220 Parli PG400kV Bays 423,424 of New Parli-Old Parli line-2 at Old Parli

S/sApplicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 24-04-2018 22:30

Certificate No WRLDCWR-1/67

532 765kV NEW Parli765/400kV, 1500MVA ICT-2 with bays 704,705,404,405 at

New ParliApplicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 24-04-2018 22:35

Certificate No WRLDC/PPTL/01

533 765kV NEW Parli765kV New Parli-Solapur line-1 with bay 706 at New Parli

Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 24-04-2018 22:45Certificate No WRLDC/PPTL/01

534 765kV NEW Parli765kV New Parli-Solapur line-2 with bay 709 at New Parli

Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 24-04-2018 23:51Certificate No WRLDC/PPTL/01

535 765kV NEW Parli765/400kV, 1500MVA ICT-1 with bays 701,702,401,402 at

New ParliApplicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 26-04-2018 13:00

Certificate No WRLDC/PPTL/01

536 765kV Sasan UMPP765kV S/C SasaN UMPP- Vindhyachal pooling Station 2nd

lineApplicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 26-04-2018 13:00 Certificate No: WRLDC/CWTL/02

537 765 Vindhyachal PS 765kV Bays 713Main and bay equipment of 765kV

Vindhyachal PS-Sasan 2nd S/C line at 765kV Vindhyachal PS

Applicable √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 26-04-2018 13:04 Certificate No WRLDC/WR-2/96

538 765 Vindhyachal PS 765kV Bays 714Tie and bay equipment of 765kV

Vindhyachal PS-Sasan 2nd S/C line at 765kV Vindhyachal PS

Applicable √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 26-04-2018 13:04 Certificate No WRLDC/WR-2/96

539 400kV Boisar 500MVA 400/220kV ICT#4 along with associated

bays(403/212) and bay equipment at Boisar SS Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 04-05-2018 19:00 Certificate No WRLDC/WR-2/100

540 765 Durg PG765kV Bay 822(Main Bay of Durg-Rajnandgaon line-1) at

Durg PS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 08-05-2018 13:30 Certificate No WRLDC/WR-1/81

541 765kV Gwalior400kV Bays 416(Future Bay of Gwalior-Morna line 1) at

765/400kV Gwalior SSApplicable √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 09-05-2018 19:28 Certificate No WRLDC/WR-2/98

542 765kV Gwalior400kV Bays 417(Tie bay of Gwalior-Morna line 1) at

765/400kV Gwalior SSApplicable √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 09-05-2018 19:28 Certificate No WRLDC/WR-2/98

543 765kV Gwalior400kV Bays 418(Main bay of Gwalior-Morna line 1) at

765/400kV Gwalior SSApplicable √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 09-05-2018 19:28 Certificate No WRLDC/WR-2/98

544 765kV Gwalior400kV Bays 419(Main bay of Gwalior-Morna line 2) at

765/400kV Gwalior SSApplicable √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 09-05-2018 19:28 Certificate No WRLDC/WR-2/98

545 765kV Gwalior400kV Bays 420(Tie bay of Gwalior-Morna line 2) at

765/400kV Gwalior SSApplicable √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 09-05-2018 19:28 Certificate No WRLDC/WR-2/98

546 765kV Gwalior400kV Bays 421(Future Bay of Gwalior-Morna line 2) at

765/400kV Gwalior SSApplicable √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 09-05-2018 19:28 Certificate No WRLDC/WR-2/98

547 765 Warora33/0.04kV, 800KVA Tertiary Transformer and associated

bay connected at ICT-2 Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 10-05-2018 13:51 Certificate No WRLDC/PWTL/03

548 765 Warora765kV, 3*110MVAR Bus Reactor and associated bay( 714

(Tie bay) & 713(Main bay)) Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 10-05-2018 20:59 Certificate No WRLDC/PWTL/03

549 400 Indore(MPPTCL)408R Bay associated with existing 50MVAR Line Reactor of

400kV Itarsi-Indore 1 bay equipments at 400/220kV Indore

SS(MPPTCL)

Applicable √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 11-05-2018 17:56 Certificate No WRLDC/WR-2/102

550 400 Warora 400kV, 80MVAR Line Reactor of Warora-Parli line-2 Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 12-05-2018 15:25 Certificate No WRLDC/PWTL/04

551 400 Warora 400kV, 80MVAR Line Reactor of Warora-Parli line-1 Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 12-05-2018 16:48 Certificate No WRLDC/PWTL/04

552 400 Warora400kV Wardha-Warora line-1 with bays(408(Tie bay),

409(Main bay)) Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 13-05-2018 23:55 Certificate No WRLDC/PWTL/04

553 400 Warora400kV Wardha-Warora line-2 with bays(411(Tie bay),

412(Main bay)) Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 13-05-2018 23:55 Certificate No WRLDC/PWTL/04

554 400 Warora400kV Warora-Parli line-1 with bays(405(Tie bay), 406(Main

bay)) Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 13-05-2018 23:55 Certificate No WRLDC/PWTL/04

555 400 Warora400kV Warora-Parli line-2 with bays(402(Tie bay), 403(Main

bay)) Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 14-05-2018 00:53 Certificate No WRLDC/PWTL/04

556 400 KAPP 400kV KAPP 3&4 400kV Bus Reactor of 125MVAR N/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 14-05-2018 19:42

557 765 Gadarwara NTPC NTPC Gadarwara STPP bays 705 N/a √ √ √ √ √ √ √ √ √ √ √ √ √ 16-05-2018 16:30

558 400 Wanakbori TPS400kV D/C Line from Wanakbori TPS Switch Yar to New Unit

No 8 GIS Switch YardN/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 17-05-2018 00:00

559 400 Wanakbori TPS400KV DC transmission line from W'bori TPS existing AIS

switchyard to New unit no.8 GIS SwitchyardN/a √ √ √ √ √ √ √ √ √ √ √ N/a 17-05-2018 06:42

560 765 Gadarwara NTPC NTPC Gadarwara STPP bays 708 N/a √ √ √ √ √ √ √ √ √ √ √ √ √ 17-05-2018 13:55

561 765 Warora765kV, 3*110MVAR Line Reactor of 765kV Warora- New

Parli line-1 with bay( 712 (Line Reactor Bay)) Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 18-05-2018 16:48 Certificate No WRLDC/PWTL/03

562 220 Navasari 220kV line Bay no 209 of 220kV Navasari Bhestan 1 at

Navasari GISApplicable √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 18-05-2018 17:25 Certificate No WRLDC/WR-2/104

563 Navasari 220kV line bay 210 of 220kV Navasari Bhestan 2 line at

Navasari GISApplicable √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 18-05-2018 17:38 Certificate No WRLDC/WR-2/104

564 765 Warora765kV, 3*110MVAR Line Reactor of 765kV Warora- New

Parli line-2 with bay( 715 (Line Reactor Bay)) Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 18-05-2018 20:10 Certificate No WRLDC/PWTL/03

565 400 Khandwa 500MVA 400/220kV ICT3 along with associated bay 404 and

209 and bay equipments at 400/ 220kV Khandwa SS

Applicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 19-05-2018 21:05 Certificate No WRLDC/WR-2/103

566 765kV NEW Parli 712 Bay (Future bay bus isolator only) Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 20-05-2018 15:30

567 765kV NEW Parli 707 Bay ( Main Bay of 765kV Warora line-1) Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 20-05-2018 15:52

568 765kV NEW Parli708 Bay (Tie Bay of 765kV Warora line-1 and 765kV Solapur

line-2)Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 20-05-2018 16:23

569 765kV NEW Parli 710 Bay ( Main Bay of 765kV Warora line-2) Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 20-05-2018 16:32

570 765kV NEW Parli 711 Bay (Tie Bay of 765kV Warora line-2) Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 20-05-2018 16:40

571 765kV NEW Parli Warora line-1 Reactor as Bus Reactor Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 21-05-2018 13:36

572 765kV NEW Parli Warora line-2 Reactor as Bus Reactor Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 21-05-2018 19:28

573 400 Shujalpur406R Bay of 50MVAR line reactor of Bina Shujalpur 2 line

with associated bay equipment at 400/220kV Shujalpur SS-

for making LR switchable

Applicable √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 23-05-2018 18:28 Certificate No: WRLDC/WR-2/105

574 765 Warora765/400kV 3*500MVA ICT-1 and associated bay( 702(Tie

bay) & 703(Main bay) at 765kV side, 402(Tie bay) &

401(Main bay) at 400kV side) Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 02-06-2018 13:51 Certificate No WRLDC/PWTL/03

575 765 Warora765/400kV 3*500MVA ICT-2 and associated bay( 705(Tie

bay) & 706(Main bay) at 765kV side, 405(Tie bay) &

404(Main bay) at 400kV side) Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 02-06-2018 13:51 Certificate No WRLDC/PWTL/03

576 765 NEW Parli765kV Warora-New Parli line-2 with bays 715 & 714 at

WaroraApplicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 02-06-2018 19:00 Certificate No WRLDC/PPTL/02

577 765 NEW Parli765kV Warora-New Parli line-1 with bays 712 & 711 at

WaroraApplicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 04-06-2018 15:53 Certificate No WRLDC/PPTL/02

578 400 DehgamDehgam 500MVA 400/220/33kV ICT 3 with Bay no 209 and

409Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 05-06-2018 15:36 Certificate No WRLDC/WR-2/106

579 220 Barsaita Desh 220kV Bay 201 at Barsaita Desh (ICT-1 bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 18-06-2018 00:00

580 33 Barsaita Desh 33kV Bay 305 at Barsaita Desh (ICT-1 bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 19-06-2018 17:00

581 220 Barsaita Desh 220/33 kV ICT-1 at Barsaita Desh N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 19-06-2018 17:00

582 33 Barsaita Desh 33kV Bay 301 at Barsaita Desh (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 19-06-2018 18:13

583 220 Barsaita Desh 220kV Bay 203 at Barsaita Desh (Rewa line-1 bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 20-06-2018 10:30

584 220 Barsaita Desh220kV Rewa-Barsaita Desh ckt-1 ( Bay 203 at BarsaitaDesh,

Bay 215 at Rewa PS ).N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 20-06-2018 10:30

585 220 Rewa400/220/33kV, 500MVA ICT-1 along with associated bay

equipment (400kV Side Main: 419 & Tie:420 and 220kV

Side: Main 210 )

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 20-06-2018 10:30 Certificate No WRLDC/WR-2/107

586 220 Rewa400/220/33kV, 500MVA ICT-2 along with associated bay

equipment (400kV Side Main: 413 & Tie:414 and 220kV

Side: Main 207 )

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 20-06-2018 10:30 Certificate No WRLDC/WR-2/107

587 220 Rewa 220kV Bus Coupler Bay 206 with associated bay equipment Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 20-06-2018 10:30 Certificate No WRLDC/WR-2/107

588 33 Barsaita Desh 33kV Bay 302 at Barsaita Desh (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 20-06-2018 18:25

Page 14: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

589 765 Warora,PWTL765kV Bay no 707(Main bay) of Gadarwara-1 at 765kV

Warora SS Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ 23-06-2018 13:29

590 765 Warora,PWTL765kV Bay no 708(Tie bay) of Gadarwara-1 at 765kV Warora

SS Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ 23-06-2018 13:30

591 765 Warora,PWTL 765kV Furture Bay no 709(Isolator only) at 765kV Warora SSN/a

√ √ √ √ √ √ √ √ √ √ √ √ √ 23-06-2018 13:30

592 400 Sanand(Charal)400kV Chorania-Kosamba line 1 with revised line length

317.76km using LILO at 400kV Sanand(Charal)N/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 24-06-2018 18:00

593 220 Bhilosa DNH 220 kV Vapi-Bhilosa Circuit N/a √ √ √ √ √ √ √ √ √ √ √ N/a 05-07-2018 22:03

594 400 Khargone NTPC400kV Bay 413 (Main Bay of Khandwa- Khargone line) at

NTPC KhargoneApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 06-07-2018 22:45

595 400 Khargone NTPC400kV Bay 414 (Tie Bay of Khandwa-Khargone line) at NTPC

KhargoneApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 06-07-2018 23:10

596 400 Khargone NTPC400kV Bay 415 (Main Bay of Khargone-Rajgarh line) at NTPC

KhargoneApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 07-07-2018 00:17

597 400 Khargone NTPC400kV Khandwa-Khargone (NTPC) line (Only for LILO portion

of400kV Khandwa-Rajgarh at NTPC Khargone) Applicable √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 07-07-2018 00:20 Certificate No WRLDC/KTL/01

598 400 Khargone NTPC400kV Khargone (NTPC)-Rajgarh line (Only for LILO portion

of400kV Khandwa-Rajgarh at NTPC Khargone) Applicable √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 07-07-2018 00:20 Certificate No WRLDC/KTL/01

599 400 LARA NTPC SS400/11.5/11.5kV, 120MVA Station Transfomer-2 at LARA

NTPS SSN/a √ √ √ √ √ √ √ √ √ √ √ N/a 13-07-2018 17:45

600 765 Warora765kV 1x110MVAR Spare Bus Reactor at 765kV Warora

PWTL SS 1-PhaseApplicable √ √ √ √ √ √ √ √ √ √ √ √ √ 13-07-2018 17:45

601 400 Bhadrawati

400kV Bay no.412 (Main bay of 63MVAR Bus Reactor-2) at

Bhadrawati SS-for making the existing 63MVAR Shunt

Reactor switchable at Bhadrawati (previously Line reactor of

Bhadrawatai-Dhariwal line)

Applicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 17-07-2018 18:59 Certificate No WRLDC/WR-1/69

602 765 Warora,PWTL765kV Gadarwara-Warora line-1 Anti-theft charging from

Warora end ( Main Bay 720 at Gadarwara, Main Bay 707 at

Warora). Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ 19-07-2018 16:53

603 765 Warora,PWTL765kV Gadarwara-Warora line-2 Anti-theft charging from

Warora end(Main Bay 723 at Gadarwara, Main Bay 710 at

Warora). Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ 19-07-2018 19:18

604 400 Essar Power MP SS50MVAR Line Reactor 2 of Mahan Sipat line 2 at 400kV Essar

Mahan with bay 409RApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 21-07-2018 13:24 Certificate No WRLDC/EPTCL/01

605 400 Essar Power MP SS50MVAR Line Reactor 1 of Mahan Sipat line 1 at 400kV Essar

Mahan with bay 412RApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 21-07-2018 14:38 Certificate No WRLDC/EPTCL/01

606 Champa765kV Champa PS-Dharamjaygarh line-2(with bay 721 at

Champa, Bay 703 at Dharamjaigad)Applicable √ √ √ √ N/A N/A √ √ √ √ √ √ √ √ √ √ √ √ 21-07-2018 18:10 Certificate No: WRLDC/CWTL/07

607 765 Dharamjaygarh, Champa, CWRTL765kV Champa- Dharamjaygarh Ckt#2(Bay 721 at Champa &

Bay 703 at Dharamjaygarh)Applicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 21-07-2018 18:10 Certificate No WRLDC/CWTL/07

608 765 Dharamjaygarh765kV Bay No. 703(Main bay) of Champa- Dharamjaygarh

line-2 at Dharamjaygarh(Korba) SSApplicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 21-07-2018 18:11 Certificate No WRLDC/WR-1/71

609 765 Champa PS765kV Bay No 721 of Champa- Dhramjaygarh 2nd S/C line at

765kV Champa PSApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 21-07-2018 18:25 Certificate No WRLDC/WR-1/68

610 400 Khargone NTPC400/11.5/11.5 kV Station Transformer-1 at Khargone NTPC

N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 21-07-2018 18:29

611 400 Khargone NTPC 400kV Bay No.401 (Main Bay of ST-1) at NTPC Khargone SS N/a √ √ √ √ √ √ √ √ √ √ √ √ 21-07-2018 18:29

612 400 Khargone NTPC 400kV Bay No.402(Tie-Bay of Station Transformer-1) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 21-07-2018 18:29

613 400 Khargone NTPC400kV Bay No. 403(Main-Bay of Khargone-Khandwa PS

ckt#1)N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 21-07-2018 18:29

614 220 Rewa PS220kV Bay 212 (of Rewa(pooling)-Ramnagar Pahad line-2)

along with associated bay equipmentApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 22-07-2018 17:50 Certificate No: WRLDC/WR-2/108

615 220 Ramnagar Pahad 220kV Rewa-Ramnagar Pahad ckt-2 N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 22-07-2018 18:14

616 220 Barsaita Desh 220kV Bay 204 at Barsaita Desh (ICT-2 bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 23-07-2018 18:37

617 220 Barsaita Desh 220kV Bay 205 at Barsaita Desh (Rewa line-2 bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 23-07-2018 18:37

618 220 Barsaita Desh220kV Rewa-Barsaita Desh ckt-2 (Bay 205 at Barsaita Desh,

Bay 214 at Rewa PS)N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 23-07-2018 18:37

619 220 Rewa PS220kV Bay 214 (of Rewa(pooling)-BarsaitaDesh line-2)

along with associated bay equipmentApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 23-07-2018 18:38 Certificate No: WRLDC/WR-2/108

620 33 Barsaita Desh100mva 220/33kV ICT2 at Barsaita Desh (Bay 204 at

Barsaita Desh)N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 23-07-2018 20:40

621 33 Barsaita Desh 33kV Bay 312 at Barsaita Desh (ICT-2 bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 24-07-2018 19:41

622 33 Barsaita Desh 33kV Bay 317 at Barsaita Desh (Bus Sectionalizer bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 25-07-2018 20:18

623 33 Barsaita Desh 33kV Bay 324 at Barsaita Desh (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 25-07-2018 20:36

624 220 OSTRO Naranpar Ravli PS220kV Ostro Naranpar Ravli PS- Bachau PG line-1 with bay

205 at Ostro, bay 210 at BachauN/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 26-07-2018 06:53

625 220 OSTRO Naranpar Ravli PS220kV Ostro Naranpar Ravli PS- Bachau PG line-2 with bay

203 at Ostro, bay 211 at BachauN/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 26-07-2018 23:52

626 220 OSTRO Naranpar Ravli PS220/33kV 2*150MVA ICT 2 with bay 202 on 220kV Side and

bay 301 on 33kV SideN/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 27-07-2018 23:03

627 220 Ramnagar Pahad 220kV Bay 200 at Ramnagar Pahad (PT bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 28-07-2018 16:30

628 220 Ramnagar Pahad 220kV Bay 203 at Ramnagar Pahad (Rewa line-2 bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 28-07-2018 17:01

629 33 Ramnagar Pahad 33kV Bay 305 at Ramnagar Pahad (ICT-1 bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 29-07-2018 16:47

630 33 RAMNAGAR PAHAD 100MVA 220/33kV ICT1 at Ramnagar Pahad N/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 29-07-2018 17:40

631 33 RAMNAGAR PAHAD33kV side Bays 301 302 303 304 305 306 307 308 309 310

at Ramnagar PahadN/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 29-07-2018 17:40

632 220 Ramnagar Pahad 220kV Bay 201 at Ramnagar Pahad (ICT-1 bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 29-07-2018 17:59

633 220 Ramnagar Pahad 220/33 kV ICT-1 at Ramnagar Pahad N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 29-07-2018 17:59

634 33 ACME SOLAR 33kV ACME-Ramnagar Pahad line 1A N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 29-07-2018 18:07

635 33 Ramnagar Pahad 33kV Bay 301 at Ramnagar Pahad (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 29-07-2018 18:07

636 33 ACME SOLAR 33kV ACME-Ramnagar Pahad line 1B N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 29-07-2018 18:40

637 33 Ramnagar Pahad 33kV Bay 302 at Ramnagar Pahad (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 29-07-2018 18:40

638 33 ACME SOLAR 33kV ACME-Ramnagar Pahad line 2A N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 29-07-2018 18:53

639 33 Ramnagar Pahad 33kV Bay 303 at Ramnagar Pahad (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 29-07-2018 18:53

640 33 ACME SOLAR 33kV ACME-Ramnagar Pahad line C1 N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 29-07-2018 20:10

641 33 Ramnagar Pahad 33kV Bay 307 at Ramnagar Pahad (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 29-07-2018 20:10

642 33 ACME SOLAR 33kV ACME-Ramnagar Pahad line 2B N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 29-07-2018 20:58

643 33 Ramnagar Pahad 33kV Bay 304 at Ramnagar Pahad (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 29-07-2018 20:58

644 33 Ramnagar Pahad 33kV Bay 309 at Ramnagar Pahad (Bus Sectionalizer bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 30-07-2018 17:49

645 33 ACME SOLAR 33kV ACME-Ramnagar Pahad line C2 N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 30-07-2018 18:31

646 33 ACME SOLAR 33kV ACME-Ramnagar Pahad line C3 N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 30-07-2018 18:31

647 33 Ramnagar Pahad 33kV Bay 310 at Ramnagar Pahad (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 30-07-2018 18:31

648 220 Mapusa220kV line bay 212(pertaining to Mapusa-Teum 220kV line)

at 400/220kV Mapusa SSApplicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 31-07-2018 00:00 Certificate No WRLDC/WR-1/76

649 220 Mapusa220kV line bay 213(pertaining to Mapusa-Teum 220kV line)

at 400/220kV Mapusa SSApplicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 31-07-2018 00:00 Certificate No WRLDC/WR-1/76

650 400 Parli PG400/220/33kV 500MVA 3-Phase ICT-1 along with bay Nos

419 & 201 at 400kV Parli SSApplicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 31-07-2018 20:24 Certificate No WRLDCWR-1/77

651 400 Parli PG400/220/33kV 500MVA 3-Phase ICT-2 along with bay Nos

422 & 203 at 400kV Parli SSApplicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 31-07-2018 20:29 Certificate No WRLDCWR-1/77

652 220 Parli PG 220kV Bay 209(Bus Coupler Bay) at 400kV Parli SS Applicable √ √ √ √ √ √ √ √ √ √ √ √ N/a 01-08-2018 17:15 Certificate No WRLDCWR-1/79

653 220 OSTRO Naranpar Ravli PS220/33kV 2*150MVA ICT 1 with bay 204 on 220kV Side and

bay 311 on 33kV SideN/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 03-08-2018 14:40

654 765kV Bilaspur PG 765kV Bays 701( Main Bay of sipat#3) at Bilaspur Applicable √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ 06-08-2018 18:53 Certificate No WRLDC/WR-1/75

655 765kV Bilaspur PG 765kV Bays 702 ( Tie Bay of sipat#3)at Bilaspur Applicable √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ 06-08-2018 18:53 Certificate No WRLDC/WR-1/75

656 765kV Bilaspur PG765kV Bays 703 (Future Bay-Isolator only of sipat#3) at

Bilaspur Applicable √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ 06-08-2018 18:53 Certificate No WRLDC/WR-1/75

657 765 Sipat NTPC765kV Sipat-Bilaspur Ckt#3 with Bay 701 at Bilaspur & Bay

707 at Sipat NTPCApplicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 06-08-2018 18:56 Certificate No WRLDC/STL/01R1

658 220 Parli PG 220kV Bay 210 (of Parli TPS line-2) at 400kV Parli SS Applicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 10-08-2018 17:49 Certificate No WRLDCWR-1/72

659 220 Parli PG220kV Bay 212 (of Osmanabad line-2) at 400kV Parli

SSApplicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 10-08-2018 17:49

Certificate No WRLDCWR-1/72

660 220 Parli PG 220kV Bay 206 (of Parli TPS line-1) at 400kV Parli SS Applicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 10-08-2018 17:49 Certificate No WRLDCWR-1/72

661 220 Parli PG 220kV Bay 208 (of Harangul line) at 400kV Parli SS Applicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 10-08-2018 17:49 Certificate No WRLDCWR-1/72

662 220 Parli PG 220kV Bay 205 (Transfer Bus Coupler Bay) at 400kV Parli SS Applicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 13-08-2018 20:19Certificate No WRLDCWR-1/73

663 220 Sabalgarh(MPPTCL)220kV Bay No 208 (of Sabalgarh - Morena(Adani)line) at

Sablagarh MPPTCL SSN/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 15-08-2018 15:09

Page 15: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

664 220 Sabalgarh(MPPTCL)220kV Sabalgarh(220kV MPPTCL S/s)- Morena(400kV Adani

S/s) S/C lineN/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 15-08-2018 15:09

665 765 Dharamjaygarh765kV 701(Isolator only) (Future Bay) of Champa-

Dharamjaygarh line-2 at Dharamjaygarh(Korba) SSApplicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 16-08-2018 12:59

666 765 Dharamjaygarh765kV Bay No.702(Tie bay) of Champa- Dharamjaygarh line-

2 at Dharamjaygarh(Korba) SSApplicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 16-08-2018 12:59 Certificate No WRLDC/WR-1/74

667 400 Vadodara 400kV, 125MVAR Bus Reactor with Bay 418 at Vadodara SS Applicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 25-08-2018 16:09Certificate No WRLDC/WR-2/109

668 400 Vadodara400kV Bay 401(of D-Gen line-2) with associated bay

equipments at Vadodara GISApplicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 25-08-2018 16:48

Certificate No WRLDC/WR-2/110

669 400 Vadodara400kV Bay 402(of D-Gen line-1) with associated bay

equipments at Vadodara GISApplicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 25-08-2018 16:58

Certificate No WRLDC/WR-2/110

670 220 Raigarh (PGCIL)220kV Raigarh-Raigarh(PG)-LILO portion only of 220kV

Raigarh(CSPTCL)-Budipadar(OPTCL) at Raigarh PGCIL Applicable√ √ √ √ √ √ √ √ √ √ √ √ 25-08-2018 18:53

671 220 Khandwa220kV Bay 210(of Khandwa-Chhanera line-1) with

associated bay equipments at Khandwa SSApplicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 27-08-2018 14:42 Certificate No WRLDC/WR-2/112-Idle Charging

672 220 Khandwa220kV Bay 212(of Khandwa-Chhanera line-2) with

associated bay equipments at Khandwa SSApplicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 27-08-2018 15:29 Certificate No WRLDC/WR-2/112-Idle Charging

673 220 OSTRO Naranpar Ravli PS220kV Bay Number 206 (Bus Coupler Bay) at 220kV OSTRO

Naranpar Ravli PSN/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 29-08-2018 10:50

674 765 Gadarwara NTPC3*315 MVA, 765kV/27kV Generator Transformer-1 at NTPC

Gadarwara SS (Bay 701 at NTPC Gadarwara SS).N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 30-08-2018 05:12

675 400 Indore PG500MVA, 400/220KV ICT-2 with Bay No 406 on 400kV side

& Bay No 208 on 220kV side at Indore SS- idle charging only-

idle charging only

Applicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 31-08-2018 14:33 Certificate No WRLDC/WR-2/111

676 220 Indore PG220kV Bay No 206 (of Bus Coupler) at Indore SS- idle

charging only- idle charging onlyApplicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 31-08-2018 14:47 Certificate No WRLDC/WR-2/111

677 220 Indore PG220kV Bay No 201(of Indore-Ujjain line-1) at Indore SS- idle

charging only- idle charging onlyApplicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 31-08-2018 15:17 Certificate No WRLDC/WR-2/111

678 220 Indore PG220kV Bay No 203(of Indore-Ujjain line-2) at Indore SS- idle

charging only- idle charging onlyApplicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 31-08-2018 15:37 Certificate No WRLDC/WR-2/111

679 220 Indore PG220kV Bay No 205(of Indore-Jetpura line-1) at Indore

SSApplicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 31-08-2018 16:06 Certificate No WRLDC/WR-2/111

680 220 Indore PG220kV Bay No 207(of Indore-Jetpura line-2) at Indore

SSApplicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 31-08-2018 16:41 Certificate No WRLDC/WR-2/111

681 400 Bilaspur PGMahan- Bilaspur Ckt #2 (Anti theft charging) from Bilaspur

PG end (Bays 412 at Bilaspur, 409 at Mahan)Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 31-08-2018 17:49

682 400 Bilaspur PGMahan- Bilaspur Ckt #1 (Anti theft charging) from Bilaspur

PG end (Bays 409 at Bilaspur, 412 at Mahan)Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 31-08-2018 18:32

683 220 Bhilosa DNH 220kV Bhilosa Kharadpada N/a √ √ √ √ √ √ √ √ √ √ √ N/a 05-09-2018 13:41

684 220 Morena MPPTCL 220kV Morena Mp to Morena Adani line N/a √ √ √ √ √ √ √ √ √ √ √ N/a 05-09-2018 19:20

685 401 Charal(Sanand) of GETCO400kV Charal-Chorania line along with Bay No 406 at

Charal(Sanand) SSN/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 07-09-2018 01:24

686 403 Charal(Sanand) of GETCO 400kV PT Bay along with Bay No 411 at Charal(Sanand) SS N/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 07-09-2018 01:24

687 402 Charal(Sanand) of GETCO400kV Bus Coupler along with Bay No 410 at Charal(Sanand)

SSN/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 07-09-2018 01:34

688 400 Charal(Sanand) of GETCO400kV Charal-Kosamba line along with Bay No 405 at

Charal(Sanand) SSN/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 07-09-2018 01:42

689 404 Charal(Sanand) of GETCO400/220kV, 500MVA ICT-3 along with Bay No.412 at

Charal(Sanand) SSN/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 07-09-2018 02:00

690 220 Rewa PS220kV Transfer Bus Coupler Bay 211 with associated bay

equipmentApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 12-09-2018 16:20 Certificate No: WRLDC/WR-2/115

691 400 Charal(Sanand) of GETCO400kV Bay no. 407(of 400/220kV, 500MVA ICT-2) at

Charal(Sanand) SSN/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 15-09-2018 14:05

692 400 Charal(Sanand) of GETCO400kV Bay no. 413(of 400kV 125MVAR Reactor) at

Charal(Sanand) SSN/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 15-09-2018 14:05

693 400 Charal(Sanand) of GETCO 400kV Bay no. 402(of Vadavi line) at Charal(Sanand) SS N/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 17-09-2018 17:51

694 400 Charal(Sanand) of GETCO 400kV Bay no. 403(of Halvad line) at Charal(Sanand) SS N/a √ √ √ √ √ √ √ √ √ √ √ √ N/a 17-09-2018 18:10

695 400 Jagdalpur315 MVA, 400/220/33 kV ICT-2 at Jagdalpur CSPTCL S/S with

bays 407,408 on 400kV Side, 201 on 220kV SideN/a √ √ √ N/A √ √ √ √ √ √ √ N/a 19-09-2018 17:06

696 400 Bilaspur PG50MVAR line Reactor of 400kV Mahan-Bilaspur line-2 at

Bilaspur PGApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 19-09-2018 17:57 Certificate No WRLDC/EPTCL/02

697 400 Essar Power MP SS400kV Mahan-Bilaspur line-2 (Main Bay 412 at Bilaspur,

Main Bay 409 at Essar Mahan).Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 19-09-2018 17:57 Certificate No WRLDC/EPTCL/01

698 400 Indore PG400kV Bay No 403(of 500MVA, 400/220KV ICT-1) at Indore

SS- idle charging onlyApplicable √ √ √ √ √ √ √ √ √ √ √ √ N/a √ √ √ √ 19-09-2018 18:27 Certificate No WRLDC/WR-2/113

699 400 Bilaspur PG50MVAR line Reactor of 400kV Mahan-Bilaspur line-1 at

Bilaspur PGApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 20-09-2018 11:57 Certificate No WRLDC/EPTCL/02

700 400 Essar Power MP SS400kV Mahan-Bilaspur line-1 (Main Bay 409 at Bilaspur,

Main Bay 412 at Essar Mahan).Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 20-09-2018 11:57 Certificate No WRLDC/EPTCL/01

701 765 Champa PS765kV Bay No 707(Main Bay of Champa-Raigarh(Kotra) line-

2) at Champa PSApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 24-09-2018 12:57 Certificate No WRLDC/WR-1/78

702 765 Champa PS765kV Raigarh (kotra) – Champa PS 2nd S/C line ( Bay 707 at

Champa PS, Bay 724 at Kotra SS)Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 24-09-2018 12:57 Certificate No WRLDC/CWTL/108

703 765 Kotra PS765kV Bay No 724 (Main Bay of Kotra-Champa ckt#2) at

Kotra PSApplicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 24-09-2018 12:57 Certificate No WRLDC/WR-1/78

704 765 Kotra PS765kV Bay No 725 Tie Bay of Kotra-Champa ckt#2) at Kotra

PSApplicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 24-09-2018 12:57 Certificate No WRLDC/WR-1/78

705 765 Kotra PS765kV Bay No 726 (Future Bay-Isolator only of Kotra-

Champa ckt#2) at Kotra PSApplicable √ √ √ √ √ √ √ √ √ √ √ √ √ √ 24-09-2018 12:57

706 220 Indore PG220kV Bay No 204(of 500MVA, 400/220KV ICT-1) at Indore

SS- idle charging only- idle charging onlyApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 25-09-2018 17:51 Certificate No WRLDC/WR-2/113

707 400 Indore PG500MVA, 400/220KV ICT-1 (Bay No 403 on 400kV side &

Bay No 204 on 220kV side) at Indore SS- idle charging only-

idle charging only

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 25-09-2018 17:51 Certificate No WRLDC/WR-2/113

708 220 Indore PG220kV Bay No 209(of Indore-SEB line-1) at Indore SS- idle

charging only- idle charging onlyApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 25-09-2018 18:28 Certificate No WRLDC/WR-2/113

709 400 Indore MPPTCL400kV Bay 408R ( Reactor bay of Indore-Itarsi line-2 ) at

Indore MPPTCL SS - for making 50 MVAR line reactor of

Indore-Itarsi line-2 switchable

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 01-10-2018 17:58 Certificate no: WRLDC/WR-2/114

710 400 Charal(Sanand) of GETCO 400kV Bay no. 408(of Future Line 01) at Charal(Sanand) SS N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 04-10-2018 17:57

711 400 Charal(Sanand) of GETCO 400kV Bay no. 409(of Future Line 02) at Charal(Sanand) SS N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 04-10-2018 18:24

712 220 Ramnagar Pahad 220kV Bay 205 at Ramnagar Pahad (Rewa line-1 bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 11-10-2018 12:34

713 220 Indore PG220kV Bay No 202 (of Transfer Bus Coupler) at Indore SS-

idle charging onlyApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 12-10-2018 17:09 Certificate No WRLDC/WR-2/113

714 765 Warora765kV Gadarwara-Warora line-1 ( Main Bay 720 at

Gadarwara, Main Bay 707 at Warora). Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 13-10-2018 13:04 Certificate No WRLDC/PWTL/04

715 765 Gadarwara NTPC 765kV, 3*110 MVAR Line Reactor-1 (of Gadarwara-Warora

line-1) at Gadarawara NTPC SS along with Bay 720R.

N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 13-10-2018 22:24

716 765 Gadarwara NTPC765kV Bays 720 (Main Bay), 719 (Tie Bay) & 718(Future bay-

Isolator only) of Gadarwara-Warora line-1 at Gadarawara

NTPC SS.

N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 13-10-2018 22:24

717 Warora,PWTL765kV Gadarwara-Warora line-1 along with 3*110 MVAR

Line Reactor and associated Bay 707 at Warora. Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 13-10-2018 22:24

Certificate No: WRLDC/PWTL/05

718 220 Ramnagar Pahad 220kV Bay 207 at Ramnagar Pahad (ICT-3 bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 14-10-2018 16:31

719 220 Ramnagar Pahad 220kV Rewa-Ramnagar Pahad ckt-1 N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 14-10-2018 18:07

720 220 Rewa PS220kV Bay 213 (of Rewa(pooling)-Ramnagar Pahad line-1)

along with associated bay equipmentApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 14-10-2018 18:07 Certificate No: WRLDC/WR-2/115

721 33 Barsaita Desh100 MVA, 220/33kV ICT-3 ( Bay 207 on 220kV side, Bay 320

on 33kV side ) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 14-10-2018 23:27

722 220 Barsaita Desh 220kV Bay 207 at Barsaita Desh (ICT-3 bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 14-10-2018 23:27

723 132 Kirnapur MPPTCL 132kV Kirnapur-Dongargarh line N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 15-10-2018 18:10

724 33 ACME SOLAR 33kV ACME- Ramnagar Pahad lines C4 N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 15-10-2018 18:48

725 33 Ramnagar Pahad 33kV Bay 311 at Ramnagar Pahad (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 15-10-2018 18:48

726 33 Ramnagar Pahad 33kV Bay 313 at Ramnagar Pahad (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 15-10-2018 18:52

727 33 Ramnagar Pahad 33kV Bay 314 at Ramnagar Pahad (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 15-10-2018 18:55

728 33 Ramnagar Pahad 33kV Bay 315 at Ramnagar Pahad (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 15-10-2018 18:58

Page 16: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

729 33 Ramnagar Pahad 33kV Bay 320 at Ramnagar Pahad (ICT-3 bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 15-10-2018 19:01

730 220 Ramnagar Pahad 100MVA, 220/33 kV ICT-3 at Ramnagar Pahad N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 15-10-2018 19:01

731 33 Ramnagar Pahad 33kV Bay 316 at Ramnagar Pahad (Bus Coupler bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 15-10-2018 19:19

732 33 Ramnagar Pahad 33kV Bay 318 at Ramnagar Pahad (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 15-10-2018 19:28

733 33 ACME SOLAR 33kV ACME- Ramnagar Pahad lines 4B N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 15-10-2018 19:30

734 33 Ramnagar Pahad 33kV Bay 319 at Ramnagar Pahad (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 15-10-2018 19:30

735 33 Ramnagar Pahad 33kV Bay 321 at Ramnagar Pahad (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 15-10-2018 19:32

736 33 ACME SOLAR 33kV ACME- Ramnagar Pahad lines 3A N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 15-10-2018 19:53

737 33 Ramnagar Pahad 33kV Bay 323 at Ramnagar Pahad (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 15-10-2018 19:53

738 33 Ramnagar Pahad 33kV Bay 324 at Ramnagar Pahad (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 15-10-2018 20:00

739 33 Warora,PWTLTie bay 708 associated with 765kV Warora-Gadarwara line-2

at Warora SS Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 16-10-2018 20:20

Certificate No: WRLDC/PWTL/05

740 400 Charal(Sanand) of GETCO400/220kV, 500MVA ICT-1 along with Bay No.404 at

Charal(Sanand) SSN/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 17-10-2018 17:10

741 765 Warora765kV Gadarwara-Warora line-2 (Main Bay 723 at

Gadarwara, Main Bay 710 at Warora). Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 20-10-2018 18:31 Certificate No WRLDC/PWTL/04

742 765 Gadarwara NTPC 765kV, 3*110 MVAR Line Reactor-2 (of Gadarwara-Warora

line-2) at Gadarawara NTPC SS along with Bay 723R.

N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 20-10-2018 18:32

743 765 Gadarwara NTPC 765kV Bays 722 (Tie Bay) & 721(Future bay-Isolator only) of

Gadarwara-Warora line-2 at Gadarawara NTPC SS.

N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 20-10-2018 18:32

744 Warora,PWTL765kV Gadarwara-Warora line-2 along with 3*110 MVAR

Line Reactor and associated Bay 710 at Warora. Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 20-10-2018 18:32

Certificate No: WRLDC/PWTL/05

745 400 Champa HVDC400 kV Bay 474 (Main bay of AC Filter Bank ACF-6) at HVDC

Champa SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 26-10-2018 16:59

746 400 Champa HVDC400 kV, 125 MVAR AC Filter-A type - 1 No

• COM2A-HACQ61 at HVDC Champa SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 26-10-2018 17:15

747 400 Champa HVDC400 kV Bay 473 (Main bay of AC Filter Bank ACF-5) at HVDC

Champa SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 27-10-2018 14:17

748 400 Champa HVDC400 kV, 125 MVAR AC Filter-A type - 1 No

• COM2A-HACQ51 at HVDC Champa SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 27-10-2018 14:54

749 400 Champa HVDC400 kV, 125 MVAR AC Filter-A type - 1 No

• COM2A-HACQ51 at HVDC Champa SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 27-10-2018 14:54

750 400 Champa HVDC400 kV, 165 MVAR AC Filter-C type - 3 Nos

• COM2A-HACQ64 at HVDC Champa SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 27-10-2018 18:18

751 765 Gadarwara NTPC NTPC Gadarwara STPP bays 703 N/a √ √ √ √ √ √ √ √ √ √ √ √ √ 29-10-2018 17:49

752 400 Champa HVDC400 kV Bay 471 (Future bay-Isolator only) at HVDC Champa

SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 29-10-2018 17:53

753 400 Champa HVDC400 kV Bay 472 (Tie bay of AC Filter Bank ACF-5) at HVDC

Champa SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 29-10-2018 18:05

754 400 Champa HVDC400 kV, 125 MVAR AC Filter-B type - 1 No

• COM2A-HACQ52 at HVDC Champa SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 29-10-2018 18:37

755 33 Barsaita Desh 33kV Bay 311 at Barsaita Desh (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 29-10-2018 19:26

756 33 Barsaita Desh 33kV Bay 313 at Barsaita Desh (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 29-10-2018 19:37

757 220 Chhanera MPPTCL220kV Khandwa-Chhanera line-2(Bay 212 at Khandwa PG)

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 31-10-2018 19:50

758 220 Khandwa220kV Bay 212(of Khandwa-Chhanera line-2) with

associated bay equipments at Khandwa SSApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 31-10-2018 19:50 Certificate No WRLDC/WR-2/116

759 765 Dharamjaygarh765kV Dharamjaygarh-Jharsuguda ckt-3(Main bay 721 at

Dharamjaygarh,Main bay 715 at Dharamjaygarh) with

3*110 MVAR LR at Dharamjaygarh

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 31-10-2018 23:35 Certificate No POSOCO/NLDC/SO/12-1

760 765 Dharamjaygarh765kV Dharamjaygarh-Jharsuguda ckt-4(Main bay 718 at

Dharamjaygarh, Main bay 718 at Dharamjaygarh) with

3*110 MVAR LR at Dharamjaygarh

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 01-11-2018 20:10 Certificate No POSOCO/NLDC/SO/12-2

761 400 CGPL Mundra 400kV Bay 407 (Main bay of 400kV CGPL Mundra-Bhuj line-

2) with associated bay equipment at CGPL Mundra SS.

Applicable √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 01-11-2018 20:42 Certificate No WRLDC/WR-2/118

762 400 Champa HVDC400 kV Bay 469 (Tie bay of HVDC Champa-Kurukshetra Pole-

3) at HVDC Champa SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 02-11-2018 18:02

763 400 Champa HVDC400 kV Bay 470 (Main bay of HVDC Champa-Kurukshetra

Pole-3) at HVDC Champa SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 02-11-2018 18:02

764 400 Champa HVDC

Converter Transformer for Pole-3-

• Star-Star Connected: 3*296MVA, 400kV/334kV

• Star-Delta Connected: 3*296MVA, 400kV/334kVApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 02-11-2018 18:02

765 800 Champa HVDC+800 kV,1500 MW ,12 Pulse Converter Bridge for Pole-3 at

HVDC Champa SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 02-11-2018 18:02

766 220 Chhanera MPPTCL220kV Khandwa-Chhanera line-1(Bay 210 at Khandwa PG)

Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 03-11-2018 11:03

767 220 Khandwa220kV Bay 210(of Khandwa-Chhanera line-1) with

associated bay equipments at Khandwa SSApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 03-11-2018 11:03 Certificate No WRLDC/WR-2/116

768 400 Champa HVDC DC Switchyard for Pole-3 at HVDC Champa SS. Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 04-11-2018 11:26

769 400 Champa HVDC 33kV/433V tertiary transformer at HVDC Champa Applicable √ √ √ √ N/A √ √ √ √ √ √ √ √ 05-11-2018 18:42

770 220 Malanpur MPPTCL 220kV Malanpur MP to Morena Adani line N/a √ √ √ √ N/A √ √ √ √ √ √ √ N/a 05-11-2018 20:47

771 220 Mehgaon MPPTCL 220kV Mehgaon MP to Morena Adani N/a √ √ √ √ N/A √ √ √ √ √ √ √ N/a 05-11-2018 21:28

772 765 Gadarwara NTPC765kV Bay 723 (Main Bay) of Gadarwara-Warora line-2 at

Gadarawara NTPC SS.N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 06-11-2018 21:51

773 220 Raigarh (PGCIL) 220kV Raigarh(PG)-Budipadar-LILO portion only of 220kV

Raigarh(CSPTCL)-Budipadar(OPTCL) at Raigarh PGCIL Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ 09-11-2018 13:03

774 400 Bhusawal(Khadka MSETCL)400kV Reactor Bay(of 50MVAR Reactor) at Khadka MSETCL)

SSN/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 10-11-2018 11:06

775 400 Champa HVDCShunt Reactor-80MVAR-COM2A-HACQ65 at HVDC Champa

SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 14-11-2018 19:03

776 220 Rewa PS220kV Bay 208 (of Rewa(pooling)-Badwar(Solar) line-2 Bay

along with associated bay equipmentApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 19-11-2018 16:33 Certificate No: WRLDC/WR-2/117- Idle Charging only

777 220 Rewa PS220kV Bay 209 (of Rewa(pooling)-Badwar(Solar) line-1 Bay

along with associated bay equipmentApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 20-11-2018 13:45 Certificate No: WRLDC/WR-2/117- Idle Charging only

778 400 Hadala GETCO500MVA, 400/220/33kV ICT-4 (Bay No. 415 on 400kV Side,

Bay No. 221 on 220kV Side) at Hadala GETCO SS. N/a√ √ √ √ N/A √ √ √ √ √ √ N/a 20-11-2018 18:11

779 400 Kala GIS500MVA, 400/220 kV ICT-3 along with bays 409(400kV side)

and 208(220kV Side) at Kala GIS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 22-11-2018 17:09 Certificate No WRLDC/WR-2/119

780 765 Durg PG765kV Bay 825(Main Bay of Durg-Rajnandgaon line-2) at

Durg PS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 27-11-2018 17:38 Certificate No WRLDC/WR-1/80

781 765 Durg PG765kV Bay 826(Tie Bay of Durg-Rajnandgaon line-2) at Durg

PS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 27-11-2018 18:00 Certificate No WRLDC/WR-1/80

782 765 Durg PG 765kV Bay 827(Future Bay-Isolator only) at Durg PS. Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 27-11-2018 18:00 Certificate No WRLDC/WR-1/80

783 765 Auranagabad MSETCL(Ektuni)765kV 80MVAR Spare Bus Reactor at Aurangabad MSETCL

S/SN/a √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 29-11-2018 18:29

784 400 Champa HVDC400 kV Bay 476 (Main bay of AC Filter Bank ACF-4) at HVDC

Champa SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 30-11-2018 18:24

785 400 Champa HVDC400 kV, 125 MVAR AC Filter-A type - 1 No

• COM2A-HACQ41 at HVDC Champa SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ 30-11-2018 18:46

786 220 Indore PG220kV Bay No 211(of Indore-SEB line-2) at Indore SS- idle

charging onlyApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 03-12-2018 18:07 Certificate No WRLDC/WR-2/120

787 220 Jetpura(MPPTCL)Part of LILO of Indore(Jetpura-MP)-Ujjain lines 1&2 at

Indore(PG): 220kV Jetpura(MP)-Indore(PG) line-1 (bay 205

at Indore PG, bay No. 10 at Jetpura(MP)) N/a

√ √ √ √ N/A √ √ √ √ √ √ √ N/a 10-12-2018 19:18

788 400 Indore PG500MVA, 400/220KV ICT-2 with Bay No 406 on 400kV side

& Bay No 208 on 220kV side at Indore SS Applicable √ √ √ √ √ N/A

√ √ √ √ √ √ √ N/a √ √ √ √ 10-12-2018 19:18

Certificate No WRLDC/WR-2/121

789 220 Indore PG 220kV Bay No 206 (of Bus Coupler) at Indore SS Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 10-12-2018 19:18 Certificate No WRLDC/WR-2/121

790 220 Indore PG220kV Bay No 205(of Indore-Jetpura line-1) at Indore

SS Applicable √ √ √ √ √ N/A

√ √ √ √ √ √ √ N/a √ √ √ √ 10-12-2018 19:18

Certificate No WRLDC/WR-2/121

791 400 Indore PG500MVA, 400/220KV ICT-1 with Bay No 403 on 400kV side

& Bay No 204 on 220kV side at Indore SS Applicable √ √ √ √ √ N/A

√ √ √ √ √ √ √ N/a √ √ √ √ 10-12-2018 19:18

Certificate No WRLDC/WR-2/121

792 220 Indore PG220kV Bay No 202 (of Transfer Bus Coupler) at Indore SS Applicable √ √ √ √ √

N/A√ √ √ √ √ √ √ N/a √ √ √ √

10-12-2018 19:18Certificate No WRLDC/WR-2/121

793 220 Indore PG220kV Bay No 207(of Indore-Jetpura line-2) at Indore

SS Applicable √ √ √ √ √ N/A

√ √ √ √ √ √ √ N/a √ √ √ √ 10-12-2018 19:37

Certificate No WRLDC/WR-2/121

Page 17: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

794 220 Jetpura(MPPTCL)Part of LILO of Indore(Jetpura-MP)-Ujjain lines 1&2 at

Indore(PG): 220kV Jetpura(MP)-Indore(PG) line-2 (bay 207

at Indore PG, bay No. 9 at Jetpura(MP)) N/a

√ √ √ √ N/A √ √ √ √ √ √ √ N/a 10-12-2018 19:38

795 220 Ujjain(MPPTCL)Part of LILO of Indore(Jetpura-MP)-Ujjain lines 1&2 at

Indore(PG): 220kV Ujjain(MP)-Indore(PG) line-1 (bay 201 at

Indore PG, bay No. at Ujjain(MP)) N/a

√ √ √ √ N/A √ √ √ √ √ √ √ N/a 10-12-2018 23:38

796 220 Ujjain(MPPTCL)Part of LILO of Indore(Jetpura-MP)-Ujjain lines 1&2 at

Indore(PG): 220kV Ujjain(MP)-Indore(PG) line-2 (bay 203 at

Indore PG, bay No. at Ujjain(MP)) N/a

√ √ √ √ N/A √ √ √ √ √ √ √ N/a 11-12-2018 00:01

797 220 Indore PG 220kV Bay No 201(of Indore-Ujjain line-1) at Indore SS Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 12-12-2018 21:13 Certificate No WRLDC/WR-2/121

798 220 Indore PG 220kV Bay No 203(of Indore-Ujjain line-2) at Indore SS Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ 12-12-2018 21:14 Certificate No WRLDC/WR-2/121

799 Vindhyachal PS

765kV Vindhyachal PS-Jabalpur PS line-1 with bays (M-719

at Vindhyachal) along with 3*110MVAR Line Reactor at

Vindhyachal PS- Anti-theft charging from Vindhyachal PS

without active power flow Applicable

√ √ √ √ √ √ √ √ √ √ √ 13-12-2018 21:18

800 765 Vindhyachal PS765kV Bay 719 (Main bay),3*110MVAR Line Reactor of

Vindhyachal PS-Jabalpur PS line-1 at Vindhyachal PS-without

power flow Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ √ 13-12-2018 21:18

801 765 Vindhyachal PS765kV Bay 720 (Tie bay) of Vindhyachal PS-Jabalpur PS line-1

at Vindhyachal PS.-without power flow Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ 13-12-2018 21:38

802 765 Jabalpur PS

765kV Vindhyachal PS-Jabalpur PS line-1 with bays (M-727,

T-726 at Jabalpur) along with 3*110MVAR Line Reactor at

Jabalpur ends - Anti-theft charging from Jabalpur PS

without active power flow Applicable

√ √ √ √ √ √ √ √ √ √ √ 14-12-2018 00:41

803 765 Jabalpur PS765kV Bays 727 (Main bay), 726 (Tie bay), 3*110MVAR Line

Reactor of Vindhyachal PS-Jabalpur PS line-1 at Jabalpur PS.-

without power flow Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ √ 14-12-2018 00:41

804 765 Jabalpur PS

765kV Vindhyachal PS-Jabalpur PS line-2 (M-730, T-729 at

Jabalpur, M-716,T-717 at Vindhyachal) along with

3*110MVAR Line Reactors at Jabalpur PS. - Anti-theft

charging from Jabalpur PS without active power flow Applicable

√ √ √ √ √ √ √ √ √ √ √ 15-12-2018 22:07

805 400 Banaskantha PG/ Sankhari(GETCO)400kV Banaskantha-Sankhari line-1 with associated bays(M-

419 at Banaskantha SS & M-418 at Sankhari(GETCO) SS)-

owned by PG- without power flow Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 18-12-2018 20:36

806 400 Banaskantha PG/ Sankhari(GETCO)400kV Banaskantha-Sankhari line-2 with associated bays(M-

422 at Banaskantha SS & M-419 at Sankhari(GETCO) SS)-

owned by PG - without power flow Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 18-12-2018 21:32

807 765 Vindhyachal PS

765kV Vindhyachal PS-Jabalpur PS line-2 (M-730, T-729 at

Jabalpur, M-716,T-717 at Vindhyachal) along with

3*110MVAR Line Reactors at Vindhyachal PS - Anti-theft

charging from Vindhyachal PS without active power flow Applicable

√ √ √ √ √ √ √ √ √ √ √ 19-12-2018 01:43

808 400 Gwalior3*141 MVA, 400/32 kV Coupling Transformer (of +/-

200MVAR STATCOM) along with associated bays (M-416,T-

417) at Gwalior SS.

Applicable √ √ √ √ N/A √ √ √ √ √ √ √ √ 22-12-2018 14:17

Idle charged on 30-09-2018 14:07:00

809 400 Gwalior PG32kV,125MVAR MSR-1(component of STATCOM) along with

associated equipment at 765/400kV Gwalior PG Applicable√ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 22-12-2018 14:17

810 400 Gwalior PG32kV,2*100MVAR STATCOM (Statcom 1&2) along with

associated equipment at Gwalior PG Applicable√ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ 22-12-2018 14:17

811 400 Gwalior PG32kV,125MVAR MSR-2(component of STATCOM) along with

associated equipment at 765/400kV Gwalior PG Applicable√ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 23-12-2018 15:02

812 400 Gwalior PG32kV, 125MVAR MSC along with associated equipment at

765/400kV Gwalior PG Applicable√ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 24-12-2018 15:58

813 33 Barsaita Desh 33kV Bay 310 at Barsaita Desh (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 27-12-2018 17:21

814 33 Barsaita Desh 33kV Bay 314 at Barsaita Desh (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 27-12-2018 17:25

815 33 Barsaita Desh 33kV Bay 315 at Barsaita Desh (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 27-12-2018 17:35

816 33 Barsaita Desh 33kV Bay 318 at Barsaita Desh (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 27-12-2018 17:45

817 33 Barsaita Desh 33kV Bay 319 at Barsaita Desh (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 27-12-2018 17:50

818 33 Barsaita Desh 33kV Bay 321 at Barsaita Desh (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 27-12-2018 17:55

819 33 Barsaita Desh 33kV Bay 322 at Barsaita Desh (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 27-12-2018 18:02

820 Banaskantha PG400 kV Bay 423 (Tie bay) of Banaskantha-Sankhari line-2 at

Banaskantha Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 28-12-2018 15:20

821 765 Banaskantha PG765/400 kV, 1500 MVA ICT-2 along with bays 715 (Main),

424 (Main), 423 (Tie)  at Banaskantha SS.-without power

flow Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ √ 28-12-2018 15:20

822 765 Vindhyachal PS765kV Bay 719 (Main bay) of Vindhyachal PS-Jabalpur PS

line-1 Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 30-12-2018 15:08 Certificate No WRLDC/WR-2/124

823 765 Vindhyachal PS765kV, 3*110MVAR Line Reactor of Vindhyachal PS-Jabalpur

PS line-1 Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 30-12-2018 15:08 Certificate No WRLDC/WR-2/124

824 765 Jabalpur PS/Vindhyachal PS/ PJTL765kV Vindhyachal PS-Jabalpur PS line-1 (Bays M-827, T-826

at Jabalpur,M-719, T-720 at Vindhyachal-Bays owned by PG)

and 3*110MVAR Line Reactors at both ends Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 30-12-2018 15:09

825 765 Jabalpur PS765kV Bay 827 (Main bay) of Vindhyachal PS-Jabalpur PS

line-1. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 30-12-2018 15:09 Certificate No WRLDC/WR-2/123

826 765 Jabalpur PS765kV, 3*110MVAR Line Reactor of Vindhyachal PS-Jabalpur

PS line-1. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 30-12-2018 15:09 Certificate No WRLDC/WR-2/123

827 765 Jabalpur PS765kV Bay 826 (Tie bay) of Vindhyachal PS-Jabalpur PS line-

1. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 30-12-2018 15:10 Certificate No WRLDC/WR-2/123

828 765 Vindhyachal PS765kV Bay 720 (Tie bay) of Vindhyachal PS-Jabalpur PS line-1 Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 30-12-2018 15:10 Certificate No WRLDC/WR-2/124

829 765 Jabalpur PS765kV Bay 829 (Tie bay) of Vindhyachal PS-Jabalpur PS line-2 Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 30-12-2018 16:31 Certificate No WRLDC/WR-2/123

830 765 Jabalpur PS765kV, 3*110MVAR Line Reactor of Vindhyachal PS-Jabalpur

PS line-2 Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 30-12-2018 16:31 Certificate No WRLDC/WR-2/123

831 765 Vindhyachal PS765kV Bay 716 (Main bay) of Vindhyachal PS-Jabalpur PS

line-2 Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 30-12-2018 16:31 Certificate No WRLDC/WR-2/124

832 765 Vindhyachal PS765kV,3*110MVAR Line Reactor of Vindhyachal PS-Jabalpur

PS line-2 Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 30-12-2018 16:31 Certificate No WRLDC/WR-2/124

833 765 Jabalpur PS/Vindhyachal PS/ PJTL765kV Vindhyachal PS-Jabalpur PS line-2 (Bay T-829 at

Jabalpur, M-716,T-717 at Vindhyachal-Bays owned by PG)

and 3*110MVAR Line Reactors at both ends Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 30-12-2018 16:31

834 765 Vindhyachal PS765kV Bay 717(Tie bay) of Vindhyachal PS-Jabalpur PS line-2 Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 30-12-2018 16:41 Certificate No WRLDC/WR-2/124

835 765 Banaskantha PG765 kV, 330 MVAR Bus Reactor with bays 709 (Main bay) at

Banaskantha SS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ 31-12-2018 20:58

836 765 Jabalpur PS765kV Bay 830 (Main bay) of Vindhyachal PS-Jabalpur PS

line-2 Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ √ √ √ √ 01-01-2019 18:49 Certificate No WRLDC/WR-2/123

837 400 Banaskantha PG400 kV Bay 420 (Tie bay) of Banaskantha-Sankhari line-1 at

Banaskantha Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 03-01-2019 20:38

838 765 Banaskantha PG765/400 kV, 1500 MVA ICT-1 along with bays 712 (Main),

711 (Tie), 421 (Main), 420 (Tie) at Banaskantha SS.-without

power flow Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ √ 03-01-2019 20:38

839 400 Parli MSETCL400kV, 50 MVAR Line Reactor of Parli(MS)-Lonikhand line-2

at Parli MSETCL (replacement of old line reactor which

caught fire on 30.10.2015) N/a

√ √ √ √ √ N/A √ √ √ √ √ √ √

N/a

05-01-2019 01:03

840 765 Banaskantha PG765 kV 708 (Tie bay) of 330 MVAR Bus Reactor at

Banaskantha SS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ 05-01-2019 20:16

841 765 Banaskantha PG 765 kV Bays 719 (Main bay) of 765 kV Bhuj-Banaskantha

line-2 at Banaskantha SS.-without power flow Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ 06-01-2019 12:15

842 765 Bhuj SS765 kV Bhuj-Banaskantha-line-2 along with 330 MVAR Line

Reactor and bay 707R ( Line Reactor bay) at Bhuj SS.-

without powerflow Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ 06-01-2019 12:15

843 765 Bhuj SS765 kV Bay 707 (Main bay) of Bhuj-Banaskantha-line-2 at

Bhuj SS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ 06-01-2019 12:44

844 400 IndorePG400kV Bay 412 (Main) of Indore Ujjain line-1 at Indore PG. Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ N/a

09-01-2019 16:59

845 400 IndorePG 400kV Bay 411 (Tie) of Indore Ujjain line-1 at Indore PG. Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 09-01-2019 17:15

Page 18: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

846 400 IndorePG400kV Bay 430 (Main) of Indore Ujjain line-2 at Indore PG. Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ N/a

09-01-2019 17:25

847 400 IndorePG 400kV Bay 429 (Tie) of Indore Ujjain line-2 at Indore PG. Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 09-01-2019 17:35

848 220 KAPP 220kV Bay 215 of SUT-4A&4B at Kakrapar SS N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 09-01-2019 20:22

849 220 KAPP220/6.9/6.9kV, 70/35/35 MVA Start Up Transformer(SUT)

4A at Kakrapar SS.- No-load chargingN/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 09-01-2019 21:38

850 220 KAPP220/6.9/6.9kV, 70/35/35 MVA Start Up Transformer(SUT)

4B at Kakrapar SS.- No-load chargingN/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 09-01-2019 21:38

851 220 Parli (MSETCL)220kV Parli(PG)-Osmanabad line- part of LILO of

Parli(MSETCL)-Osmanabad line at Parli(PG) N/a√ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 18-01-2019 21:28

852 220 Parli (MSETCL)220kV Parli(MSETCL)- Parli(PG) line- part of LILO of

Parli(MSETCL)-Osmanabad line at Parli(PG) N/a√ √ √ √ √ N/A √ √ √ √ √ √ √ N/a 18-01-2019 21:59

853 765 PuneGIS765kV Bays of 803Q0A(Future bay-707) of Pune(GIS)-

Padghe line at Pune GIS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ 21-01-2019 14:59

854 765 PuneGIS765kV Bays of 803Q0B(Main bay-709) of Pune(GIS)-Padghe

line at Pune GIS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ 21-01-2019 16:02

855 765 PuneGIS765kV Bays of 803Q0C(Tie bay-708) of Pune(GIS)-Padghe

line at Pune GIS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ 21-01-2019 16:26

856 765 PuneGIS765kV Bays of 804Q0A(Future bay-710) of Pune(GIS)-

Aurangabad line at Pune GIS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ 21-01-2019 16:59

857 765 PuneGIS765kV Bays of 804Q0B(Main bay-712) of Pune(GIS)-

Aurangabad line at Pune GIS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ 21-01-2019 17:15

858 765 PuneGIS765kV Bays of 804Q0C(Tie bay-711) of Pune(GIS)-

Aurangabad line at Pune GIS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ 21-01-2019 17:28

859 765 PuneGIS765kV,240 MVAR switchable Line Reactor of Pune(GIS)-

Aurangabad Line at pune GIS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ 21-01-2019 17:57

860 765 PuneGIS765kV Bays of 804Q0D(Reactor bay-712R) of Pune(GIS)-

Aurangabad line at Pune GIS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ 21-01-2019 17:57

861 220 Rewa PS 220kV Rewa PS - Rewa Badwar(Solar) Line 1 Applicable √ √ √ √ √ N/a Line belongs to RUMS, yet to be charged

862 220 Rewa PS 220kV Rewa PS - Rewa Badwar(Solar) Line 2 Applicable √ √ √ √ √ N/a Line belongs to RUMS, yet to be charged

863 33 ACME SOLAR 33kV ACME- Ramnagar Pahad lines 3B N/a √ √ √ √ √ N/A √ √ √ √ √ √ N/a Yet to be charged

864 33 ACME SOLAR 33kV ACME- Ramnagar Pahad lines 5A N/a √ √ √ √ √ N/A √ √ √ √ √ √ N/a Yet to be charged

865 33 ACME SOLAR 33kV ACME- Ramnagar Pahad lines 5B N/a √ √ √ √ √ N/A √ √ √ √ √ √ N/a Yet to be charged

866 33 ACME SOLAR 33kV ACME- Ramnagar Pahad lines C5 N/a √ √ √ √ √ N/A √ √ √ √ √ √ N/a Yet to be charged

867 33 ARINSUN SOLAR 33kV Arinsun - Barsaita Desh line -17 N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

868 33 Ramnagar Pahad 33kV Bay 306 at Ramnagar Pahad (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

869 33 Ramnagar Pahad 33kV Bay 308 at Ramnagar Pahad (Bus Coupler bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

870 33 Ramnagar Pahad 33kV Bay 312 at Ramnagar Pahad (ICT-2 bay) Yet to be charged

871 33 Ramnagar Pahad 33kV Bay 317 at Ramnagar Pahad (Bus Sectionalizer bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

872 33 Ramnagar Pahad 33kV Bay 322 at Ramnagar Pahad (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

873 220 Ramnagar Pahad220kV Bay 202 at Ramnagar Pahad (Transfer Bus Coupler

bay)N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

874 220 Ramnagar Pahad 220kV Bay 204 at Ramnagar Pahad (ICT-2 bay) N/a Yet to be charged

875 220 Ramnagar Pahad 220kV Bay 206 at Ramnagar Pahad (Bus Coupler bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

876 33 Barsaita Desh 33kV Bay 303 at Barsaita Desh (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

877 33 Barsaita Desh 33kV Bay 304 at Barsaita Desh (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

878 33 Barsaita Desh 33kV Bay 306 at Barsaita Desh (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

879 33 Barsaita Desh 33kV Bay 307 at Barsaita Desh (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

880 33 Barsaita Desh 33kV Bay 308 at Barsaita Desh (Bus Coupler bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

881 33 Barsaita Desh 33kV Bay 309 at Barsaita Desh (Bus Sectionalizer bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

882 33 Barsaita Desh 33kV Bay 316 at Barsaita Desh (Bus Coupler bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

883 33 Barsaita Desh 33kV Bay 320 at Barsaita Desh (ICT-3 bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

884 33 Barsaita Desh 33kV Bay 323 at Barsaita Desh (Feeder bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

885 220 Barsaita Desh 220kV Bay 200 at Barsaita Desh (PT bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

886 220 Barsaita Desh 220kV Bay 202 at Barsaita Desh (Transfer Bus Coupler bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

887 220 Barsaita Desh 220kV Bay 206 at Barsaita Desh (Bus Coupler bay) N/a √ √ √ √ √ N/A √ √ √ √ √ √ N/a Yet to be charged

888 220 Barsaita Desh 220/33 kV ICT-3 at Barsaita Desh N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

889 400 CGPL Mundra 400kV Bay 410 (Main bay of 400kV CGPL Mundra-Bhuj line-

1) with associated bay equipment at CGPL Mundra SS.

Applicable √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

890 400 CGPL Mundra 400kV Bay 411 (Tie bay of 400kV CGPL Mundra-Bhuj line-1)

with associated bay equipment at CGPL Mundra SS.

Applicable √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

891 400 Champa HVDC400 kV Bay 475 (Tie bay of AC Filter Bank ACF-6) at HVDC

Champa SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ Yet to be charged

892 400 Champa HVDC 400 kV,157 MVAR AC Filters-E type - 6 Nos

• COM2A-HACQ54,54,55 at HVDC Champa SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ Yet to be charged

893 400 Champa HVDC400 kV, 165 MVAR AC Filter-C type - 3 Nos

• COM2A-HACQ62,63 at HVDC Champa SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ Yet to be charged

894 400 Champa HVDC 400 kV,157 MVAR AC Filters-E type -3 Nos

COM2A-HACQ43,44,45 at HVDC Champa SSApplicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ Yet to be charged

895 400 Champa HVDC400 kV, 125 MVAR AC Filter-B type - 1 No

• COM2A-HACQ42 at HVDC Champa SS.Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ √ Yet to be charged

896 400 Kalawad SS GETCO400 kV D/C LILO lines(approx 8km) for loop in loop out of

400 kV EPGL-Hadala line-1&2 at Kalawad S/S of GETCON/a √ √ N/A N/A N/A √ √ √ √ N/a Yet to be charged

897 400 Kirnapur MPPTCL 400/132/33kV, 100MVA ICT at Kirnapur MPPTCL SS N/a √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

898 220 OSTRO Naranpar Ravli PS33kV Bay 309 (of Capacitor Feeder-01) at Ostro Naranpar

Ravli PSN/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

899 220 OSTRO Naranpar Ravli PS33kV Bay 318 (of Capacitor Feeder-03) at Ostro Naranpar

Ravli PSN/a √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

900 220 Rewa PS 400kV Bay 410 (Main Bay of 400/220/33kV, 500MVA ICT-3) Applicable √ √ √ √ √ N/A √ N/a Yet to be charged

901 220 Rewa PS 400kV Bay 411 (Tie Bay of 400/220/33kV, 500MVA ICT-3) Applicable √ √ √ √ √ N/A √ N/a Yet to be charged

902 220 Rewa PS 220kV Bay 205 (of 400/220/33kV, 500MVA ICT-3) Applicable √ √ √ √ √ N/A √ N/a Yet to be charged

903 765 BDTCL Dhule, KTL765kV Bay 710 (Main bay of 765kV Khandwa-Dhule line-1)

at Dhule(BDTCL) SS. Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ √ Yet to be charged

904 765 BDTCL Dhule, KTL765kV Bay 711(Tie bay of 765kV Khandwa-Dhule line-1 and

765kV Khandwa-Dhule line-2) at Dhule(BDTCL) SS. Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ √ Yet to be charged

905 765 BDTCL Dhule, KTL765kV Bay 712(Main bay of 765kV Khandwa-Dhule line-2) at

Dhule(BDTCL) SS. Applicable√ √ √ √ √ √ √ √ √ √ √ √ √ √ Yet to be charged

906 765 BDTCL Dhule, KTL765kV, 3*80MVAR Line Reactor (of Khandwa-Dhule line-1)

as Bus Reactor(without line) with Line Reactor bay 710R at

Dhule(BDTCL) SS. Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ √ Yet to be charged

907 765 BDTCL Dhule, KTL765kV, 3*80MVAR Line Reactor (of Khandwa-Dhule line-2)

as Bus Reactor(without line) with Line Reactor bay 712R at

Dhule(BDTCL) SS. Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ √ Yet to be charged

908 765 BDTCL Dhule, KTL765kV, 1*80 MVAR Spare reactor at Dhule(BDTCL) SS. Applicable

√ √ √ √ √ √ √ √ √ √ √ √ √ √ Yet to be charged

909 400 Banaskantha PG400kV, 125 MVAR Bus Reactor along with associated bays

(M-418, T-417) at Banskantha SS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ N/a Yet to be charged

910 765 Banaskantha PG714 (Tie bay) of 765/400 kV, 1500 MVA ICT-2  at

Banaskantha SS.-without power flow Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ Yet to be charged

911 33 ACME SOLAR33kV ACME-Ramnagar line-4A (Bay 319 at Ramnagar

Pahad) N/a√ √ √ √ √ N/A √ √ √ √ √ √ √

N/aYet to be charged

912 765 Banaskantha PG765 kV Bays 720 (Tie bay), 719R (Line Reactor bay) &

330MVAR Line Reactor of 765 kV Bhuj-Banaskantha line-2 at

Banaskantha SS.-without power flow Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √ Yet to be charged

913 765 Bhuj SS765 kV Bay 708 (Tie bay) Bhuj-Banaskantha-line-2 at Bhuj

SS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ Yet to be charged

914 765 Banaskantha PG765 kV, 330 MVAR Line Reactor of 765 kV Bhuj-Banaskantha

line-2 with bay 719R at Banaskantha SS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ Yet to be charged

915 765 Banaskantha765 kV bay 713(Main bay) of Banaskantha-Chittorgarh line-1

at Banaskantha Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ Yet to be charged

916 765 Banaskantha765 kV bay 710(Main bay) of Banaskantha-Chittorgarh line-2

at Banaskantha Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √ √ Yet to be charged

917 220 Indore PG 220kV Bay No 209(of Indore-SEB line-1) at Indore SS Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ Yet to be charged with power flow

918 220 Indore PG 220kV Bay No 211(of Indore-SEB line-2) at Indore SS Applicable √ √ √ √ √ N/A √ √ √ √ √ √ √ N/a √ √ √ √ Yet to be charged with power flow

919 765 Gadarwara NTPC NTPC Gadarwara STPP bays 707 N/a √ √ √ √ √ N/A √ √ √ √ √ √ √ Yet to be charged, main bay of Unit-2

Page 19: Status of Application submitted for First Time Charging of Grid … · 2019-01-24 · 4 765kv Indore 765kv PG 765KV Sterlite bay at Indore & 400kv Pitampur bays (ckt-2) ... Sl.No

Under Scope of: WRLDC WRLDC NLDC WRLDC

Intimation regarding

anticipated charging of

the line along with

other documents

List of elements

to be charged

and Element

Rating details

Single line diagram of

the concerned sub

stations, along with

status of completion of

each dia/bus/breakers

List of SCADA points to be

made available (as per

standard requirement, RLDC would

need all MW and MVAr

data, voltage and frequency of all

the buses, all the breaker

and isolator positions, OLTC tap

positions, Main‐1/Main‐2

protection operated signals)

Type and Location

of Energy meters

as per relevant

CEA

regulations

Connection

Agreement,

wherever applicable

along with all

annexures

Acknowledgement by

WRLDCRequest for

charging of the

new transmission

element along

with the summary

of the

undertakings

being submitted

Undertaking in

respect of Protective

systems

Undertaking in respect

of Telemetry and

communication

Undertaking in

respect of Energy

metering

Undertaking in

respect of

Statutory

clearances

Provisional aprroval

for charging to the

Transmission

Licencee after

satifiying all

submitted

information

765KV Element

details forwared to

NLDC

Request for

issuance of

successful trial

operation

Certificate

Values of the

concerned line

flows and related

voltages just

before and after

charging of the

element

Special Energy

meter (SEM)

Reading for the

tria

Output of

Disturbance

Recorders /

Event Loggers

Transmission Elements Issuing Certificate for successful completion of trial run of transmission

element

Annexure-A1 Annexure-A2 Annexure-A3 Annexure-A4 Annexure-A5 Annexure-A6

Format II

Annexure-B1

:Format III

Annexure-B2

:Format IIIA

Annexure-B3:

Format IIIB

Annexure-B4

:Format IIIC

Annexure-B5:

Format IIID Format IVAnnexure- A1-A6

,B1-B5

Annexure-C1:

Format V

Annexure-C2 Annexure-C3 Annexure-C4 Charging Date & Time

Format VI (Certificate No)

Status of Application submitted for First Time Charging of Grid Elements

Check ListTransmission Licencee Transmission Licencee Transmission LicenceeStation Name of Transmission Element

Transmission Tariff

regulatory compliance

declaration as per clause

4.5(2) of CERC (Terms and

Conditions of Tariff), 2014

Regulation 5(2)

Sl.No. Voltage Level in

kV

920 765 Banaskantha PG765 kV Bays 716 (Main bay), 717 (Tie bay), 716R (Line

Reactor bay) & 330MVAR Line Reactor of 765 kV Bhuj-

Banaskantha line-1 at Banaskantha SS.-without power flow Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √

921 765 Durg PG, OGPTL 765kV Jharsuguda(Sundergarh(PG))-Raipur(PG) ckt-1 Applicable √ √ √ √ √ √ √ √ √

922 765 Durg PG, OGPTL 765kV Jharsuguda(Sundergarh(PG))-Raipur(PG) ckt-2 Applicable √ √ √ √ √ √ √ √ √

923 765 Warora,PWTL/WKTL 765kV, 240 MVAR Switchable Line Reactor( Reactor bay

701R ) of 765kV Warora-Rajnandgaon line-1 at Warora SS. Applicable

√ √ √ √ √ √ √ √ √ √ √ √

924 765 Warora,PWTL/WKTL 765kV, 240 MVAR Switchable Line Reactor( Reactor bay

704R ) of 765kV Warora-Rajnandgaon line-2 at Warora SS. Applicable

√ √ √ √ √ √ √ √ √ √ √ √

925 765 Banaskantha PG765 kV, 330 MVAR Line Reactor of 765 kV Bhuj-Banaskantha

line-1 with bay 716R at Banaskantha SS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √

926 765 Bhuj SS765/400 kV, 1500 MVA ICT-1 along with bays 712 (Main),

412(Main), 411(Tie) at Bhuj SS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √

927 765 Bhuj SS765/400 kV, 1500 MVA ICT-2 along with bays 709 (Main),

409(Main), 408(Tie) at Bhuj SS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √

928 765 Bhuj SS765 kV Bhuj-Banaskantha-line-1 along with bays 710 (Main),

711 (Tie), 710R ( Line Reactor bay) and 330 MVAR Line

Reactor at Bhuj SS. Applicable

√ √ √ √ √ N/A √ √ √ √ √ √ √

929 765 Bhuj SS765 kV, 330 MVAR Bus Reactor along with bays 715 (Main),

715 (Tie) at Bhuj SS. Applicable√ √ √ √ √ N/A √ √ √ √ √ √ √

930 765 NTPC Gadarwara 255 MVA, 765/132kV IBT-2 at NTPC Gadarwara SS N/a √ √ √ √ √ N/A √ √ √ √ √ √ √

931 400 Pithampur MPPTCL400kV Bay 411 (of Pithampur-SSTPH Ph-II line-1) at

Pithampur SS. N/a√ √ √ √ √ N/A √ √ √ √ √ √

932 400 Pithampur MPPTCL400kV Bay 414 (of Pithampur-Badnawar line-1) at

Pithampur SS. N/a√ √ √ √ √ N/A √ √ √ √ √ √