stationservice2012-13
TRANSCRIPT
-
8/13/2019 StationService2012-13
1/24
1
Station Service System
And DC equipments
-
8/13/2019 StationService2012-13
2/24
2
Outline1. Introduction
2. Station service electrical supply
3. DC equipment4. Conclusion
-
8/13/2019 StationService2012-13
3/24
3
IntroductionBasic Hydro Power Plant
1. Main transformer
2. Switchyard equipment3. Station service and DC equipment
-
8/13/2019 StationService2012-13
4/24
4
Lost the station service system Station service transformer got trouble.
Transmission line tripped and generating
units might be shutdown.
Black out system
-
8/13/2019 StationService2012-13
5/24
5
What is a problem ? Condition to start of unit is not available.
Auxiliary equipments could not start up
without AC power supply.
Power plant is black.
Station service system is necessary for HPPas much as water in the river or
reservoir.
-
8/13/2019 StationService2012-13
6/24
6
Station service electrical supply Auxiliary equipment works at 400-600 V.
Lighting and low voltage equipment weresupplied by 120 / 240 V.
-
8/13/2019 StationService2012-13
7/24
7
Station service system management Main Station
Load Center or Motor Control Center(MCC) or Power distributing board
Main Station
Load Center 1 Load Center 2 Load Center 3
-
8/13/2019 StationService2012-13
8/24
8
Electrical supply diagram
Motor Pump Motor PumpMotor Compressor
Power
In
BreakerDraw Out
MCC Bus
-
8/13/2019 StationService2012-13
9/24
9
Station service power supply Generator bus (11 kV)
High voltage bus (115 kV or230 kV)
Generator terminal and bus
-
8/13/2019 StationService2012-13
10/24
10
Generator bus
G1
Gen. Bus 11 kV
T2T1
G2 G3
Load 1 Load 3
400 VSS Transformer
Loads 2
High volt bus115 or 230 kV
-
8/13/2019 StationService2012-13
11/24
11
High voltage bus (230 kV or138 kV)T2T1
G2G1
Load 1 Load 3
400 VSS
Transformer
Load 2
High volt bus 115 or 230 kV
G3
-
8/13/2019 StationService2012-13
12/24
12
Generator terminal and bus
G1
High volt bus
115 or 230 kV
G2 G3
T1 T2 T3
SS A
SS
Transformer
Load 1 Load 2 Load 3 Load 4
SS B
-
8/13/2019 StationService2012-13
13/24
13
More stability
G1
Gen. Bus 11 kV
T2T1
G2 G3
DieselGenerator
SS1
115 or 230 kV
Load 3 Load 5
SS BSS2
Load 4Load 1
SS A
Load 2
Gen. Bus 11 kV
52A 52B
52C
-
8/13/2019 StationService2012-13
14/24
14
CB interlocking
DieselGenerator
SS1
Load 3 Load 5
SS BSS2
Load 4Load 1
SS A
Load 2
52A 52B
52C
Tie CB
52A I I 0 052B I 0 I 0Tie 0 I I I 052C 0 0 0 I
-
8/13/2019 StationService2012-13
15/24
15
HPP station service systemBB-NS # 1
A B
KW1B
13.8 kV/ 416
1250 kVA 24A
BB-NS # 2 BB-BB Sub BB-TA2
52A 52B
G2
KG1A
11kV / 115 kV
Ring Bus (Loop)
G1 G3 G4
E1A
MCC1
E3A
MCC3
...
Diesel Generator
225 kVA
DG
KW2B
E2A
MCC2
E4A
MCC4
To U8 52C ...
KG2A
11kV / 115 kV
KG5A
11 kV / 115 kV
52A 52B
Electrical supply for equipment U8
KW3BG8
-
8/13/2019 StationService2012-13
16/24
16
DC Power Supply Annunciation / alarm
Indicating lights on the main control panel
Protection circuits Control circuit of CB
Emergency lighting
-
8/13/2019 StationService2012-13
17/24
17
DC power supply level 110 Volt
220 Volt
48 Volt
-
8/13/2019 StationService2012-13
18/24
18
Rectifier
Battery
Main equipment of DC system
-
8/13/2019 StationService2012-13
19/24
19
Typical DC systemAux. Bus
600 V AC
125 V
DC Distribution
Bus
Battery Bank
RectifierDC
Equipmen
t
-
8/13/2019 StationService2012-13
20/24
20
Rectifier
Battery
Inverter
AC system
-
8/13/2019 StationService2012-13
21/24
-
8/13/2019 StationService2012-13
22/24
22
Off-Line UPS120 V AC 120V Safe AC
Battery Bank
Static Transfer SW.
DC
InverterRectifier
AC
-
8/13/2019 StationService2012-13
23/24
23
Off-Line UPS120 V AC 120V Safe AC
Battery Bank
Static Transfer SW.
DC
Inverter
Rectifier
AC
Rectifier
-
8/13/2019 StationService2012-13
24/24
24
Conclusion Station service system in HPP must be
more stabilization.
Uninterruptible power supply is necessary
for emergency system.
There are 3 main equipments in safe
DC/AC power supply are Rectifier,
Battery and Inverter.