2. Designing for the 21 stCentury Building Completed 2004

  • Square Footage 22,644 sf
  • Construction Cost $2,600,505
    • Training by Design $30,000 - $45,000
  • Cost Per Square Foot $125
  • Soft Cost $450,000

3. Designing for the 21 stCentury Key Features

  • Four Bay Drive-Through Apparatus Bay
  • Training Tower
  • Living Quarters for 15 Personnel

4. Orange Township Fire Station 361 5. Orange Township Fire Station 361 6. First Floor 7. Second Floor 8. Basement 9. Elevator Machine Room 10. Mechanical Room 11. Library 12. Training Room / EOC 13. Training Room / EOC 14. Training Room Audio Visual 15. Workout Room 16. Training Tower 17. Training Tower 18. Training Tower 19. Training Tower 20. Training Tower - Hydraulics 21. Training Tower 22. Training Tower 23. Training Tower 24. Training Tower 25. Mezzanine / Training Tower 26. Mezzanine 27. Mezzanine 28. Mezzanine 29. Mezzanine 30. Mezzanine 31. Mezzanine 32. Apparatus Bay Technical Rescue 33. Apparatus Bay Technical Rescue 34. Apparatus Bay Technical Rescue 35. Apparatus Bay Technical Rescue 36. Water Rescue Retention Pond 37. Water Rescue 38. Water Rescue