state route 71/91 interchange improvement project · 2021. 1. 15. · interchange improvement...

1
ORANGE COUNTY SAN BERNARDINO COUNTY RIVERSIDE COUNTY 71 P R OJ E C T C O R R I D O R 91 15 15 N 1 mile CORONA 241 SR-91 Corridor Operations Project New auxiliary lane from Green River Road on-ramp on westbound SR-91 to the SR-241 direct connector. $43.2 million TOTAL PROJECT COST: FUNDING PENDING SR-91 Corridor Improvement Project Extension of the 91 Express Lanes from the Riverside County/Orange County line to I-15, providing the frst tolled express lanes in Riverside $1.4 billion TOTAL PROJECT COST: FUNDED I-15/SR-91 Express Lanes Connector Project Interchange ramp links future southbound I-15 Express Lanes to westbound 91 Express Lanes, and eastbound 91 Express Lanes to future northbound I-15 Express Lanes. $224 million TOTAL PROJECT COST: FUNDED The Riverside County Transportation Commission (RCTC) is requesting $25 million in Infrastructure for Rebuilding America (INFRA) funds to complete a project that connects people to jobs, cuts the costs of doing business, and reduces the burden of commuting. Project improvements will: Improve rural connectivity Reduce congestion Improve safety Improve travel time reliability Improve trade Support economy STATE ROUTE 71/91 INTERCHANGE IMPROVEMENT PROJECT 2021 2024 CONSTRUCTION STARTS OPEN TO DRIVERS SR-71/91 INTERCHANGE IMPROVEMENT PROJECT Replaces existing single lane loop connection between eastbound SR-91 and northbound SR-71 with new two-lane direct connector ramp. Adds eastbound auxiliary lane south of and parallel to SR-91. Realigns eastbound entrance ramp from Green River Road. NEEDS FUNDING $124.5 million (YOE) TOTAL PROJECT COST:

Upload: others

Post on 25-Jan-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • O RA N G E

    CO U N T Y

    SA N B E R N A R D I N O

    CO U N T Y

    R I V E RS I D E

    CO U N T Y

    71

    P R OJECT CORR IDOR

    91

    15

    15

    N

    1 mile

    CORONA

    241

    SR-91 Corridor Operations Project

    New auxiliary lane from Green River Road on-ramp on westbound SR-91 to the SR-241 direct connector.

    $43.2 millionTOTAL

    PROJECT COST:

    FUNDING PENDING

    SR-91 Corridor Improvement Project

    Extension of the 91 Express Lanes from the Riverside County/Orange County line to I-15, providing the first tolled express lanes in Riverside

    $1.4 billionTOTAL

    PROJECT COST:

    FUNDED

    I-15/SR-91 Express Lanes Connector Project

    Interchange ramp links future southbound I-15 Express Lanes to westbound 91 Express Lanes, and eastbound 91 Express Lanes to future northbound I-15 Express Lanes.

    $224 millionTOTAL

    PROJECT COST:

    FUNDED

    The Riverside County Transportation Commission

    (RCTC) is requesting $25 million in Infrastructure

    for Rebuilding America (INFRA) funds to

    complete a project that connects people

    to jobs, cuts the costs of doing business,

    and reduces the burden of commuting.

    Project improvements will:

    Improve rural connectivity

    Reduce congestion

    Improve safety

    Improve travel time reliability

    Improve trade

    Support economy

    STATE ROUTE 71/91

    INTERCHANGE IMPROVEMENT PROJECT

    2021 2024

    CONSTRUCTION STARTS

    OPEN TODRIVERS

    SR-71/91 INTERCHANGE IMPROVEMENT PROJECT

    Replaces existing single lane loop connection between eastbound SR-91 and northbound SR-71 with new two-lane direct connector ramp.

    Adds eastbound auxiliary lane south of and parallel to SR-91.

    Realigns eastbound entrance ramp from Green River Road.

    NEEDS FUNDING

    $124.5 million (YOE)TOTAL

    PROJECT COST: