STATE OF CONNECTICUT
DEPARTMENT OF TRANSPORTATION
______________
Standard Specifications for
Roads, Bridges, Facilities and
Incidental Construction
FORM 817
2016
CONNECTICUT DEPARTMENT OF TRANSPORTATIONJames P. Redeker..Commissioner
STANDARD SPECIFICATIONS COMMITTEE
Thomas A. Harley, P.E., Chief EngineerRobert E. Obey, P.E., ChairmanJanet L. Mazeau, P.E., Secretary
Eric Tallarita, P.E., Assistant SecretaryTeresa Donahue, Assistant Secretary
MEMBERSLouis D. Bacho ................................................ Bridge DesignDean Cerasoli .....................................District 1, ConstructionLynn N. Cichowski .........................District 1A, ConstructionLisa N. Conroy ......................................... Traffic EngineeringJohn S. DeCastro ..................................................MaintenanceJohn S. Dunham ..................................District 4, ConstructionRobert Foley ........................................ Contract DevelopmentDomenic LaRosa ................................District 3, ConstructionRobert G. Lauzon .......................Division of Materials TestingAndrew Piraneo ................................Environmental PlanningGregory J. Soja ...........................................Consultant DesignMichael J. Strong ..........................................Facilities DesignMatthew R. Vail .................................................. State DesignD. Jay Young ......................................................Office of Rail
NON-VOTING MEMBERS
Peter Arborio ......... Connecticut Construction Industries AssociationLawrence Russ .................................. Office of the Attorney GeneralDonald Shubert .......Connecticut Construction Industries AssociationTimothy Snyder ............................. Federal Highway Administration
The following past members are acknowledged for their contributions: Lawrence J. DAddio Saul Kardouni Ted Aldieri Kimberly Lesay Andrea M. Baughn Michael W. Lonergan Mark S. Bear Michelle A. Lynch Wayne W. Blair Brian Mercure Paul H. Breen Joseph A. Misbach Scott Bushee Dennis M. Murphy Lewis S. Cannon Joseph J. Obara Ravi V. Chandran Joseph P. Ouellette Paul N. Corrente Robert P. Raiola Jo Ann Devine Mark D. Rolfe Kenneth E. Fargnoli John H. Rorrio Daniel A. Gladowski Caswell K. Smith Arthur W. Gruhn Alan R. White James E. Hamilton Lamin Williams George Hird Denise A. YoungOther non-member contributors include the following personnel: Christopher G. Angelotti .....................Office of Construction Joseph D. Arsenault .....................................Highway Design Mary K. Baier .....................................Office of Construction Delois L. Barnes ................................................ State Design Jonathan T. Boardman ..............Division of Materials Testing Derek J. Brown .............................Connecticut Construction Monique G. Burns ...................................................District 1 James P. Connery ................................Office of Construction Timothy D. Fields .........................Consultant Bridge Design Leo L. Fontaine ................................... Engineering Services Daniel Furlani ..........................Division of Materials Testing Julie M. Georges ...........................Consultant Bridge Design Rudy H. Kamm ..................................................Maintenance Adam J. LeBlanc ..........................................Highway Design Thomas E. Lynch .....................Division of Materials Testing Robert J. MacNeill ............................District 3, Construction Mark F. Makuch ...................................... Traffic Engineering Michael F. McDonnell ........................Soils and Foundations Anna S. Mermelstein ............................... Traffic Engineering Brett M. Stoeffler .................................... Traffic Engineering Donald L. Ward ..................................Office of Construction
PURCHASING PRINTED COPIES OF THESTANDARD SPECIFICATIONS FOR ROADS, BRIDGES,
FACILITIES AND INCIDENTAL CONSTRUCTIONFORM 817
To purchase copies of these Standard Specifications - Form 817, please follow the instructions on the printed copy order form at:
http://www.ct.gov/dot/form817info
These Standard Specifications - Form 817, in a searchable document format, may also be accessed on the Departments internet site: under Doing Business With CTDOT choose Standards and Specifications from the drop-down list, then click on Form 816/Form 817. Note: Open with Adobe Reader for best search results.
ITEM NUMBERING SYSTEM Item numbers, appearing in the Contract for roadway, bridge and incidental construction, consist of a 7-digit number which may be followed by a 2-digit decimal extension. The first 4 digits denote the Section number of the Standard Specification, Supplemental Specification, or Special Provision under which the item is to be constructed. The remaining digits are for Departmental coding purposes.
http://www.ct.gov/dot/cwp/view.asp?A=1385&Q=575560http://www.ct.gov/dot/cwp/view.asp?a=3609&q=430362
TABLE OF CONTENTS
Division I
GENERAL REQUIREMENTS AND COVENANTSSection Page1.01 DefinitionofTermsandPermissibleAbbreviations .............. 11.02 ProposalRequirementsandConditions ............................... 131.03 AwardandExecutionofContract ........................................ 161.04 ScopeofWork ...................................................................... 211.05 ControloftheWork .............................................................. 261.06 ControlofMaterials ............................................................. 421.07 LegalRelationsandResponsibilities ................................... 471.08 ProsecutionandProgress ..................................................... 561.09 MeasurementandPayment .................................................. 651.10 EnvironmentalCompliance .................................................. 751.11 Claims .................................................................................. 82
1.20-1.00 GeneralClausesforFacilitiesConstruction ......................... 871.20-1.01 DefinitionofTermsandPermissibleAbbreviationsfor
FacilitiesConstruction ....................................................... 881.20-1.02 ProposalRequirementsandConditionsforFacilities
Construction ..................................................................... 1001.20-1.03 AwardandExecutionofContractforFacillities
Construction ..................................................................... 1041.20-1.04 ScopeofWorkforFacilitiesConstruction ......................... 1101.20-1.05 ControloftheWorkforFacilitiesConstruction ................. 1161.20-1.06 ControlofMaterialsforFacilitiesConstruction ................ 1401.20-1.07 LegalRelationsandResponsiblitiesforFacilities
Construction ..................................................................... 1491.20-1.08 ProsecutionandProgressforFacilitiesConstruction ........ 1581.20-1.09 MeasurementandPaymentforFacilitiesConstruction ..... 1801.20-1.10 EnvironmentalComplianceforFacilitiesConstruction ..... 1911.20-1.11 ClaimsforFacilitiesConstruction ..................................... 1981.20-9.75 MobilizationandProjectCloseoutforFacilities
Construction ..................................................................... 203
Division II
CONSTRUCTION DETAILS
EARTHWORK
2.01 ClearingandGrubbing ....................................................... 2152.02 RoadwayExcavation,FormationofEmbankment
andDisposalofSurplusMaterial ..................................... 2162.03 StructureExcavation .......................................................... 2252.04 CofferdamandDewatering ................................................ 2282.05 TrenchExcavation .............................................................. 2312.06 DitchExcavation ................................................................ 236
i
2.07 Borrow................................................................................ 2372.08 Free-DrainingMaterial...................................................... 2392.09 Subgrade ............................................................................. 2402.10 WaterPollutionControl(SoilErosion) .............................. 2422.11 Anti-TrackingPad .............................................................. 2442.12 Subbase .............................................................................. 2452.13 GranularFill ....................................................................... 2462.14 CompactedGranularFill .................................................... 2472.16 PerviousStructureBackfill ................................................ 2482.19 SedimentationControlSystem ........................................... 2493.04 ProcessedAggregateBase.................................................. 2513.05 ProcessedAggregate .......................................................... 252
SURFACE COURSES OR PAVEMENTS4.01 ConcretePavement............................................................. 2554.06 BituminousConcrete .......................................................... 2684.15 PressureReliefJoint ........................................................... 289
STRUCTURES5.01 GeneralClauses .................................................................. 2905.03 RemovalofandAlterationstoExistingBridges ................ 2915.04 RailroadProtection ..........................................................