State of ColoradoUniform Voting SystemPilot Election Review Committee MeetingDecember 4, 2015 Narrative
STATE OF COLORADO UNIFORM VOTING SYSTEM 1
HART INTERCIVIC NARRATIVE – DECEMBER 4
PRELIMINARY SCHEDULE AND STAFFING PLAN
In the interim since Hart InterCivic submitted our original response to the 2013 Colorado
UVS Request for Proposals (RFP), the State has gained clarity about the goals of Colorado
counties in transitioning to the new voting system. Currently, 24 counties tentatively plan to
convert to the new system before the June 28, 2016 Primary Election. To support the
transition for these early adopters in a manner that assures the counties of successful
adoption of the new technology while providing economies of scale, Hart has revised our
original proposed project resource plan.
PRELIMINARY PROJECT SCHEDULES
Hart’s updated preliminary project schedules, included at the end of this narrative, take into
account the activities needed to support the anticipated transition of 24 early adopter
Colorado counties to the UVS before the 2016 Primary Election. The schedules include
consideration of the certification application and testing schedule outlined in the UVS
timeline the State provided.
The preliminary project schedules provided comprise an overall schedule for the State as
well as two individual schedules for each of the six tiers the State has identified. The State-
level preliminary project schedule indicates implementation activities that Hart will conduct
in coordination with the State or that apply to all early-adopter counties. Examples of
activities included at the State level include producing initial project plan documents;
conducting monthly status meetings; providing training for CDOS staff; integration of
SCORE, MOVE and ENR data; and risk-limiting audits for all 24 counties.
For each tier, we have provided one schedule that includes ballot production services (BPS).
We have also provided an alternative schedule for each tier that omits BPS and includes
implementation and training for the Verity Data and Verity Build components needed for
counties to handle their own ballot production and election definition. Offering flexible
options for these functions exemplifies our overall approach of providing choice to
Colorado’s counties as they configure voting system solutions that best serve their election
needs. Each schedule tracks precisely to the Project Labor Cost Table Hart submitted for
the November 13, 2015 PERC meeting.
2 STATE OF COLORADO UNIFORM VOTING SYSTEM
PROPOSED STAFFING
The overarching design of our staffing plan is based on an integrated, zone-based approach
that we used in our statewide implementations for Hawaii and Oklahoma. The initial and
ongoing success attained on behalf of both states proves that this approach works.
Our integrated plan provides a Project Manager at the State level who manages all
integrations, planning and communication with the State of Colorado. This State-level
Project Manager will also manage zone-level Hart Consultants, who will implement Hart’s
Verity® Voting system in the counties, using a zone definition described in “Colorado
Implementation Zones” below. This approach enables the Consultants to concentrate on the
counties within their respective zones, the counties to concentrate on local activities and the
State-level Project Manager to manage the “big-picture” concerns.
Hart proposes Jacob Shamailov as the State-level Project Manager for the CDOS UVS
implementation project. Jacob will serve as the single point of accountability for the State,
bearing responsibility for all project deliverables, project personnel, and project budget.
Reporting directly to Hart’s Colorado Project Director, Rich Geppert, Jacob will work very
closely with the CDOS Project Manager.
As Project Director, Rich will provide oversight to ensure project success, serve as an
escalation point for the CDOS and provide oversight of the Hart/State relationship. Rich
will report to Pete Lichtenheld, Project Executive Sponsor. Pete will provide a further
escalation level to the State and counties and will ensure that this high priority project
continues to receive appropriate attention and resources.
In addition to these resources, the Project Manager and Colorado consultants will have the
support of Hart’s Supply Chain Manager, Dan Gately and our Engineering Consultant,
David Patino. Dan will coordinate all equipment shipments, delivery schedules and
acceptance testing, and David will work with Hart and State personnel on trusted build
processes and integrations with SCORE, UOCAVA ballot providers, Election Night
reporting providers and any other necessary integrations or engineering-level assistance
needed.
Resumes for Hart team members are included following the organizational chart below.
The following organizational chart depicts Hart’s proposed staffing structure for the
Colorado UVS implementation.
STATE OF COLORADO UNIFORM VOTING SYSTEM 3
ORGANIZATIONAL CHART – COLORADO UVS IMPLEMENTATION
Hart’s proposed staffing structure for the Colorado UVS implementation provides
accountability, executive oversight and ample resources to ensure the success of the
State’s early-adopter counties.
4 STATE OF COLORADO UNIFORM VOTING SYSTEM
PETER LICHTENHELD
VICE PRESIDENT, OPERATIONS – PROJECT SPONSOR
As Vice President of Operations for Elections at Hart InterCivic,
Pete Lichtenheld oversees and coordinates timely and accurate
delivery of numerous customer-critical services. His management of
Professional Services, Ballot Production Services, Technical Services,
and the Customer Support Center is key to customers receiving the
voting system components and ongoing support they need.
Relevant Experience
Prior to coming to Hart, Mr. Lichtenheld gained more than 20 years of experience in training
people of every level, from kindergarten to doctoral level students. This experience was
valuable to his development of Hart’s comprehensive voting system training programs that
benefit election officials, poll workers, and technicians in thousands of jurisdictions across
the country. Mr. Lichtenheld has worked as team leader in all aspects of Hart’s elections
business. He was instrumental in organizing Hart’s Election Day help desk, and carried that
successful structure to the Customer Support Center. His hands-on work with product
documentation led to recording and improving Hart’s supply chain and equipment
management procedures.
Professional History
Hart InterCivic, Austin, Texas – 2001 to present
Vice President, Operations – 2011
Director of Operations – 2008
Director of Customer Care – 2007
Director of Consulting and Training – 2005 to 2007
Hart Voting System Training Program Manager – 2001 to 2005
Texas School for the Blind and Visually Impaired, Teacher, Austin, Texas – 1988 to 1990
Austin Independent School District (AISD), Teacher, Professional Development Trainer,
Computer Liaison, Mentor Teacher, Austin, Texas – 1982 to 2001
Education
M.A., Instructional Technology, University of Texas at Austin, Austin, Texas
B.A., Religious Studies and Philosophy, Beloit College, Beloit, Wisconsin
STATE OF COLORADO UNIFORM VOTING SYSTEM 5
Certifications/Professional Organizations
Election Center – Certified Elections/Registration Vendor (CERV)
Pragmatic Marketing – Certified Product Manager
Texas Education Agency – Certified Teacher, grades 1-8
6 STATE OF COLORADO UNIFORM VOTING SYSTEM
RICHARD M. GEPPERT, CERA, PMP
PROJECT DIRECTOR
Rich Geppert brings almost two decades of experience with election and
project management to his role as Manager of Professional Services for Hart
InterCivic. Mr. Geppert oversees Hart Project Managers, Trainers, and
Consultants, in addition to providing oversight and general direction to all
Hart voting system implementations. He has considerable experience with
election law and voting system administration.
Relevant Experience
Mr. Geppert has been the Project Manager for over 30 Hart Voting System installations,
including:
San Mateo County, California (voting system and voter registration)
Orange County, California
City of Peoria, Kane and Peoria counties, Illinois
Denton, Harris, Jack, Kaufman, McLennan, and Wise counties, Texas
State of Hawaii (deployment and implementation of voting system for 2006 and 2008
Primary and General Elections)
Mr. Geppert has been responsible for administering hundreds of elections using the Hart
Voting System.
Professional History
Hart InterCivic, Austin, Texas – 2000 to present
Manager, Professional Services – 2009 to present
Project Manager – 2000 to 2008
Travis County, Assistant Elections Manager, Austin, Texas – 1995 to 2000
Managed all facets of the elections process, including elections project management,
Election Day, Early Voting by-mail, poll worker recruitment and training, and legislative
work
Administered Early Voting Program, Central Counting Station, and Early Voting Ballot
Board
STATE OF COLORADO UNIFORM VOTING SYSTEM 7
Education
M.P.A., Baylor University, Waco, Texas
B.A., Political Science, Baylor University, Waco, Texas
Certifications/Professional Organizations
Certified Elections/Registration Administrator (CERA), Election Center
Project Management Professional (PMP) certification
8 STATE OF COLORADO UNIFORM VOTING SYSTEM
JACOB SHAMAILOV
PROJECT MANAGER
Jacob Shamailov is thoroughly versed in Hart’s Verity solution and in
understanding the needs of users of varying skill and experience levels. Jacob
actively supports users one‐on‐one during deployments. He brings to the
team a proven ability to build meaningful rapport with elections staff and
poll workers and is dedicated to customer satisfaction and ensuring efficient
implementation of the Verity Voting system.
Relevant Experience
For the recent Colorado UVS pilots, Jacob served as the Project Manager in Garfield
County.
Prior to joining Hart, Jacob was a project manager at Midwest Machinery. At U.S. Medical
Management, he gained experience working directly with users, providing live training,
remote presentations, and creating curriculum, workbooks, and manuals.
Professional History
Hart InterCivic, Austin, Texas – 2015 to present
U.S. Medical Management, Corporate Trainer, Troy, Michigan – 2013 to 2014
Midwest Machinery, Project Manager, Farmington Hills, Michigan – 2012 to 2013
Wayne State University School of Medicine, Research Technician, Detroit, Michigan –
2007 to 2011
Education
B.A., Biological Sciences, Wayne State University, Detroit, Michigan
STATE OF COLORADO UNIFORM VOTING SYSTEM 9
DAN GATELY, PMP
MANAGER, SUPPLY CHAIN
Dan Gately is the Supply Chain Manager for all hardware product lines. He
defines and oversees the process to bring a Hart product from its raw material
form to the point at which it is available to sell. His supply chain strategy and
goals include continuous process improvement, managing key risks and
supplier relationships.
Relevant Experience
Mr. Gately brings almost 30 years of management experience to Hart. He possesses strong,
practiced skills in defining manufacturing and supply chain methodology and leveraging
these process improvements to best serve the customer. He also has provided strong
production and quality assurance oversight for multiple product launches over his career.
For over 10 years, Dan has managed various supply chains as a Certified Project Manager
(PMP). This additional focus has led to many on time deliveries of products and services.
His responsibilities at Hart include sustaining and new product life cycle inventory
management, purchasing, supplier management, and contract management vendor
negotiations.
His current work builds on his previous success at several industry leaders. There his duties
included managing production, scheduling, quality assurance, mechanical design and process
validation to ensure customer deliverables were properly met and accepted.
Professional History
Hart InterCivic, Austin, Texas – 2005 to present
Manager, Supply Chain
Cesura (formerly VIEO, Inc), Austin, Texas – 2003 to 2005
Manager, Customer Support – 2005
Manager, Contract Manufacturing – 2003 to 2004
Deaton Engineering, Georgetown, Texas – 2003
FDA Validation Engineer
10 STATE OF COLORADO UNIFORM VOTING SYSTEM
3D Systems, Austin, Texas – 2000 to 2002
Director, Operations/Services
DTM, Inc, Austin, Texas – 1990 to 2000
Director, World Wide Customer Service – 1998 to 2000
Manager/Director, Operations/Manufacturing – 1990 to 1998
Education
B.S., University of Houston, Houston, Texas
B.A., Political Science, Baylor University, Waco, Texas
Certification
PMP Certification, Project Management Institute, August 2002
STATE OF COLORADO UNIFORM VOTING SYSTEM 11
DAVID PATINO
APPLICATIONS ENGINEER
David Patino is an Applications Engineer who serves as a technical liaison between
Hart’s customers, and Operations and Engineering departments. He also serves as
a subject matter expert for all Hart products.
Relevant Experience
Prior to joining Hart InterCivic, Mr. Patino was a troubleshooter for the Travis County
Clerk’s Elections Division, where he worked first-hand with the Hart Voting System. In
addition to having a thorough understanding of the elections process, he is an experienced
manager who has dealt with diverse populations.
David was also a Professional Services Consultant who trained election officials and poll
workers to use the Hart Voting System. In addition, he served as Documentation Lead for
the Hart Voting System training documentation.
Hart InterCivic, Applications Engineer, Austin, Texas – 2012 to present
Troubleshoots and develops technical solutions related to software and setup errors
escalated from the Engineering and Operations departments (including the Customer
Support Center).
Serves as a subject matter expert on existing products and product lines.
Provides occasional support for Verification demonstrations, sales demonstrations and
RFPs, and customer election events.
Serves on the help desk and/or is available to the help desk for all election events.
Professional History
Hart InterCivic, Professional Services Consultant, Austin, Texas – 2005 to 2012
Managed the full training spectrum and client relationships during the course of an
implementation.
Managed and organized information and documentation for implementation.
Conducted training sessions using classroom, Web-based, and multimedia presentations.
Assisted several large customers in day-to-day elections activities, including Oklahoma’s
State Election Board and Hamilton County, Ohio; San Mateo County, California and
Orange County, California.
12 STATE OF COLORADO UNIFORM VOTING SYSTEM
Travis County Clerk, Elections Division Troubleshooter, Austin, Texas – 2004 to 2005
Reconciled voter registration database for multiple elections.
Trained election judges and technical troubleshooters on election law and online voter
verification systems.
Coordinated and zoned technical support to more than 270 polling locations.
Diagnosed voting equipment and software issues.
Mr. Patino also has more than four years of experience as a retail manager.
Education
Undergraduate studies, Studio Art, University of Texas, Austin, Texas
STATE OF COLORADO UNIFORM VOTING SYSTEM 13
Colorado Implementation Zones
Key to the success of this project is the use of zones for the counties’ Verity
implementations. Hart has defined seven zones into which we recommend the project be
divided. We will partner with the State to refine the definition of these zones. Each zone is
assigned a Project Consultant who will manage each implementation at the county level. All
Project Consultants report to the State-level Project Manager. Although this zone-based,
regional approach applies to implementation, we strongly recommend that all training be
hands-on at the local level.
The zones have been determined by a combination of geography, the number of registered
voters per county and the complexity of the county-level implementation. As shown in the
map below, the zones are as follows:
Zone 1: Denver County
Zone 2: Arapahoe County
Zone 3: Jefferson County
Zone 4: Adams, Weld, Broomfield counties
Zone 5: Eagle, Mesa, Pitkin, Gilpin counties
Zone 6: Pueblo, Chafee, Park, Teller, Gunnison, Lake counties
Zone 7: Logan, Baca, Bent, Lincoln, Mineral, Phillips, Washington, Yuma counties
Note that neither Garfield County nor Douglas County is included in the zones for 2016,
but we fully expect that these counties will also continue their use of the Verity system. They
are already implemented for use.
14 STATE OF COLORADO UNIFORM VOTING SYSTEM
RECOMMENDED ZONES FOR 2016 IMPLEMENTATION OF COLORADO UVS
Hart recommends a proven, zone-based approach to implementing the Verity Voting
system for counties migrating to the new Colorado UVS in 2016.
Hart project management and consultant personnel working on the Colorado UVS project
will be full time employees, not contractors.
The Project Consultants that are in charge of each region will be responsible for all facets of
their respective sub-project’s management, including deliverable timeliness, training, process
integration, and support. Project Consultants will have assistance from the State-level Project
Manager and other Colorado zone consultants, as well as other Hart personnel, as schedules
demand.
With this team of senior executive leaders, project managers, consultants, and support
personnel, Hart provides the CDOS the assurance of successful implementation of the
Verity system for some 24 Colorado counties in 2016.
STATE OF COLORADO UNIFORM VOTING SYSTEM 15
UPDATED SCHEDULE OF ACTIVITIES IN OTHER JURISDICTIONS
Hart anticipated the interest and activity our recently introduced Verity system has
generated, and we have expanded our capacity to serve existing and new customers. We
assure the State of Colorado that we have ample resources at the ready to meet Colorado
counties’ demand for voting system implementations in 2016 and beyond.
JURISDICTIONS IN WHICH VERITY IS DEPLOYED
Verity has been deployed in the following jurisdictions. We invite the CDOS to contact
these customers.
Colorado
Douglas County, Colorado
Merlin Klotz, County Clerk and Recorder
(303) 660-7444
Garfield County, Colorado
Jean Alberico, County Clerk
(970) 945-2377 Ext. 1760
Minnesota
Ramsey County, Minnesota
Joseph Mansky, Election Officer
(651) 266-2171
Oregon
Clackamas County, Oregon
Sherry Hall, County Clerk
(503) 722-6086
Virginia
Campbell County, Virginia
Karen Danos, General Registrar
(434) 332-9579
16 STATE OF COLORADO UNIFORM VOTING SYSTEM
Charlottesville County, Virginia
Rosanna Bencoach, General Registrar
(434) 970-3251
Essex County, Virginia
Kelly LaFollette, General Registrar
(804) 443-4611
Henry County, Virginia
Elizabeth Stone, General Registrar
(276) 638-5108
Prince William County, Virginia
Michele White, General Registrar
(703) 792-6472
Richmond County, Virginia
Halle Keyser, General Registrar
(804) 333-4772
Washington
Chelan County, Washington
Skip Moore, County Auditor
(509) 667-6802
CONTRACTUAL COMMITMENTS IN 2016‐2020
Hart currently has contractually committed to deploy Verity for the following jurisdictions in
2016-2020:
Ada County, Idaho
Phil McGrane, Chief Deputy
(208) 287-6880
STATE OF COLORADO UNIFORM VOTING SYSTEM 17
Douglas County, Washington
Thad Duvall, County Auditor
(509) 745-8527 Ext. 6401
OUTSTANDING OFFERS IN 2016‐2020
While Hart has numerous potential opportunities to deploy Verity, we currently have
outstanding formal offers in the following jurisdictions:
Kansas
Sedgwick County, Kansas
Johnson County, Kansas
Shawnee County, Kansas
Wyandotte County, Kansas
Minnesota
Sherburne County, Minnesota
Rhode Island
The State of Rhode Island
Texas
Young County, Texas
18 STATE OF COLORADO UNIFORM VOTING SYSTEM
This page intentionally blank
STATE OF COLORADO UNIFORM VOTING SYSTEM PPS-1
PRELIMINARY PROJECT SCHEDULES The following abbreviations are used in the project schedules included in this section:
Abbreviation Description
HPM Hart Project Manager
HC Hart Consultant
CDOS CDOS Staff
CPM CDOS Project Manager
CED CDOS Elections Director
HPS Hart Project Sponsor
HTS Hart Technical Services
PPS-2 STATE OF COLORADO UNIFORM VOTING SYSTEM
This page intentionally blank
STATE OF COLORADO UNIFORM VOTING SYSTEM PPS-3
PRELIMINARY STATE PROJECT SCHEDULE
PPS-4 STATE OF COLORADO UNIFORM VOTING SYSTEM
This page intentionally blank
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
1UVS
Selectio
n0 daysYes
Mon
1/4/16
Mon
1/4/16
2Kickoff M
eetin
g1 dayN
oMon
1/11/16
Mon
1/11/16
1FS+1 wk
HPM,HC,CD
OS,CP
M3
Prod
uce Initial Project Plan Docum
ents
60 daysN
oMon
1/4/16
Fri 3/25/16
4Project Sched
ule
30 daysN
oMon
1/4/16
Fri 2/12/16
HPM,CPM
5Acceptance Test P
lan
30 daysN
oMon
1/4/16
Fri 2/12/16
4SS
CPM,HPM
6Evaluatio
n Plan
30 daysN
oMon
1/4/16
Fri 2/12/16
5SS
HPM,CPM
7Other Plan Elem
ents
30 daysN
oMon
2/15/16
Fri 3/25/16
6CP
M,HPM
8Project P
lan Acceptance
0 daysYes
Fri 2/12/16
Fri 2/12/16
69
Status Rep
orts
130 da
ysNo
Mon
1/18/16
Mon
7/18/16
10Status Rep
orts 1
0 daysYes
Mon
1/18/16
Mon
1/18/16
11Status Rep
orts 2
0 daysYes
Mon
2/15/16
Mon
2/15/16
12Status Rep
orts 3
0 daysYes
Mon
3/21/16
Mon
3/21/16
13Status Rep
orts 4
0 daysYes
Mon
4/18/16
Mon
4/18/16
14Status Rep
orts 5
0 daysYes
Mon
5/16/16
Mon
5/16/16
15Status Rep
orts 6
0 daysYes
Mon
6/20/16
Mon
6/20/16
16Status Rep
orts 7
0 daysYes
Mon
7/18/16
Mon
7/18/16
17Mon
thly Status M
eetin
gs11
1 da
ysNo
Mon
1/25/16
Mon
6/27/16
CDOS,CP
M,HPM
,HC
18Mon
thly Status M
eetin
gs 1
1 dayN
oMon
1/25/16
Mon
1/25/16
19Mon
thly Status M
eetin
gs 2
1 dayN
oMon
2/29/16
Mon
2/29/16
20Mon
thly Status M
eetin
gs 3
1 dayN
oMon
3/28/16
Mon
3/28/16
21Mon
thly Status M
eetin
gs 4
1 dayN
oMon
4/25/16
Mon
4/25/16
22Mon
thly Status M
eetin
gs 5
1 dayN
oMon
5/30/16
Mon
5/30/16
23Mon
thly Status M
eetin
gs 6
1 dayN
oMon
6/27/16
Mon
6/27/16
24Training
for C
DOS Staff
5.25
daysN
oTu
e 1/19
/16
Tue 1/26
/16
25Ve
rity Managem
ent a
nd Best P
ractices Cou
rse
4 hrsN
oTue 1/19
/16
Tue 1/19
/162
FS+1
wk
HC,CPM
,CDO
S26
Data Ope
rator T
raining Co
urse
1 dayN
oTue 1/19
/16
Wed
1/20/16
25HC
,CPM
,CDO
S27
Build
Ope
rator T
raining Co
urse
4 hrsN
oWed
1/20/16
Wed
1/20/16
26HC
,CPM
,CDO
S28
Central O
perator T
raining Co
urse
4 hrsN
oThu 1/21
/16
Thu 1/21
/1627
HC,CPM
,CDO
S29
Coun
t/Re
lay Ope
rator T
raining Co
urse
4 hrsN
oThu 1/21
/16
Thu 1/21
/1628
HC,CPM
,CDO
S30
Service & M
ainten
ance Training Co
urse
2 daysNo
Fri 1/22/16
Mon
1/25/16
29HC
,CPM
,CDO
S
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 1 of 3
State of Colorado UVS
Prod
uced
: Mon
11/30
/15 ‐ 9:26
AM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
31Po
lling
Place Ope
ratio
ns Training Co
urse
2 hrsN
oTue 1/26
/16
Tue 1/26
/163
0HC
,CPM
,CDO
S32
Data Integration
120 da
ys?N
oFri 1/8/16
Thu 6/23
/16
33SCORE
42 days?No
Fri 1/8/16
Mon
3/7/16
34Re
quire
men
ts4 da
ysNo
Fri 1/8/16
Wed
1/13/16
35De
fine data re
quire
men
ts2 daysNo
Tue 1/12
/16
Wed
1/13/16
2CD
OS,CP
M,HPM
,HTS
36De
fine file form
ats
1 dayN
oMon
1/11/16
Tue 1/12
/163
5SF
HTS,CD
OS
37De
fine electio
n process flow
1 dayN
oFri 1/8/16
Mon
1/11/16
36SF
CDOS,HT
S38
Sub Project E
xecutio
n (if necessary)
30 days?No
Mon
1/11/16
Fri 2/19/16
39Software coding
20 days?No
Mon
1/11/16
Fri 2/5/1637
HTS
40Mod
ule testing
10 days?No
Mon
2/8/16
Fri 2/19/16
39HT
S41
System
Level Testin
g11
daysN
oMon
2/22/16
Mon
3/7/16
42Test Design
10 daysN
oMon
2/22/16
Fri 3/4/1640
CPM
43Test Executio
n1 dayN
oMon
3/7/16
Mon
3/7/1642
CPM,HPM
44System
Accep
tance
0 daysYes
Mon
3/7/16
Mon
3/7/1643
45MOVE
Provide
r Intergration (E1C
)42
days?No
Fri 3/4/16
Mon
5/2/16
46Re
quire
men
ts4 da
ysNo
Fri 3/4/16
Wed
3/9/16
47De
fine data re
quire
men
ts2 daysNo
Tue 3/8/16
Wed
3/9/162,44
CDOS,CP
M,HPM
,HTS
48De
fine file form
ats
1 dayN
oMon
3/7/16
Tue 3/8/16
47SF
HTS,CD
OS
49De
fine electio
n process flow
1 dayN
oFri 3/4/16
Mon
3/7/1648SF
CDOS,HT
S50
Sub Project E
xecutio
n (if necessary)
30 days?No
Mon
3/7/16
Fri 4/15/16
51Software coding
20 days?No
Mon
3/7/16
Fri 4/1/1649
HTS
52Mod
ule testing
10 days?No
Mon
4/4/16
Fri 4/15/16
51HT
S53
System
Level Testin
g11
daysN
oMon
4/18/16
Mon
5/2/16
54Test Design
10 daysN
oMon
4/18/16
Fri 4/29/16
52CP
M55
Test Executio
n1 dayN
oMon
5/2/16
Mon
5/2/1654
CPM,HPM
56System
Accep
tance
0 daysYes
Mon
5/2/16
Mon
5/2/1655
57EN
R Provider In
tegration (Scytl)
42 days?No
Wed
4/27/16
Thu 6/23
/16
58Re
quire
men
ts4 da
ysNo
Wed
4/27/16
Mon
5/2/16
59De
fine data re
quire
men
ts2 daysNo
Fri 4/29/16
Mon
5/2/162,56
SFCD
OS,CP
M,HPM
,HTS
60De
fine file form
ats
1 dayN
oThu 4/28
/16
Fri 4/29/16
59SF
HTS,CD
OS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 2 of 3
State of Colorado UVS
Prod
uced
: Mon
11/30
/15 ‐ 9:26
AM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
61De
fine electio
n process flow
1 dayN
oWed
4/27/16
Thu 4/28
/1660SF
CDOS,HT
S62
Sub Project E
xecutio
n (if necessary)
30 days?No
Thu 4/28
/16
Wed
6/8/16
63Software coding
20 days?No
Thu 4/28
/16
Wed
5/25/16
61HT
S64
Mod
ule testing
10 days?No
Thu 5/26
/16
Wed
6/8/1663
HTS
65System
Level Testin
g11
daysN
oTh
u 6/9/16
Thu 6/23
/16
66Test Design
10 daysN
oThu 6/9/16
Wed
6/22/16
64CP
M67
Test Executio
n1 dayN
oThu 6/23
/16
Thu 6/23
/1666
CPM,HPM
68System
Accep
tance
0 daysYes
Thu 6/23
/16
Thu 6/23
/1667
69Risk Lim
iting
Aud
it15
.75 da
ys?N
oTu
e 1/26
/16
Tue 7/5/16
70De
velop RLA Plan
30 daysN
oTue 1/26
/16
Tue 3/8/16
31CD
OS,HP
M71
Cond
uct in all 24 coun
ties
1 wk?
No
Wed
6/29/16
Tue 7/5/16
CDOS,CE
D,CP
M
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 3 of 3
State of Colorado UVS
Prod
uced
: Mon
11/30
/15 ‐ 9:26
AM
This page intentionally blank
STATE OF COLORADO UNIFORM VOTING SYSTEM PPS-9
PRELIMINARY TIER 1.1 PROJECT SCHEDULE – WITH BALLOT PRODUCTION SERVICES
PPS-10 STATE OF COLORADO UNIFORM VOTING SYSTEM
This page intentionally blank
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
1Tier 1.1 Cou
nty Ve
rity Im
plem
entatio
n13
9 da
ys?N
oMon
1/4/16
Thu 7/14
/16
2Co
ntract Signe
d1 dayY
esMon
1/4/16
Mon
1/4/16
3Order Hardw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
4Ve
rity System
Com
pone
nts
1 dayN
oTue 1/5/16
Tue 1/5/16
2CP
M,HTS
5Other Hardw
are ‐ P
Cs, Scann
ers, and
Prin
ters
1 dayN
oWed
1/6/16
Wed
1/6/164
HTS
6Order Softw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
7Ve
rity Ap
plications and
Firm
ware
1 dayN
oTue 1/5/16
Tue 1/5/16
2HT
S
83rd Party Software
1 dayN
oWed
1/6/16
Wed
1/6/167
HTS
9Kickoff M
eetin
g with
Cou
nty
1 day?
Yes
Tue 1/12
/16
Tue 1/12
/162
FS+1
wk
CS,HC,HP
M
10Co
unty app
roval of P
roject Sched
ule / A
ccep
tance Test Plan /
Evaluatio
n Plan
0 daysYes
Tue 1/12
/16
Tue 1/12
/169
FF
11Order Sup
plies
1 dayN
oWed
1/13/16
Wed
1/13/16
9HP
M
12Order Training Materials
1 dayN
oWed
1/13/16
Wed
1/13/16
9,10
HC
13Workflow, Tim
e, and
Resou
rce Plan
ning
2 da
ysNo
Wed
1/13/16
Thu 1/14
/16
14Co
nduct S
ite Survey An
alysis
2 daysNo
Wed
1/13/16
Thu 1/14
/169
15Ap
pliatio
n an
d Pe
riphe
ral H
ardw
are Co
nfiguration in Austin
4.25
daysN
oTh
u 1/21
/16
Wed
1/27/16
16Re
ceive Ap
plication and Pe
riphe
ral H
ardw
are
1 dayN
oThu 1/21
/16
Thu 1/21
/165FS+2 wks
HTS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 1 of 7
State of Colorado UVS
‐ Tier 1.1 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:38
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
17Co
nfigure Ha
rdware
2 daysNo
Fri 1/22/16
Mon
1/25/16
16HT
S
18Test Hardw
are
1 dayN
oTue 1/26
/16
Tue 1/26
/161
7HT
S
19Ship Hardw
are
2 hrsN
oWed
1/27/16
Wed
1/27/16
18HT
S
20Dep
loy Ve
rity System
Softw
are an
d Hardw
are
0.75
daysN
oTu
e 2/2/16
Tue 2/2/16
21Cu
stom
er Receives C
ompu
ter H
ardw
are
2 hrsN
oTue 2/2/16
Tue 2/2/16
19FS+4
days
CS
22Co
nfigure, Test, and Set U
p System
s4 hrsN
oTue 2/2/16
Tue 2/2/16
21CS,HPM
23Cu
stom
er Accep
tance
0 daysYes
Tue 2/2/16
Tue 2/2/16
22CS,HPM
24Re
ceive an
d Ac
cept Verity
Voting Hardw
are
37 days?No
Mon
1/4/16
Tue 2/23
/16
25Delivery of Verity
Voting Eq
uipm
ent
5 da
ys?N
oWed
2/17/16
Tue 2/23
/16
26Re
ceive Ha
rdware and Enter into Inventory
3 days?N
oWed
2/17/16
Fri 2/19/16
4FS+30
days
CS
27Co
nduct C
ustomer Accep
tance Test
1 dayY
esMon
2/22/16
Mon
2/22/16
26CS,HPM
28Co
nfigure for U
se and
Place in Storage
1 dayN
oTue 2/23
/16
Tue 2/23
/162
7CS
29Dispo
se of o
ld equ
ipmen
t10
days?No
Mon
1/4/16
Fri 1/15/16
CS30
Cond
uct M
ock Electio
n "Rou
nd Trip
"1 dayN
oMon
1/18/16
Mon
1/18/16
29CS,HPM
,HC
31Co
nduct V
oting for the
June
28, 201
6 Prim
ary Electio
n13
0.5 da
ys?N
oMon
1/4/16
Mon
7/4/16
32Co
unty Staff Training
10 daysN
oMon
1/4/16
Fri 1/15/16
33Create Training Plan/Sched
ule
4 hrsN
oFri 1/15/16
Fri 1/15/16
14CS,HC
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 2 of 7
State of Colorado UVS
‐ Tier 1.1 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:38
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
34Secure Cou
nty Ap
proval of T
raining Plan
0 daysYes
Fri 1/15/16
Fri 1/15/16
33
35Ve
rity Managem
ent a
nd Best P
ractices Cou
rse
4 hrsN
oFri 1/15/16
Fri 1/15/16
34CS,HC
36Ce
ntral O
perator T
raining Co
urse
4 hrsN
oMon
1/4/16
Mon
1/4/16
CS,HC
37Co
unt/Re
lay Ope
rator T
raining Co
urse
4 hrsN
oMon
1/4/16
Mon
1/4/1636
CS,HC
38Service & M
ainten
ance Training Co
urse
2 daysNo
Tue 1/5/16
Wed
1/6/1637
CS,HC
39Po
lling
Place Ope
ratio
ns Training Co
urse
2 hrsN
oThu 1/7/16
Thu 1/7/16
38CS,HC
40Program Ballot
6 da
ys?N
oFri 4/29/16
Fri 5/6/16
41Ba
llot C
ertification
0 daysYes
Fri 4/29/16
Fri 4/29/16
42Da
ta Entry / Im
port into Layou
t1 dayN
oFri 4/29/16
Fri 4/29/16
41CS,HPM
43Proo
f Ballot
1 day?
No
Mon
5/2/16
Mon
5/2/1642
CS
44Enter foreign
language te
xt (if req
uired)
1 day?
No
Tue 5/3/16
Tue 5/3/16
43CS,HPM
45Re
cord Aud
io1 day?
No
Wed
5/4/16
Wed
5/4/1644
CS,HPM
46Final text / aud
iot p
roof of b
allot
4 hrs?No
Thu 5/5/16
Thu 5/5/16
45CS
47Ro
und Trip
4 hrsN
oThu 5/5/16
Thu 5/5/16
46CS,HPM
48Ba
llot R
eady fo
r Election
0 daysYes
Thu 5/5/16
Thu 5/5/16
47
49Create vDrives
1 day?
No
Fri 5/6/16
Fri 5/6/1648
CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 3 of 7
State of Colorado UVS
‐ Tier 1.1 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:38
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
50By
Mail V
oting
119 da
ys?N
oTh
u 1/14
/16
Tue 6/28
/16
51Order blank
ballot stock fo
r office prin
ting
1 day?
No
Thu 1/14
/16
Thu 1/14
/1612
52Send
files to printer (or prin
t in office)
2 daysNo
Mon
5/9/16
Tue 5/10
/164
9CS
53Print b
allots
1 wkNo
Wed
5/11/16
Tue 5/17
/165
2CS
54Mail ballots ‐ UOCA
VA2 daysNo
Fri 5/13/16
Mon
5/16/16
53SS
CS
55Mail ballots ‐ Re
gular
4 daysNo
Mon
6/6/16
Thu 6/9/16
54CS
56Re
ceive ballots
26 daysN
oTue 5/24
/16
Tue 6/28
/165
4FS+1 wk
CS
57Re
solutio
n Bo
ard Training
2 hrsN
oMon
6/13/16
Mon
6/13/16
56FS‐12 days
CS,HC
58Scan/Resolve ballots
11 daysN
oMon
6/13/16
Tue 6/28
/165
7CS
59Write CV
Rs to
vDrives
1 hr
No
Tue 6/28
/16
Tue 6/28
/165
8HC
,CS
60VS
PCs
37.75 da
ysNo
Mon
5/9/16
Wed
6/29/16
61Training
0.25
daysN
oMon
6/20/16
Mon
6/20/16
62Po
lling
Place Ope
ratio
ns Training Co
urse(s)
2 hrsN
oMon
6/20/16
Mon
6/20/16
67FS‐7 days
CS,HC
63Pre‐de
fine Ve
rity Vo
ting Units in th
e Wareh
ouse
1 hr
No
Mon
5/9/16
Mon
5/9/1649
CS
64Marshall and
Dep
loy Equipm
ent to VS
PCs
1 dayN
oFri 6/17/16
Fri 6/17/16
67SS‐1 day,63
CS
65Disburse Sup
plies
4 hrsN
oFri 6/17/16
Fri 6/17/16
64SS
CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 4 of 7
State of Colorado UVS
‐ Tier 1.1 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:38
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
66Setup Po
lls2 hrsN
oFri 6/17/16
Fri 6/17/16
65CS
67VS
PCs o
pen
7 daysNo
Mon
6/20/16
Tue 6/28
/16
68VS
PC Closeou
t2 hrsN
oTue 6/28
/16
Tue 6/28
/166
7FS‐1 day
CS,HPM
69Re
turn Equ
ipmen
t to Wareh
ouse
4 hrsN
oWed
6/29/16
Wed
6/29/16
68FS+1
day
CS
70Co
nduct E
lection Day Voting (ED)
20.5 daysN
oMon
6/6/16
Mon
7/4/16
71Marshal Equ
ipmen
t for ED
1 dayN
oMon
6/20/16
Mon
6/20/16
64CS
72Co
nduct P
oll W
orker T
raining
1 wkNo
Mon
6/6/16
Fri 6/10/16
49FS+4
wks
CS,HC
73Pred
efine Ve
rity Vo
ting Units fo
r ED locatio
ns at
Wareh
ouse
1 dayN
oTue 6/21
/16
Tue 6/21
/167
1CS
74De
ploy
equ
ipmen
t to ED
polling place(s)
3 daysNo
Wed
6/22/16
Fri 6/24/16
73CS
75Disburse Sup
plies
6 hrsN
oFri 6/24/16
Fri 6/24/16
74FF
CS
76Setup Po
lls2 hrsN
oMon
6/27/16
Mon
6/27/16
75CS
77ED
Field Sup
port
1 dayN
oMon
6/27/16
Tue 6/28
/167
6HP
M,HC,CS
78Close Po
lls2 hrsN
oTue 6/28
/16
Tue 6/28
/167
7FF
CS,HPM
79De
liver vDrives to
Cou
nting Station
2 hrsN
oTue 6/28
/16
Tue 6/28
/167
8CS
80Re
turn Equ
ipmen
t to Wareh
ouse
4 daysNo
Tue 6/28
/16
Mon
7/4/1679
CS
81Ce
ntral Cou
nty Station Plan
ning
and
Ope
ratio
n12
6.5 da
ysNo
Mon
1/4/16
Tue 6/28
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 5 of 7
State of Colorado UVS
‐ Tier 1.1 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:38
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
82L&
A Test
4 hrsN
oFri 6/17/16
Mon
6/20/16
77SF‐5 days
CS,HPM
83Marshal and
Distrib
ute Equipm
ent to Ce
ntral Cou
nting
Station
2 daysNo
Mon
1/4/16
Tue 1/5/16
CS
84Set U
p CC
S1 dayN
oWed
1/6/16
Wed
1/6/1683
CS
85CC
S Training
2 hrsN
oThu 1/7/16
Thu 1/7/16
84CS,HC
86Tabu
late Election Re
sults
0.25
daysN
oTu
e 6/28
/16
Tue 6/28
/16
87VS
PC vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/166
8CS
88Ab
sentee
vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/165
9CS
89Electio
n Da
y vD
rives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/167
8CD
OS
90Gen
erate Re
ports
1 hr
No
Tue 6/28
/16
Tue 6/28
/168
9CS
91Po
st Election Ac
tivities
12.5 daysN
oTu
e 6/28
/16
Thu 7/14
/16
92Ba
ckup
and
Archive Results
1 hr
No
Tue 6/28
/16
Tue 6/28
/169
0CS
93Po
st Election Au
dit
1 dayN
oThu 7/7/16
Thu 7/7/16
94Canvass
1 dayN
oThu 7/14
/16
Thu 7/14
/16
95Co
nduct P
ost E
lection An
alysis / Project W
rap Up
2 da
ysNo
Tue 6/28
/16
Thu 6/30
/16
96Do
cumen
t and
Analyze Lessons Learned
2 daysNo
Tue 6/28
/16
Thu 6/30
/1690
CS,HPM
,HC
97Tier 1.1 Cou
nty / Hart /
CDOS (if re
quire
d) Project Review and
Wrap Up Meetin
g0.5 da
ysNo
Thu 6/30
/16
Thu 6/30
/1696
CPM,CS,HPM
,HPS,H
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 6 of 7
State of Colorado UVS
‐ Tier 1.1 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:38
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
98Finalize Transition Plan
to Sup
port
4 hrsN
oThu 6/30
/16
Thu 6/30
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 7 of 7
State of Colorado UVS
‐ Tier 1.1 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:38
PM
This page intentionally blank
STATE OF COLORADO UNIFORM VOTING SYSTEM PPS-19
PRELIMINARY TIER 1.1 PROJECT SCHEDULE – WITHOUT BALLOT PRODUCTION SERVICES
PPS-20 STATE OF COLORADO UNIFORM VOTING SYSTEM
This page intentionally blank
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
1Tier 1.1 Cou
nty Ve
rity Im
plem
entatio
n13
9 da
ys?N
oMon
1/4/16
Thu 7/14
/16
2Co
ntract Signe
d1 dayY
esMon
1/4/16
Mon
1/4/16
3Order Hardw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
4Ve
rity System
Com
pone
nts
1 dayN
oTue 1/5/16
Tue 1/5/16
2CP
M,HTS
5Other Hardw
are ‐ P
Cs, Scann
ers, and
Prin
ters
1 dayN
oWed
1/6/16
Wed
1/6/164
HTS
6Order Softw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
7Ve
rity Ap
plications and
Firm
ware
1 dayN
oTue 1/5/16
Tue 1/5/16
2HT
S
83rd Party Software
1 dayN
oWed
1/6/16
Wed
1/6/167
HTS
9Kickoff M
eetin
g with
Cou
nty
1 day?
Yes
Tue 1/12
/16
Tue 1/12
/162
FS+1
wk
CS,HC,HP
M
10Co
unty app
roval of P
roject Sched
ule / A
ccep
tance Test Plan /
Evaluatio
n Plan
0 daysYes
Tue 1/12
/16
Tue 1/12
/169
FF
11Order Sup
plies
1 dayN
oWed
1/13/16
Wed
1/13/16
9HP
M
12Order Training Materials
1 dayN
oWed
1/13/16
Wed
1/13/16
9,10
HC
13Workflow, Tim
e, and
Resou
rce Plan
ning
2 da
ysNo
Wed
1/13/16
Thu 1/14
/16
14Co
nduct S
ite Survey An
alysis
2 daysNo
Wed
1/13/16
Thu 1/14
/169
15Ap
pliatio
n an
d Pe
riphe
ral H
ardw
are Co
nfiguration in Austin
4.25
daysN
oTh
u 1/21
/16
Wed
1/27/16
16Re
ceive Ap
plication and Pe
riphe
ral H
ardw
are
1 dayN
oThu 1/21
/16
Thu 1/21
/165FS+2 wks
HTS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 1 of 7
State of Colorado UVS
‐ Tier 1.1 No BP
SProd
uced
: Mon
11/23
/15 ‐ 4:03
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
17Co
nfigure Ha
rdware
2 daysNo
Fri 1/22/16
Mon
1/25/16
16HT
S
18Test Hardw
are
1 dayN
oTue 1/26
/16
Tue 1/26
/161
7HT
S
19Ship Hardw
are
2 hrsN
oWed
1/27/16
Wed
1/27/16
18HT
S
20Dep
loy Ve
rity System
Softw
are an
d Hardw
are
0.75
daysN
oTu
e 2/2/16
Tue 2/2/16
21Cu
stom
er Receives C
ompu
ter H
ardw
are
2 hrsN
oTue 2/2/16
Tue 2/2/16
19FS+4
days
CS
22Co
nfigure, Test, and Set U
p System
s4 hrsN
oTue 2/2/16
Tue 2/2/16
21CS,HPM
23Cu
stom
er Accep
tance
0 daysYes
Tue 2/2/16
Tue 2/2/16
22CS,HPM
24Re
ceive an
d Ac
cept Verity
Voting Hardw
are
29 days?No
Fri 1/15/16
Wed
2/24/16
25Co
nduct W
areh
ouse Facility Plann
ing
1 dayN
oFri 1/15/16
Fri 1/15/16
14CS,HPM
26Delivery of Verity
Voting Eq
uipm
ent
6 da
ys?N
oWed
2/17/16
Wed
2/24/16
27Re
ceive Ha
rdware and Enter into Inventory
3 days?N
oWed
2/17/16
Fri 2/19/16
4FS+30
days
CS
28Co
nduct C
ustomer Accep
tance Test
2 daysYes
Mon
2/22/16
Tue 2/23
/162
7CS,HPM
29Co
nfigure for U
se and
Place in Storage
1 dayN
oWed
2/24/16
Wed
2/24/16
28CS
30Dispo
se of o
ld equ
ipmen
t20
days?No
Mon
1/18/16
Fri 2/12/16
25CS
31Co
nduct M
ock Electio
n "Rou
nd Trip
"1 dayN
oMon
2/15/16
Mon
2/15/16
30CS,HPM
,HC
32Co
nduct V
oting for the
June
28, 201
6 Prim
ary Electio
n13
0.5 da
ys?N
oMon
1/4/16
Mon
7/4/16
33Co
unty Staff Training
7.25
daysN
oFri 1/15/16
Tue 1/26
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 2 of 7
State of Colorado UVS
‐ Tier 1.1 No BP
SProd
uced
: Mon
11/23
/15 ‐ 4:03
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
34Create Training Plan/Sched
ule
2 daysNo
Fri 1/15/16
Mon
1/18/16
14CS,HC
35Secure Cou
nty Ap
proval of T
raining Plan
0 daysYes
Mon
1/18/16
Mon
1/18/16
34
36Ve
rity Managem
ent a
nd Best P
ractices Cou
rse
4 hrsN
oTue 1/19
/16
Tue 1/19
/163
5CS,HC
37Da
ta Training Co
urse
1 dayN
oTue 1/19
/16
Wed
1/20/16
36CS,HC
38Bu
ild Ope
rator T
raining Co
urse
4 hrsN
oWed
1/20/16
Wed
1/20/16
37CS,HC
39Ce
ntral O
perator T
raining Co
urse
4 hrsN
oThu 1/21
/16
Thu 1/21
/1638
CS,HC
40Co
unt/Re
lay Ope
rator T
raining Co
urse
4 hrsN
oThu 1/21
/16
Thu 1/21
/1639
CS,HC
41Service & M
ainten
ance Training Co
urse
2 daysNo
Fri 1/22/16
Mon
1/25/16
40CS,HC
42Po
lling
Place Ope
ratio
ns Training Co
urse
2 hrsN
oTue 1/26
/16
Tue 1/26
/164
1CS,HC
43Program Ballot
7 da
ys?N
oFri 4/29/16
Mon
5/9/16
44Ba
llot C
ertification
0 daysYes
Fri 4/29/16
Fri 4/29/16
45Da
ta Entry / Im
port into Layou
t1 dayN
oFri 4/29/16
Fri 4/29/16
44CS,HPM
46Proo
f Ballot
1 day?
No
Mon
5/2/16
Mon
5/2/1645
CS
47Enter foreign
language te
xt (if req
uired)
1 day?
No
Tue 5/3/16
Tue 5/3/16
46CS,HPM
48Re
cord Aud
io1 day?
No
Wed
5/4/16
Wed
5/4/1647
CS,HPM
49Final text / aud
iot p
roof of b
allot
1 day?
No
Thu 5/5/16
Thu 5/5/16
48CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 3 of 7
State of Colorado UVS
‐ Tier 1.1 No BP
SProd
uced
: Mon
11/23
/15 ‐ 4:03
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
50Ro
und Trip
1 day?
No
Fri 5/6/16
Fri 5/6/1649
CS,HPM
51Ba
llot R
eady fo
r Election
0 daysYes
Fri 5/6/16
Fri 5/6/1650
52Create vDrives
1 day?
No
Mon
5/9/16
Mon
5/9/1651
CS
53By
Mail V
oting
119 da
ys?N
oTh
u 1/14
/16
Tue 6/28
/16
54Order blank
ballot stock fo
r office prin
ting
1 day?
No
Thu 1/14
/16
Thu 1/14
/1612
55Send
files to printer (or prin
t in office)
2 daysNo
Tue 5/10
/16
Wed
5/11/16
52CS
56Print b
allots
1 wkNo
Thu 5/12
/16
Wed
5/18/16
55CS
57Mail ballots ‐ UOCA
VA2 daysNo
Fri 5/13/16
Mon
5/16/16
56SS
CS
58Mail ballots ‐ Re
gular
4 daysNo
Mon
6/6/16
Thu 6/9/16
57CS
59Re
ceive ballots
26 daysN
oTue 5/24
/16
Tue 6/28
/165
7FS+1 wk
CS
60Re
solutio
n Bo
ard Training
2 hrsN
oMon
6/13/16
Mon
6/13/16
59FS‐12 days
CS,HC
61Scan/Resolve ballots
11 daysN
oMon
6/13/16
Tue 6/28
/166
0CS
62Write CV
Rs to
vDrives
1 hr
No
Tue 6/28
/16
Tue 6/28
/166
1HC
,CS
63VS
PCs
36.75 da
ysNo
Tue 5/10
/16
Wed
6/29/16
64Training
0.25
daysN
oMon
6/20/16
Mon
6/20/16
65Po
lling
Place Ope
ratio
ns Training Co
urse(s)
2 hrsN
oMon
6/20/16
Mon
6/20/16
70FS‐7 days
CS,HC
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 4 of 7
State of Colorado UVS
‐ Tier 1.1 No BP
SProd
uced
: Mon
11/23
/15 ‐ 4:03
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
66Pre‐de
fine Ve
rity Vo
ting Units in th
e Wareh
ouse
1 hr
No
Tue 5/10
/16
Tue 5/10
/165
2CS
67Marshall and
Dep
loy Equipm
ent to VS
PCs
1 dayN
oFri 6/17/16
Fri 6/17/16
70SS‐1 day,66
CS
68Disburse Sup
plies
4 hrsN
oFri 6/17/16
Fri 6/17/16
67SS
CS
69Setup Po
lls2 hrsN
oFri 6/17/16
Fri 6/17/16
68CS
70VS
PCs o
pen
7 daysNo
Mon
6/20/16
Tue 6/28
/16
71VS
PC Closeou
t2 hrsN
oTue 6/28
/16
Tue 6/28
/167
0FS‐1 day
CS,HPM
72Re
turn Equ
ipmen
t to Wareh
ouse
4 hrsN
oWed
6/29/16
Wed
6/29/16
71FS+1
day
CS
73Co
nduct E
lection Day Voting (ED)
19.5 daysN
oTu
e 6/7/16
Mon
7/4/16
74Marshal Equ
ipmen
t for ED
1 dayN
oMon
6/20/16
Mon
6/20/16
67CS
75Co
nduct P
oll W
orker T
raining
1 wkNo
Tue 6/7/16
Mon
6/13/16
52FS+4
wks
CS,HC
76Pred
efine Ve
rity Vo
ting Units fo
r ED locatio
ns at
Wareh
ouse
1 dayN
oTue 6/21
/16
Tue 6/21
/167
4CS
77De
ploy
equ
ipmen
t to ED
polling place(s)
3 daysNo
Wed
6/22/16
Fri 6/24/16
76CS
78Disburse Sup
plies
6 hrsN
oFri 6/24/16
Fri 6/24/16
77FF
CS
79Setup Po
lls2 hrsN
oMon
6/27/16
Mon
6/27/16
78CS
80ED
Field Sup
port
1 dayN
oMon
6/27/16
Tue 6/28
/167
9HP
M,HC,CS
81Close Po
lls2 hrsN
oTue 6/28
/16
Tue 6/28
/168
0FF
CS,HPM
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 5 of 7
State of Colorado UVS
‐ Tier 1.1 No BP
SProd
uced
: Mon
11/23
/15 ‐ 4:03
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
82De
liver vDrives to
Cou
nting Station
2 hrsN
oTue 6/28
/16
Tue 6/28
/168
1CS
83Re
turn Equ
ipmen
t to Wareh
ouse
4 daysNo
Tue 6/28
/16
Mon
7/4/1682
CS
84Ce
ntral Cou
nty Station Plan
ning
and
Ope
ratio
n12
6.5 da
ysNo
Mon
1/4/16
Tue 6/28
/16
85L&
A Test
1 dayN
oFri 6/17/16
Mon
6/20/16
80SF‐5 days
CS,HPM
86Marshal and
Distrib
ute Equipm
ent to Ce
ntral Cou
nting
Station
2 daysNo
Mon
1/4/16
Tue 1/5/16
CS
87Set U
p CC
S1 dayN
oWed
1/6/16
Wed
1/6/1686
CS
88CC
S Training
2 hrsN
oThu 1/7/16
Thu 1/7/16
87CS,HC
89Tabu
late Election Re
sults
0.25
daysN
oTu
e 6/28
/16
Tue 6/28
/16
90VS
PC vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/167
1CS
91Ab
sentee
vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/166
2CS
92Electio
n Da
y vD
rives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/168
1CD
OS
93Gen
erate Re
ports
1 hr
No
Tue 6/28
/16
Tue 6/28
/169
2CS
94Po
st Election Ac
tivities
12.5 daysN
oTu
e 6/28
/16
Thu 7/14
/16
95Ba
ckup
and
Archive Results
1 hr
No
Tue 6/28
/16
Tue 6/28
/169
3CS
96Po
st Election Au
dit
1 dayN
oThu 7/7/16
Thu 7/7/16
97Canvass
1 dayN
oThu 7/14
/16
Thu 7/14
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 6 of 7
State of Colorado UVS
‐ Tier 1.1 No BP
SProd
uced
: Mon
11/23
/15 ‐ 4:03
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
98Co
nduct P
ost E
lection An
alysis / Project W
rap Up
5 da
ysNo
Tue 6/28
/16
Tue 7/5/16
99Do
cumen
t and
Analyze Lessons Learned
5 daysNo
Tue 6/28
/16
Tue 7/5/16
93CS,HPM
,HC
100
Tier 1.1 Cou
nty / Hart /
CDOS (if re
quire
d) Project Review and
Wrap Up Meetin
g0.5 da
ysNo
Tue 7/5/16
Tue 7/5/16
99CP
M,CS,HPM
,HPS,H
101
Finalize Transition Plan
to Sup
port
4 hrsN
oTue 7/5/16
Tue 7/5/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 7 of 7
State of Colorado UVS
‐ Tier 1.1 No BP
SProd
uced
: Mon
11/23
/15 ‐ 4:03
PM
This page intentionally blank
STATE OF COLORADO UNIFORM VOTING SYSTEM PPS-29
PRELIMINARY TIER 1.2 PROJECT SCHEDULE – WITH BALLOT PRODUCTION SERVICES
PPS-30 STATE OF COLORADO UNIFORM VOTING SYSTEM
This page intentionally blank
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
1Tier 1.2 Cou
nty Ve
rity Im
plem
entatio
n13
9 da
ys?N
oMon
1/4/16
Thu 7/14
/16
2Co
ntract Signe
d1 dayY
esMon
1/4/16
Mon
1/4/16
3Order Hardw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
4Ve
rity System
Com
pone
nts
1 dayN
oTue 1/5/16
Tue 1/5/16
2CP
M,HTS
5Other Hardw
are ‐ P
Cs, Scann
ers, and
Prin
ters
1 dayN
oWed
1/6/16
Wed
1/6/164
HTS
6Order Softw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
7Ve
rity Ap
plications and
Firm
ware
1 dayN
oTue 1/5/16
Tue 1/5/16
2HT
S
83rd Party Software
1 dayN
oWed
1/6/16
Wed
1/6/167
HTS
9Kickoff M
eetin
g with
Cou
nty
1 day?
Yes
Tue 1/12
/16
Tue 1/12
/162
FS+1
wk
CS,HC,HP
M
10Co
unty app
roval of P
roject Sched
ule / A
ccep
tance Test Plan /
Evaluatio
n Plan
0 daysYes
Tue 1/12
/16
Tue 1/12
/169
FF
11Order Sup
plies
1 dayN
oWed
1/13/16
Wed
1/13/16
9HP
M
12Order Training Materials
1 dayN
oWed
1/13/16
Wed
1/13/16
9,10
HC
13Workflow, Tim
e, and
Resou
rce Plan
ning
2 da
ysNo
Wed
1/13/16
Thu 1/14
/16
14Co
nduct S
ite Survey An
alysis
2 daysNo
Wed
1/13/16
Thu 1/14
/169
15Ap
pliatio
n an
d Pe
riphe
ral H
ardw
are Co
nfiguration in Austin
4.25
daysN
oTh
u 1/21
/16
Wed
1/27/16
16Re
ceive Ap
plication and Pe
riphe
ral H
ardw
are
1 dayN
oThu 1/21
/16
Thu 1/21
/165FS+2 wks
HTS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 1 of 7
State of Colorado UVS
‐ Tier 1.2 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:43
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
17Co
nfigure Ha
rdware
2 daysNo
Fri 1/22/16
Mon
1/25/16
16HT
S
18Test Hardw
are
1 dayN
oTue 1/26
/16
Tue 1/26
/161
7HT
S
19Ship Hardw
are
2 hrsN
oWed
1/27/16
Wed
1/27/16
18HT
S
20Dep
loy Ve
rity System
Softw
are an
d Hardw
are
0.75
daysN
oTu
e 2/2/16
Tue 2/2/16
21Cu
stom
er Receives C
ompu
ter H
ardw
are
2 hrsN
oTue 2/2/16
Tue 2/2/16
19FS+4
days
CS
22Co
nfigure, Test, and Set U
p System
s4 hrsN
oTue 2/2/16
Tue 2/2/16
21CS,HPM
23Cu
stom
er Accep
tance
0 daysYes
Tue 2/2/16
Tue 2/2/16
22CS,HPM
24Re
ceive an
d Ac
cept Verity
Voting Hardw
are
37 days?No
Mon
1/4/16
Tue 2/23
/16
25Delivery of Verity
Voting Eq
uipm
ent
5 da
ys?N
oWed
2/17/16
Tue 2/23
/16
26Re
ceive Ha
rdware and Enter into Inventory
3 days?N
oWed
2/17/16
Fri 2/19/16
4FS+30
days
CS
27Co
nduct C
ustomer Accep
tance Test
1 dayY
esMon
2/22/16
Mon
2/22/16
26CS,HPM
28Co
nfigure for U
se and
Place in Storage
1 dayN
oTue 2/23
/16
Tue 2/23
/162
7CS
29Dispo
se of o
ld equ
ipmen
t10
days?No
Mon
1/4/16
Fri 1/15/16
CS30
Cond
uct M
ock Electio
n "Rou
nd Trip
"1 dayN
oMon
1/18/16
Mon
1/18/16
29CS,HPM
,HC
31Co
nduct V
oting for the
June
28, 201
6 Prim
ary Electio
n13
0.5 da
ys?N
oMon
1/4/16
Mon
7/4/16
32Co
unty Staff Training
10 daysN
oMon
1/4/16
Fri 1/15/16
33Create Training Plan/Sched
ule
4 hrsN
oFri 1/15/16
Fri 1/15/16
14CS,HC
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 2 of 7
State of Colorado UVS
‐ Tier 1.2 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:43
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
34Secure Cou
nty Ap
proval of T
raining Plan
0 daysYes
Fri 1/15/16
Fri 1/15/16
33
35Ve
rity Managem
ent a
nd Best P
ractices Cou
rse
4 hrsN
oFri 1/15/16
Fri 1/15/16
34CS,HC
36Ce
ntral O
perator T
raining Co
urse
4 hrsN
oMon
1/4/16
Mon
1/4/16
CS,HC
37Co
unt/Re
lay Ope
rator T
raining Co
urse
4 hrsN
oMon
1/4/16
Mon
1/4/1636
CS,HC
38Service & M
ainten
ance Training Co
urse
2 daysNo
Tue 1/5/16
Wed
1/6/1637
CS,HC
39Po
lling
Place Ope
ratio
ns Training Co
urse
2 hrsN
oThu 1/7/16
Thu 1/7/16
38CS,HC
40Program Ballot
6 da
ys?N
oFri 4/29/16
Fri 5/6/16
41Ba
llot C
ertification
0 daysYes
Fri 4/29/16
Fri 4/29/16
42Da
ta Entry / Im
port into Layou
t1 dayN
oFri 4/29/16
Fri 4/29/16
41CS,HPM
43Proo
f Ballot
1 day?
No
Mon
5/2/16
Mon
5/2/1642
CS
44Enter foreign
language te
xt (if req
uired)
1 day?
No
Tue 5/3/16
Tue 5/3/16
43CS,HPM
45Re
cord Aud
io1 day?
No
Wed
5/4/16
Wed
5/4/1644
CS,HPM
46Final text / aud
iot p
roof of b
allot
4 hrs?No
Thu 5/5/16
Thu 5/5/16
45CS
47Ro
und Trip
4 hrsN
oThu 5/5/16
Thu 5/5/16
46CS,HPM
48Ba
llot R
eady fo
r Election
0 daysYes
Thu 5/5/16
Thu 5/5/16
47
49Create vDrives
1 day?
No
Fri 5/6/16
Fri 5/6/1648
CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 3 of 7
State of Colorado UVS
‐ Tier 1.2 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:43
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
50By
Mail V
oting
119 da
ys?N
oTh
u 1/14
/16
Tue 6/28
/16
51Order blank
ballot stock fo
r office prin
ting
1 day?
No
Thu 1/14
/16
Thu 1/14
/1612
52Send
files to printer (or prin
t in office)
2 daysNo
Mon
5/9/16
Tue 5/10
/164
9CS
53Print b
allots
1 wkNo
Wed
5/11/16
Tue 5/17
/165
2CS
54Mail ballots ‐ UOCA
VA2 daysNo
Fri 5/13/16
Mon
5/16/16
53SS
CS
55Mail ballots ‐ Re
gular
4 daysNo
Mon
6/6/16
Thu 6/9/16
54CS
56Re
ceive ballots
26 daysN
oTue 5/24
/16
Tue 6/28
/165
4FS+1 wk
CS
57Re
solutio
n Bo
ard Training
2 hrsN
oMon
6/13/16
Mon
6/13/16
56FS‐12 days
CS,HC
58Scan/Resolve ballots
11 daysN
oMon
6/13/16
Tue 6/28
/165
7CS
59Write CV
Rs to
vDrives
1 hr
No
Tue 6/28
/16
Tue 6/28
/165
8HC
,CS
60VS
PCs
37.75 da
ysNo
Mon
5/9/16
Wed
6/29/16
61Training
0.25
daysN
oMon
6/20/16
Mon
6/20/16
62Po
lling
Place Ope
ratio
ns Training Co
urse(s)
2 hrsN
oMon
6/20/16
Mon
6/20/16
67FS‐7 days
CS,HC
63Pre‐de
fine Ve
rity Vo
ting Units in th
e Wareh
ouse
1 hr
No
Mon
5/9/16
Mon
5/9/1649
CS
64Marshall and
Dep
loy Equipm
ent to VS
PCs
1 dayN
oFri 6/17/16
Fri 6/17/16
67SS‐1 day,63
CS
65Disburse Sup
plies
4 hrsN
oFri 6/17/16
Fri 6/17/16
64SS
CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 4 of 7
State of Colorado UVS
‐ Tier 1.2 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:43
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
66Setup Po
lls2 hrsN
oFri 6/17/16
Fri 6/17/16
65CS
67VS
PCs o
pen
7 daysNo
Mon
6/20/16
Tue 6/28
/16
68VS
PC Closeou
t2 hrsN
oTue 6/28
/16
Tue 6/28
/166
7FS‐1 day
CS,HPM
69Re
turn Equ
ipmen
t to Wareh
ouse
4 hrsN
oWed
6/29/16
Wed
6/29/16
68FS+1
day
CS
70Co
nduct E
lection Day Voting (ED)
20.5 daysN
oMon
6/6/16
Mon
7/4/16
71Marshal Equ
ipmen
t for ED
1 dayN
oMon
6/20/16
Mon
6/20/16
64CS
72Co
nduct P
oll W
orker T
raining
1 wkNo
Mon
6/6/16
Fri 6/10/16
49FS+4
wks
CS,HC
73Pred
efine Ve
rity Vo
ting Units fo
r ED locatio
ns at
Wareh
ouse
1 dayN
oTue 6/21
/16
Tue 6/21
/167
1CS
74De
ploy
equ
ipmen
t to ED
polling place(s)
3 daysNo
Wed
6/22/16
Fri 6/24/16
73CS
75Disburse Sup
plies
6 hrsN
oFri 6/24/16
Fri 6/24/16
74FF
CS
76Setup Po
lls2 hrsN
oMon
6/27/16
Mon
6/27/16
75CS
77ED
Field Sup
port
1 dayN
oMon
6/27/16
Tue 6/28
/167
6HP
M,HC,CS
78Close Po
lls2 hrsN
oTue 6/28
/16
Tue 6/28
/167
7FF
CS,HPM
79De
liver vDrives to
Cou
nting Station
2 hrsN
oTue 6/28
/16
Tue 6/28
/167
8CS
80Re
turn Equ
ipmen
t to Wareh
ouse
4 daysNo
Tue 6/28
/16
Mon
7/4/1679
CS
81Ce
ntral Cou
nty Station Plan
ning
and
Ope
ratio
n12
6.5 da
ysNo
Mon
1/4/16
Tue 6/28
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 5 of 7
State of Colorado UVS
‐ Tier 1.2 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:43
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
82L&
A Test
4 hrsN
oFri 6/17/16
Mon
6/20/16
77SF‐5 days
CS,HPM
83Marshal and
Distrib
ute Equipm
ent to Ce
ntral Cou
nting
Station
2 daysNo
Mon
1/4/16
Tue 1/5/16
CS
84Set U
p CC
S1 dayN
oWed
1/6/16
Wed
1/6/1683
CS
85CC
S Training
2 hrsN
oThu 1/7/16
Thu 1/7/16
84CS,HC
86Tabu
late Election Re
sults
0.25
daysN
oTu
e 6/28
/16
Tue 6/28
/16
87VS
PC vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/166
8CS
88Ab
sentee
vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/165
9CS
89Electio
n Da
y vD
rives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/167
8CD
OS
90Gen
erate Re
ports
1 hr
No
Tue 6/28
/16
Tue 6/28
/168
9CS
91Po
st Election Ac
tivities
12.5 daysN
oTu
e 6/28
/16
Thu 7/14
/16
92Ba
ckup
and
Archive Results
1 hr
No
Tue 6/28
/16
Tue 6/28
/169
0CS
93Po
st Election Au
dit
1 dayN
oThu 7/7/16
Thu 7/7/16
94Canvass
1 dayN
oThu 7/14
/16
Thu 7/14
/16
95Co
nduct P
ost E
lection An
alysis / Project W
rap Up
2 da
ysNo
Tue 6/28
/16
Thu 6/30
/16
96Do
cumen
t and
Analyze Lessons Learned
2 daysNo
Tue 6/28
/16
Thu 6/30
/1690
CS,HPM
,HC
97Tier 1.2 Cou
nty / Hart /
CDOS (if re
quire
d) Project Review and
Wrap Up Meetin
g0.5 da
ysNo
Thu 6/30
/16
Thu 6/30
/1696
CPM,CS,HPM
,HPS,H
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 6 of 7
State of Colorado UVS
‐ Tier 1.2 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:43
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
98Finalize Transition Plan
to Sup
port
4 hrsN
oThu 6/30
/16
Thu 6/30
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 7 of 7
State of Colorado UVS
‐ Tier 1.2 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:43
PM
This page intentionally blank
STATE OF COLORADO UNIFORM VOTING SYSTEM PPS-39
PRELIMINARY TIER 1.2 PROJECT SCHEDULE – WITHOUT BALLOT PRODUCTION SERVICES
PPS-40 STATE OF COLORADO UNIFORM VOTING SYSTEM
This page intentionally blank
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
1Tier 1.2 Cou
nty Ve
rity Im
plem
entatio
n13
9 da
ys?N
oMon
1/4/16
Thu 7/14
/16
2Co
ntract Signe
d1 dayY
esMon
1/4/16
Mon
1/4/16
3Order Hardw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
4Ve
rity System
Com
pone
nts
1 dayN
oTue 1/5/16
Tue 1/5/16
2CP
M,HTS
5Other Hardw
are ‐ P
Cs, Scann
ers, and
Prin
ters
1 dayN
oWed
1/6/16
Wed
1/6/164
HTS
6Order Softw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
7Ve
rity Ap
plications and
Firm
ware
1 dayN
oTue 1/5/16
Tue 1/5/16
2HT
S
83rd Party Software
1 dayN
oWed
1/6/16
Wed
1/6/167
HTS
9Kickoff M
eetin
g with
Cou
nty
1 day?
Yes
Tue 1/12
/16
Tue 1/12
/162
FS+1
wk
CS,HC,HP
M
10Co
unty app
roval of P
roject Sched
ule / A
ccep
tance Test Plan /
Evaluatio
n Plan
0 daysYes
Tue 1/12
/16
Tue 1/12
/169
FF
11Order Sup
plies
1 dayN
oWed
1/13/16
Wed
1/13/16
9HP
M
12Order Training Materials
1 dayN
oWed
1/13/16
Wed
1/13/16
9,10
HC
13Workflow, Tim
e, and
Resou
rce Plan
ning
2 da
ysNo
Wed
1/13/16
Thu 1/14
/16
14Co
nduct S
ite Survey An
alysis
2 daysNo
Wed
1/13/16
Thu 1/14
/169
15Ap
pliatio
n an
d Pe
riphe
ral H
ardw
are Co
nfiguration in Austin
4.25
daysN
oTh
u 1/21
/16
Wed
1/27/16
16Re
ceive Ap
plication and Pe
riphe
ral H
ardw
are
1 dayN
oThu 1/21
/16
Thu 1/21
/165FS+2 wks
HTS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 1 of 7
State of Colorado UVS
‐ Tier 1.2 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:46
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
17Co
nfigure Ha
rdware
2 daysNo
Fri 1/22/16
Mon
1/25/16
16HT
S
18Test Hardw
are
1 dayN
oTue 1/26
/16
Tue 1/26
/161
7HT
S
19Ship Hardw
are
2 hrsN
oWed
1/27/16
Wed
1/27/16
18HT
S
20Dep
loy Ve
rity System
Softw
are an
d Hardw
are
0.75
daysN
oTu
e 2/2/16
Tue 2/2/16
21Cu
stom
er Receives C
ompu
ter H
ardw
are
2 hrsN
oTue 2/2/16
Tue 2/2/16
19FS+4
days
CS
22Co
nfigure, Test, and Set U
p System
s4 hrsN
oTue 2/2/16
Tue 2/2/16
21CS,HPM
23Cu
stom
er Accep
tance
0 daysYes
Tue 2/2/16
Tue 2/2/16
22CS,HPM
24Re
ceive an
d Ac
cept Verity
Voting Hardw
are
29 days?No
Fri 1/15/16
Wed
2/24/16
25Co
nduct W
areh
ouse Facility Plann
ing
4 hrsN
oFri 1/15/16
Fri 1/15/16
14CS,HPM
26Delivery of Verity
Voting Eq
uipm
ent
6 da
ys?N
oWed
2/17/16
Wed
2/24/16
27Re
ceive Ha
rdware and Enter into Inventory
3 days?N
oWed
2/17/16
Fri 2/19/16
4FS+30
days
CS
28Co
nduct C
ustomer Accep
tance Test
2 daysYes
Mon
2/22/16
Tue 2/23
/162
7CS,HPM
29Co
nfigure for U
se and
Place in Storage
1 dayN
oWed
2/24/16
Wed
2/24/16
28CS
30Dispo
se of o
ld equ
ipmen
t10
days?No
Fri 1/15/16
Fri 1/29/16
25CS
31Co
nduct M
ock Electio
n "Rou
nd Trip
"1 dayN
oFri 1/29/16
Mon
2/1/1630
CS,HPM
,HC
32Co
nduct V
oting for the
June
28, 201
6 Prim
ary Electio
n13
0.5 da
ys?N
oMon
1/4/16
Mon
7/4/16
33Co
unty Staff Training
6.25
daysN
oFri 1/15/16
Mon
1/25/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 2 of 7
State of Colorado UVS
‐ Tier 1.2 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:46
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
34Create Training Plan/Sched
ule
1 dayN
oFri 1/15/16
Fri 1/15/16
14CS,HC
35Secure Cou
nty Ap
proval of T
raining Plan
0 daysYes
Fri 1/15/16
Fri 1/15/16
34
36Ve
rity Managem
ent a
nd Best P
ractices Cou
rse
4 hrsN
oMon
1/18/16
Mon
1/18/16
35CS,HC
37Da
ta Training Co
urse
1 dayN
oMon
1/18/16
Tue 1/19
/163
6CS,HC
38Bu
ild Ope
rator T
raining Co
urse
4 hrsN
oTue 1/19
/16
Tue 1/19
/163
7CS,HC
39Ce
ntral O
perator T
raining Co
urse
4 hrsN
oWed
1/20/16
Wed
1/20/16
38CS,HC
40Co
unt/Re
lay Ope
rator T
raining Co
urse
4 hrsN
oWed
1/20/16
Wed
1/20/16
39CS,HC
41Service & M
ainten
ance Training Co
urse
2 daysNo
Thu 1/21
/16
Fri 1/22/16
40CS,HC
42Po
lling
Place Ope
ratio
ns Training Co
urse
2 hrsN
oMon
1/25/16
Mon
1/25/16
41CS,HC
43Program Ballot
7 da
ys?N
oFri 4/29/16
Mon
5/9/16
44Ba
llot C
ertification
0 daysYes
Fri 4/29/16
Fri 4/29/16
45Da
ta Entry / Im
port into Layou
t1 dayN
oFri 4/29/16
Fri 4/29/16
44CS,HPM
46Proo
f Ballot
1 day?
No
Mon
5/2/16
Mon
5/2/1645
CS
47Enter foreign
language te
xt (if req
uired)
1 day?
No
Tue 5/3/16
Tue 5/3/16
46CS,HPM
48Re
cord Aud
io1 day?
No
Wed
5/4/16
Wed
5/4/1647
CS,HPM
49Final text / aud
iot p
roof of b
allot
1 day?
No
Thu 5/5/16
Thu 5/5/16
48CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 3 of 7
State of Colorado UVS
‐ Tier 1.2 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:46
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
50Ro
und Trip
1 day?
No
Fri 5/6/16
Fri 5/6/1649
CS,HPM
51Ba
llot R
eady fo
r Election
0 daysYes
Fri 5/6/16
Fri 5/6/1650
52Create vDrives
1 day?
No
Mon
5/9/16
Mon
5/9/1651
CS
53By
Mail V
oting
119 da
ys?N
oTh
u 1/14
/16
Tue 6/28
/16
54Order blank
ballot stock fo
r office prin
ting
1 day?
No
Thu 1/14
/16
Thu 1/14
/1612
55Send
files to printer (or prin
t in office)
2 daysNo
Tue 5/10
/16
Wed
5/11/16
52CS
56Print b
allots
1 wkNo
Thu 5/12
/16
Wed
5/18/16
55CS
57Mail ballots ‐ UOCA
VA2 daysNo
Fri 5/13/16
Mon
5/16/16
56SS
CS
58Mail ballots ‐ Re
gular
4 daysNo
Mon
6/6/16
Thu 6/9/16
57CS
59Re
ceive ballots
26 daysN
oTue 5/24
/16
Tue 6/28
/165
7FS+1 wk
CS
60Re
solutio
n Bo
ard Training
2 hrsN
oMon
6/13/16
Mon
6/13/16
59FS‐12 days
CS,HC
61Scan/Resolve ballots
11 daysN
oMon
6/13/16
Tue 6/28
/166
0CS
62Write CV
Rs to
vDrives
1 hr
No
Tue 6/28
/16
Tue 6/28
/166
1HC
,CS
63VS
PCs
36.75 da
ysNo
Tue 5/10
/16
Wed
6/29/16
64Training
0.25
daysN
oMon
6/20/16
Mon
6/20/16
65Po
lling
Place Ope
ratio
ns Training Co
urse(s)
2 hrsN
oMon
6/20/16
Mon
6/20/16
70FS‐7 days
CS,HC
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 4 of 7
State of Colorado UVS
‐ Tier 1.2 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:46
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
66Pre‐de
fine Ve
rity Vo
ting Units in th
e Wareh
ouse
1 hr
No
Tue 5/10
/16
Tue 5/10
/165
2CS
67Marshall and
Dep
loy Equipm
ent to VS
PCs
1 dayN
oFri 6/17/16
Fri 6/17/16
70SS‐1 day,66
CS
68Disburse Sup
plies
4 hrsN
oFri 6/17/16
Fri 6/17/16
67SS
CS
69Setup Po
lls2 hrsN
oFri 6/17/16
Fri 6/17/16
68CS
70VS
PCs o
pen
7 daysNo
Mon
6/20/16
Tue 6/28
/16
71VS
PC Closeou
t2 hrsN
oTue 6/28
/16
Tue 6/28
/167
0FS‐1 day
CS,HPM
72Re
turn Equ
ipmen
t to Wareh
ouse
4 hrsN
oWed
6/29/16
Wed
6/29/16
71FS+1
day
CS
73Co
nduct E
lection Day Voting (ED)
19.5 daysN
oTu
e 6/7/16
Mon
7/4/16
74Marshal Equ
ipmen
t for ED
1 dayN
oMon
6/20/16
Mon
6/20/16
67CS
75Co
nduct P
oll W
orker T
raining
1 wkNo
Tue 6/7/16
Mon
6/13/16
52FS+4
wks
CS,HC
76Pred
efine Ve
rity Vo
ting Units fo
r ED locatio
ns at
Wareh
ouse
1 dayN
oTue 6/21
/16
Tue 6/21
/167
4CS
77De
ploy
equ
ipmen
t to ED
polling place(s)
3 daysNo
Wed
6/22/16
Fri 6/24/16
76CS
78Disburse Sup
plies
6 hrsN
oFri 6/24/16
Fri 6/24/16
77FF
CS
79Setup Po
lls2 hrsN
oMon
6/27/16
Mon
6/27/16
78CS
80ED
Field Sup
port
1 dayN
oMon
6/27/16
Tue 6/28
/167
9HP
M,HC,CS
81Close Po
lls2 hrsN
oTue 6/28
/16
Tue 6/28
/168
0FF
CS,HPM
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 5 of 7
State of Colorado UVS
‐ Tier 1.2 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:46
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
82De
liver vDrives to
Cou
nting Station
2 hrsN
oTue 6/28
/16
Tue 6/28
/168
1CS
83Re
turn Equ
ipmen
t to Wareh
ouse
4 daysNo
Tue 6/28
/16
Mon
7/4/1682
CS
84Ce
ntral Cou
nty Station Plan
ning
and
Ope
ratio
n12
6.5 da
ysNo
Mon
1/4/16
Tue 6/28
/16
85L&
A Test
4 hrsN
oFri 6/17/16
Mon
6/20/16
80SF‐5 days
CS,HPM
86Marshal and
Distrib
ute Equipm
ent to Ce
ntral Cou
nting
Station
2 daysNo
Mon
1/4/16
Tue 1/5/16
CS
87Set U
p CC
S1 dayN
oWed
1/6/16
Wed
1/6/1686
CS
88CC
S Training
2 hrsN
oThu 1/7/16
Thu 1/7/16
87CS,HC
89Tabu
late Election Re
sults
0.25
daysN
oTu
e 6/28
/16
Tue 6/28
/16
90VS
PC vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/167
1CS
91Ab
sentee
vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/166
2CS
92Electio
n Da
y vD
rives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/168
1CD
OS
93Gen
erate Re
ports
1 hr
No
Tue 6/28
/16
Tue 6/28
/169
2CS
94Po
st Election Ac
tivities
12.5 daysN
oTu
e 6/28
/16
Thu 7/14
/16
95Ba
ckup
and
Archive Results
1 hr
No
Tue 6/28
/16
Tue 6/28
/169
3CS
96Po
st Election Au
dit
1 dayN
oThu 7/7/16
Thu 7/7/16
97Canvass
1 dayN
oThu 7/14
/16
Thu 7/14
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 6 of 7
State of Colorado UVS
‐ Tier 1.2 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:46
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
98Co
nduct P
ost E
lection An
alysis / Project W
rap Up
3 da
ysNo
Tue 6/28
/16
Fri 7/1/16
99Do
cumen
t and
Analyze Lessons Learned
3 daysNo
Tue 6/28
/16
Fri 7/1/1693
CS,HPM
,HC
100
Tier 1.2 Cou
nty / Hart /
CDOS (if re
quire
d) Project Review and
Wrap Up Meetin
g0.5 da
ysNo
Fri 7/1/16
Fri 7/1/1699
CPM,CS,HPM
,HPS,H
101
Finalize Transition Plan
to Sup
port
4 hrsN
oFri 7/1/16
Fri 7/1/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 7 of 7
State of Colorado UVS
‐ Tier 1.2 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:46
PM
This page intentionally blank
STATE OF COLORADO UNIFORM VOTING SYSTEM PPS-49
PRELIMINARY TIER 1.3 PROJECT SCHEDULE – WITH BALLOT PRODUCTION SERVICES
PPS-50 STATE OF COLORADO UNIFORM VOTING SYSTEM
This page intentionally blank
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
1Tier 1.3 Cou
nty Ve
rity Im
plem
entatio
n13
9 da
ys?N
oMon
1/4/16
Thu 7/14
/16
2Co
ntract Signe
d1 dayY
esMon
1/4/16
Mon
1/4/16
3Order Hardw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
4Ve
rity System
Com
pone
nts
1 dayN
oTue 1/5/16
Tue 1/5/16
2CP
M,HTS
5Other Hardw
are ‐ P
Cs, Scann
ers, and
Prin
ters
1 dayN
oWed
1/6/16
Wed
1/6/164
HTS
6Order Softw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
7Ve
rity Ap
plications and
Firm
ware
1 dayN
oTue 1/5/16
Tue 1/5/16
2HT
S
83rd Party Software
1 dayN
oWed
1/6/16
Wed
1/6/167
HTS
9Kickoff M
eetin
g with
Cou
nty
1 day?
Yes
Tue 1/12
/16
Tue 1/12
/162
FS+1
wk
CS,HC,HP
M
10Co
unty app
roval of P
roject Sched
ule / A
ccep
tance Test Plan /
Evaluatio
n Plan
0 daysYes
Tue 1/12
/16
Tue 1/12
/169
FF
11Order Sup
plies
1 dayN
oWed
1/13/16
Wed
1/13/16
9HP
M
12Order Training Materials
1 dayN
oWed
1/13/16
Wed
1/13/16
9,10
HC
13Workflow, Tim
e, and
Resou
rce Plan
ning
2 da
ysNo
Wed
1/13/16
Thu 1/14
/16
14Co
nduct S
ite Survey An
alysis
2 daysNo
Wed
1/13/16
Thu 1/14
/169
15Ap
pliatio
n an
d Pe
riphe
ral H
ardw
are Co
nfiguration in Austin
4.25
daysN
oTh
u 1/21
/16
Wed
1/27/16
16Re
ceive Ap
plication and Pe
riphe
ral H
ardw
are
1 dayN
oThu 1/21
/16
Thu 1/21
/165FS+2 wks
HTS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 1 of 7
State of Colorado UVS
‐ Tier 1.3 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:48
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
17Co
nfigure Ha
rdware
2 daysNo
Fri 1/22/16
Mon
1/25/16
16HT
S
18Test Hardw
are
1 dayN
oTue 1/26
/16
Tue 1/26
/161
7HT
S
19Ship Hardw
are
2 hrsN
oWed
1/27/16
Wed
1/27/16
18HT
S
20Dep
loy Ve
rity System
Softw
are an
d Hardw
are
0.75
daysN
oTu
e 2/2/16
Tue 2/2/16
21Cu
stom
er Receives C
ompu
ter H
ardw
are
2 hrsN
oTue 2/2/16
Tue 2/2/16
19FS+4
days
CS
22Co
nfigure, Test, and Set U
p System
s4 hrsN
oTue 2/2/16
Tue 2/2/16
21CS,HPM
23Cu
stom
er Accep
tance
0 daysYes
Tue 2/2/16
Tue 2/2/16
22CS,HPM
24Re
ceive an
d Ac
cept Verity
Voting Hardw
are
37 days?No
Mon
1/4/16
Tue 2/23
/16
25Delivery of Verity
Voting Eq
uipm
ent
5 da
ys?N
oWed
2/17/16
Tue 2/23
/16
26Re
ceive Ha
rdware and Enter into Inventory
3 days?N
oWed
2/17/16
Fri 2/19/16
4FS+30
days
CS
27Co
nduct C
ustomer Accep
tance Test
1 dayY
esMon
2/22/16
Mon
2/22/16
26CS,HPM
28Co
nfigure for U
se and
Place in Storage
1 dayN
oTue 2/23
/16
Tue 2/23
/162
7CS
29Dispo
se of o
ld equ
ipmen
t10
days?No
Mon
1/4/16
Fri 1/15/16
CS30
Cond
uct M
ock Electio
n "Rou
nd Trip
"1 dayN
oMon
1/18/16
Mon
1/18/16
29CS,HPM
,HC
31Co
nduct V
oting for the
June
28, 201
6 Prim
ary Electio
n13
0.5 da
ys?N
oMon
1/4/16
Mon
7/4/16
32Co
unty Staff Training
10 daysN
oMon
1/4/16
Fri 1/15/16
33Create Training Plan/Sched
ule
4 hrsN
oFri 1/15/16
Fri 1/15/16
14CS,HC
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 2 of 7
State of Colorado UVS
‐ Tier 1.3 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:48
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
34Secure Cou
nty Ap
proval of T
raining Plan
0 daysYes
Fri 1/15/16
Fri 1/15/16
33
35Ve
rity Managem
ent a
nd Best P
ractices Cou
rse
4 hrsN
oFri 1/15/16
Fri 1/15/16
34CS,HC
36Ce
ntral O
perator T
raining Co
urse
4 hrsN
oMon
1/4/16
Mon
1/4/16
CS,HC
37Co
unt/Re
lay Ope
rator T
raining Co
urse
4 hrsN
oMon
1/4/16
Mon
1/4/1636
CS,HC
38Service & M
ainten
ance Training Co
urse
2 daysNo
Tue 1/5/16
Wed
1/6/1637
CS,HC
39Po
lling
Place Ope
ratio
ns Training Co
urse
2 hrsN
oThu 1/7/16
Thu 1/7/16
38CS,HC
40Program Ballot
6 da
ys?N
oFri 4/29/16
Fri 5/6/16
41Ba
llot C
ertification
0 daysYes
Fri 4/29/16
Fri 4/29/16
42Da
ta Entry / Im
port into Layou
t1 dayN
oFri 4/29/16
Fri 4/29/16
41CS,HPM
43Proo
f Ballot
1 day?
No
Mon
5/2/16
Mon
5/2/1642
CS
44Enter foreign
language te
xt (if req
uired)
1 day?
No
Tue 5/3/16
Tue 5/3/16
43CS,HPM
45Re
cord Aud
io1 day?
No
Wed
5/4/16
Wed
5/4/1644
CS,HPM
46Final text / aud
iot p
roof of b
allot
4 hrs?No
Thu 5/5/16
Thu 5/5/16
45CS
47Ro
und Trip
4 hrsN
oThu 5/5/16
Thu 5/5/16
46CS,HPM
48Ba
llot R
eady fo
r Election
0 daysYes
Thu 5/5/16
Thu 5/5/16
47
49Create vDrives
1 day?
No
Fri 5/6/16
Fri 5/6/1648
CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 3 of 7
State of Colorado UVS
‐ Tier 1.3 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:48
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
50By
Mail V
oting
119 da
ys?N
oTh
u 1/14
/16
Tue 6/28
/16
51Order blank
ballot stock fo
r office prin
ting
1 day?
No
Thu 1/14
/16
Thu 1/14
/1612
52Send
files to printer (or prin
t in office)
2 daysNo
Mon
5/9/16
Tue 5/10
/164
9CS
53Print b
allots
1 wkNo
Wed
5/11/16
Tue 5/17
/165
2CS
54Mail ballots ‐ UOCA
VA2 daysNo
Fri 5/13/16
Mon
5/16/16
53SS
CS
55Mail ballots ‐ Re
gular
4 daysNo
Mon
6/6/16
Thu 6/9/16
54CS
56Re
ceive ballots
26 daysN
oTue 5/24
/16
Tue 6/28
/165
4FS+1 wk
CS
57Re
solutio
n Bo
ard Training
2 hrsN
oMon
6/13/16
Mon
6/13/16
56FS‐12 days
CS,HC
58Scan/Resolve ballots
11 daysN
oMon
6/13/16
Tue 6/28
/165
7CS
59Write CV
Rs to
vDrives
1 hr
No
Tue 6/28
/16
Tue 6/28
/165
8HC
,CS
60VS
PCs
37.75 da
ysNo
Mon
5/9/16
Wed
6/29/16
61Training
0.25
daysN
oMon
6/20/16
Mon
6/20/16
62Po
lling
Place Ope
ratio
ns Training Co
urse(s)
2 hrsN
oMon
6/20/16
Mon
6/20/16
67FS‐7 days
CS,HC
63Pre‐de
fine Ve
rity Vo
ting Units in th
e Wareh
ouse
1 hr
No
Mon
5/9/16
Mon
5/9/1649
CS
64Marshall and
Dep
loy Equipm
ent to VS
PCs
1 dayN
oFri 6/17/16
Fri 6/17/16
67SS‐1 day,63
CS
65Disburse Sup
plies
4 hrsN
oFri 6/17/16
Fri 6/17/16
64SS
CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 4 of 7
State of Colorado UVS
‐ Tier 1.3 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:48
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
66Setup Po
lls2 hrsN
oFri 6/17/16
Fri 6/17/16
65CS
67VS
PCs o
pen
7 daysNo
Mon
6/20/16
Tue 6/28
/16
68VS
PC Closeou
t2 hrsN
oTue 6/28
/16
Tue 6/28
/166
7FS‐1 day
CS,HPM
69Re
turn Equ
ipmen
t to Wareh
ouse
4 hrsN
oWed
6/29/16
Wed
6/29/16
68FS+1
day
CS
70Co
nduct E
lection Day Voting (ED)
20.5 daysN
oMon
6/6/16
Mon
7/4/16
71Marshal Equ
ipmen
t for ED
1 dayN
oMon
6/20/16
Mon
6/20/16
64CS
72Co
nduct P
oll W
orker T
raining
1 wkNo
Mon
6/6/16
Fri 6/10/16
49FS+4
wks
CS,HC
73Pred
efine Ve
rity Vo
ting Units fo
r ED locatio
ns at
Wareh
ouse
1 dayN
oTue 6/21
/16
Tue 6/21
/167
1CS
74De
ploy
equ
ipmen
t to ED
polling place(s)
3 daysNo
Wed
6/22/16
Fri 6/24/16
73CS
75Disburse Sup
plies
6 hrsN
oFri 6/24/16
Fri 6/24/16
74FF
CS
76Setup Po
lls2 hrsN
oMon
6/27/16
Mon
6/27/16
75CS
77ED
Field Sup
port
1 dayN
oMon
6/27/16
Tue 6/28
/167
6HP
M,HC,CS
78Close Po
lls2 hrsN
oTue 6/28
/16
Tue 6/28
/167
7FF
CS,HPM
79De
liver vDrives to
Cou
nting Station
2 hrsN
oTue 6/28
/16
Tue 6/28
/167
8CS
80Re
turn Equ
ipmen
t to Wareh
ouse
4 daysNo
Tue 6/28
/16
Mon
7/4/1679
CS
81Ce
ntral Cou
nty Station Plan
ning
and
Ope
ratio
n12
6.5 da
ysNo
Mon
1/4/16
Tue 6/28
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 5 of 7
State of Colorado UVS
‐ Tier 1.3 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:48
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
82L&
A Test
4 hrsN
oFri 6/17/16
Mon
6/20/16
77SF‐5 days
CS,HPM
83Marshal and
Distrib
ute Equipm
ent to Ce
ntral Cou
nting
Station
2 daysNo
Mon
1/4/16
Tue 1/5/16
CS
84Set U
p CC
S1 dayN
oWed
1/6/16
Wed
1/6/1683
CS
85CC
S Training
2 hrsN
oThu 1/7/16
Thu 1/7/16
84CS,HC
86Tabu
late Election Re
sults
0.25
daysN
oTu
e 6/28
/16
Tue 6/28
/16
87VS
PC vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/166
8CS
88Ab
sentee
vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/165
9CS
89Electio
n Da
y vD
rives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/167
8CD
OS
90Gen
erate Re
ports
1 hr
No
Tue 6/28
/16
Tue 6/28
/168
9CS
91Po
st Election Ac
tivities
12.5 daysN
oTu
e 6/28
/16
Thu 7/14
/16
92Ba
ckup
and
Archive Results
1 hr
No
Tue 6/28
/16
Tue 6/28
/169
0CS
93Po
st Election Au
dit
1 dayN
oThu 7/7/16
Thu 7/7/16
94Canvass
1 dayN
oThu 7/14
/16
Thu 7/14
/16
95Co
nduct P
ost E
lection An
alysis / Project W
rap Up
2 da
ysNo
Tue 6/28
/16
Thu 6/30
/16
96Do
cumen
t and
Analyze Lessons Learned
2 daysNo
Tue 6/28
/16
Thu 6/30
/1690
CS,HPM
,HC
97Tier 1.3 Cou
nty / Hart /
CDOS (if re
quire
d) Project Review and
Wrap Up Meetin
g0.5 da
ysNo
Thu 6/30
/16
Thu 6/30
/1696
CPM,CS,HPM
,HPS,H
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 6 of 7
State of Colorado UVS
‐ Tier 1.3 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:48
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
98Finalize Transition Plan
to Sup
port
4 hrsN
oThu 6/30
/16
Thu 6/30
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 7 of 7
State of Colorado UVS
‐ Tier 1.3 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:48
PM
This page intentionally blank
STATE OF COLORADO UNIFORM VOTING SYSTEM PPS-59
PRELIMINARY TIER 1.3 PROJECT SCHEDULE – WITHOUT BALLOT PRODUCTION SERVICES
PPS-60 STATE OF COLORADO UNIFORM VOTING SYSTEM
This page intentionally blank
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
1Tier 1.3 Cou
nty Ve
rity Im
plem
entatio
n13
9 da
ys?N
oMon
1/4/16
Thu 7/14
/16
2Co
ntract Signe
d1 dayY
esMon
1/4/16
Mon
1/4/16
3Order Hardw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
4Ve
rity System
Com
pone
nts
1 dayN
oTue 1/5/16
Tue 1/5/16
2CP
M,HTS
5Other Hardw
are ‐ P
Cs, Scann
ers, and
Prin
ters
1 dayN
oWed
1/6/16
Wed
1/6/164
HTS
6Order Softw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
7Ve
rity Ap
plications and
Firm
ware
1 dayN
oTue 1/5/16
Tue 1/5/16
2HT
S
83rd Party Software
1 dayN
oWed
1/6/16
Wed
1/6/167
HTS
9Kickoff M
eetin
g with
Cou
nty
1 day?
Yes
Tue 1/12
/16
Tue 1/12
/162
FS+1
wk
CS,HC,HP
M
10Co
unty app
roval of P
roject Sched
ule / A
ccep
tance Test Plan /
Evaluatio
n Plan
0 daysYes
Tue 1/12
/16
Tue 1/12
/169
FF
11Order Sup
plies
1 dayN
oWed
1/13/16
Wed
1/13/16
9HP
M
12Order Training Materials
1 dayN
oWed
1/13/16
Wed
1/13/16
9,10
HC
13Workflow, Tim
e, and
Resou
rce Plan
ning
2 da
ysNo
Wed
1/13/16
Thu 1/14
/16
14Co
nduct S
ite Survey An
alysis
2 daysNo
Wed
1/13/16
Thu 1/14
/169
15Ap
pliatio
n an
d Pe
riphe
ral H
ardw
are Co
nfiguration in Austin
4.25
daysN
oTh
u 1/21
/16
Wed
1/27/16
16Re
ceive Ap
plication and Pe
riphe
ral H
ardw
are
1 dayN
oThu 1/21
/16
Thu 1/21
/165FS+2 wks
HTS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 1 of 7
State of Colorado UVS
‐ Tier 1.3 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:50
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
17Co
nfigure Ha
rdware
2 daysNo
Fri 1/22/16
Mon
1/25/16
16HT
S
18Test Hardw
are
1 dayN
oTue 1/26
/16
Tue 1/26
/161
7HT
S
19Ship Hardw
are
2 hrsN
oWed
1/27/16
Wed
1/27/16
18HT
S
20Dep
loy Ve
rity System
Softw
are an
d Hardw
are
0.75
daysN
oTu
e 2/2/16
Tue 2/2/16
21Cu
stom
er Receives C
ompu
ter H
ardw
are
2 hrsN
oTue 2/2/16
Tue 2/2/16
19FS+4
days
CS
22Co
nfigure, Test, and Set U
p System
s4 hrsN
oTue 2/2/16
Tue 2/2/16
21CS,HPM
23Cu
stom
er Accep
tance
0 daysYes
Tue 2/2/16
Tue 2/2/16
22CS,HPM
24Re
ceive an
d Ac
cept Verity
Voting Hardw
are
29 days?No
Fri 1/15/16
Wed
2/24/16
25Co
nduct W
areh
ouse Facility Plann
ing
4 hrsN
oFri 1/15/16
Fri 1/15/16
14CS,HPM
26Delivery of Verity
Voting Eq
uipm
ent
6 da
ys?N
oWed
2/17/16
Wed
2/24/16
27Re
ceive Ha
rdware and Enter into Inventory
3 days?N
oWed
2/17/16
Fri 2/19/16
4FS+30
days
CS
28Co
nduct C
ustomer Accep
tance Test
2 daysYes
Mon
2/22/16
Tue 2/23
/162
7CS,HPM
29Co
nfigure for U
se and
Place in Storage
1 dayN
oWed
2/24/16
Wed
2/24/16
28CS
30Dispo
se of o
ld equ
ipmen
t10
days?No
Fri 1/15/16
Fri 1/29/16
25CS
31Co
nduct M
ock Electio
n "Rou
nd Trip
"1 dayN
oFri 1/29/16
Mon
2/1/1630
CS,HPM
,HC
32Co
nduct V
oting for the
June
28, 201
6 Prim
ary Electio
n13
0.5 da
ys?N
oMon
1/4/16
Mon
7/4/16
33Co
unty Staff Training
6.25
daysN
oFri 1/15/16
Mon
1/25/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 2 of 7
State of Colorado UVS
‐ Tier 1.3 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:50
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
34Create Training Plan/Sched
ule
1 dayN
oFri 1/15/16
Fri 1/15/16
14CS,HC
35Secure Cou
nty Ap
proval of T
raining Plan
0 daysYes
Fri 1/15/16
Fri 1/15/16
34
36Ve
rity Managem
ent a
nd Best P
ractices Cou
rse
4 hrsN
oMon
1/18/16
Mon
1/18/16
35CS,HC
37Da
ta Training Co
urse
1 dayN
oMon
1/18/16
Tue 1/19
/163
6CS,HC
38Bu
ild Ope
rator T
raining Co
urse
4 hrsN
oTue 1/19
/16
Tue 1/19
/163
7CS,HC
39Ce
ntral O
perator T
raining Co
urse
4 hrsN
oWed
1/20/16
Wed
1/20/16
38CS,HC
40Co
unt/Re
lay Ope
rator T
raining Co
urse
4 hrsN
oWed
1/20/16
Wed
1/20/16
39CS,HC
41Service & M
ainten
ance Training Co
urse
2 daysNo
Thu 1/21
/16
Fri 1/22/16
40CS,HC
42Po
lling
Place Ope
ratio
ns Training Co
urse
2 hrsN
oMon
1/25/16
Mon
1/25/16
41CS,HC
43Program Ballot
7 da
ys?N
oFri 4/29/16
Mon
5/9/16
44Ba
llot C
ertification
0 daysYes
Fri 4/29/16
Fri 4/29/16
45Da
ta Entry / Im
port into Layou
t1 dayN
oFri 4/29/16
Fri 4/29/16
44CS,HPM
46Proo
f Ballot
1 day?
No
Mon
5/2/16
Mon
5/2/1645
CS
47Enter foreign
language te
xt (if req
uired)
1 day?
No
Tue 5/3/16
Tue 5/3/16
46CS,HPM
48Re
cord Aud
io1 day?
No
Wed
5/4/16
Wed
5/4/1647
CS,HPM
49Final text / aud
iot p
roof of b
allot
1 day?
No
Thu 5/5/16
Thu 5/5/16
48CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 3 of 7
State of Colorado UVS
‐ Tier 1.3 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:50
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
50Ro
und Trip
1 day?
No
Fri 5/6/16
Fri 5/6/1649
CS,HPM
51Ba
llot R
eady fo
r Election
0 daysYes
Fri 5/6/16
Fri 5/6/1650
52Create vDrives
1 day?
No
Mon
5/9/16
Mon
5/9/1651
CS
53By
Mail V
oting
119 da
ys?N
oTh
u 1/14
/16
Tue 6/28
/16
54Order blank
ballot stock fo
r office prin
ting
1 day?
No
Thu 1/14
/16
Thu 1/14
/1612
55Send
files to printer (or prin
t in office)
2 daysNo
Tue 5/10
/16
Wed
5/11/16
52CS
56Print b
allots
1 wkNo
Thu 5/12
/16
Wed
5/18/16
55CS
57Mail ballots ‐ UOCA
VA2 daysNo
Fri 5/13/16
Mon
5/16/16
56SS
CS
58Mail ballots ‐ Re
gular
4 daysNo
Mon
6/6/16
Thu 6/9/16
57CS
59Re
ceive ballots
26 daysN
oTue 5/24
/16
Tue 6/28
/165
7FS+1 wk
CS
60Re
solutio
n Bo
ard Training
2 hrsN
oMon
6/13/16
Mon
6/13/16
59FS‐12 days
CS,HC
61Scan/Resolve ballots
11 daysN
oMon
6/13/16
Tue 6/28
/166
0CS
62Write CV
Rs to
vDrives
1 hr
No
Tue 6/28
/16
Tue 6/28
/166
1HC
,CS
63VS
PCs
36.75 da
ysNo
Tue 5/10
/16
Wed
6/29/16
64Training
0.25
daysN
oMon
6/20/16
Mon
6/20/16
65Po
lling
Place Ope
ratio
ns Training Co
urse(s)
2 hrsN
oMon
6/20/16
Mon
6/20/16
70FS‐7 days
CS,HC
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 4 of 7
State of Colorado UVS
‐ Tier 1.3 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:50
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
66Pre‐de
fine Ve
rity Vo
ting Units in th
e Wareh
ouse
1 hr
No
Tue 5/10
/16
Tue 5/10
/165
2CS
67Marshall and
Dep
loy Equipm
ent to VS
PCs
1 dayN
oFri 6/17/16
Fri 6/17/16
70SS‐1 day,66
CS
68Disburse Sup
plies
4 hrsN
oFri 6/17/16
Fri 6/17/16
67SS
CS
69Setup Po
lls2 hrsN
oFri 6/17/16
Fri 6/17/16
68CS
70VS
PCs o
pen
7 daysNo
Mon
6/20/16
Tue 6/28
/16
71VS
PC Closeou
t2 hrsN
oTue 6/28
/16
Tue 6/28
/167
0FS‐1 day
CS,HPM
72Re
turn Equ
ipmen
t to Wareh
ouse
4 hrsN
oWed
6/29/16
Wed
6/29/16
71FS+1
day
CS
73Co
nduct E
lection Day Voting (ED)
19.5 daysN
oTu
e 6/7/16
Mon
7/4/16
74Marshal Equ
ipmen
t for ED
1 dayN
oMon
6/20/16
Mon
6/20/16
67CS
75Co
nduct P
oll W
orker T
raining
1 wkNo
Tue 6/7/16
Mon
6/13/16
52FS+4
wks
CS,HC
76Pred
efine Ve
rity Vo
ting Units fo
r ED locatio
ns at
Wareh
ouse
1 dayN
oTue 6/21
/16
Tue 6/21
/167
4CS
77De
ploy
equ
ipmen
t to ED
polling place(s)
3 daysNo
Wed
6/22/16
Fri 6/24/16
76CS
78Disburse Sup
plies
6 hrsN
oFri 6/24/16
Fri 6/24/16
77FF
CS
79Setup Po
lls2 hrsN
oMon
6/27/16
Mon
6/27/16
78CS
80ED
Field Sup
port
1 dayN
oMon
6/27/16
Tue 6/28
/167
9HP
M,HC,CS
81Close Po
lls2 hrsN
oTue 6/28
/16
Tue 6/28
/168
0FF
CS,HPM
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 5 of 7
State of Colorado UVS
‐ Tier 1.3 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:50
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
82De
liver vDrives to
Cou
nting Station
2 hrsN
oTue 6/28
/16
Tue 6/28
/168
1CS
83Re
turn Equ
ipmen
t to Wareh
ouse
4 daysNo
Tue 6/28
/16
Mon
7/4/1682
CS
84Ce
ntral Cou
nty Station Plan
ning
and
Ope
ratio
n12
6.5 da
ysNo
Mon
1/4/16
Tue 6/28
/16
85L&
A Test
4 hrsN
oFri 6/17/16
Mon
6/20/16
80SF‐5 days
CS,HPM
86Marshal and
Distrib
ute Equipm
ent to Ce
ntral Cou
nting
Station
2 daysNo
Mon
1/4/16
Tue 1/5/16
CS
87Set U
p CC
S1 dayN
oWed
1/6/16
Wed
1/6/1686
CS
88CC
S Training
2 hrsN
oThu 1/7/16
Thu 1/7/16
87CS,HC
89Tabu
late Election Re
sults
0.25
daysN
oTu
e 6/28
/16
Tue 6/28
/16
90VS
PC vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/167
1CS
91Ab
sentee
vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/166
2CS
92Electio
n Da
y vD
rives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/168
1CD
OS
93Gen
erate Re
ports
1 hr
No
Tue 6/28
/16
Tue 6/28
/169
2CS
94Po
st Election Ac
tivities
12.5 daysN
oTu
e 6/28
/16
Thu 7/14
/16
95Ba
ckup
and
Archive Results
1 hr
No
Tue 6/28
/16
Tue 6/28
/169
3CS
96Po
st Election Au
dit
1 dayN
oThu 7/7/16
Thu 7/7/16
97Canvass
1 dayN
oThu 7/14
/16
Thu 7/14
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 6 of 7
State of Colorado UVS
‐ Tier 1.3 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:50
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
98Co
nduct P
ost E
lection An
alysis / Project W
rap Up
3 da
ysNo
Tue 6/28
/16
Fri 7/1/16
99Do
cumen
t and
Analyze Lessons Learned
3 daysNo
Tue 6/28
/16
Fri 7/1/1693
CS,HPM
,HC
100
Tier 1.3 Cou
nty / Hart /
CDOS (if re
quire
d) Project Review and
Wrap Up Meetin
g0.5 da
ysNo
Fri 7/1/16
Fri 7/1/1699
CPM,CS,HPM
,HPS,H
101
Finalize Transition Plan
to Sup
port
4 hrsN
oFri 7/1/16
Fri 7/1/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 7 of 7
State of Colorado UVS
‐ Tier 1.3 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:50
PM
This page intentionally blank
STATE OF COLORADO UNIFORM VOTING SYSTEM PPS-69
PRELIMINARY TIER 1.4 PROJECT SCHEDULE – WITH BALLOT PRODUCTION SERVICES
PPS-70 STATE OF COLORADO UNIFORM VOTING SYSTEM
This page intentionally blank
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
1Tier 1.4 Cou
nty Ve
rity Im
plem
entatio
n13
9 da
ys?N
oMon
1/4/16
Thu 7/14
/16
2Co
ntract Signe
d1 dayY
esMon
1/4/16
Mon
1/4/16
3Order Hardw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
4Ve
rity System
Com
pone
nts
1 dayN
oTue 1/5/16
Tue 1/5/16
2CP
M,HTS
5Other Hardw
are ‐ P
Cs, Scann
ers, and
Prin
ters
1 dayN
oWed
1/6/16
Wed
1/6/164
HTS
6Order Softw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
7Ve
rity Ap
plications and
Firm
ware
1 dayN
oTue 1/5/16
Tue 1/5/16
2HT
S
83rd Party Software
1 dayN
oWed
1/6/16
Wed
1/6/167
HTS
9Kickoff M
eetin
g with
Cou
nty
1 day?
Yes
Tue 1/12
/16
Tue 1/12
/162
FS+1
wk
CS,HC,HP
M
10Co
unty app
roval of P
roject Sched
ule / A
ccep
tance Test Plan /
Evaluatio
n Plan
0 daysYes
Tue 1/12
/16
Tue 1/12
/169
FF
11Order Sup
plies
1 dayN
oWed
1/13/16
Wed
1/13/16
9HP
M
12Order Training Materials
1 dayN
oWed
1/13/16
Wed
1/13/16
9,10
HC
13Workflow, Tim
e, and
Resou
rce Plan
ning
2 da
ysNo
Wed
1/13/16
Thu 1/14
/16
14Co
nduct S
ite Survey An
alysis
2 daysNo
Wed
1/13/16
Thu 1/14
/169
15Ap
pliatio
n an
d Pe
riphe
ral H
ardw
are Co
nfiguration in Austin
4.25
daysN
oTh
u 1/21
/16
Wed
1/27/16
16Re
ceive Ap
plication and Pe
riphe
ral H
ardw
are
1 dayN
oThu 1/21
/16
Thu 1/21
/165FS+2 wks
HTS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 1 of 7
State of Colorado UVS
‐ Tier 1.4 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:52
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
17Co
nfigure Ha
rdware
2 daysNo
Fri 1/22/16
Mon
1/25/16
16HT
S
18Test Hardw
are
1 dayN
oTue 1/26
/16
Tue 1/26
/161
7HT
S
19Ship Hardw
are
2 hrsN
oWed
1/27/16
Wed
1/27/16
18HT
S
20Dep
loy Ve
rity System
Softw
are an
d Hardw
are
0.75
daysN
oTu
e 2/2/16
Tue 2/2/16
21Cu
stom
er Receives C
ompu
ter H
ardw
are
2 hrsN
oTue 2/2/16
Tue 2/2/16
19FS+4
days
CS
22Co
nfigure, Test, and Set U
p System
s4 hrsN
oTue 2/2/16
Tue 2/2/16
21CS,HPM
23Cu
stom
er Accep
tance
0 daysYes
Tue 2/2/16
Tue 2/2/16
22CS,HPM
24Re
ceive an
d Ac
cept Verity
Voting Hardw
are
37 days?No
Mon
1/4/16
Tue 2/23
/16
25Delivery of Verity
Voting Eq
uipm
ent
5 da
ys?N
oWed
2/17/16
Tue 2/23
/16
26Re
ceive Ha
rdware and Enter into Inventory
3 days?N
oWed
2/17/16
Fri 2/19/16
4FS+30
days
CS
27Co
nduct C
ustomer Accep
tance Test
1 dayY
esMon
2/22/16
Mon
2/22/16
26CS,HPM
28Co
nfigure for U
se and
Place in Storage
1 dayN
oTue 2/23
/16
Tue 2/23
/162
7CS
29Dispo
se of o
ld equ
ipmen
t10
days?No
Mon
1/4/16
Fri 1/15/16
CS30
Cond
uct M
ock Electio
n "Rou
nd Trip
"1 dayN
oMon
1/18/16
Mon
1/18/16
29CS,HPM
,HC
31Co
nduct V
oting for the
June
28, 201
6 Prim
ary Electio
n13
0.5 da
ys?N
oMon
1/4/16
Mon
7/4/16
32Co
unty Staff Training
10 daysN
oMon
1/4/16
Fri 1/15/16
33Create Training Plan/Sched
ule
4 hrsN
oFri 1/15/16
Fri 1/15/16
14CS,HC
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 2 of 7
State of Colorado UVS
‐ Tier 1.4 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:52
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
34Secure Cou
nty Ap
proval of T
raining Plan
0 daysYes
Fri 1/15/16
Fri 1/15/16
33
35Ve
rity Managem
ent a
nd Best P
ractices Cou
rse
4 hrsN
oFri 1/15/16
Fri 1/15/16
34CS,HC
36Ce
ntral O
perator T
raining Co
urse
4 hrsN
oMon
1/4/16
Mon
1/4/16
CS,HC
37Co
unt/Re
lay Ope
rator T
raining Co
urse
4 hrsN
oMon
1/4/16
Mon
1/4/1636
CS,HC
38Service & M
ainten
ance Training Co
urse
2 daysNo
Tue 1/5/16
Wed
1/6/1637
CS,HC
39Po
lling
Place Ope
ratio
ns Training Co
urse
2 hrsN
oThu 1/7/16
Thu 1/7/16
38CS,HC
40Program Ballot
6 da
ys?N
oFri 4/29/16
Fri 5/6/16
41Ba
llot C
ertification
0 daysYes
Fri 4/29/16
Fri 4/29/16
42Da
ta Entry / Im
port into Layou
t1 dayN
oFri 4/29/16
Fri 4/29/16
41CS,HPM
43Proo
f Ballot
1 day?
No
Mon
5/2/16
Mon
5/2/1642
CS
44Enter foreign
language te
xt (if req
uired)
1 day?
No
Tue 5/3/16
Tue 5/3/16
43CS,HPM
45Re
cord Aud
io1 day?
No
Wed
5/4/16
Wed
5/4/1644
CS,HPM
46Final text / aud
iot p
roof of b
allot
4 hrs?No
Thu 5/5/16
Thu 5/5/16
45CS
47Ro
und Trip
4 hrsN
oThu 5/5/16
Thu 5/5/16
46CS,HPM
48Ba
llot R
eady fo
r Election
0 daysYes
Thu 5/5/16
Thu 5/5/16
47
49Create vDrives
1 day?
No
Fri 5/6/16
Fri 5/6/1648
CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 3 of 7
State of Colorado UVS
‐ Tier 1.4 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:52
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
50By
Mail V
oting
119 da
ys?N
oTh
u 1/14
/16
Tue 6/28
/16
51Order blank
ballot stock fo
r office prin
ting
1 day?
No
Thu 1/14
/16
Thu 1/14
/1612
52Send
files to printer (or prin
t in office)
2 daysNo
Mon
5/9/16
Tue 5/10
/164
9CS
53Print b
allots
1 wkNo
Wed
5/11/16
Tue 5/17
/165
2CS
54Mail ballots ‐ UOCA
VA2 daysNo
Fri 5/13/16
Mon
5/16/16
53SS
CS
55Mail ballots ‐ Re
gular
4 daysNo
Mon
6/6/16
Thu 6/9/16
54CS
56Re
ceive ballots
26 daysN
oTue 5/24
/16
Tue 6/28
/165
4FS+1 wk
CS
57Re
solutio
n Bo
ard Training
2 hrsN
oMon
6/13/16
Mon
6/13/16
56FS‐12 days
CS,HC
58Scan/Resolve ballots
11 daysN
oMon
6/13/16
Tue 6/28
/165
7CS
59Write CV
Rs to
vDrives
1 hr
No
Tue 6/28
/16
Tue 6/28
/165
8HC
,CS
60VS
PCs
37.75 da
ysNo
Mon
5/9/16
Wed
6/29/16
61Training
0.25
daysN
oMon
6/20/16
Mon
6/20/16
62Po
lling
Place Ope
ratio
ns Training Co
urse(s)
2 hrsN
oMon
6/20/16
Mon
6/20/16
67FS‐7 days
CS,HC
63Pre‐de
fine Ve
rity Vo
ting Units in th
e Wareh
ouse
1 hr
No
Mon
5/9/16
Mon
5/9/1649
CS
64Marshall and
Dep
loy Equipm
ent to VS
PCs
1 dayN
oFri 6/17/16
Fri 6/17/16
67SS‐1 day,63
CS
65Disburse Sup
plies
4 hrsN
oFri 6/17/16
Fri 6/17/16
64SS
CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 4 of 7
State of Colorado UVS
‐ Tier 1.4 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:52
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
66Setup Po
lls2 hrsN
oFri 6/17/16
Fri 6/17/16
65CS
67VS
PCs o
pen
7 daysNo
Mon
6/20/16
Tue 6/28
/16
68VS
PC Closeou
t2 hrsN
oTue 6/28
/16
Tue 6/28
/166
7FS‐1 day
CS,HPM
69Re
turn Equ
ipmen
t to Wareh
ouse
4 hrsN
oWed
6/29/16
Wed
6/29/16
68FS+1
day
CS
70Co
nduct E
lection Day Voting (ED)
20.5 daysN
oMon
6/6/16
Mon
7/4/16
71Marshal Equ
ipmen
t for ED
1 dayN
oMon
6/20/16
Mon
6/20/16
64CS
72Co
nduct P
oll W
orker T
raining
1 wkNo
Mon
6/6/16
Fri 6/10/16
49FS+4
wks
CS,HC
73Pred
efine Ve
rity Vo
ting Units fo
r ED locatio
ns at
Wareh
ouse
1 dayN
oTue 6/21
/16
Tue 6/21
/167
1CS
74De
ploy
equ
ipmen
t to ED
polling place(s)
3 daysNo
Wed
6/22/16
Fri 6/24/16
73CS
75Disburse Sup
plies
6 hrsN
oFri 6/24/16
Fri 6/24/16
74FF
CS
76Setup Po
lls2 hrsN
oMon
6/27/16
Mon
6/27/16
75CS
77ED
Field Sup
port
1 dayN
oMon
6/27/16
Tue 6/28
/167
6HP
M,HC,CS
78Close Po
lls2 hrsN
oTue 6/28
/16
Tue 6/28
/167
7FF
CS,HPM
79De
liver vDrives to
Cou
nting Station
2 hrsN
oTue 6/28
/16
Tue 6/28
/167
8CS
80Re
turn Equ
ipmen
t to Wareh
ouse
4 daysNo
Tue 6/28
/16
Mon
7/4/1679
CS
81Ce
ntral Cou
nty Station Plan
ning
and
Ope
ratio
n12
6.5 da
ysNo
Mon
1/4/16
Tue 6/28
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 5 of 7
State of Colorado UVS
‐ Tier 1.4 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:52
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
82L&
A Test
4 hrsN
oFri 6/17/16
Mon
6/20/16
77SF‐5 days
CS,HPM
83Marshal and
Distrib
ute Equipm
ent to Ce
ntral Cou
nting
Station
2 daysNo
Mon
1/4/16
Tue 1/5/16
CS
84Set U
p CC
S1 dayN
oWed
1/6/16
Wed
1/6/1683
CS
85CC
S Training
2 hrsN
oThu 1/7/16
Thu 1/7/16
84CS,HC
86Tabu
late Election Re
sults
0.25
daysN
oTu
e 6/28
/16
Tue 6/28
/16
87VS
PC vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/166
8CS
88Ab
sentee
vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/165
9CS
89Electio
n Da
y vD
rives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/167
8CD
OS
90Gen
erate Re
ports
1 hr
No
Tue 6/28
/16
Tue 6/28
/168
9CS
91Po
st Election Ac
tivities
12.5 daysN
oTu
e 6/28
/16
Thu 7/14
/16
92Ba
ckup
and
Archive Results
1 hr
No
Tue 6/28
/16
Tue 6/28
/169
0CS
93Po
st Election Au
dit
1 dayN
oThu 7/7/16
Thu 7/7/16
94Canvass
1 dayN
oThu 7/14
/16
Thu 7/14
/16
95Co
nduct P
ost E
lection An
alysis / Project W
rap Up
2 da
ysNo
Tue 6/28
/16
Thu 6/30
/16
96Do
cumen
t and
Analyze Lessons Learned
2 daysNo
Tue 6/28
/16
Thu 6/30
/1690
CS,HPM
,HC
97Tier 1.4 Cou
nty / Hart /
CDOS (if re
quire
d) Project Review and
Wrap Up Meetin
g0.5 da
ysNo
Thu 6/30
/16
Thu 6/30
/1696
CPM,CS,HPM
,HPS,H
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 6 of 7
State of Colorado UVS
‐ Tier 1.4 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:52
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
98Finalize Transition Plan
to Sup
port
4 hrsN
oThu 6/30
/16
Thu 6/30
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 7 of 7
State of Colorado UVS
‐ Tier 1.4 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:52
PM
This page intentionally blank
STATE OF COLORADO UNIFORM VOTING SYSTEM PPS-79
PRELIMINARY TIER 1.4 PROJECT SCHEDULE – WITHOUT BALLOT PRODUCTION SERVICES
PPS-80 STATE OF COLORADO UNIFORM VOTING SYSTEM
This page intentionally blank
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
1Tier 1.4 Cou
nty Ve
rity Im
plem
entatio
n13
9 da
ys?N
oMon
1/4/16
Thu 7/14
/16
2Co
ntract Signe
d1 dayY
esMon
1/4/16
Mon
1/4/16
3Order Hardw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
4Ve
rity System
Com
pone
nts
1 dayN
oTue 1/5/16
Tue 1/5/16
2CP
M,HTS
5Other Hardw
are ‐ P
Cs, Scann
ers, and
Prin
ters
1 dayN
oWed
1/6/16
Wed
1/6/164
HTS
6Order Softw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
7Ve
rity Ap
plications and
Firm
ware
1 dayN
oTue 1/5/16
Tue 1/5/16
2HT
S
83rd Party Software
1 dayN
oWed
1/6/16
Wed
1/6/167
HTS
9Kickoff M
eetin
g with
Cou
nty
1 day?
Yes
Tue 1/12
/16
Tue 1/12
/162
FS+1
wk
CS,HC,HP
M
10Co
unty app
roval of P
roject Sched
ule / A
ccep
tance Test Plan /
Evaluatio
n Plan
0 daysYes
Tue 1/12
/16
Tue 1/12
/169
FF
11Order Sup
plies
1 dayN
oWed
1/13/16
Wed
1/13/16
9HP
M
12Order Training Materials
1 dayN
oWed
1/13/16
Wed
1/13/16
9,10
HC
13Workflow, Tim
e, and
Resou
rce Plan
ning
2 da
ysNo
Wed
1/13/16
Thu 1/14
/16
14Co
nduct S
ite Survey An
alysis
2 daysNo
Wed
1/13/16
Thu 1/14
/169
15Ap
pliatio
n an
d Pe
riphe
ral H
ardw
are Co
nfiguration in Austin
4.25
daysN
oTh
u 1/21
/16
Wed
1/27/16
16Re
ceive Ap
plication and Pe
riphe
ral H
ardw
are
1 dayN
oThu 1/21
/16
Thu 1/21
/165FS+2 wks
HTS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 1 of 7
State of Colorado UVS
‐ Tier 1.4 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:54
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
17Co
nfigure Ha
rdware
2 daysNo
Fri 1/22/16
Mon
1/25/16
16HT
S
18Test Hardw
are
1 dayN
oTue 1/26
/16
Tue 1/26
/161
7HT
S
19Ship Hardw
are
2 hrsN
oWed
1/27/16
Wed
1/27/16
18HT
S
20Dep
loy Ve
rity System
Softw
are an
d Hardw
are
0.75
daysN
oTu
e 2/2/16
Tue 2/2/16
21Cu
stom
er Receives C
ompu
ter H
ardw
are
2 hrsN
oTue 2/2/16
Tue 2/2/16
19FS+4
days
CS
22Co
nfigure, Test, and Set U
p System
s4 hrsN
oTue 2/2/16
Tue 2/2/16
21CS,HPM
23Cu
stom
er Accep
tance
0 daysYes
Tue 2/2/16
Tue 2/2/16
22CS,HPM
24Re
ceive an
d Ac
cept Verity
Voting Hardw
are
37 days?No
Mon
1/4/16
Tue 2/23
/16
25Delivery of Verity
Voting Eq
uipm
ent
5 da
ys?N
oWed
2/17/16
Tue 2/23
/16
26Re
ceive Ha
rdware and Enter into Inventory
3 days?N
oWed
2/17/16
Fri 2/19/16
4FS+30
days
CS
27Co
nduct C
ustomer Accep
tance Test
1 dayY
esMon
2/22/16
Mon
2/22/16
26CS,HPM
28Co
nfigure for U
se and
Place in Storage
1 dayN
oTue 2/23
/16
Tue 2/23
/162
7CS
29Dispo
se of o
ld equ
ipmen
t10
days?No
Mon
1/4/16
Fri 1/15/16
CS30
Cond
uct M
ock Electio
n "Rou
nd Trip
"1 dayN
oMon
1/18/16
Mon
1/18/16
29CS,HPM
,HC
31Co
nduct V
oting for the
June
28, 201
6 Prim
ary Electio
n13
0.5 da
ys?N
oMon
1/4/16
Mon
7/4/16
32Co
unty Staff Training
5.75
daysN
oFri 1/15/16
Fri 1/22/16
33Create Training Plan/Sched
ule
4 hrsN
oFri 1/15/16
Fri 1/15/16
14CS,HC
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 2 of 7
State of Colorado UVS
‐ Tier 1.4 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:54
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
34Secure Cou
nty Ap
proval of T
raining Plan
0 daysYes
Fri 1/15/16
Fri 1/15/16
33
35Ve
rity Managem
ent a
nd Best P
ractices Cou
rse
4 hrsN
oFri 1/15/16
Fri 1/15/16
34CS,HC
36Da
ta Training Co
urse
1 dayN
oMon
1/18/16
Mon
1/18/16
35CS,HC
37Bu
ild Ope
rator T
raining Co
urse
4 hrsN
oTue 1/19
/16
Tue 1/19
/163
6CS,HC
38Ce
ntral O
perator T
raining Co
urse
4 hrsN
oTue 1/19
/16
Tue 1/19
/163
7CS,HC
39Co
unt/Re
lay Ope
rator T
raining Co
urse
4 hrsN
oWed
1/20/16
Wed
1/20/16
38CS,HC
40Service & M
ainten
ance Training Co
urse
2 daysNo
Wed
1/20/16
Fri 1/22/16
39CS,HC
41Po
lling
Place Ope
ratio
ns Training Co
urse
2 hrsN
oFri 1/22/16
Fri 1/22/16
40CS,HC
42Program Ballot
6 da
ys?N
oFri 4/29/16
Fri 5/6/16
43Ba
llot C
ertification
0 daysYes
Fri 4/29/16
Fri 4/29/16
44Da
ta Entry / Im
port into Layou
t1 dayN
oFri 4/29/16
Fri 4/29/16
43CS,HPM
45Proo
f Ballot
1 day?
No
Mon
5/2/16
Mon
5/2/1644
CS
46Enter foreign
language te
xt (if req
uired)
1 day?
No
Tue 5/3/16
Tue 5/3/16
45CS,HPM
47Re
cord Aud
io1 day?
No
Wed
5/4/16
Wed
5/4/1646
CS,HPM
48Final text / aud
iot p
roof of b
allot
4 hrs?No
Thu 5/5/16
Thu 5/5/16
47CS
49Ro
und Trip
4 hrsN
oThu 5/5/16
Thu 5/5/16
48CS,HPM
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 3 of 7
State of Colorado UVS
‐ Tier 1.4 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:54
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
50Ba
llot R
eady fo
r Election
0 daysYes
Thu 5/5/16
Thu 5/5/16
49
51Create vDrives
1 day?
No
Fri 5/6/16
Fri 5/6/1650
CS
52By
Mail V
oting
119 da
ys?N
oTh
u 1/14
/16
Tue 6/28
/16
53Order blank
ballot stock fo
r office prin
ting
1 day?
No
Thu 1/14
/16
Thu 1/14
/1612
54Send
files to printer (or prin
t in office)
2 daysNo
Mon
5/9/16
Tue 5/10
/165
1CS
55Print b
allots
1 wkNo
Wed
5/11/16
Tue 5/17
/165
4CS
56Mail ballots ‐ UOCA
VA2 daysNo
Fri 5/13/16
Mon
5/16/16
55SS
CS
57Mail ballots ‐ Re
gular
4 daysNo
Mon
6/6/16
Thu 6/9/16
56CS
58Re
ceive ballots
26 daysN
oTue 5/24
/16
Tue 6/28
/165
6FS+1 wk
CS
59Re
solutio
n Bo
ard Training
2 hrsN
oMon
6/13/16
Mon
6/13/16
58FS‐12 days
CS,HC
60Scan/Resolve ballots
11 daysN
oMon
6/13/16
Tue 6/28
/165
9CS
61Write CV
Rs to
vDrives
1 hr
No
Tue 6/28
/16
Tue 6/28
/166
0HC
,CS
62VS
PCs
37.75 da
ysNo
Mon
5/9/16
Wed
6/29/16
63Training
0.25
daysN
oMon
6/20/16
Mon
6/20/16
64Po
lling
Place Ope
ratio
ns Training Co
urse(s)
2 hrsN
oMon
6/20/16
Mon
6/20/16
69FS‐7 days
CS,HC
65Pre‐de
fine Ve
rity Vo
ting Units in th
e Wareh
ouse
1 hr
No
Mon
5/9/16
Mon
5/9/1651
CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 4 of 7
State of Colorado UVS
‐ Tier 1.4 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:54
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
66Marshall and
Dep
loy Equipm
ent to VS
PCs
1 dayN
oFri 6/17/16
Fri 6/17/16
69SS‐1 day,65
CS
67Disburse Sup
plies
4 hrsN
oFri 6/17/16
Fri 6/17/16
66SS
CS
68Setup Po
lls2 hrsN
oFri 6/17/16
Fri 6/17/16
67CS
69VS
PCs o
pen
7 daysNo
Mon
6/20/16
Tue 6/28
/16
70VS
PC Closeou
t2 hrsN
oTue 6/28
/16
Tue 6/28
/166
9FS‐1 day
CS,HPM
71Re
turn Equ
ipmen
t to Wareh
ouse
4 hrsN
oWed
6/29/16
Wed
6/29/16
70FS+1
day
CS
72Co
nduct E
lection Day Voting (ED)
20.5 daysN
oMon
6/6/16
Mon
7/4/16
73Marshal Equ
ipmen
t for ED
1 dayN
oMon
6/20/16
Mon
6/20/16
66CS
74Co
nduct P
oll W
orker T
raining
1 wkNo
Mon
6/6/16
Fri 6/10/16
51FS+4
wks
CS,HC
75Pred
efine Ve
rity Vo
ting Units fo
r ED locatio
ns at
Wareh
ouse
1 dayN
oTue 6/21
/16
Tue 6/21
/167
3CS
76De
ploy
equ
ipmen
t to ED
polling place(s)
3 daysNo
Wed
6/22/16
Fri 6/24/16
75CS
77Disburse Sup
plies
6 hrsN
oFri 6/24/16
Fri 6/24/16
76FF
CS
78Setup Po
lls2 hrsN
oMon
6/27/16
Mon
6/27/16
77CS
79ED
Field Sup
port
1 dayN
oMon
6/27/16
Tue 6/28
/167
8HP
M,HC,CS
80Close Po
lls2 hrsN
oTue 6/28
/16
Tue 6/28
/167
9FF
CS,HPM
81De
liver vDrives to
Cou
nting Station
2 hrsN
oTue 6/28
/16
Tue 6/28
/168
0CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 5 of 7
State of Colorado UVS
‐ Tier 1.4 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:54
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
82Re
turn Equ
ipmen
t to Wareh
ouse
4 daysNo
Tue 6/28
/16
Mon
7/4/1681
CS
83Ce
ntral Cou
nty Station Plan
ning
and
Ope
ratio
n12
6.5 da
ysNo
Mon
1/4/16
Tue 6/28
/16
84L&
A Test
4 hrsN
oFri 6/17/16
Mon
6/20/16
79SF‐5 days
CS,HPM
85Marshal and
Distrib
ute Equipm
ent to Ce
ntral Cou
nting
Station
2 daysNo
Mon
1/4/16
Tue 1/5/16
CS
86Set U
p CC
S1 dayN
oWed
1/6/16
Wed
1/6/1685
CS
87CC
S Training
2 hrsN
oThu 1/7/16
Thu 1/7/16
86CS,HC
88Tabu
late Election Re
sults
0.25
daysN
oTu
e 6/28
/16
Tue 6/28
/16
89VS
PC vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/167
0CS
90Ab
sentee
vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/166
1CS
91Electio
n Da
y vD
rives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/168
0CD
OS
92Gen
erate Re
ports
1 hr
No
Tue 6/28
/16
Tue 6/28
/169
1CS
93Po
st Election Ac
tivities
12.5 daysN
oTu
e 6/28
/16
Thu 7/14
/16
94Ba
ckup
and
Archive Results
1 hr
No
Tue 6/28
/16
Tue 6/28
/169
2CS
95Po
st Election Au
dit
1 dayN
oThu 7/7/16
Thu 7/7/16
96Canvass
1 dayN
oThu 7/14
/16
Thu 7/14
/16
97Co
nduct P
ost E
lection An
alysis / Project W
rap Up
2 da
ysNo
Tue 6/28
/16
Thu 6/30
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 6 of 7
State of Colorado UVS
‐ Tier 1.4 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:54
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
98Do
cumen
t and
Analyze Lessons Learned
2 daysNo
Tue 6/28
/16
Thu 6/30
/1692
CS,HPM
,HC
99Tier 1.4 Cou
nty / Hart /
CDOS (if re
quire
d) Project Review and
Wrap Up Meetin
g0.5 da
ysNo
Thu 6/30
/16
Thu 6/30
/1698
CPM,CS,HPM
,HPS,H
100
Finalize Transition Plan
to Sup
port
4 hrsN
oThu 6/30
/16
Thu 6/30
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 7 of 7
State of Colorado UVS
‐ Tier 1.4 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:54
PM
This page intentionally blank
STATE OF COLORADO UNIFORM VOTING SYSTEM PPS-89
PRELIMINARY TIER 2 PROJECT SCHEDULE – WITH BALLOT PRODUCTION SERVICES
PPS-90 STATE OF COLORADO UNIFORM VOTING SYSTEM
This page intentionally blank
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
1Tier 2 Cou
nty Ve
rity Im
plem
entatio
n13
9 da
ys?N
oMon
1/4/16
Thu 7/14
/16
2Co
ntract Signe
d1 dayY
esMon
1/4/16
Mon
1/4/16
3Order Hardw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
4Ve
rity System
Com
pone
nts
1 dayN
oTue 1/5/16
Tue 1/5/16
2CP
M,HTS
5Other Hardw
are ‐ P
Cs, Scann
ers, and
Prin
ters
1 dayN
oWed
1/6/16
Wed
1/6/164
HTS
6Order Softw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
7Ve
rity Ap
plications and
Firm
ware
1 dayN
oTue 1/5/16
Tue 1/5/16
2HT
S
83rd Party Software
1 dayN
oWed
1/6/16
Wed
1/6/167
HTS
9Kickoff M
eetin
g with
Cou
nty
1 day?
Yes
Tue 1/12
/16
Tue 1/12
/162
FS+1
wk
CS,HC,HP
M
10Co
unty app
roval of P
roject Sched
ule / A
ccep
tance Test Plan /
Evaluatio
n Plan
0 daysYes
Tue 1/12
/16
Tue 1/12
/169
FF
11Order Sup
plies
1 dayN
oWed
1/13/16
Wed
1/13/16
9HP
M
12Order Training Materials
1 dayN
oWed
1/13/16
Wed
1/13/16
9,10
HC
13Workflow, Tim
e, and
Resou
rce Plan
ning
2 da
ysNo
Wed
1/13/16
Thu 1/14
/16
14Co
nduct S
ite Survey An
alysis
2 daysNo
Wed
1/13/16
Thu 1/14
/169
15Ap
pliatio
n an
d Pe
riphe
ral H
ardw
are Co
nfiguration in Austin
4.25
daysN
oTh
u 1/21
/16
Wed
1/27/16
16Re
ceive Ap
plication and Pe
riphe
ral H
ardw
are
1 dayN
oThu 1/21
/16
Thu 1/21
/165FS+2 wks
HTS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 1 of 7
State of Colorado UVS
‐ Tier 2 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:56
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
17Co
nfigure Ha
rdware
2 daysNo
Fri 1/22/16
Mon
1/25/16
16HT
S
18Test Hardw
are
1 dayN
oTue 1/26
/16
Tue 1/26
/161
7HT
S
19Ship Hardw
are
2 hrsN
oWed
1/27/16
Wed
1/27/16
18HT
S
20Dep
loy Ve
rity System
Softw
are an
d Hardw
are
0.75
daysN
oTu
e 2/2/16
Tue 2/2/16
21Cu
stom
er Receives C
ompu
ter H
ardw
are
2 hrsN
oTue 2/2/16
Tue 2/2/16
19FS+4
days
CS
22Co
nfigure, Test, and Set U
p System
s4 hrsN
oTue 2/2/16
Tue 2/2/16
21CS,HPM
23Cu
stom
er Accep
tance
0 daysYes
Tue 2/2/16
Tue 2/2/16
22CS,HPM
24Re
ceive an
d Ac
cept Verity
Voting Hardw
are
37 days?No
Mon
1/4/16
Tue 2/23
/16
25Delivery of Verity
Voting Eq
uipm
ent
5 da
ys?N
oWed
2/17/16
Tue 2/23
/16
26Re
ceive Ha
rdware and Enter into Inventory
3 days?N
oWed
2/17/16
Fri 2/19/16
4FS+30
days
CS
27Co
nduct C
ustomer Accep
tance Test
1 dayY
esMon
2/22/16
Mon
2/22/16
26CS,HPM
28Co
nfigure for U
se and
Place in Storage
1 dayN
oTue 2/23
/16
Tue 2/23
/162
7CS
29Dispo
se of o
ld equ
ipmen
t10
days?No
Mon
1/4/16
Fri 1/15/16
CS30
Cond
uct M
ock Electio
n "Rou
nd Trip
"1 dayN
oMon
1/18/16
Mon
1/18/16
29CS,HPM
,HC
31Co
nduct V
oting for the
June
28, 201
6 Prim
ary Electio
n13
0.5 da
ys?N
oMon
1/4/16
Mon
7/4/16
32Co
unty Staff Training
10 daysN
oMon
1/4/16
Fri 1/15/16
33Create Training Plan/Sched
ule
4 hrsN
oFri 1/15/16
Fri 1/15/16
14CS,HC
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 2 of 7
State of Colorado UVS
‐ Tier 2 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:56
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
34Secure Cou
nty Ap
proval of T
raining Plan
0 daysYes
Fri 1/15/16
Fri 1/15/16
33
35Ve
rity Managem
ent a
nd Best P
ractices Cou
rse
4 hrsN
oFri 1/15/16
Fri 1/15/16
34CS,HC
36Ce
ntral O
perator T
raining Co
urse
4 hrsN
oMon
1/4/16
Mon
1/4/16
CS,HC
37Co
unt/Re
lay Ope
rator T
raining Co
urse
4 hrsN
oMon
1/4/16
Mon
1/4/1636
CS,HC
38Service & M
ainten
ance Training Co
urse
2 daysNo
Tue 1/5/16
Wed
1/6/1637
CS,HC
39Po
lling
Place Ope
ratio
ns Training Co
urse
2 hrsN
oThu 1/7/16
Thu 1/7/16
38CS,HC
40Program Ballot
6 da
ys?N
oFri 4/29/16
Fri 5/6/16
41Ba
llot C
ertification
0 daysYes
Fri 4/29/16
Fri 4/29/16
42Da
ta Entry / Im
port into Layou
t1 dayN
oFri 4/29/16
Fri 4/29/16
41CS,HPM
43Proo
f Ballot
1 day?
No
Mon
5/2/16
Mon
5/2/1642
CS
44Enter foreign
language te
xt (if req
uired)
1 day?
No
Tue 5/3/16
Tue 5/3/16
43CS,HPM
45Re
cord Aud
io1 day?
No
Wed
5/4/16
Wed
5/4/1644
CS,HPM
46Final text / aud
iot p
roof of b
allot
4 hrs?No
Thu 5/5/16
Thu 5/5/16
45CS
47Ro
und Trip
4 hrsN
oThu 5/5/16
Thu 5/5/16
46CS,HPM
48Ba
llot R
eady fo
r Election
0 daysYes
Thu 5/5/16
Thu 5/5/16
47
49Create vDrives
1 day?
No
Fri 5/6/16
Fri 5/6/1648
CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 3 of 7
State of Colorado UVS
‐ Tier 2 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:56
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
50By
Mail V
oting
119 da
ys?N
oTh
u 1/14
/16
Tue 6/28
/16
51Order blank
ballot stock fo
r office prin
ting
1 day?
No
Thu 1/14
/16
Thu 1/14
/1612
52Send
files to printer (or prin
t in office)
2 daysNo
Mon
5/9/16
Tue 5/10
/164
9CS
53Print b
allots
1 wkNo
Wed
5/11/16
Tue 5/17
/165
2CS
54Mail ballots ‐ UOCA
VA2 daysNo
Fri 5/13/16
Mon
5/16/16
53SS
CS
55Mail ballots ‐ Re
gular
4 daysNo
Mon
6/6/16
Thu 6/9/16
54CS
56Re
ceive ballots
26 daysN
oTue 5/24
/16
Tue 6/28
/165
4FS+1 wk
CS
57Re
solutio
n Bo
ard Training
2 hrsN
oMon
6/13/16
Mon
6/13/16
56FS‐12 days
CS,HC
58Scan/Resolve ballots
11 daysN
oMon
6/13/16
Tue 6/28
/165
7CS
59Write CV
Rs to
vDrives
1 hr
No
Tue 6/28
/16
Tue 6/28
/165
8HC
,CS
60VS
PCs
37.75 da
ysNo
Mon
5/9/16
Wed
6/29/16
61Training
0.25
daysN
oMon
6/20/16
Mon
6/20/16
62Po
lling
Place Ope
ratio
ns Training Co
urse(s)
2 hrsN
oMon
6/20/16
Mon
6/20/16
67FS‐7 days
CS,HC
63Pre‐de
fine Ve
rity Vo
ting Units in th
e Wareh
ouse
1 hr
No
Mon
5/9/16
Mon
5/9/1649
CS
64Marshall and
Dep
loy Equipm
ent to VS
PCs
1 dayN
oFri 6/17/16
Fri 6/17/16
67SS‐1 day,63
CS
65Disburse Sup
plies
4 hrsN
oFri 6/17/16
Fri 6/17/16
64SS
CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 4 of 7
State of Colorado UVS
‐ Tier 2 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:56
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
66Setup Po
lls2 hrsN
oFri 6/17/16
Fri 6/17/16
65CS
67VS
PCs o
pen
7 daysNo
Mon
6/20/16
Tue 6/28
/16
68VS
PC Closeou
t2 hrsN
oTue 6/28
/16
Tue 6/28
/166
7FS‐1 day
CS,HPM
69Re
turn Equ
ipmen
t to Wareh
ouse
4 hrsN
oWed
6/29/16
Wed
6/29/16
68FS+1
day
CS
70Co
nduct E
lection Day Voting (ED)
20.5 daysN
oMon
6/6/16
Mon
7/4/16
71Marshal Equ
ipmen
t for ED
1 dayN
oMon
6/20/16
Mon
6/20/16
64CS
72Co
nduct P
oll W
orker T
raining
1 wkNo
Mon
6/6/16
Fri 6/10/16
49FS+4
wks
CS,HC
73Pred
efine Ve
rity Vo
ting Units fo
r ED locatio
ns at
Wareh
ouse
1 dayN
oTue 6/21
/16
Tue 6/21
/167
1CS
74De
ploy
equ
ipmen
t to ED
polling place(s)
3 daysNo
Wed
6/22/16
Fri 6/24/16
73CS
75Disburse Sup
plies
6 hrsN
oFri 6/24/16
Fri 6/24/16
74FF
CS
76Setup Po
lls2 hrsN
oMon
6/27/16
Mon
6/27/16
75CS
77ED
Field Sup
port
1 dayN
oMon
6/27/16
Tue 6/28
/167
6HP
M,HC,CS
78Close Po
lls2 hrsN
oTue 6/28
/16
Tue 6/28
/167
7FF
CS,HPM
79De
liver vDrives to
Cou
nting Station
2 hrsN
oTue 6/28
/16
Tue 6/28
/167
8CS
80Re
turn Equ
ipmen
t to Wareh
ouse
4 daysNo
Tue 6/28
/16
Mon
7/4/1679
CS
81Ce
ntral Cou
nty Station Plan
ning
and
Ope
ratio
n12
6.5 da
ysNo
Mon
1/4/16
Tue 6/28
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 5 of 7
State of Colorado UVS
‐ Tier 2 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:56
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
82L&
A Test
4 hrsN
oFri 6/17/16
Mon
6/20/16
77SF‐5 days
CS,HPM
83Marshal and
Distrib
ute Equipm
ent to Ce
ntral Cou
nting
Station
2 daysNo
Mon
1/4/16
Tue 1/5/16
CS
84Set U
p CC
S1 dayN
oWed
1/6/16
Wed
1/6/1683
CS
85CC
S Training
2 hrsN
oThu 1/7/16
Thu 1/7/16
84CS,HC
86Tabu
late Election Re
sults
0.25
daysN
oTu
e 6/28
/16
Tue 6/28
/16
87VS
PC vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/166
8CS
88Ab
sentee
vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/165
9CS
89Electio
n Da
y vD
rives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/167
8CD
OS
90Gen
erate Re
ports
1 hr
No
Tue 6/28
/16
Tue 6/28
/168
9CS
91Po
st Election Ac
tivities
12.5 daysN
oTu
e 6/28
/16
Thu 7/14
/16
92Ba
ckup
and
Archive Results
1 hr
No
Tue 6/28
/16
Tue 6/28
/169
0CS
93Po
st Election Au
dit
1 dayN
oThu 7/7/16
Thu 7/7/16
94Canvass
1 dayN
oThu 7/14
/16
Thu 7/14
/16
95Co
nduct P
ost E
lection An
alysis / Project W
rap Up
2 da
ysNo
Tue 6/28
/16
Thu 6/30
/16
96Do
cumen
t and
Analyze Lessons Learned
2 daysNo
Tue 6/28
/16
Thu 6/30
/1690
CS,HPM
,HC
97Tier 2 Cou
nty / Hart /
CDOS (if re
quire
d) Project Review and
Wrap Up Meetin
g0.5 da
ysNo
Thu 6/30
/16
Thu 6/30
/1696
CPM,CS,HPM
,HPS,H
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 6 of 7
State of Colorado UVS
‐ Tier 2 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:56
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
98Finalize Transition Plan
to Sup
port
4 hrsN
oThu 6/30
/16
Thu 6/30
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 7 of 7
State of Colorado UVS
‐ Tier 2 BPS
Prod
uced
: Mon
11/23
/15 ‐ 3:56
PM
This page intentionally blank
STATE OF COLORADO UNIFORM VOTING SYSTEM PPS-99
PRELIMINARY TIER 2 PROJECT SCHEDULE – WITHOUT BALLOT PRODUCTION SERVICES
PPS-100 STATE OF COLORADO UNIFORM VOTING SYSTEM
This page intentionally blank
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
1Tier 2 Cou
nty Ve
rity Im
plem
entatio
n13
9 da
ys?N
oMon
1/4/16
Thu 7/14
/16
2Co
ntract Signe
d1 dayY
esMon
1/4/16
Mon
1/4/16
3Order Hardw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
4Ve
rity System
Com
pone
nts
1 dayN
oTue 1/5/16
Tue 1/5/16
2CP
M,HTS
5Other Hardw
are ‐ P
Cs, Scann
ers, and
Prin
ters
1 dayN
oWed
1/6/16
Wed
1/6/164
HTS
6Order Softw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
7Ve
rity Ap
plications and
Firm
ware
1 dayN
oTue 1/5/16
Tue 1/5/16
2HT
S
83rd Party Software
1 dayN
oWed
1/6/16
Wed
1/6/167
HTS
9Kickoff M
eetin
g with
Cou
nty
1 day?
Yes
Tue 1/12
/16
Tue 1/12
/162
FS+1
wk
CS,HC,HP
M
10Co
unty app
roval of P
roject Sched
ule / A
ccep
tance Test Plan /
Evaluatio
n Plan
0 daysYes
Tue 1/12
/16
Tue 1/12
/169
FF
11Order Sup
plies
1 dayN
oWed
1/13/16
Wed
1/13/16
9HP
M
12Order Training Materials
1 dayN
oWed
1/13/16
Wed
1/13/16
9,10
HC
13Workflow, Tim
e, and
Resou
rce Plan
ning
2 da
ysNo
Wed
1/13/16
Thu 1/14
/16
14Co
nduct S
ite Survey An
alysis
2 daysNo
Wed
1/13/16
Thu 1/14
/169
15Ap
pliatio
n an
d Pe
riphe
ral H
ardw
are Co
nfiguration in Austin
4.25
daysN
oTh
u 1/21
/16
Wed
1/27/16
16Re
ceive Ap
plication and Pe
riphe
ral H
ardw
are
1 dayN
oThu 1/21
/16
Thu 1/21
/165FS+2 wks
HTS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 1 of 7
State of Colorado UVS
‐ Tier 2 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:58
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
17Co
nfigure Ha
rdware
2 daysNo
Fri 1/22/16
Mon
1/25/16
16HT
S
18Test Hardw
are
1 dayN
oTue 1/26
/16
Tue 1/26
/161
7HT
S
19Ship Hardw
are
2 hrsN
oWed
1/27/16
Wed
1/27/16
18HT
S
20Dep
loy Ve
rity System
Softw
are an
d Hardw
are
0.75
daysN
oTu
e 2/2/16
Tue 2/2/16
21Cu
stom
er Receives C
ompu
ter H
ardw
are
2 hrsN
oTue 2/2/16
Tue 2/2/16
19FS+4
days
CS
22Co
nfigure, Test, and Set U
p System
s4 hrsN
oTue 2/2/16
Tue 2/2/16
21CS,HPM
23Cu
stom
er Accep
tance
0 daysYes
Tue 2/2/16
Tue 2/2/16
22CS,HPM
24Re
ceive an
d Ac
cept Verity
Voting Hardw
are
37 days?No
Mon
1/4/16
Tue 2/23
/16
25Delivery of Verity
Voting Eq
uipm
ent
5 da
ys?N
oWed
2/17/16
Tue 2/23
/16
26Re
ceive Ha
rdware and Enter into Inventory
3 days?N
oWed
2/17/16
Fri 2/19/16
4FS+30
days
CS
27Co
nduct C
ustomer Accep
tance Test
1 dayY
esMon
2/22/16
Mon
2/22/16
26CS,HPM
28Co
nfigure for U
se and
Place in Storage
1 dayN
oTue 2/23
/16
Tue 2/23
/162
7CS
29Dispo
se of o
ld equ
ipmen
t10
days?No
Mon
1/4/16
Fri 1/15/16
CS30
Cond
uct M
ock Electio
n "Rou
nd Trip
"1 dayN
oMon
1/18/16
Mon
1/18/16
29CS,HPM
,HC
31Co
nduct V
oting for the
June
28, 201
6 Prim
ary Electio
n13
0.5 da
ys?N
oMon
1/4/16
Mon
7/4/16
32Co
unty Staff Training
5.75
daysN
oFri 1/15/16
Fri 1/22/16
33Create Training Plan/Sched
ule
4 hrsN
oFri 1/15/16
Fri 1/15/16
14CS,HC
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 2 of 7
State of Colorado UVS
‐ Tier 2 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:58
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
34Secure Cou
nty Ap
proval of T
raining Plan
0 daysYes
Fri 1/15/16
Fri 1/15/16
33
35Ve
rity Managem
ent a
nd Best P
ractices Cou
rse
4 hrsN
oFri 1/15/16
Fri 1/15/16
34CS,HC
36Da
ta Training Co
urse
1 dayN
oMon
1/18/16
Mon
1/18/16
35CS,HC
37Bu
ild Ope
rator T
raining Co
urse
4 hrsN
oTue 1/19
/16
Tue 1/19
/163
6CS,HC
38Ce
ntral O
perator T
raining Co
urse
4 hrsN
oTue 1/19
/16
Tue 1/19
/163
7CS,HC
39Co
unt/Re
lay Ope
rator T
raining Co
urse
4 hrsN
oWed
1/20/16
Wed
1/20/16
38CS,HC
40Service & M
ainten
ance Training Co
urse
2 daysNo
Wed
1/20/16
Fri 1/22/16
39CS,HC
41Po
lling
Place Ope
ratio
ns Training Co
urse
2 hrsN
oFri 1/22/16
Fri 1/22/16
40CS,HC
42Program Ballot
6 da
ys?N
oFri 4/29/16
Fri 5/6/16
43Ba
llot C
ertification
0 daysYes
Fri 4/29/16
Fri 4/29/16
44Da
ta Entry / Im
port into Layou
t1 dayN
oFri 4/29/16
Fri 4/29/16
43CS,HPM
45Proo
f Ballot
1 day?
No
Mon
5/2/16
Mon
5/2/1644
CS
46Enter foreign
language te
xt (if req
uired)
1 day?
No
Tue 5/3/16
Tue 5/3/16
45CS,HPM
47Re
cord Aud
io1 day?
No
Wed
5/4/16
Wed
5/4/1646
CS,HPM
48Final text / aud
iot p
roof of b
allot
4 hrs?No
Thu 5/5/16
Thu 5/5/16
47CS
49Ro
und Trip
4 hrsN
oThu 5/5/16
Thu 5/5/16
48CS,HPM
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 3 of 7
State of Colorado UVS
‐ Tier 2 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:58
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
50Ba
llot R
eady fo
r Election
0 daysYes
Thu 5/5/16
Thu 5/5/16
49
51Create vDrives
1 day?
No
Fri 5/6/16
Fri 5/6/1650
CS
52By
Mail V
oting
119 da
ys?N
oTh
u 1/14
/16
Tue 6/28
/16
53Order blank
ballot stock fo
r office prin
ting
1 day?
No
Thu 1/14
/16
Thu 1/14
/1612
54Send
files to printer (or prin
t in office)
2 daysNo
Mon
5/9/16
Tue 5/10
/165
1CS
55Print b
allots
1 wkNo
Wed
5/11/16
Tue 5/17
/165
4CS
56Mail ballots ‐ UOCA
VA2 daysNo
Fri 5/13/16
Mon
5/16/16
55SS
CS
57Mail ballots ‐ Re
gular
4 daysNo
Mon
6/6/16
Thu 6/9/16
56CS
58Re
ceive ballots
26 daysN
oTue 5/24
/16
Tue 6/28
/165
6FS+1 wk
CS
59Re
solutio
n Bo
ard Training
2 hrsN
oMon
6/13/16
Mon
6/13/16
58FS‐12 days
CS,HC
60Scan/Resolve ballots
11 daysN
oMon
6/13/16
Tue 6/28
/165
9CS
61Write CV
Rs to
vDrives
1 hr
No
Tue 6/28
/16
Tue 6/28
/166
0HC
,CS
62VS
PCs
37.75 da
ysNo
Mon
5/9/16
Wed
6/29/16
63Training
0.25
daysN
oMon
6/20/16
Mon
6/20/16
64Po
lling
Place Ope
ratio
ns Training Co
urse(s)
2 hrsN
oMon
6/20/16
Mon
6/20/16
69FS‐7 days
CS,HC
65Pre‐de
fine Ve
rity Vo
ting Units in th
e Wareh
ouse
1 hr
No
Mon
5/9/16
Mon
5/9/1651
CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 4 of 7
State of Colorado UVS
‐ Tier 2 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:58
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
66Marshall and
Dep
loy Equipm
ent to VS
PCs
1 dayN
oFri 6/17/16
Fri 6/17/16
69SS‐1 day,65
CS
67Disburse Sup
plies
4 hrsN
oFri 6/17/16
Fri 6/17/16
66SS
CS
68Setup Po
lls2 hrsN
oFri 6/17/16
Fri 6/17/16
67CS
69VS
PCs o
pen
7 daysNo
Mon
6/20/16
Tue 6/28
/16
70VS
PC Closeou
t2 hrsN
oTue 6/28
/16
Tue 6/28
/166
9FS‐1 day
CS,HPM
71Re
turn Equ
ipmen
t to Wareh
ouse
4 hrsN
oWed
6/29/16
Wed
6/29/16
70FS+1
day
CS
72Co
nduct E
lection Day Voting (ED)
20.5 daysN
oMon
6/6/16
Mon
7/4/16
73Marshal Equ
ipmen
t for ED
1 dayN
oMon
6/20/16
Mon
6/20/16
66CS
74Co
nduct P
oll W
orker T
raining
1 wkNo
Mon
6/6/16
Fri 6/10/16
51FS+4
wks
CS,HC
75Pred
efine Ve
rity Vo
ting Units fo
r ED locatio
ns at
Wareh
ouse
1 dayN
oTue 6/21
/16
Tue 6/21
/167
3CS
76De
ploy
equ
ipmen
t to ED
polling place(s)
3 daysNo
Wed
6/22/16
Fri 6/24/16
75CS
77Disburse Sup
plies
6 hrsN
oFri 6/24/16
Fri 6/24/16
76FF
CS
78Setup Po
lls2 hrsN
oMon
6/27/16
Mon
6/27/16
77CS
79ED
Field Sup
port
1 dayN
oMon
6/27/16
Tue 6/28
/167
8HP
M,HC,CS
80Close Po
lls2 hrsN
oTue 6/28
/16
Tue 6/28
/167
9FF
CS,HPM
81De
liver vDrives to
Cou
nting Station
2 hrsN
oTue 6/28
/16
Tue 6/28
/168
0CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 5 of 7
State of Colorado UVS
‐ Tier 2 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:58
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
82Re
turn Equ
ipmen
t to Wareh
ouse
4 daysNo
Tue 6/28
/16
Mon
7/4/1681
CS
83Ce
ntral Cou
nty Station Plan
ning
and
Ope
ratio
n12
6.5 da
ysNo
Mon
1/4/16
Tue 6/28
/16
84L&
A Test
4 hrsN
oFri 6/17/16
Mon
6/20/16
79SF‐5 days
CS,HPM
85Marshal and
Distrib
ute Equipm
ent to Ce
ntral Cou
nting
Station
2 daysNo
Mon
1/4/16
Tue 1/5/16
CS
86Set U
p CC
S1 dayN
oWed
1/6/16
Wed
1/6/1685
CS
87CC
S Training
2 hrsN
oThu 1/7/16
Thu 1/7/16
86CS,HC
88Tabu
late Election Re
sults
0.25
daysN
oTu
e 6/28
/16
Tue 6/28
/16
89VS
PC vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/167
0CS
90Ab
sentee
vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/166
1CS
91Electio
n Da
y vD
rives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/168
0CD
OS
92Gen
erate Re
ports
1 hr
No
Tue 6/28
/16
Tue 6/28
/169
1CS
93Po
st Election Ac
tivities
12.5 daysN
oTu
e 6/28
/16
Thu 7/14
/16
94Ba
ckup
and
Archive Results
1 hr
No
Tue 6/28
/16
Tue 6/28
/169
2CS
95Po
st Election Au
dit
1 dayN
oThu 7/7/16
Thu 7/7/16
96Canvass
1 dayN
oThu 7/14
/16
Thu 7/14
/16
97Co
nduct P
ost E
lection An
alysis / Project W
rap Up
2 da
ysNo
Tue 6/28
/16
Thu 6/30
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 6 of 7
State of Colorado UVS
‐ Tier 2 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:58
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
98Do
cumen
t and
Analyze Lessons Learned
2 daysNo
Tue 6/28
/16
Thu 6/30
/1692
CS,HPM
,HC
99Tier 2 Cou
nty / Hart /
CDOS (if re
quire
d) Project Review and
Wrap Up Meetin
g0.5 da
ysNo
Thu 6/30
/16
Thu 6/30
/1698
CPM,CS,HPM
,HPS,H
100
Finalize Transition Plan
to Sup
port
4 hrsN
oThu 6/30
/16
Thu 6/30
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 7 of 7
State of Colorado UVS
‐ Tier 2 No BP
SProd
uced
: Mon
11/23
/15 ‐ 3:58
PM
This page intentionally blank
STATE OF COLORADO UNIFORM VOTING SYSTEM PPS-109
PRELIMINARY TIER 3 PROJECT SCHEDULE – WITH BALLOT PRODUCTION SERVICES
PPS-110 STATE OF COLORADO UNIFORM VOTING SYSTEM
This page intentionally blank
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
1Tier 3 Cou
nty Ve
rity Im
plem
entatio
n13
9 da
ys?N
oMon
1/4/16
Thu 7/14
/16
2Co
ntract Signe
d1 dayY
esMon
1/4/16
Mon
1/4/16
3Order Hardw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
4Ve
rity System
Com
pone
nts
1 dayN
oTue 1/5/16
Tue 1/5/16
2CP
M,HTS
5Other Hardw
are ‐ P
Cs, Scann
ers, and
Prin
ters
1 dayN
oWed
1/6/16
Wed
1/6/164
HTS
6Order Softw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
7Ve
rity Ap
plications and
Firm
ware
1 dayN
oTue 1/5/16
Tue 1/5/16
2HT
S
83rd Party Software
1 dayN
oWed
1/6/16
Wed
1/6/167
HTS
9Kickoff M
eetin
g with
Cou
nty
1 day?
Yes
Tue 1/12
/16
Tue 1/12
/162
FS+1
wk
CS,HC,HP
M
10Co
unty app
roval of P
roject Sched
ule / A
ccep
tance Test Plan /
Evaluatio
n Plan
0 daysYes
Tue 1/12
/16
Tue 1/12
/169
FF
11Order Sup
plies
1 dayN
oWed
1/13/16
Wed
1/13/16
9HP
M
12Order Training Materials
1 dayN
oWed
1/13/16
Wed
1/13/16
9,10
HC
13Workflow, Tim
e, and
Resou
rce Plan
ning
2 da
ysNo
Wed
1/13/16
Thu 1/14
/16
14Co
nduct S
ite Survey An
alysis
2 daysNo
Wed
1/13/16
Thu 1/14
/169
15Ap
pliatio
n an
d Pe
riphe
ral H
ardw
are Co
nfiguration in Austin
4.25
daysN
oTh
u 1/21
/16
Wed
1/27/16
16Re
ceive Ap
plication and Pe
riphe
ral H
ardw
are
1 dayN
oThu 1/21
/16
Thu 1/21
/165FS+2 wks
HTS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 1 of 6
State of Colorado UVS
‐ Tier 3 BPS
Prod
uced
: Mon
11/23
/15 ‐ 4:00
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
17Co
nfigure Ha
rdware
2 daysNo
Fri 1/22/16
Mon
1/25/16
16HT
S
18Test Hardw
are
1 dayN
oTue 1/26
/16
Tue 1/26
/161
7HT
S
19Ship Hardw
are
2 hrsN
oWed
1/27/16
Wed
1/27/16
18HT
S
20Dep
loy Ve
rity System
Softw
are an
d Hardw
are
0.75
daysN
oTu
e 2/2/16
Tue 2/2/16
21Cu
stom
er Receives C
ompu
ter H
ardw
are
2 hrsN
oTue 2/2/16
Tue 2/2/16
19FS+4
days
CS
22Co
nfigure, Test, and Set U
p System
s4 hrsN
oTue 2/2/16
Tue 2/2/16
21CS,HPM
23Cu
stom
er Accep
tance
0 daysYes
Tue 2/2/16
Tue 2/2/16
22CS,HPM
24Re
ceive an
d Ac
cept Verity
Voting Hardw
are
37 days?No
Mon
1/4/16
Tue 2/23
/16
25Delivery of Verity
Voting Eq
uipm
ent
5 da
ys?N
oWed
2/17/16
Tue 2/23
/16
26Re
ceive Ha
rdware and Enter into Inventory
3 days?N
oWed
2/17/16
Fri 2/19/16
4FS+30
days
CS
27Co
nduct C
ustomer Accep
tance Test
1 dayY
esMon
2/22/16
Mon
2/22/16
26CS,HPM
28Co
nfigure for U
se and
Place in Storage
1 dayN
oTue 2/23
/16
Tue 2/23
/162
7CS
29Dispo
se of o
ld equ
ipmen
t10
days?No
Mon
1/4/16
Fri 1/15/16
CS30
Cond
uct M
ock Electio
n "Rou
nd Trip
"1 dayN
oMon
1/18/16
Mon
1/18/16
29CS,HPM
,HC
31Co
nduct V
oting for the
June
28, 201
6 Prim
ary Electio
n13
0.5 da
ys?N
oMon
1/4/16
Mon
7/4/16
32Co
unty Staff Training
3.75
daysN
oFri 1/15/16
Wed
1/20/16
33Create Training Plan/Sched
ule
4 hrsN
oFri 1/15/16
Fri 1/15/16
14CS,HC
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 2 of 6
State of Colorado UVS
‐ Tier 3 BPS
Prod
uced
: Mon
11/23
/15 ‐ 4:00
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
34Secure Cou
nty Ap
proval of T
raining Plan
0 daysYes
Fri 1/15/16
Fri 1/15/16
33
35Ve
rity Managem
ent a
nd Best P
ractices Cou
rse
4 hrsN
oFri 1/15/16
Fri 1/15/16
34CS,HC
36Co
unt/Re
lay Ope
rator T
raining Co
urse
4 hrsN
oMon
1/18/16
Mon
1/18/16
35CS,HC
37Service & M
ainten
ance Training Co
urse
2 daysNo
Mon
1/18/16
Wed
1/20/16
36CS,HC
38Po
lling
Place Ope
ratio
ns Training Co
urse
2 hrsN
oWed
1/20/16
Wed
1/20/16
37CS,HC
39Program Ballot
6 da
ys?N
oFri 4/29/16
Fri 5/6/16
40Ba
llot C
ertification
0 daysYes
Fri 4/29/16
Fri 4/29/16
41Da
ta Entry / Im
port into Layou
t1 dayN
oFri 4/29/16
Fri 4/29/16
40CS,HPM
42Proo
f Ballot
1 day?
No
Mon
5/2/16
Mon
5/2/1641
CS
43Enter foreign
language te
xt (if req
uired)
1 day?
No
Tue 5/3/16
Tue 5/3/16
42CS,HPM
44Re
cord Aud
io1 day?
No
Wed
5/4/16
Wed
5/4/1643
CS,HPM
45Final text / aud
iot p
roof of b
allot
4 hrs?No
Thu 5/5/16
Thu 5/5/16
44CS
46Ro
und Trip
4 hrsN
oThu 5/5/16
Thu 5/5/16
45CS,HPM
47Ba
llot R
eady fo
r Election
0 daysYes
Thu 5/5/16
Thu 5/5/16
46
48Create vDrives
1 day?
No
Fri 5/6/16
Fri 5/6/1647
CS
49By
Mail V
oting
119 da
ys?N
oTh
u 1/14
/16
Tue 6/28
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 3 of 6
State of Colorado UVS
‐ Tier 3 BPS
Prod
uced
: Mon
11/23
/15 ‐ 4:00
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
50Order blank
ballot stock fo
r office prin
ting
1 day?
No
Thu 1/14
/16
Thu 1/14
/1612
51Send
files to printer (or prin
t in office)
2 daysNo
Mon
5/9/16
Tue 5/10
/164
8CS
52Print b
allots
1 wkNo
Wed
5/11/16
Tue 5/17
/165
1CS
53Mail ballots ‐ UOCA
VA2 daysNo
Fri 5/13/16
Mon
5/16/16
52SS
CS
54Mail ballots ‐ Re
gular
4 daysNo
Mon
6/6/16
Thu 6/9/16
53CS
55Re
ceive ballots
26 daysN
oTue 5/24
/16
Tue 6/28
/165
3FS+1 wk
CS
56Re
solutio
n Bo
ard Training
2 hrsN
oMon
6/13/16
Mon
6/13/16
55FS‐12 days
CS,HC
57Scan/Resolve ballots
11 daysN
oMon
6/13/16
Tue 6/28
/165
6CS
58Write CV
Rs to
vDrives
1 hr
No
Tue 6/28
/16
Tue 6/28
/165
7HC
,CS
59VS
PCs
37.75 da
ysNo
Mon
5/9/16
Wed
6/29/16
60Training
0.25
daysN
oMon
6/20/16
Mon
6/20/16
61Po
lling
Place Ope
ratio
ns Training Co
urse(s)
2 hrsN
oMon
6/20/16
Mon
6/20/16
66FS‐7 days
CS,HC
62Pre‐de
fine Ve
rity Vo
ting Units in th
e Wareh
ouse
1 hr
No
Mon
5/9/16
Mon
5/9/1648
CS
63Marshall and
Dep
loy Equipm
ent to VS
PCs
1 dayN
oFri 6/17/16
Fri 6/17/16
66SS‐1 day,62
CS
64Disburse Sup
plies
4 hrsN
oFri 6/17/16
Fri 6/17/16
63SS
CS
65Setup Po
lls2 hrsN
oFri 6/17/16
Fri 6/17/16
64CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 4 of 6
State of Colorado UVS
‐ Tier 3 BPS
Prod
uced
: Mon
11/23
/15 ‐ 4:00
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
66VS
PCs o
pen
7 daysNo
Mon
6/20/16
Tue 6/28
/16
67VS
PC Closeou
t2 hrsN
oTue 6/28
/16
Tue 6/28
/166
6FS‐1 day
CS,HPM
68Re
turn Equ
ipmen
t to Wareh
ouse
4 hrsN
oWed
6/29/16
Wed
6/29/16
67FS+1
day
CS
69Co
nduct E
lection Day Voting (ED)
20.5 daysN
oMon
6/6/16
Mon
7/4/16
70Marshal Equ
ipmen
t for ED
1 dayN
oMon
6/20/16
Mon
6/20/16
63CS
71Co
nduct P
oll W
orker T
raining
1 wkNo
Mon
6/6/16
Fri 6/10/16
48FS+4
wks
CS,HC
72Pred
efine Ve
rity Vo
ting Units fo
r ED locatio
ns at
Wareh
ouse
1 dayN
oTue 6/21
/16
Tue 6/21
/167
0CS
73De
ploy
equ
ipmen
t to ED
polling place(s)
3 daysNo
Wed
6/22/16
Fri 6/24/16
72CS
74Disburse Sup
plies
6 hrsN
oFri 6/24/16
Fri 6/24/16
73FF
CS
75Setup Po
lls2 hrsN
oMon
6/27/16
Mon
6/27/16
74CS
76ED
Field Sup
port
1 dayN
oMon
6/27/16
Tue 6/28
/167
5HP
M,HC,CS
77Close Po
lls2 hrsN
oTue 6/28
/16
Tue 6/28
/167
6FF
CS,HPM
78De
liver vDrives to
Cou
nting Station
2 hrsN
oTue 6/28
/16
Tue 6/28
/167
7CS
79Re
turn Equ
ipmen
t to Wareh
ouse
4 daysNo
Tue 6/28
/16
Mon
7/4/1678
CS
80Ce
ntral Cou
nty Station Plan
ning
and
Ope
ratio
n12
6.5 da
ysNo
Mon
1/4/16
Tue 6/28
/16
81L&
A Test
4 hrsN
oFri 6/17/16
Mon
6/20/16
76SF‐5 days
CS,HPM
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 5 of 6
State of Colorado UVS
‐ Tier 3 BPS
Prod
uced
: Mon
11/23
/15 ‐ 4:00
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
82Marshal and
Distrib
ute Equipm
ent to Ce
ntral Cou
nting
Station
2 daysNo
Mon
1/4/16
Tue 1/5/16
CS
83Set U
p CC
S1 dayN
oWed
1/6/16
Wed
1/6/1682
CS
84CC
S Training
2 hrsN
oThu 1/7/16
Thu 1/7/16
83CS,HC
85Tabu
late Election Re
sults
0.25
daysN
oTu
e 6/28
/16
Tue 6/28
/16
86VS
PC vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/166
7CS
87Ab
sentee
vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/165
8CS
88Electio
n Da
y vD
rives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/167
7CD
OS
89Gen
erate Re
ports
1 hr
No
Tue 6/28
/16
Tue 6/28
/168
8CS
90Po
st Election Ac
tivities
12.5 daysN
oTu
e 6/28
/16
Thu 7/14
/16
91Ba
ckup
and
Archive Results
1 hr
No
Tue 6/28
/16
Tue 6/28
/168
9CS
92Po
st Election Au
dit
1 dayN
oThu 7/7/16
Thu 7/7/16
93Canvass
1 dayN
oThu 7/14
/16
Thu 7/14
/16
94Co
nduct P
ost E
lection An
alysis / Project W
rap Up
2 da
ysNo
Tue 6/28
/16
Thu 6/30
/16
95Do
cumen
t and
Analyze Lessons Learned
2 daysNo
Tue 6/28
/16
Thu 6/30
/1689
CS,HPM
,HC
96Tier 3 Cou
nty / Hart /
CDOS (if re
quire
d) Project Review and
Wrap Up Meetin
g0.5 da
ysNo
Thu 6/30
/16
Thu 6/30
/1695
CPM,CS,HPM
,HPS,H
97Finalize Transition Plan
to Sup
port
4 hrsN
oThu 6/30
/16
Thu 6/30
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 6 of 6
State of Colorado UVS
‐ Tier 3 BPS
Prod
uced
: Mon
11/23
/15 ‐ 4:00
PM
STATE OF COLORADO UNIFORM VOTING SYSTEM PPS-117
PRELIMINARY TIER 3 PROJECT SCHEDULE – WITHOUT BALLOT PRODUCTION SERVICES
PPS-118 STATE OF COLORADO UNIFORM VOTING SYSTEM
This page intentionally blank
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
1Tier 3 Cou
nty Ve
rity Im
plem
entatio
n13
9 da
ys?N
oMon
1/4/16
Thu 7/14
/16
2Co
ntract Signe
d1 dayY
esMon
1/4/16
Mon
1/4/16
3Order Hardw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
4Ve
rity System
Com
pone
nts
1 dayN
oTue 1/5/16
Tue 1/5/16
2CP
M,HTS
5Other Hardw
are ‐ P
Cs, Scann
ers, and
Prin
ters
1 dayN
oWed
1/6/16
Wed
1/6/164
HTS
6Order Softw
are
2 da
ysNo
Tue 1/5/16
Wed
1/6/16
7Ve
rity Ap
plications and
Firm
ware
1 dayN
oTue 1/5/16
Tue 1/5/16
2HT
S
83rd Party Software
1 dayN
oWed
1/6/16
Wed
1/6/167
HTS
9Kickoff M
eetin
g with
Cou
nty
1 day?
Yes
Tue 1/12
/16
Tue 1/12
/162
FS+1
wk
CS,HC,HP
M
10Co
unty app
roval of P
roject Sched
ule / A
ccep
tance Test Plan /
Evaluatio
n Plan
0 daysYes
Tue 1/12
/16
Tue 1/12
/169
FF
11Order Sup
plies
1 dayN
oWed
1/13/16
Wed
1/13/16
9HP
M
12Order Training Materials
1 dayN
oWed
1/13/16
Wed
1/13/16
9,10
HC
13Workflow, Tim
e, and
Resou
rce Plan
ning
2 da
ysNo
Wed
1/13/16
Thu 1/14
/16
14Co
nduct S
ite Survey An
alysis
2 daysNo
Wed
1/13/16
Thu 1/14
/169
15Ap
pliatio
n an
d Pe
riphe
ral H
ardw
are Co
nfiguration in Austin
4.25
daysN
oTh
u 1/21
/16
Wed
1/27/16
16Re
ceive Ap
plication and Pe
riphe
ral H
ardw
are
1 dayN
oThu 1/21
/16
Thu 1/21
/165FS+2 wks
HTS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 1 of 7
State of Colorado UVS
‐ Tier 3 No BP
SProd
uced
: Mon
11/23
/15 ‐ 4:02
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
17Co
nfigure Ha
rdware
2 daysNo
Fri 1/22/16
Mon
1/25/16
16HT
S
18Test Hardw
are
1 dayN
oTue 1/26
/16
Tue 1/26
/161
7HT
S
19Ship Hardw
are
2 hrsN
oWed
1/27/16
Wed
1/27/16
18HT
S
20Dep
loy Ve
rity System
Softw
are an
d Hardw
are
0.75
daysN
oTu
e 2/2/16
Tue 2/2/16
21Cu
stom
er Receives C
ompu
ter H
ardw
are
2 hrsN
oTue 2/2/16
Tue 2/2/16
19FS+4
days
CS
22Co
nfigure, Test, and Set U
p System
s4 hrsN
oTue 2/2/16
Tue 2/2/16
21CS,HPM
23Cu
stom
er Accep
tance
0 daysYes
Tue 2/2/16
Tue 2/2/16
22CS,HPM
24Re
ceive an
d Ac
cept Verity
Voting Hardw
are
37 days?No
Mon
1/4/16
Tue 2/23
/16
25Delivery of Verity
Voting Eq
uipm
ent
5 da
ys?N
oWed
2/17/16
Tue 2/23
/16
26Re
ceive Ha
rdware and Enter into Inventory
3 days?N
oWed
2/17/16
Fri 2/19/16
4FS+30
days
CS
27Co
nduct C
ustomer Accep
tance Test
1 dayY
esMon
2/22/16
Mon
2/22/16
26CS,HPM
28Co
nfigure for U
se and
Place in Storage
1 dayN
oTue 2/23
/16
Tue 2/23
/162
7CS
29Dispo
se of o
ld equ
ipmen
t10
days?No
Mon
1/4/16
Fri 1/15/16
CS30
Cond
uct M
ock Electio
n "Rou
nd Trip
"1 dayN
oMon
1/18/16
Mon
1/18/16
29CS,HPM
,HC
31Co
nduct V
oting for the
June
28, 201
6 Prim
ary Electio
n13
0.5 da
ys?N
oMon
1/4/16
Mon
7/4/16
32Co
unty Staff Training
5.75
daysN
oFri 1/15/16
Fri 1/22/16
33Create Training Plan/Sched
ule
4 hrsN
oFri 1/15/16
Fri 1/15/16
14CS,HC
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 2 of 7
State of Colorado UVS
‐ Tier 3 No BP
SProd
uced
: Mon
11/23
/15 ‐ 4:02
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
34Secure Cou
nty Ap
proval of T
raining Plan
0 daysYes
Fri 1/15/16
Fri 1/15/16
33
35Ve
rity Managem
ent a
nd Best P
ractices Cou
rse
4 hrsN
oFri 1/15/16
Fri 1/15/16
34CS,HC
36Da
ta Training Co
urse
1 dayN
oMon
1/18/16
Mon
1/18/16
35CS,HC
37Bu
ild Ope
rator T
raining Co
urse
4 hrsN
oTue 1/19
/16
Tue 1/19
/163
6CS,HC
38Ce
ntral O
perator T
raining Co
urse
4 hrsN
oTue 1/19
/16
Tue 1/19
/163
7CS,HC
39Co
unt/Re
lay Ope
rator T
raining Co
urse
4 hrsN
oWed
1/20/16
Wed
1/20/16
38CS,HC
40Service & M
ainten
ance Training Co
urse
2 daysNo
Wed
1/20/16
Fri 1/22/16
39CS,HC
41Po
lling
Place Ope
ratio
ns Training Co
urse
2 hrsN
oFri 1/22/16
Fri 1/22/16
40CS,HC
42Program Ballot
6 da
ys?N
oFri 4/29/16
Fri 5/6/16
43Ba
llot C
ertification
0 daysYes
Fri 4/29/16
Fri 4/29/16
44Da
ta Entry / Im
port into Layou
t1 dayN
oFri 4/29/16
Fri 4/29/16
43CS,HPM
45Proo
f Ballot
1 day?
No
Mon
5/2/16
Mon
5/2/1644
CS
46Enter foreign
language te
xt (if req
uired)
1 day?
No
Tue 5/3/16
Tue 5/3/16
45CS,HPM
47Re
cord Aud
io1 day?
No
Wed
5/4/16
Wed
5/4/1646
CS,HPM
48Final text / aud
iot p
roof of b
allot
4 hrs?No
Thu 5/5/16
Thu 5/5/16
47CS
49Ro
und Trip
4 hrsN
oThu 5/5/16
Thu 5/5/16
48CS,HPM
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 3 of 7
State of Colorado UVS
‐ Tier 3 No BP
SProd
uced
: Mon
11/23
/15 ‐ 4:02
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
50Ba
llot R
eady fo
r Election
0 daysYes
Thu 5/5/16
Thu 5/5/16
49
51Create vDrives
1 day?
No
Fri 5/6/16
Fri 5/6/1650
CS
52By
Mail V
oting
119 da
ys?N
oTh
u 1/14
/16
Tue 6/28
/16
53Order blank
ballot stock fo
r office prin
ting
1 day?
No
Thu 1/14
/16
Thu 1/14
/1612
54Send
files to printer (or prin
t in office)
2 daysNo
Mon
5/9/16
Tue 5/10
/165
1CS
55Print b
allots
1 wkNo
Wed
5/11/16
Tue 5/17
/165
4CS
56Mail ballots ‐ UOCA
VA2 daysNo
Fri 5/13/16
Mon
5/16/16
55SS
CS
57Mail ballots ‐ Re
gular
4 daysNo
Mon
6/6/16
Thu 6/9/16
56CS
58Re
ceive ballots
26 daysN
oTue 5/24
/16
Tue 6/28
/165
6FS+1 wk
CS
59Re
solutio
n Bo
ard Training
2 hrsN
oMon
6/13/16
Mon
6/13/16
58FS‐12 days
CS,HC
60Scan/Resolve ballots
11 daysN
oMon
6/13/16
Tue 6/28
/165
9CS
61Write CV
Rs to
vDrives
1 hr
No
Tue 6/28
/16
Tue 6/28
/166
0HC
,CS
62VS
PCs
37.75 da
ysNo
Mon
5/9/16
Wed
6/29/16
63Training
0.25
daysN
oMon
6/20/16
Mon
6/20/16
64Po
lling
Place Ope
ratio
ns Training Co
urse(s)
2 hrsN
oMon
6/20/16
Mon
6/20/16
69FS‐7 days
CS,HC
65Pre‐de
fine Ve
rity Vo
ting Units in th
e Wareh
ouse
1 hr
No
Mon
5/9/16
Mon
5/9/1651
CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 4 of 7
State of Colorado UVS
‐ Tier 3 No BP
SProd
uced
: Mon
11/23
/15 ‐ 4:02
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
66Marshall and
Dep
loy Equipm
ent to VS
PCs
1 dayN
oFri 6/17/16
Fri 6/17/16
69SS‐1 day,65
CS
67Disburse Sup
plies
4 hrsN
oFri 6/17/16
Fri 6/17/16
66SS
CS
68Setup Po
lls2 hrsN
oFri 6/17/16
Fri 6/17/16
67CS
69VS
PCs o
pen
7 daysNo
Mon
6/20/16
Tue 6/28
/16
70VS
PC Closeou
t2 hrsN
oTue 6/28
/16
Tue 6/28
/166
9FS‐1 day
CS,HPM
71Re
turn Equ
ipmen
t to Wareh
ouse
4 hrsN
oWed
6/29/16
Wed
6/29/16
70FS+1
day
CS
72Co
nduct E
lection Day Voting (ED)
20.5 daysN
oMon
6/6/16
Mon
7/4/16
73Marshal Equ
ipmen
t for ED
1 dayN
oMon
6/20/16
Mon
6/20/16
66CS
74Co
nduct P
oll W
orker T
raining
1 wkNo
Mon
6/6/16
Fri 6/10/16
51FS+4
wks
CS,HC
75Pred
efine Ve
rity Vo
ting Units fo
r ED locatio
ns at
Wareh
ouse
1 dayN
oTue 6/21
/16
Tue 6/21
/167
3CS
76De
ploy
equ
ipmen
t to ED
polling place(s)
3 daysNo
Wed
6/22/16
Fri 6/24/16
75CS
77Disburse Sup
plies
6 hrsN
oFri 6/24/16
Fri 6/24/16
76FF
CS
78Setup Po
lls2 hrsN
oMon
6/27/16
Mon
6/27/16
77CS
79ED
Field Sup
port
1 dayN
oMon
6/27/16
Tue 6/28
/167
8HP
M,HC,CS
80Close Po
lls2 hrsN
oTue 6/28
/16
Tue 6/28
/167
9FF
CS,HPM
81De
liver vDrives to
Cou
nting Station
2 hrsN
oTue 6/28
/16
Tue 6/28
/168
0CS
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 5 of 7
State of Colorado UVS
‐ Tier 3 No BP
SProd
uced
: Mon
11/23
/15 ‐ 4:02
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
82Re
turn Equ
ipmen
t to Wareh
ouse
4 daysNo
Tue 6/28
/16
Mon
7/4/1681
CS
83Ce
ntral Cou
nty Station Plan
ning
and
Ope
ratio
n12
6.5 da
ysNo
Mon
1/4/16
Tue 6/28
/16
84L&
A Test
4 hrsN
oFri 6/17/16
Mon
6/20/16
79SF‐5 days
CS,HPM
85Marshal and
Distrib
ute Equipm
ent to Ce
ntral Cou
nting
Station
2 daysNo
Mon
1/4/16
Tue 1/5/16
CS
86Set U
p CC
S1 dayN
oWed
1/6/16
Wed
1/6/1685
CS
87CC
S Training
2 hrsN
oThu 1/7/16
Thu 1/7/16
86CS,HC
88Tabu
late Election Re
sults
0.25
daysN
oTu
e 6/28
/16
Tue 6/28
/16
89VS
PC vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/167
0CS
90Ab
sentee
vDrives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/166
1CS
91Electio
n Da
y vD
rives to
Cou
nt1 hr
No
Tue 6/28
/16
Tue 6/28
/168
0CD
OS
92Gen
erate Re
ports
1 hr
No
Tue 6/28
/16
Tue 6/28
/169
1CS
93Po
st Election Ac
tivities
12.5 daysN
oTu
e 6/28
/16
Thu 7/14
/16
94Ba
ckup
and
Archive Results
1 hr
No
Tue 6/28
/16
Tue 6/28
/169
2CS
95Po
st Election Au
dit
1 dayN
oThu 7/7/16
Thu 7/7/16
96Canvass
1 dayN
oThu 7/14
/16
Thu 7/14
/16
97Co
nduct P
ost E
lection An
alysis / Project W
rap Up
2 da
ysNo
Tue 6/28
/16
Thu 6/30
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 6 of 7
State of Colorado UVS
‐ Tier 3 No BP
SProd
uced
: Mon
11/23
/15 ‐ 4:02
PM
IDTask Nam
eDu
ratio
nMilest
Start
Finish
Pred
ecessors
Resource Initials
98Do
cumen
t and
Analyze Lessons Learned
2 daysNo
Tue 6/28
/16
Thu 6/30
/1692
CS,HPM
,HC
99Tier 3 Cou
nty / Hart /
CDOS (if re
quire
d) Project Review and
Wrap Up Meetin
g0.5 da
ysNo
Thu 6/30
/16
Thu 6/30
/1698
CPM,CS,HPM
,HPS,H
100
Finalize Transition Plan
to Sup
port
4 hrsN
oThu 6/30
/16
Thu 6/30
/16
State of Colorado UVS
DRAF
T VE
RITY Project Sched
ule
Hart InterCivic, Inc.
Verity Vo
ting System
Page 7 of 7