State Highway 6 Corridor Overlay
August 3, 2009
1
Purpose of Workshop
• Review the need/benefit of an Overlay District• Review Work Authorization and Task• Review results from Visual Preference Survey• Discuss MDP recommendations• Provide direction to consultant
2
The Need• To manage certain visual elements • To improve circulation and access management along
SH 6 corridor• To provide continuity of aesthetic elements of future
development or redevelopment
3
Benefits of a SH 6 Corridor Overlay
• Works with existing zoning districts• Provides visual continuity• Manages certain aesthetic elements• Allows improvement of circulation and access
4
Scope of Work• Work Authorization # 3: Prepare SH 6 Corridor
Overlay Plan • Research existing conditions along SH 6• Prepare materials for this workshop• Prepare a draft ordinance and coordinate with
City attorney • Attend the PD&Z public hearing and 2 City
Council public hearings; prepare and present overview of draft ordinance if requested
5
Work to Date
1. Review of current Manvel zoning ordinances, comprehensive and thoroughfare plans
2. Review other state and local corridor overlay ordinances
3. Held Open House and Visual Preference Survey 4. Prepared synopsis of Visual Preference Survey5. Prepared written options for consideration
6
VISUAL PREFERENCE SURVEY RESULTS
7
Visual Preference Survey Elements
• Building Placement• Sidewalk Placement• Parking Lot Design• Street Design• Access and Signage• Building Orientation
• Building Materials• Building Color Palette• Vehicular Screening• Non-Building Screening• Parks and Plazas
8
Visual Preference Survey Results
9
ELEMENT RESULTS
- UNDERLINED ELEMENTS REPRESENT MOST FEASIBLE ISSUES - A B
Screening: Vehicle Parking 38 3
Building Materials 38 6
Parks and Plazas 37 4
Access and Signage 35 8
Screening: Non-Building Elements 33 10
Street Design 32 10
Building Orientation 30 11
Parking Lot Design 28 15
Building Color Palette 25 18
Sidewalk Placement 23 19
Building Placement 23 19
MDP OPTIONS FOR CONSIDERATION
10
Compliance
• Existing non-confirming buildings remain with no expansion or addition
• New development or redevelopment (removal or expansion/addition) requires compliance with new Overlay regulations
11
SH 6 CORRIDOR OVERLAY OPTIONSPlease Start Worksheet Now
12
District LocationOption 1• 350’ deep from SH-6
Option 2• 700’ deep from SH-6
13
End limit at East and West city limit crossing of SH 6
350’ Extent700’ ExtentCity Limits
350’
700’
700’
350’
Building Materials (Facing or Visible from SH 6)
Option 1 Prohibited Material• Metal sheet siding• Smooth concrete block• Exterior Insulation and Finish
Systems (EIFS)• Plywood / Offset Strand
Board(OSB)
Option 2 Required MaterialsAll building materials must use minimum 90% masonry materials on all walls visible from SH 6•Stone•Brick•Concrete•Hollow clay tile•Decorative concrete block or tile•Glass block•True stucco•Other materials laid unit by unit and set in mortar
14
Dumpster/Mechanical Screening
Option 1• Trash dumpsters and recycle
bins must not be visible from SH 6 -OR- must be screened on all sides
• Screening material at least as high as top of receptacle
Option 2A. Mechanical rooftop
elements must not be visible from SH 6,
orB. New overhead power
located at the rear of the development
15
Circulation and Access
• More development without increased access will lead to traffic congestion (FM 518)
• Historic standard – 350’ block spacing network
16
17
18
FM 518 in Pearland
1919
I-10 @ Beltway 8
College
NationalRetailer National
Retailer
NationalRetailer
202020
SH-6 in Sugarland
212121
Circulation and Access (350’ District)
Option 1• New development must
provide:– One continuous access way
parallel to SH-6 spanning from one side of the property to the other.
– One continuous access way perpendicular to SH-6 from the front of the property to the back.
Option 2• In addition to Option 1
– Parcels wider than 300 feet must provide one perpendicular accessway every 300 feet.
– Parallel accessways must be located between 300-350 feet from SH-6.
22
Example 350’ District
23
SH 6
Circulation and Access (700’ District)
Option 1• New development must
provide– One continuous access way
parallel to SH-6– One access way
perpendicular to SH-6 from front to back of property.
Option 2• In addition to Option 1
– Parcels wider than 300 feet must provide one perpendicular accessway every 300 feet.
– Parallel accessways must be located between 400-700 feet from SH-6.
24
Subsequent Development (350’ option)
25
THANK YOU! Please turn in worksheets.