Stanleigh Treatment Facility Replacement BC MEND November 28, 2007 Debbie Berthelot, Reclamation Manager, Elliot Lake Maxine Wiber, VP Closed Mines Art Coggan, Construction Manager

Upload: others

Post on 28-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

Stanleigh Treatment Facility Replacement

BC MEND November 28, 2007

Debbie Berthelot, Reclamation Manager, Elliot Lake

Maxine Wiber, VP Closed Mines

Art Coggan, Construction Manager

Page 2: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

2

Elliot Lake Location Map

SudburyElliot Lake

Sault Ste. Marie

Manitoulin Island

Lake HuronMichigan

North Channel

Page 3: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

3

Serpent River Watershed

Page 4: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

4

Stanleigh TMA 1996

Page 5: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

5

Page 6: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

6

Stanleigh TMA June 2005

McCabe Lake

Treatment Plant

Stanleigh TMA

Discharge to McCabe Lake

N

Page 7: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

7

Stanleigh Operating Elevations and Treatment Volumes

350352354356358360362364366

Jan-97 Jan-99 Jan-01 Jan-03 Jan-05 Jan-07

Date

Elev

atio

n (m

)

0

2

4

6

8

10

Ann

ual V

olum

e (M

m3)

TMA Elev Min OperatingMax Operating Annual Volume Treated

Page 8: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

8

Flooded Basin Surface Water Quality

0200400600800

100012001400160018002000

Jan-90

Jan-92

Jan-94

Jan-96

Jan-98

Jan-00

Jan-02

Jan-04

Jan-06

Sulp

hate

(mg/

L)

02468101214161820

Rad

ium

-226

(Bq/

L)

Sulphate Radium

Page 9: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

9

Basin Water Quality November 2005Action Level

PWQO Unit Count Max Min Avg

pH 6.5 - 9.5 9 6.9 6.5TSS 30 (mg/L) 9 1 1 1Sulfate (mg/L) 9 249 242 244Radium 0.37 1 (Bq/L) 9 0.68 0.33 0.52Uranium 0.005 (mg/L) 9 <0.005 <0.005 <0.005Cobalt 0.0009 (mg/L) 9 0.0009 0.0006 0.0007Copper1 0.300 0.005 (mg/L) 9 <0.001 <0.001 <0.001Iron 0.3 (mg/L) 9 0.120 0.078 0.090Lead1 0.2 0.005 (mg/L) 9 0.0009 0.0006 0.0007Nickel 0.5 0.025 (mg/L) 9 0.0032 0.0022 0.0027Selenium 0.1 (mg/L) 9 0.0004 0.0003 0.0003Silver 0.0001 (mg/L) 9 0.00051 0.00025 0.00040Zinc 0.5 0.03 (mg/L) 9 0.005 0.002 0.003

1. PWQO adjusted for hardness

Page 10: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

10

Current Treatment Plant

Page 11: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

11

Physical Components• TMA Spillway

• Settling Pond Dam and Spillway

• New ETP

• Settling Pond

• Demolition existing ETP

Stanleigh TMA

Current Plant

Proposed Plant

Stanleigh TMA

New Settling Pond Dam

New Settling Pond

Page 12: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

12

Hydrological Analysis

• Based on current TMA configuration with Diversion Dams R3, R5, 9 and 10 in place for final watershed area of 13.3 km2

• 2005 dam safety review recently completed by SNC Lavalin confirm PMP estimate as conservative; based on 1971 to 2000 data set; PMP range 276 mm (Sudbury) to 354mm (Mississauga Hydro) over 12 hour period

• Peak TMA elevation during the PMP (424 mm in 12 hours) event would be 1210.5’; or 4.5’ below the crest of Dam B;

• Retention of diversion dams enable TMA spillway raise of 0.6 m while maintaining projected water elevations consistent with 1996 design for TMA with diversion dams removed – increase operational freeboard and long-term drought protection

• Settling Pond Dam designed to safely convey flow resulting from PMP assuming TMA starting water elevation at invert of TMA spillway

Page 13: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

13

Design Criteria• Settling Pond/Treatment Plant

– 11 ha; 0.24 Mm3 capacity– Average flow volume 8.7 Mm3/yr (annual average precipitation) – Normal operating rate 275 L/s – Treatment capacity to 500 L/s (15.8 Mm3/yr)

• Dam– Zoned rockfill dam with till core founded on bedrock based on design

criteria consistent with those in place at all other Elliot Lake facilities– Safely convey flow from PMP– Stable for 1,000 year return earthquake– No loss of structural integrity for Maximum Credible Earthquake– Seepage of < 1 L/s

Page 14: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

14

New Plant DiagramSiphon

Water Turbine Stilling Well

1% - 20%

Lime Slurry Pump9500 L Tank

2% - 20%

Barium Chloride

Float Tank

9500 L Tank

MixingChannel

Settling Pond

Discharge Spillway

Effluent Treatment Plant

Stanleigh TMA

Reagent Addition Channel

Dam B

Page 15: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

15

Operations and Maintenance

• The new treatment facility does not change tailings management area operating levels

• Flow and reagent addition rates are expected to be very similar to current operations

• Operational spillway convey and measure flows up to 1 in 100 year return event; incorporate stop log structure to provide 0.3m storage during upset conditions

• Operating staff have been involved in review of treatment plant design and will participate directly in plant commissioning

• Instrumentation and equipment has been selected for simplicity, ease of maintenance and compatibility with existing treatment plants

Page 16: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

16

Energy Efficiency Focus

• Anticipate energy consumption reduction of 95%

• Incorporate alternative (green/renewable) energy sources into design:

– Gravity feed inflow and tiered foundation to allow gravity feed of reagents

– Building size and materials to minimize heating costs– Cross-flow turbine installed at siphon outlet provide electricity

required for plant operations– 12 KW diesel generator maintain battery pack during shut-down;

instrumentation designed to minimize energy draw – Power management system to manage integration of energy

sources

Page 17: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

17

Project Surface Water Influences

• Conditions in the receiving environment are not expected to change as a result of the new treatment facility

• Annual discharge volume will be the same as current system

• Effluent quality will be similar to existing facility

• No significant change expected in annual loadings from new facility

Page 18: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

18

Permits Required• CNSC - Amendment to existing

license condition.

• CEAA Triggered by federal license amendment – Screening level.

• MOE - Certificate of Approval Industrial Sewage; Certificate of Approval Air for diesel generator

• MNR – Land Use Permit for hydro generation and Work Permit

• Disposition water rights trigger Class EA through MNR and Electricity EA with MOE

• Clearance Letter from DFO under Fisheries Act

Canadian Environmental Assessment Act

Class EA – Resource Stewardship and MOE Electricity EA

Canadian Nuclear Safety Commission

Fisheries & Oceans Canada

Ministry of Environment

Ministry of Natural Resources

Page 19: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

19

Settling Pond Dam

Page 20: Stanleigh Treatment Facility Replacementbc-mlard.ca/...BERTHELOT-ETAL-stanleigh-treatment-facility-replace… · Stanleigh Treatment Facility Replacement BC MEND November 28, 2007

20

Treatment Plant