Standards Update Project 2013-03 Geomagnetic Disturbance Mitigation. Kenneth A. Donohoo, Oncor Electric Delivery Co LLC Chairperson, GMD Task Force Presentation to ERCOT ROS August 15, 2013. Management of HILF Event Risks. Strategic direction, coordinated action. November 2010. June 2010. - PowerPoint PPT Presentation

TRANSCRIPT

  • Standards UpdateProject 2013-03 Geomagnetic Disturbance Mitigation Kenneth A. Donohoo, Oncor Electric Delivery Co LLCChairperson, GMD Task ForcePresentation to ERCOT ROSAugust 15, 2013

    RELIABILITY | ACCOUNTABILITY*

    Strategic direction, coordinated action

    Management of HILF Event RisksJune 2010November 2010

    RELIABILITY | ACCOUNTABILITY*

    Task Force ReportsProvide a total of 55 recommendationsSome propose further studyOthers are intended for owner/operator consideration and implementationNovember 2011February 2012May 2012May 2012

    RELIABILITY | ACCOUNTABILITY*

    2012 Special Assessment Report Identifies grid vulnerabilitiesRoadmap to address risks Four high-level recommended actionsTools for industry plannersTools for system operatorsEducation and information exchangesReview need for Reliability StandardsSupporting tasks for Phase 2 project

    RELIABILITY | ACCOUNTABILITY*

    Strategic Roadmap

    RELIABILITY | ACCOUNTABILITY*

    Phase 2 OverviewApproaching mid-point of the action plan to implement recommendations from the 2012 GMD Report Several project plan tasks are expected to complete in 2013Provide additional open-source tools for industry to assess risks and evaluate mitigation strategiesStrong collaboration with EPRI, NATF, government, and private sector researchers

    RELIABILITY | ACCOUNTABILITY*

    Phase 2 Project TeamsTeam 1: Planning Study and Assessment DesignChair: Russell Neal, P.E. (Southern California Edison)Team 2: Equipment Model Development and ValidationChair: Dr. Luis Marti (HydroOne)Team 3: GIC Model Development and ValidationChair: Dr. Randy Horton, P.E. (Southern Company)Team 4: System Operating Practices, Tools, and TrainingChair: Frank Koza, P.E. (PJM)

    RELIABILITY | ACCOUNTABILITY*

    Phase 2 2013 Work PlanTools for vulnerability assessment and planningSevere GMD event scenarios (1-in-100 year)Guide for calculating geomagnetic induced currents (GICs)Initial equipment models and guidelines for system studiesTools for mitigationBest-practice operating procedures (PC and OC approved)Guide for evaluating GIC mitigation measuresEnhanced system operator training

    RELIABILITY | ACCOUNTABILITY*

    Team 1 UpdatePlanning Application Guide revised with EPRI and other Task Force leadersTask force review and comment: July 18 August 9http://www.nerc.com/comm/PC/Pages/Geomagnetic-Disturbance-Task-Force-(GMDTF)-2013.aspx

    RELIABILITY | ACCOUNTABILITY*

    Team 2 UpdateEquipment modeling and testing began in June.Additional utilities are needed to participateTests/models to date (3 utilities, 4 manufacturers)Single-phase 500/16.5 kV 350 MVA SVC transformer (H1)Limited thermal testing dataTested to 17 A/phaseManufacturer modeling to start in August 20133-phase, 3-limb autotransformer 240/138 kV 125 MVA (H1)Tests limited to 30A/phase dcManufacturer modeling report pendingSingle-phase 400 MVA autotransformer (SoC)Tests limited to 30A/phase dcManufacturer modeling report pending

    RELIABILITY | ACCOUNTABILITY*

    Team 3 UpdateFinal draft of GIC Application GuideReference storm scenario

    RELIABILITY | ACCOUNTABILITY*

    Team 4 UpdateIndustry Survey (North American Transmission Forum Brief)System Operator training in development

    RELIABILITY | ACCOUNTABILITY*

    Looking AheadA Reliability Assessment carried out by planners and planning coordinators in early 2014 will employ the Phase 2 Project toolsResults will be used to:Improve next iteration of tools and modelsInform the development and implementation of StandardsIdentify issues for further studyUpdate the GMD Interim Report

    RELIABILITY | ACCOUNTABILITY*

    RELIABILITY | ACCOUNTABILITY*

    Order No. 779FERC Order directs NERC to file standards that address geomagnetic disturbance (GMD) impacts in two stages:Operating Procedures (file by January 2014)Vulnerability assessments and mitigation plans (file by January 2015)

    RELIABILITY | ACCOUNTABILITY*

    Standard Drafting Team

    NameRegistered EntityFrank Koza (Chair)PJM InterconnectionRandy Horton (Vice-chair)Southern CompanyDonald AtkinsonGeorgia Transmission CorporationEmanuel BernabeuDominion Resource Services, IncKenneth FleischerNextEra EnergyLuis MartiHydro One NetworksAntti PulkkinenNASA Goddard Space Flight CenterQun QiuAmerican Electric Power

    RELIABILITY | ACCOUNTABILITY*

    Stage 1: Operating ProceduresStandard(s) that require entities to implement Operating Procedures to mitigate the effects of GMDsRequirements should allow procedures to be tailored based on entity-specific factors such as geography, geology, or topologyConsider coordination of procedures across regionsBoard approval by November 2013

    RELIABILITY | ACCOUNTABILITY*

    Stage 2: Assessments and MitigationDevelop Standards that require assessment of benchmark GMD events and strategies to mitigate identified impactsResearch and tools being produced through the GMD Task Force Phase 2 project provide the technical foundationBoard approval by November 2014

    RELIABILITY | ACCOUNTABILITY*

    RELIABILITY | ACCOUNTABILITY*

    PurposeTo mitigate the effects of geomagnetic disturbance (GMD) events by implementing Operating Procedures

    RELIABILITY | ACCOUNTABILITY*

    ApplicabilityReliability CoordinatorsTransmission Operators and Balancing AuthoritiesLimited to those with an area that includes any transformer with high side terminal voltage greater than 200 kVEffects of GMD on systems below 200 kV are far less due to higher line resistance (see Chapter 8 of 2012 GMD Report)http://www.nerc.com/pa/RAPA/ra/Pages/default.aspx

    RELIABILITY | ACCOUNTABILITY*

    Reliability CoordinatorsEach Reliability Coordinator shall develop, maintain, and implement a GMD Operating Plan that includes:A description of activities to mitigate the effects of GMD eventsA process to determine that the GMD Operating Procedures in the Reliability Coordinator Area are coordinated and compatibleProvides a wide-area view for effective coordination

    RELIABILITY | ACCOUNTABILITY*

    Transmission Operators and Balancing AuthoritiesEach applicable entity shall develop, maintain, and implement GMD Operating Procedures that include:Steps for disseminating space weather information to System OperatorsSteps to be employed by System Operators that are coordinated with its Reliability Coordinator to mitigate the effects on the system from GMDPredetermined trigger conditions for initiating and terminating steps or tasks in the Operating ProcedureGMD Task Force Operating Procedure templates provide steps and trigger conditions for entities to consider

    RELIABILITY | ACCOUNTABILITY*

    ImplementationFERC Order specifies six-month implementationIn jurisdictions where regulatory approval is required:Standard becomes effective by the first day of the first calendar quarter, six calendar months following applicable regulatory approvalIn jurisdictions where regulatory approval is not required:Standard becomes effective by the first day of the first calendar quarter, six calendar months following NERC Board of Trustees approval

    RELIABILITY | ACCOUNTABILITY*

    ScheduleComment Period: June 27 August 12Ballot pool forming: June 27 July 26Industry Webinar: July 30 | 11:00 a.m. - 12:30 p.m. EDTBallot and Non-binding poll: August 2 12SDT Meeting to consider comments and revise: August 21-23Board Approval by November 2013

    RELIABILITY | ACCOUNTABILITY*

    RELIABILITY | ACCOUNTABILITY*

    NEXT NERC GMDTF Face to Face Meeting Nov. 13-15, 2013, Atlanta, GA

    Standard Project 2013-03 Geomagnetic Disturbance Mitigation http://www.nerc.com/pa/Stand/Pages/Project-2013-03-Geomagnetic-Disturbance-Mitigation.aspx