standards en 15221/1-7 · • more detailed descriptions are part of a follow-up project ->...
TRANSCRIPT
04.12.2012 1
Standards EN 15221/1-7
Development in Switzerland
M. Christen
Presentation
Paris, 29.11.2012
Existing Cost Codes
04.12.2012 2
OPIK ITOCC-OPD
Danish FM cost structure
France - Apogee
UK Building Cost
Information Service JELLEMA
QUICKSCAN
BOMA CHART OF ACCOUNTS
NEN
IFMA WORKPOINT
ACCOUNTING
IFMA/GLOBAL FM
BENCHMARKS
GEFMA/IFMA SUBMISSION CODES
GEFMA 200
Nordic Life Cylce Cost Structure LCC
CEEC Cost groups
DIN 18960
CRB Nutzungskosten NKS
ProLeMo IFMA
BMI – Property occupancy cost analysis
ÖNorm
ISO/FDS 15686-5
CREIS Pom+
04.12.2012 3
Benchmarking
• Most widespread FM-benchmarking in CH: FM-Monitor by pom+
-> Privat consulting company (marketing initiative)
• Adaptation to EN 15221 is being investigated
• Master students work on selecting a benchmarking system
Pes
t co
ntr
ol
FM-Monitor compared to EN15221
Acquisition Administration/Maintenance/Operation = running costs
Space (fabric and technic) 1100
Workplace 1400
Primary activities specific 1900
Outdoors 1200
Cleaning 1300
Facility Management – Integration of processes on strategic level (Total support costs)
Rea
l est
ate
dev
elo
pm
ent
Tech
nic
al m
ain
ten
ance
Bu
ildin
g o
per
atio
n
Hel
p d
esk
incl
. jan
ito
r
Imp
rove
men
ts,
add
itio
ns
Tech
nic
al o
per
atio
n
Exte
rnal
str
uct
ure
Inte
rnal
str
uct
ure
Bu
ildin
g te
chn
iqu
e
Was
te
Ener
gy
Wat
er
Init
ial/
bas
e b
uid
ling
incl
. te
chn
ic /
inve
stem
nt
Bu
ildin
g m
ain
ten
ance
CA
FM
Art
Exte
rnal
wo
rkp
lace
s
Pri
mar
y p
roce
ss r
elat
ed u
tilit
ies
Lan
d, s
ite,
lot
Occ
up
ier
fito
ut
an
d a
dap
tati
on
s
Spac
e m
anag
emen
t
Pro
per
ty a
dm
inis
trat
ion
Bu
ildin
g in
itia
l per
form
ance
Par
kin
g fa
cilit
ies
Furn
itu
re
Ass
et r
epla
cem
ent
and
ref
urb
ish
m.
Po
rtfo
lio O
pti
mis
atio
n
Uti
litie
s
Mai
nte
nan
ce a
nd
op
erat
ion
Ad
dit
ion
al s
pac
e o
n s
ite
Ro
uti
ne
clea
nin
g (p
erio
dic
<1
yea
r)
Spec
ial c
lean
ing
(ord
ered
)
Enh
ance
men
t o
f in
itia
l per
form
ance
Space & Infrastructure – Integration of processes on tactical level 1000 (Real estate support management) accommodation & workplace – building efficiency (p& o = effectiveness)
Bewirtschaftung
HSSE (Health. Safety, Security & Environment) 2100
Main-tenance
op
erat
ion
Overview Facility Products and comparison with Dutch Standards
04.12.2012 5
EN15221/1-7
Source: NFC 2011
ProLeMo (IFMA CH)
• Prozess-Leistungs-Modell (Engl: Process Activities/Services Model)
• Developed by IFMA Switzerland
• Describing Processes/Services e.g. as a structure for tendering
• More detailed descriptions are part of a follow-up project
-> Building administration oriented (strategic level <-> tactical level)
-> Diverting attention away from EN 15221
• Adaptation to EN 15221 is announced/investigated by IFMA
04.12.2012 7
Art
Exte
rnal
wo
rkp
lace
s
Pri
mar
y p
roce
ss r
elat
ed u
tilit
ies
Lan
d, s
ite,
lot
Occ
up
ier
fito
ut
an
d a
dap
tati
on
s
Spac
e m
anag
emen
t
Rea
l est
ate
dev
elo
pm
ent
Pro
per
ty a
dm
inis
trat
ion
Bu
ildin
g in
itia
l per
form
ance
Tech
nic
al m
ain
ten
ance
Bu
ildin
g o
per
atio
n
Hel
p d
esk
incl
. jan
ito
r
Pes
t C
on
tro
l
Par
kin
g fa
cilit
ies
Hierarchical structure of Facility Products - part 1 Space & Infrastructure
Furn
itu
re
Ass
et r
epla
cem
ent
and
ref
urb
ish
men
t
Acquisition
Po
rtfo
lio O
pti
mis
atio
n
Imp
rove
men
ts,
add
itio
ns
Tech
nic
al o
per
atio
n
Exte
rnal
str
uct
ure
Inte
rnal
str
uct
ure
Bu
ildin
g te
chn
iqu
e
Uti
litie
s
Mai
nte
nan
ce a
nd
op
erat
ion
Was
te
Ener
gy
Wat
er
Ou
tsid
e fa
cilit
ies
Inte
rnal
mo
ves
Ro
uti
ne
clea
nin
g (p
erio
dic
<1
yea
r)
Spec
ial c
lean
ing
(ord
ered
)
Init
ial/
bas
e b
uid
ling
incl
. Te
chn
ic /
inve
stem
nt
Bu
ildin
g m
ain
ten
ance
Administration/Maintenance/Operation = running costs
Enh
ance
men
t o
f in
itia
l per
form
ance
Space (fabric and technic) Workplace Primary activities specific
Outdoors Cleaning
Space & Infrastructure – Integration of processes on tactical level(Real estate support management) accommodation & workplace – building efficiency (p& o = effectiveness)
Facility Management – Integration of processes on strategic level (Total support costs)
CA
FM
ProLeMo
EN15221-4
<->
ProLeMo
Serv
ice
des
k
Trai
nin
g (I
CT)
Safe
ty &
Hea
lth
Mee
tin
g ro
om
s an
d E
ven
ts
Wo
rkw
ear
and
oth
er t
exti
les
Rec
epti
on
an
d c
on
tact
cen
ter
Flee
t m
anag
emen
t M
ob
ility
Structure of Facility Products - part 2.1 People & Organisation
Secu
rity
s
ecu
rin
g P
eop
le
Cat
erin
g an
d v
end
ing
Ass
ets
Ph
ysic
al a
. so
ftw
are
and
Inte
llect
ual
pro
per
ty
Imp
lem
enti
ng
Lega
l an
d
org
. ob
ligat
ion
s le
gal
com
plia
nce
Tele
com
mu
nic
atio
sn a
nd
Co
nn
ecti
vity
IT e
nd
use
r se
rvic
es
Cen
tral
an
d d
istr
iub
ute
d s
ervi
ces
Off
ice
sup
plie
s, s
tati
on
ary
Do
cum
ents
Man
agem
ent
Lib
rary
Logistics
Envi
ron
men
tal p
rote
ctio
n
Health. Safety, Security & Environment HSSE
Peo
ple
occ
uo
pat
ion
. hea
lth
Imp
lem
enti
ng
Lega
l + o
rg
ob
ligat
ion
leg
al c
om
plia
nce
Hospitality
ICT
Imp
lem
enti
ng
Lega
l + o
rg
ob
ligat
ion
leg
al c
om
plia
nce
see
par
t 2
.2
Lau
nd
ry
Po
st r
oo
m, i
nte
rnal
dis
trib
.
Rep
ro a
nd
Arc
hiv
es
Tran
spo
rt
Trav
else
rvic
es
People & Organisation – Integration of processes on tactical level
Facility Management – Strategic Integration (Total support costs)
For further subdivision of ICT products please refer to table A.2.
EN15221-4
<->
ProLeMo
Pro
cure
men
t
Mar
keti
ng
Bu
sin
ess
sup
po
rt H
RM
Bu
sin
ess
sup
po
rt F
inan
ce
Bu
sin
ess
soft
war
e
Secr
etar
ial s
ervi
ces
Facility Management – Strategic Integration (Total support costs)
People & Organisation – Integration of processes on tactical level (part 2)
Insu
ran
ce
Lega
l ad
vice
Structure of Facility Products - part 2.2 People & Organisation
Lega
l co
un
sel a
nd
co
ntr
acts
Business Support (Management support)
Organisation specific
Ris
k p
olic
y
Co
ntr
acts
Sala
ries
an
d p
ensi
on
s
Trai
nin
g &
Dev
elo
pm
ent
Rec
ruit
ing
Acc
ou
nti
ng,
Bu
dge
tin
g
Rep
ort
ing
Co
ntr
olli
ng
Life
cyc
le
pla
nn
ing/
engi
nee
rin
g Su
stai
nab
ility
ISO
14
00
0
Qu
alit
y IS
O 9
00
0
Ris
k m
anag
emen
t
Iden
tity
Central or Horizontal Functions
EN15221-4
<->
ProLeMo
Theme
Plan Do Check Act
Strategic
levelClient interface Alignment with client Consulting of client Reporting to client
Change mngt. on
strategic level
QM quality management
strategic level
Identifying demand
Needs and demand
Specifications
n/aFullfillment of
requirementsrefer to below
FM-organisation FM-agreement Lead FM organisation Control FM
organisation
Managing
improvement process
StrategyStrategic planning and
strategy developm.
Strategic projects
(strategy
implementation)
Strategic controllingCommunication
External relations
Tactical
level Customer interface
Alignment with
customer
Coordination
client/customer
Consulting of cust.
Reporting to customer
Change mngt. on
tactical level
Com. w. customer
QM quality management
tactical levelSL elaboration n/a
Compare results
Quality controlrefer to below
FS-organisationService level
agreement (SLA)Manage FM team
Evaluation
performance
Cost control
Continuous improvem.
process
Tactics and central
functions / Resources
Tactical planning
a. central functions
Service coordinat.
Manage central
functions
Monitoring
performance
Provider manag.
Com. w. end users
Operational
level Facility products and
facilty servicesProduct planning
Refer to
Product mapEvaluation, Reporting Operational measures
QM quality management
operational level
Organizing
Measurement
(I/T/O)
Data collection Measure results Improve measurement
Facili
ty M
anager
Facili
ty S
erv
ices M
anager
Opera
tion
EN15221-4
<->
ProLeMo
04.12.2012 11
Cost structure in CH-hospitals
• New tarif system being introduced (Fallpauschalen = flat rate per case)
• Hospitals have little knowledge about their FM costs
• New cost structures needed for more transparency
• Departments are eager to reduce costs -> everything is shed into FM
• FM knows how to optimise support services
1 9 Nutzerspezifische Betriebseinrichtungen Gemäss SLA
1 9 1 Ver- und Entsorgung Kerngeschäft dito
1 9 2 Externe Arbeitsplätze dito
1 9 9 Branchenspezifische Produkte (z.B. Gesundheitswesen)dito
1 9 9 H1 Instandhaltung von Medizintechnik dito 8 Support und Services
1 9 9 H1 Kinderkrippe 71 Kinderkrippen
1 9 9 H2 Personalunterkuft 73 Personalunterkunft
1 9 9 H3 Kommerzflächen 74,75 Blumenladen, Coiffeur
1 9 9 H4 Schwimmbad 76 Schwimmbad
1 9 9 H5 Geschützte Operationssääle 78 Geschützte Operationssääle
1 9 9 H6 Militärspital 79 Militärspital
1 9 9 H7 Arztpraxen 80 Arztpraxen
2 9 Organisationsspezifisch dito
2 9 1 Business application providing dito
2 9 9 Branchenspezifisch (z.B. Gesundheitswesen) dito
2 9 9 H1 Hotellerie dito
2 9 9 H2 1 Zimmer SLA (pro Bett) 41 Hotellerie Zimmer
2 9 9 H3 2 Küche SLA (pro Essen) 42 Hotellerie Küche
2 9 9 H4 3 Services SLA (Tarife) 43 Hotellerie Service
2 9 9 H2 Patient transport SLA (pro km) 8 Support und Services
2 9 9 H3 Bed sterilization SLA (pro Bett) 8 Support und Services
2 9 9 H4 Maintenance of biomedical equipment SLA (pro Gerät) 8 Support und Services
2 9 9 H5 Sterilization service SLA (pro Auftrag) 18 Zentralsterilisation
2 9 9 H6 Labor SLA (pro Auftrag) 29 Labor
2 9 9 H7 Aphotheke SLA (Preis) 14 Apotheke
2 9 9 H8 Ambulanzdienste SLA (Preis, km, h) 77 Rettungs bzw. Ambulanzdienst
2 9 9 H9 Notfallzentrale SLA (Anrufe, Präsenzzeit) 81 Notfallzentrale
2 9 9 H10 Broadcasting services SLA 8 Support und Services
1 9 Primary activity specific
2 9 Organisation specific (industry sector)
Str
ate
gic
level
Tactical le
vel
Level 1
Level 2
Level 3 Verrechnung Bsp.
REKOLE
Kostenstellen
04.12.2012 13
Maintenance budgeting
Raised common standards
Additional performance/
functionality
Building initial performance
(at time of acquisition) 1110
Value (Condition)
Time
Devaluation
(decline depending partly on maintenance and operation)
Asset replacement and refurbishment 1120
(maintenance listed as an asset)
Enhancement of initial performance 1130
04.12.2012 14
EN 15221/1-7 in CH - Summary
• Activities and influences on different levels
• Universities are teaching the standard
• Low selling figures of standards (included in membership?)
• Small interest in presentations (50 listeners in 3)
• Practical instruments are needed
• People believe in standards, but they have to know them