standards-based architecture as the safe choice
DESCRIPTION
Smart Meter Rollout - a risky project Standards - to avoid manufacture lock-in Interoperability - to minimise integration costs Interoperability providers Interoperability - based on a transparent process Interoperability avoiding technology lock-in Smart Meter rollout - managed riskTRANSCRIPT
![Page 1: Standards-based architecture as the safe choice](https://reader034.vdocuments.mx/reader034/viewer/2022052601/558c2fadd8b42a553e8b461f/html5/thumbnails/1.jpg)
Thomas Schaub EUW 2014
© Landis+Gyr | 4 November 2014
Standards-based architecture as the safe choice
![Page 2: Standards-based architecture as the safe choice](https://reader034.vdocuments.mx/reader034/viewer/2022052601/558c2fadd8b42a553e8b461f/html5/thumbnails/2.jpg)
European Utility Week | Thomas Schaub | © Landis+Gyr | 4 November 2014
Smart meter rollout – a risky project
2
exchange the entire meter park
manufacturer lock-in rocketing integration costs
![Page 3: Standards-based architecture as the safe choice](https://reader034.vdocuments.mx/reader034/viewer/2022052601/558c2fadd8b42a553e8b461f/html5/thumbnails/3.jpg)
European Utility Week | Thomas Schaub | © Landis+Gyr | 4 November 2014
Standards - to avoid manufacturer lock-in
Open standardisation processes
Open specification
Transparency on patents
3
provided by the official standardisation organisations:
![Page 4: Standards-based architecture as the safe choice](https://reader034.vdocuments.mx/reader034/viewer/2022052601/558c2fadd8b42a553e8b461f/html5/thumbnails/4.jpg)
European Utility Week | Thomas Schaub | © Landis+Gyr | 4 November 2014
Interoperability – to minimize integration costs
4
standard + exchangeable companion specification
no standard
with standard
syst
em A
syst
em B
€ € € € € €
€ € €
provided by the official standardisation organisations:
Who provides INTEROPERABILITY ?
![Page 5: Standards-based architecture as the safe choice](https://reader034.vdocuments.mx/reader034/viewer/2022052601/558c2fadd8b42a553e8b461f/html5/thumbnails/5.jpg)
European Utility Week | Thomas Schaub | © Landis+Gyr | 4 November 2014
Interoperability providers
5
![Page 6: Standards-based architecture as the safe choice](https://reader034.vdocuments.mx/reader034/viewer/2022052601/558c2fadd8b42a553e8b461f/html5/thumbnails/6.jpg)
European Utility Week | Thomas Schaub | © Landis+Gyr | 4 November 2014
Interoperability – based on a transparent process
6
![Page 7: Standards-based architecture as the safe choice](https://reader034.vdocuments.mx/reader034/viewer/2022052601/558c2fadd8b42a553e8b461f/html5/thumbnails/7.jpg)
European Utility Week | Thomas Schaub | © Landis+Gyr | 4 November 2014
Interoperability - avoiding technology lock-in
7
PLC
S-FSK IEC 61034-5-1
IP v4 / IP V6
GPRS Ethernet
6lowPAN
ITU-T
G.9903
COSEM IEC 62056-6-2
DLMS IEC 62056-5-3
Communications
Functionality + Security
new
functionality
New
• use cases
• market requirements
new
technology new
technology
New
• comms media
• comms technology
![Page 8: Standards-based architecture as the safe choice](https://reader034.vdocuments.mx/reader034/viewer/2022052601/558c2fadd8b42a553e8b461f/html5/thumbnails/8.jpg)
European Utility Week | Thomas Schaub | © Landis+Gyr | 4 November 2014
Smart meter rollout – managed risk
manufacturer lock-in
8
rocketing integration costs
exchange the entire meter park
![Page 9: Standards-based architecture as the safe choice](https://reader034.vdocuments.mx/reader034/viewer/2022052601/558c2fadd8b42a553e8b461f/html5/thumbnails/9.jpg)
Thank you for your attention
9