standard drafting team rosters - nerc standard drafting team rosters – november 2013 6 project...

26
3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 | www.nerc.com Standard Drafting Team Rosters November 2013

Upload: truongtram

Post on 12-May-2018

216 views

Category:

Documents


3 download

TRANSCRIPT

3353 Peachtree Road NE

Suite 600, North Tower Atlanta, GA 30326

404-446-2560 | www.nerc.com

Standard Drafting Team Rosters

November 2013

1 NERC Standard Drafting Team Rosters – November 2013

Table of Contents

Project 2012-05 ATC Revisions Standard Drafting Team .................................................... 2

Project 2010-14.1 Balancing Authority Reliability-based Controls, Phase 1: Reserves Standard Drafting Team ...................................................................................................... 3

Project 2010-14.2 Balancing Authority Reliability-based Controls, Phase 2 Standard Drafting Team ..................................................................................................................... 4

Project 2013-01 Cold Weather Preparedness Standard Drafting Team............................. 5

Project 2008-12 Coordinate Interchange Standard Drafting Team.................................... 6 Project 2010-17 Definition of Bulk Electric System Standard Drafting Team .................... 7

Project 2010-04 Demand Data (MOD C) Standard Drafting Team ..................................... 8

Project 2009-01 Disturbance and Sabotage Reporting Standard Drafting Team............... 9

Project 2007-11 Disturbance Monitoring Standard Drafting Team ................................. 10

Project 2010-02 FAC Five-Year Review Team ................................................................... 11

Project 2007-09 Generator Verification Standard Drafting Team .................................... 12

Project 2013-03 Geomagnetic Disturbance Mitigation Standard Drafting Team ............ 13

Project 2010-03 Modeling Data (MOD B) Standard Drafting Team ................................. 14

Project 2007-02 Operating Personnel Communications Protocols Standard Drafting Team ................................................................................................................................. 15

Project 2007-17 Protection System Maintenance and Testing Standard Drafting Team 16

Project 2010-05-1 Protection Systems, Phase 1: Misoperations Standard Drafting Team........................................................................................................................................... 18

Project 2007-03 Real-Time Operations Standard Drafting Team ..................................... 19

Project 2010-13.2 Phase 2 of Relay Loadability: Generation Standard Drafting Team.... 20

Project 2006-06 Reliability Coordination Standard Drafting Team .................................. 21

Project 2007-06 System Protection Coordination Standard Drafting Team .................... 22

Project 2010-01 Training (PER) Standard Drafting Team ................................................. 23

Project 2008-02 Undervoltage Load Shedding Standard Drafting Team ......................... 24

Project 2013-04 Voltage and Reactive Control (VAR) Standard Drafting Team ............... 25

NERC Standard Drafting Team Rosters – November 2013 2

Standard Drafting Team Rosters

Project 2012-05

ATC Revisions (MOD A) Standard Drafting Team

Chair Aaron Staley Orlando Utilities Commission

Vice Chair Michael Lowman Duke Energy

Member David Dockery AECI

Ryan Harrigill SPP

Marilyn Jayachandran PJM

Ross Kovacs Georgia Transmission Corporation

Sunish Mathew Southern Company

Tung Nguyen MISO

Dede Subakti CAISO

James Randall BPA

Phillip Shafeei Colorado Springs Utilities

NERC Staff Ryan Stewart – Standards Developer North American Electric Reliability Corporation

Valerie Agnew – Director of Standards Development

North American Electric Reliability Corporation

3 NERC Standard Drafting Team Rosters – November 2013

Project 2010-14.1 Balancing Authority Reliability-based Controls, Phase 1: Reserves

Standard Drafting Team

Chair Glenn Stephens Santee Cooper

Vice Chair Thomas W. Siegrist Brickfield Burchette Ritts and Stone, PC

Member Gerald D. Beckerle Ameren Services

Howard F. Illian Energy Mark, Inc.

David F. Lemmons Xcel Energy, Inc.

Clyde Loutan California ISO

David McRee Duke Energy Carolina

H. Steven Myers Electric Reliability Council of Texas, Inc.

LeRoy Patterson Patterson Consulting

Michael Potishnak Representing NPCC

Mark Prosperi-Porta British Columbia Transmission Corporation

Jerry Rust Northwest Power Pool

Stephen Swan Midwest ISO, Inc.

Thomas Washburn Florida Municipal Power Pool

NERC Staff Darrel Richardson – Standards Developer

North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – November 2013 4

Project 2010-14.2 Balancing Authority Reliability-based Controls, Phase 2

Standard Drafting Team

Chair Doug Hils Duke Energy

Vice Chair Thomas W. Siegrist Brickfield Burchette Ritts and Stone, PC

Member Scott Brooks Manitoba Hydro

Ron Carlsen Southern Company

Howard F. Illian Energy Mark, Inc.

Mike Potishnak Representing NPCC

Jerry Rust Northwest Power Pool

Robert Staton Xcel Energy

Glenn Stephens Santee Cooper

Stephen Swan Midwest ISO, Inc.

Mark Trumble Omaha Public Power District

NERC Staff Sean Cavote (Lead Standards Developer)

North American Electric Reliability Corporation

Laura Anderson (Supporting Standards Developer)

North American Electric Reliability Corporation

Stephen Crutchfield (Supporting Standards Developer)

North American Electric Reliability Corporation

Mallory Huggins (Supporting Standards Developer)

North American Electric Reliability Corporation

Laura Hussey (Director of Standards Development)

North American Electric Reliability Corporation

5 NERC Standard Drafting Team Rosters – November 2013

Project 2013-01 Cold Weather Preparedness

Standard Drafting Team

Chair Ed Schnell American Electric Power

Vice Chair Matt Averett Southern Company

Member Jason Fisher Minnesota Power

Mike Gentry Salt River Project

Kevin Lynch PSEG Power Fossil LLC

NERC Staff Barb Nutter – Standards Developer (Primary)

North American Electric Reliability Corporation

Scott Barfield – Standards Developer (Backup)

North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – November 2013 6

Project 2008-12 Coordinate Interchange Standard Drafting Team

Chair Cheryl Mendrala ISO New England

Vice Chair Robert Harshbarger Puget Sound Energy, Inc.

Member Clint Aymond Entergy Services, Inc.

David McRee Duke Energy

Joel Mickey Electric Reliability Council of Texas, Inc.

Christopher Pacella PJM Interconnection

Mary Willey Bonneville Power Administration

NERC Staff Stephen Crutchfield – Standards Developer

North American Electric Reliability Corporation

Laura Hussey – Director of Standards Development

North American Electric Reliability Corporation

Mallory Huggins – Standards Developer

North American Electric Reliability Corporation

Sean Cavote – Standards Developer North American Electric Reliability Corporation

7 NERC Standard Drafting Team Rosters – November 2013

Project 2010-17 Definition of Bulk Electric System

Standard Drafting Team

Chair Peter Heidrich – Manager of Reliability Standards

Florida Reliability Coordinating Council

Vice Chair Barry R. Lawson – Associate Director, Power Delivery & Reliability

National Rural Electric Cooperative Association

Member Jennifer Dering – Manager Operations Planning, Transmission

New York Power Authority

Brian Evans-Mongeon – President and CPO

Utility Services, Inc.

Philip A. Fedora – Assistant Vice President, Reliability Services

NPCC

Ajay Garg – Manager, Policy and Approvals

Hydro One Networks, Inc.

John Hughes – Vice President, Technical Affairs

Electricity Consumers Resource Council (ELCON)

Jeff Mitchell – Director, Engineering RFC

Rich Salgo – Director, Electric System Operations

NV Energy

Jason Snodgrass – Regulatory Compliance Manager

Georgia Transmission Corporation

Jennifer T. Sterling, P.E. – Director, Transmission Strategy and Compliance

Exelon

Jonathan Sykes – Manager, System Protection

Pacific Gas & Electric

NERC Staff Edward J. Dobrowolski – Standards Developer

North American Electric Reliability Corporation

Stacey Tyrewala – Attorney North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – November 2013 8

Project 2010-04 Demand Data (MOD C)

Standard Drafting Team

Chair Mark Kuras PJM

Vice Chair Josh Collins MISO

Member Paul Kure ReliabilityFirst Corporation

Brian Glover Great River Energy

Robert Emmert CAISO

Barbara Doland SERC

Andrey Oks NPCC

NERC Staff Darrel Richardson – Standards Developer

North American Electric Reliability Corporation

9 NERC Standard Drafting Team Rosters – November 2013

Project 2009-01 Disturbance and Sabotage Reporting

Standard Drafting Team

Chair Brian Evans-Mongeon Utility Services, Inc

Vice Chair Joseph G. DePoorter – Reliability Compliance Manager

Madison Gas and Electric Co.

Member Chris Boucher BC Transmission Corporation

Michelle Draxton Constellation Energy Group

James E. Hartmann, Jr. – Supervisor, System Operations

Electric Reliability Council of Texas, Inc.

Thomas M. Moleski – Senior Analyst PJM Interconnection, L.L.C.

NERC Staff Bob Canada – CIP Cybersecurity Specialist

North American Electric Reliability Corporation

Stephen Crutchfield – Standards Developer

North American Electric Reliability Corporation

Brian Harrell – Associate Director of CIP Programs Division

North American Electric Reliability Corporation

Scott R. Mix – CIP Technical Manager North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – November 2013 10

Project 2007-11 Disturbance Monitoring Standard Drafting Team

Chair Lee Pedowicz NPCC

Member Frank Ashrafi Southern California Edison

Alan D. Baker Florida Power & Light

Daniel J. Hansen NRG

Tim Kucey PSEG Fossil LLC

H. Steven Myers ERCOT

Jack Soehren ITC Holdings

Vladimir Stanisic AESI Inc.

NERC Staff Barb Nutter – Standards Developer (Primary)

North American Electric Reliability Corporation

11 NERC Standard Drafting Team Rosters – November 2013

Project 2010-02 FAC Five-Year Review Team

Chair John Beck Con Edison

Vice Chair Michael Steckelberg Great River Energy

Member Brian Dale Georgia Power Company

Ruth Kloecker ITC Holdings

Stewart Rake Luminant Generation Company LLC

Ganesh Velummylum Northern Indiana Public Service Co.

NERC Staff Mallory Huggins (Lead Standards Developer)

NERC

Sean Cavote (Supporting Standards Developer)

NERC

Ed Dobrowolski (Supporting Standards Developer)

NERC

Laura Hussey (Director of Standards Development)

NERC

NERC Standard Drafting Team Rosters – November 2013 12

Project 2007-09 Generator Verification

Standard Drafting Team

Chair Lee Y. Taylor Southern Company Services, Inc.

Vice Chair Ken Stenroos Florida Power & Light Co.

Member Baj Agrawal Arizona Public Service Co.

Donald G. Davies Western Electricity Coordinating Council

Les Hajagos Kestrel Power Engineering Ltd

Gary Humphries Duke Energy Carolina

Venkat S. Kolluri Entergy Corporation

David Kral Xcel Energy, Inc.

Gary Kruempel MidAmerican Energy Co.

Daniel J. Leonard GE Energy

Jason MacDowell GE Energy

Craig Quist PacifiCorp

Balbir S. Sandhu Manitoba Hydro

William D. Shultz Southern Company

Vladimir Stanisic Ontario Power Generation Inc.

Chifong L. Thomas BrightSource Energy

David Thompson TVA

Edward J. Wingard American Electric Power

David Youngblood Luminant

Hamid Zakery Calpine Corporation

NERC Staff Stephen Crutchfield – Standards Developer

North American Electric Reliability Corporation

13 NERC Standard Drafting Team Rosters – November 2013

Project 2013-03 Geomagnetic Disturbance Mitigation

Standard Drafting Team

Chair Frank Koza PJM Interconnection

Vice Chair Randy Horton Southern Company

Member Donald Atkinson Georgia Transmission Corporation

Emanuel Bernabeu Dominion Resource Services, Inc

Kenneth Fleischer NextEra Energy

Luis Marti Hydro One Networks

Antti Pulkkinen NASA Goddard Space Flight Center

Qun Qiu American Electric Power

NERC Staff Mark Olson – Standards Developer North American Electric Reliability Corportation

NERC Standard Drafting Team Rosters – November 2013 14

Project 2010-03 Modeling Data (MOD B) Standard Drafting Team

Chair Bobby Jones Southern Company Services

Vice Chair Reené Miranda Xcel Energy, Inc.

Member Durgesh Manjure MISO

Kent Bolton WECC

Jeff Gindling Duke Energy

Wayne Haidle Basin Electric Power Cooperative

James Teixeira ERCOT

Catherine Wesley PJM Interconnection

NERC Staff Steven Noess – Associate Director of Standards Development

North American Electric Reliability Corporation

15 NERC Standard Drafting Team Rosters – November 2013

Project 2007-02 Operating Personnel Communications Protocols

Standard Drafting Team

Chair Lloyd S. Snyder – Manager, Transmission Operations

Georgia Systems Operations Corporation

Member Glen Boyle – Engineer/Instructor PJM Interconnection, LLC

Mike Brost – Vice President, Electric Systems

JEA

Michael Cassiadoro – Director of Reliability Coordination

WECC

Tom Irvine – Manager, Grid Operations

Hydro One Networks, Inc.

Robert C. Rhodes, Jr. – Manager, Reliability Standards

SPP

Stephen Solis – Planning and Operating Standards Compliance

Electric Reliability Council of Texas, Inc.

John Stephens – Director, Power System Control

City Utilities of Springfield

Fred Waites – Team Leader, Training Southern Company

NERC Staff Stephen Eldridge – Standards Developer

North American Electric Reliability Corporation

William Edwards – Attorney North American Electric Reliability Corporation

Marisa Hecht – Standards Developer North American Electric Reliability Corporation

Howard Gugel – Director of Standards Development

North American Electric Reliability Corporation

Larry J. Kezele – Manager of Operations

North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – November 2013 16

Project 2007-17 Protection System Maintenance and Testing

Standard Drafting Team

Chair Charles W. Rogers Consumers Energy

Member John Anderson Xcel Energy, Inc.

Rick Ashton Tri-State G & T Association

Bob Bentert Florida Power & Light Co.

Forrest Brock Western Farmers Electric Cooperative

Aaron Feathers Pacific Gas and Electric Company

Samuel Francis Oncor Electric Delivery

Carol Gerou, P.E. Midwest Reliability Organization

Russell Hardison, P.E. Tennessee Valley Authority

Ervin D. Harper NRG Texas Maintenance Services

James M. Kinney FirstEnergy Corporation

Mark Lukas Commonwealth Edison Co.

Kristina Marriott ENOSERV

Michael Palusso Southern California Edison

Mark Peterson Great River Energy

John Schechter American Electric Power

William D. Shultz Southern Company

Eric Udren Quanta Technology

Scott Vaughan City of Roseville

Matthew Westrich American Transmission Company

Philip B. Winston Southern Company

David Youngblood Luminant Power

John Zipp ITC Holdings

17 NERC Standard Drafting Team Rosters – November 2013

NERC Staff Al McMeekin – Standards Developer North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – November 2013 18

Project 2010-05-1 Protection Systems, Phase 1: Misoperations

Standard Drafting Team

Chair Mark J. Kuras PJM Interconnection, LLC

Member Martin Bauer, P.E. U.S. Bureau of Reclamation

Paul DiFilippo HydroOne Networks, Inc.

Mark Gutzmann Xcel Energy, Inc.

Ted Kramer Duke Energy

Bill Middaugh Tri-State G & T Association, Inc.

John W. Miller Georgia Transmission Corporation

Steve Paglow American Electric Power

Richard A. Purdy, PE Dominion Virginia Power

Tim Seeber ComEd/Exelon

Patrick Sorrells Sacramento Municipal Utility District

NERC Staff Scott Barfield-McGinnis – Standards Developer

North American Electric Reliability Corporation

19 NERC Standard Drafting Team Rosters – November 2013

Project 2007-03 Real-Time Operations

Standard Drafting Team

Chair James S. Case – Director, Weekly Operations

Entergy Services, Inc.

Vice Chair Karl Tammar – Transmission Operations Manager

Sharyland Utilities, L.P.

Member Albert DiCaprio – Strategist PJM Interconnection, L.L.C.

Jason L. Marshall, P.E. – Director, Reliability Compliance

ACES Power Marketing

H. Steven Myers – Principal, Operating and Planning Standards

Electric Reliability Council of Texas, Inc.

Gregory Van Pelt California ISO

NERC Staff Edward J. Dobrowolski – Standards Developer

North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – November 2013 20

Project 2010-13.2 Phase 2 of Relay Loadability: Generation

Standard Drafting Team

Chair Charles W. Rogers Consumers Energy

Member Jeff Billo ERCOT

S. Bryan Burch, P.E. Southern Company

Steven Hataway Florida Power & Light Co.

Jonathan E Hayes Southwest Power Pool, Inc.

Mike Jensen Pacific Gas and Electric Company

Sudhir Thakur, P.E. Exelon Nuclear

Joe T. Uchiyama U.S. Bureau of Reclamation

Benson Vuong Salt River Project

David Youngblood Luminant Energy

NERC Staff Scott Barfield-McGinnis – Standards Developer

North American Electric Reliability Corporation

21 NERC Standard Drafting Team Rosters – November 2013

Project 2006-06 Reliability Coordination Standard Drafting Team

Chair William Hardy Southern Company Services, Inc.

Member Earl A. Barber National Grid

James S. Case – Director, Weekly Operations

Entergy Services, Inc.

Albert DiCaprio – Strategist PJM Interconnection, L.L.C.

Anthony Jankowski – Manager, Electric System Operations

We Energies

H. Steven Myers – Manager of Operating Standards

Electric Reliability Council of Texas, Inc.

Robert C. Rhodes, Jr. – Manager, Reliability Coordination

Southwest Power Pool

Eric Senkowicz – Manager of Operations

Florida Reliability Coordinating Council

NERC Staff Scott Barfield-McGinnis – Standards Developer

North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – November 2013 22

Project 2007-06 System Protection Coordination

Standard Drafting Team

Chair Philip Winston Georgia Power Company

Vice Chair Bill Middaugh Tri-State G & T Association, Inc.

Member Forrest Brock Western Farmers Electric Cooperative

David Cirka National Grid

Samuel Francis Oncor Electric Delivery

Jeffrey Iler American Electric Power

William Waudby Consumers Energy

Kevin Wempe Kansas City Power & Light Co.

NERC Staff Al McMeekin – Standards Developer North American Electric Reliability Corporation

23 NERC Standard Drafting Team Rosters – November 2013

Project 2010-01 Training (PER)

Standard Drafting Team

Chair Patti Metro NRECA

Vice Chair Lauri Jones PG&E

Member Charles Abell Ameren

Sam Austin Tennessee Valley Authority

Jim Bowles ERCOT

Jeff Gooding Florida Power & Light Co.

Mark Grear Constellation

Venona Greaff OXY

John M. Rymer MISO

Stanley Winbush American Electric Power

NERC Staff Jordan Mallory – Standards Developer Specialist

North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – November 2013 24

Project 2008-02 Undervoltage Load Shedding

Standard Drafting Team

Chair Greg Vassallo Bonneville Power Administration

Member José Conto ERCOT

Bill Harm PJM

Sharma Kolluri Entergy

Charles-Eric Langlois Hydro-Quebec TransEnergie

Manish Patel Southern Company

Fabio Rodriguez Duke Energy

Hari Singh Xcel Energy

Matthew Tackett MISO

NERC Staff Erika Chanzes – Standards Developer North American Electric Reliability Corporation

Phil Tatro – Technical Advisor North American Electric Reliability Corporation

25 NERC Standard Drafting Team Rosters – November 2013

Project 2013-04 Voltage and Reactive Control (VAR)

Standard Drafting Team

Chair Bill Harm PJM Interconnection, L.L.C.

Vice Chair Martin Kaufman Exxon Mobil Research and Engineering

Member Joshua Pierce Southern Company Transmission Planning

Sharma Kolluri Entergy Services Inc.

Scott Berry Indiana Municipal Power Agency

Hari Singh Xcel Energy

Hamid Zakery Calpine Corporation

Steve Hitchens Bonneville Power Administration

Joe Seabrook Puget Sound Energy, Inc.

Brian Buckley TECO Energy

Mike Swearingen Tri-County Electric

NERC Staff Soo Jin Kim – Standards Developer North American Electric Reliability Corporation