stakeholders working group south orange county major...

45
1 Stakeholders Working Group South Orange County Major Investment Study November 14, 2006

Upload: others

Post on 13-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

1

Stakeholders Working Group

South Orange CountyMajor Investment Study

November 14, 2006

Page 2: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

2

Major Investment Study

• Integrated Planning, Engineering, and Public Outreach Process

• Starts Broadly with Mobility Problems and Purpose and Need Statement

• Results in Multimodal Program of Project Strategies

• Sets the Stage for Future Local, State, and Federal Funding and Further Refined Studies

Page 3: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

3

SOC Study Area

Page 4: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

4

Study Approach

• Spring ’06 – Fall ‘06- One-on-one Meetings with Cities in Study Area - Gather Information and Collect Data to Create a Purpose

and Need Statement

• Winter ’06 – End of ’07- Alternatives Development- Technical Analysis- Public Outreach

• Conclude Study in December ’07• Cities Participate in On-Going Advisory

Meetings throughout Study

Page 5: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

5

Public Involvement Program

Page 6: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

6

Public Involvement Program

• “Project Initiation / Scoping” Phase Began in Spring ’06 with One-on-One Interviews with Agency Staff

• Study Process Guided by Three Committees:- Policy Advisory Committee

- Technical Advisory Committee

- Stakeholder Working Group

Page 7: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

7

Public Involvement Program

Goals

• Communicate proactively throughout the process with stakeholders

• Engage a broad-based group of stakeholders

• Solicit usable feedback

• Meet all federal and regional guidelines and complements the technical study

Page 8: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

8

Public Involvement ProgramA variety of outreach techniques will be used,

including:

• Establish a communications infrastructure

- Stakeholder database

- Hotline

- Newsletter Network

Page 9: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

9

Public Involvement Program

Outreach Techniques (cont.)

• Draft and design public information materials

- Fact sheets

- Newsletters

- Frequently Asked Questions

- Study website

- Email blasts

- Surveys

Page 10: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

10

Public Involvement ProgramOutreach Techniques (cont.)

• Conduct outreach activities that engage stakeholders

- Round tables

- Open houses and workshops

- Activity centers

- Speakers Bureau presentations

Page 11: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

11

Public Involvement Program

Outreach Techniques (cont.)

• Facilitate on-going dialogue with key community leaders

- Policy Advisory Committee

- Stakeholder Working Group

- Elected official briefings

Page 12: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

12

Public Involvement ProgramOutreach Techniques (cont.)• Engage the broader community through a

comprehensive media relations program

- Messaging

- Creative story concepts

- Press Releases

- Media Advisories

- Daily and weekly newspapers

- Community newsletter network

Page 13: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

13

Identify Corridor

Deficiencies

(Spring / Summer 2006)

Develop Purpose and

Need

Develop Initial Alternative Strategies

(Fall 2006)

Evaluate Initial

Alternative Strategies

(Spring 2007)

Select Primary

Alternative Strategies

(Summer 2007)

Recommend Locally Preferred Strategy

Primary Alternative Strategies Analysis

(Fall/Winter 2007)

Elected Official and Community

Leader Outreach

Technical and Stakeholder

Input

Community Meetings

Public Input

Consensus Building

Public Feedback

Community Leader

FeedbackInclude

Community Needs

Presentation to the Public

Consensus Building

ConceptualDefinitions

Environmental and Community Considerations

Cost Considerations

Effectiveness

Feasibility

Fundability

Cost/Benefit Analysis

Environmental Factors

Engineering Factors

Community Impacts

ConceptualEngineering

Layouts

Financial Analysis

Cost Estimates

Environmental Assessments

Evaluation Report

Technical Documentation

PUBLIC OUTREACH

TECHNICAL PROCESS

Collect Data

IdentifyConstraints

Review Previous Studies

Conduct Site Reviews

Study Process

13

Page 14: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

14

Study Area Demographics

Page 15: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

15

Study Area Demographics

0

0.2

0.4

0.6

0.8

1

1.2

Millions

2000 2030

SOC Study Area Population

2000 2030 Growth

SOC Study Area 809,600 1,153,100 42.4%

Orange Co. (as a whole) 2,864,200 3,552,700 24.0%Source: OCP 2004

Projected Change in Population between 2000 and 2030

Page 16: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

16

00.10.20.30.40.50.60.70.8

Millions

2000 2030

SOC Study Area Employment

Study Area Demographics

2000 2030 Growth

SOC Study Area 517,700 766,700 48.1%

Orange Co. (as a whole) 1,514,600 1,921,800 26.9%Source: OCP 2004

Projected Change in Employment between 2000 and 2030

Page 17: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

17

• Major Development Initiatives in the South Orange County Study Area Include:

- Tustin Legacy

- Great Park / Heritage Fields

- Ladera Ranch

- Rancho Mission Viejo

- Talega

- Marblehead

Planned Development

Page 18: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

18

Jobs / Housing Balance

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

2000 2030

Balance = 1.0

Study Area

Orange County

Jobs

/ H

ousin

g Rat

io

Source: OCP 2004

Number of Jobs Per Employed Resident

Page 19: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

19

Major Travel Markets

• Commute Trips- Predominantly Peak Period - Study Area is “Jobs Rich” (especially in northern portion)- Importer of Work Trips

• Local Trips- Significant Proportion of Average Daily Traffic- To / From Home (Shopping, Errands, School)- To / From Work (Mostly Midday Trips)

• Weekend / Recreational Trips

Page 20: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

20

Mobility Problems

AM Peak PeriodTraffic Congestion

2000 2030

Source: 2006 LRTP

Page 21: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

21

Mobility Problems

Freeway Roadway0%

200%

400%

600%

800%

1000%

South Orange County Will Experience More Traffic Congestion Between 2000 to 2030

Traf

fic C

onge

stio

n In

crea

se

Source: OCTAM 3.2

Page 22: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

22

Summer Weekend PatternAv

erag

e Dai

ly Tra

ffic

Source: Freeway Performance Measurement System, PeMS, (August 2004); UC Berkeley & Caltrans

0

25,000

50,000

75,000

100,000

125,000

150,000

175,000

200,000

SU MO TU WE TH FR SA

Three Highest Days

I-5 Freeway, near San Diego County LineD

aily

Tra

ffic

Volu

mes

Page 23: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

23

Source: OCTA, 2005

South Orange County OCTA Bus Routes

Existing Bus Routes

Local Bus Service

Community Bus Service

Station Link Routes

Express Bus Service

Bus Route Coverage

South Orange County Study Area

Page 24: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

24

Transit Mode Share

Source: OCTA Transit Master Plan, Systems Gaps and Needs Assessment, IBI Group, June 2005

Year 2000 Peak Period Percent Share Transit Trips

Productions

Page 25: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

25

Discussion:Issues and Opportunities

Page 26: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

26

Discussion

• Understanding Regional Transportation Needs in South Orange County Leads to Identifying Solutions

• This is an Important First Step to a Major Investment Study

• Would Like to Get a Handle on Underlying Causes of Transportation Issues and Problems

• Take into Account Different Perspectives

Page 27: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

27

Discussion

What is the Biggest Transportation Problem Facing South Orange County?

Page 28: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

28

Discussion

At a Minimum, What Does a Successful Transportation Solution Need to Achieve?

Page 29: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

29

Discussion

As We Evaluate Different Transportation Alternatives, What Do We Need to Take into

Consideration?

Page 30: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

30

South Orange County MIS

What We’ve Heard So Far

Page 31: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

31

Sources of Input

• Technical Analysis on Existing and Future Travel Conditions in the Study Area

• One-on-One Meetings with Cities, County of Orange, Transportation Agencies

• Technical Advisory Committee

• Policy Advisory Committee

• Stakeholders Working Group

Page 32: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

32

Purpose and Need

• Eight Key Themes Are Emerging:- Freeway

Congestion

- Arterial Roadway Congestion

- Weekend Congestion

- Lack of Transit Choices

- Rail Corridor Constraints

- Economic Growth and Quality of Life

- Need to Maximize Utilization of Existing Infrastructure

- Systems Gaps

Page 33: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

33

Freeway Congestion

• Growth in Population, Jobs, Housing

• Jobs – Housing Balance

• High Travel Demand

• Traffic Congestion

• Operational Deficiencies Northbound on I-5, PM Peak HourNorthbound on I-5, PM Peak Hour

Page 34: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

34

Arterial Roadway Congestion

• Arterial network configuration

• Limited arterial infrastructure for “east–west” travel within the study area

• Arterial Operational Deficiencies

- Spot locations

- Apt to be near interchanges

Page 35: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

35

2004 Arterial Traffic Flows(On MPAH System)

0 – 10,00010,001 – 20,00020,001 – 30,00030,000 – 50,00050,000 – 84,000

Traffic Volume

South Orange County Traffic FlowSource: OCTA, 2005

Arterial Roadway Issues

Page 36: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

36

Weekend Congestion

• Inter-Regional Travel

• Beach Areas / Community Attractions

• Seasonal, Recreational Travel

• Hours of Congestion Relatively Consistent

Page 37: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

37

Lack of Transit Choices• Topography, land use characteristics,

urban design

• High median household income

• Long headways (rail, bus)

• Need to improve bus transit connectivity

• Need for transit that can compete with the auto / target specific markets

Page 38: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

38

Rail Corridor Constraints

• Areas of Single-Track Limits Capacity

• Lack of Station Parking / Access to Stations

• Public Concern Over System Expansion

• Pedestrian / Bike Access to Beach

• Auto Conflicts at Rail Crossings

Page 39: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

39

Economic Growth / Quality of Life

• Substantial growth in employment and population

• Growth increases travel demand

• Minimize traffic intrusion, noise, environmental impacts

• Maintain / improve visual character

Page 40: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

40

Utilize Existing Infrastructure

• Environmental & cost concerns of added roadway capacity

• Public perception that the toll roads could be better utilized

• Traffic signal equipment/systems needs upgrades

• Pursue full range of low-cost, operational tools and strategies (transportation systems management)

Page 41: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

41

Systems Gaps

• Elements that close gaps or that enhance system connectivity still need to occur

- Intermodal facilities, support facilities

- HOV ramps, direct connectors

- Missing components of arterial system (Master Plan Arterial Highways)

Page 42: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

42

System Gaps

• Identified Gaps in the Master Plan of Arterial Highways System

Source: OCTA, 2006.

Page 43: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

43

South Orange County MIS

Next Meeting

Page 44: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

44

South Orange County MIS

Extra Slides

Page 45: Stakeholders Working Group South Orange County Major ...thetransitcoalition.us/.../SOCMISSWGPresentationv3... · Presentation to the Public Consensus Building Conceptual Definitions

45

Foothill South (SR 241)

• Extension of the SR 241 Toll Road is a project that is funded and committed.

• Part of future year (Year 2030) baseline transportation network for:- OCTA Long Range Transportation Plan- South Orange County Major Investment Study

• The South Orange County Study is broader in scope compared to the Foothill South Project.