stair tower - panel colour tbc - swansea.ac.uk and west elevations - ahr-ar-b02-… · stair tower...

1
A 0.000 m 00_Ground Floor A 4.100 m 01_First Floor A 8.150 m Second Floor A 12.050 m 03_Third Floor. A 19.850 m 05_Roof R6 R7 R8 R9 R10 R11 R12 R13 R14 A 21.825 m 06_Parapet R5 R4 R3 R1 R2 A 15.950 m 04_Fourth Floor 3300 6075 6075 6075 6075 6075 6075 5625 5625 6075 6075 6075 3300 Stair tower - panel colour TBC Stair tower - panel colour TBC A 0.000 m 00_Ground Floor A 4.100 m 01_First Floor A 8.150 m Second Floor A 12.050 m 03_Third Floor. A 19.850 m 05_Roof A B E C D A 21.825 m 06_Parapet A 15.950 m 04_Fourth Floor 9000 9000 6000 12000 Stair tower - panel colour TBC Red Brick (colour TBC) Glass Metal Cladding Standing Seam / Aluminium Rainscreen Panel (TBC) Solar Thermal Collectior - area TBC Metal Cladding Aluminium Horizontal Composite Panel (TBC) Pre-cast concrete/ reconstituted stone panel (TBC) Metal clad recessed reveals shown to head of all openings within brick Red Brick - reference image - Swansea Bay Campus student halls of residence to west of site Potential green wall AHR Architects Ltd 8th Floor Clifton Heights Triangle West Bristol BS8 1EJ United Kingdom T +44(0)117 9299146 E [email protected] www.ahr-global.com original by date created approved by client name project drawing computer file plot date project number scale drawing number rev issue status This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings.The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR. @A3 1 : 200 C:\Revit Projects\2015.00682.000 - IMPACT, Swansea University REVIT 2015 - RT local.rvt F HB HB 22/06/16 North and West Elevations 2015.00682.000 IMPACT Swansea University AHR-AR-B02-20-300 PL 1 : 200 West Elevation 1 : 200 North Elevation 0 SCALE 1 : 4 8 12 200 Rev Description Date Dr by App by A Revised for Stage 2 Issue 22.07.16 HB HB B Revised to include client directed post stage 2 changes 16.09.16 HB HB/GO C Revised to include client directed post stage 2 changes 05.10.16 HB HB D PT Agreed Elevations. Hand rail added to north and south elevation. Notes added. Key amended. Issued for comment. Grid reviewed. 17.01.17 RT FC E Issued for Public Consultation 09.02.17 RT FC F Precast stone added to north elevation following SU review. Material palette refined. 17.02.17 RT FC

Upload: tranminh

Post on 03-May-2018

221 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Stair tower - panel colour TBC - swansea.ac.uk and West Elevations - AHR-AR-B02-… · Stair tower - panel colour TBC Stair tower - panel colour TBC A 0.000 m 00_Ground Floor A

A

0.000 m

00_Ground Floor

A

4.100 m

01_First Floor

A

8.150 m

Second Floor

A

12.050 m

03_Third Floor.

A

19.850 m

05_Roof

R6 R7 R8 R9 R10 R11 R12 R13 R14

A

21.825 m

06_Parapet

R5R4R3R1 R2

A

15.950 m

04_Fourth Floor

3300 6075 6075 6075 6075 6075 6075 5625 5625 6075 6075 6075 3300

Stair tower - panelcolour TBC

Stair tower - panelcolour TBC

A

0.000 m

00_Ground Floor

A

4.100 m

01_First Floor

A

8.150 m

Second Floor

A

12.050 m

03_Third Floor.

A

19.850 m

05_Roof

ABE CD

A

21.825 m

06_Parapet

A

15.950 m

04_Fourth Floor

9000 9000 6000 12000 Stair tower - panelcolour TBC

Red Brick (colour TBC)

Glass

Metal Cladding Standing Seam / Aluminium Rainscreen Panel (TBC)

Solar Thermal Collectior - area TBC

Metal Cladding Aluminium Horizontal Composite Panel (TBC)

Pre-cast concrete/ reconstituted stone panel (TBC)

Metal clad recessed reveals shown to head of allopenings within brick

Red Brick - referenceimage - Swansea BayCampus student halls ofresidence to west of site

Potential green wall

AHR Architects Ltd8th FloorClifton HeightsTriangle WestBristolBS8 1EJUnited Kingdom

T +44(0)117 9299146E [email protected]

original by date created approved by

client name

project

drawing

computer file plot date

project number scale

drawing number rev issue status

This drawing is to be read in conjunction with all relateddrawings. All dimensions must be checked and verified onsite before commencing any work or producing shopdrawings.The originator should be notified immediately ofany discrepancy. This drawing is copyright and remains theproperty of AHR.

@A3 1 : 200

C:\Revit Projects\2015.00682.000 - IMPACT, SwanseaUniversity REVIT 2015 - RT local.rvt

F

HB HB22/06/16

North and West Elevations

2015.00682.000

IMPACT

Swansea University

AHR-AR-B02-20-300 PL

1 : 200

West Elevation

1 : 200

North Elevation

0

SCALE 1 :

4 8 12

200

Rev Description Date Dr by App by

A Revised for Stage 2 Issue 22.07.16 HB HB

B Revised to include clientdirected post stage 2changes

16.09.16 HB HB/GO

C Revised to include clientdirected post stage 2changes

05.10.16 HB HB

D PT Agreed Elevations. Handrail added to north and southelevation. Notes added. Keyamended. Issued forcomment. Grid reviewed.

17.01.17 RT FC

E Issued for Public Consultation 09.02.17 RT FC

F Precast stone added to northelevation following SU review.Material palette refined.

17.02.17 RT FC