st. lucie unit 1 - drawing 8770-b-327, rev. 59. 'extension ... · st lucie plant—...
TRANSCRIPT
SHEETNO
REVNO
SHEETNO
REVNO
SHEETNO
REVNO
591
592
< 593
594
595
596
597
598
599
601
602
603
604
605
606
607
609
610
611
612
613
6141
.I 615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
631
632
633
634
635
636
641
STATlON AIR COMPRESSOR
INSTRUMENT 8c STATION AIR INSTRUMENTATION
INSTRUMENT AIR COMPRESSOR 1A 8c DRYER 1A
INSTRUMENT AIR COMPRESSOR 1B & DRYER 1B
CONTAINMENT INSTRUMENT AIR COMPRESSOR 1A
CONTAINMENT INSTRUMENT AIR COMPRESSOR 1B
HYDROGEN RECOMBINER 1A
HYDROGEN RECOMBINER 1B
CONTAINMENT INSTRUMENT AIR DRYER 1A 8c 1B
INSTRUMENT AIR COMPRESSOR EMERG COOUNG SYS
AUX FW HDR A 8c B FLOW 8c PRESSURE
AUX FW HDR C FLOW 8c PRESSURE 8c FWP 1A & 1B FLOW
SG 1A 8c 1B ATM STM DUMP 8c FWP DISCH HDR PRESS
CONDENSATE PUMP 1C
CONDENSATE PUMP 1A
CONDENSATE PUMP 1B
FW 8c COND PH CONDUCTIVITY & FW DISSOLYED Q RECORDERS
AUX FWP 1A DISCHARGE TO ST GEN 1A MY-09-9
AUX FWP 1B DISCHARGE TO ST GEN 1B MV-09—10
AUX FWP 1A DISCHARGE TO ST GEN 1B MY-09-13
AUX FWP 1B DISCHARGE TO ST GEN 1A MV-09-14
AUX FWP 1C DISCHARGE TO ST GEN 1A MY-09-11
AUX FWP 1C DISCHARGE TO ST GEN 1B MV-09—12
FWP 1A/1B DISCHARGE TO STEAM GEN 1A HCV-09-7
FEEDWATER PUMP 1A i
FEEDWATER PUMP 1A DISCHARGE VALVE MV-09-1
FEEDWATER PUMP 1A REQRC YALVES
FEEDWATER PUMP 1A AUX OIL PUMP
FEEDWATER REGULATING SYSTEM 1A
FEEDWATER PUMP 1B
FEEDWATER PUMP 1B DISCHARGE VALVE MV-09-2
FEEDWATER PUMP 1B RECIRC VALYES
FEEDWATER PUMP 1B AUX OIL PUMP
FEEDWATER REGULATING SYSTEM 1B
HEATER DRAIN PUMP 1A
HEATER DRAIN PUMP 1B
FW REGULATING SYSTEM 1A & 1B FLOW 8c INDICATION
FWP 1A & 1B BEARING TEMP & SGFW SEAL LEAK OFF TK LVL
AUX FEEDWATER PUMP 1A
AUX FEEDWATER PUMP 1B
AUX FEEDWATER PUMP 1C — TURBINE
AUX FEEDWATER PUMP 1C — STEAM YALVE MY-08—3
FW PUMP 1A/1B DISCHARGE TO STEAM GEN 1B HCV-09-8
FEEOWATER REG BLOCK VALVE MV-09—5
FW REG 100K BYPASS VALVE MV-09-3
FEEDWATER REG BLOCK VALVE MV-09—6
FW REG 100K BYPASS YALVE MV-09-4
AUX FWP 1C TURB GOV & CONTROL PANEL
SGB RATE CONTROL 8c CONDENSATE CONDUCTIVITY
TEMP STRAINERS DIFF PRESS ALARMS
HTR DRAIN 8c STA MISC ANNUNQATOR "F SH 1 RTGB-102
642
643
645
647
648
649
651
652
653
654
659
660
. 661
662
663
665
666
667
668
669
670
671
672
673
674
675
676
687
REV DATE BY
693
694
695
699
701
702
703
704
705
706
707
709
710
711
712
713
714
715
716
717
718
719
720
721
724
726
727
728
731
732
734
735
CHLORINATION SYSTEM-3
CHLORINATION SYSTEM-4
AUX FWP 1C 8c TURB iNLET PRESS 8c STM GEN FLOW 8c PRESSURE
REHEATER CONTROL
RHTR 1A MAIN STEAM BLOCK VALYE MV-08—4
RHTR 1A MAIN STEAM WARM-UP VALVE MY-08-5
RHTR 1D MAIN STEAM BLOCK YALYE MV—08-6
RHTR 10 MAIN STEAM WARM-UP VALVE MV-08—7
RHTR 1B MAIN STEAM BLOCK VALVE MV-08—8
RHTR 1B MAIN STEAM WARM-UP VALVE MY—08-9
RHTR 1C MAIN STEAM BLOCK VALVE MV—08—10
RHTR 1C MAIN STEAM WARM-UP VALYE MV-08-11
TURBINE TRIP STM GEN Hl—Hl LEVEL
TURBINE AUTO-STOP-TRIP & TURBINE ALARMS
EMERGENCY TURBINE TRIP 8c TURBINE ALARMS
TURBINE RUNBACK
THROTTLE 8c GOVERNOR VALVE INDICATING LIGHTS
THROTTLE 8c GOVERNOR VALVES — LEFT
THROTTLE 8c GOVERNOR VALVES — RIGHT
INTERCEPT & REHEAT STOP YALVE TEST
GOVERNOR CONTROL CABINET
INTERCEPT 8c REHEAT STOP VALVE INDICATING LIGHTS
DEH CONTROL CABINET INTERCONNECTING CABLES
DEH GOVERNOR FLUID PUMP 1A-MP1
OEH GOVERNOR FLUID PUMP 1B-MP2
H2 DETECTION INSIDE EXQTER HOUSING
BEARING OIL PUMP — BOP
SEAL OIL BACK-UP PUMP — SOB
EMERGENCY OIL PUMP — EOP
TURNING GEAR- TG
TURNING GEAR AUTOMATIC CONTROL
TG BEARING OIL UFT PUMP — BL
TURBINE LUBE OIL TRANSFER PUMP
TURB LUBE OIL COND, TURB LUBE OIL FILTER PUMP 8c LUBE OIL FILTER BLOWER
OIL VAPOR EXTRACTOR (OIL RESERVOIR) — OER
EBASCO SERVICES INCORPORATEDNEW YORK
FLORIDA POWER 8c LIGHT COMPANY
ST LUCIE PLANT—EXTENSION—UNIT 1
CONTROL WIRING DIAGRAMAPPROVED
R C HAEKLER
8770- B-327
V.O. M.M. INDEX SHEET 5
FILE: USC00018
HTR DRAIN & STA MISC ANNUNCIATOR "F" SH 2 RTGB-102
RTGB-102 120V VITAL AC 8c 45Y DC DISTRIBUTION
RTGB 125V DC 8c 120Y AC DISTRIBUTION
RTGB-105 120V AC 8c 125V DC DISTRIBUTION
RTGB-106 45Y DC 8c 120V AC MEAS CHANNELS — DISTRIBUTION
RTGB-106 120V AC 8c 125V DC DISTRIBUTION — SH 1
RTGB-106 120V AC 8c 125V DC DISTRIBUTION — SH 2
HSCP 1A, 1B, 1AB 120V AC DISTRIBUTION
CONDENSATE — FW ANNUNQATOR "G" SH 1 RTGB—102
CONDENSATE — FW ANNUNQATOR "G" SH 2 RTGB-102
SG 1A TO AFWP—1C TURBINE MV-08-13
SG 1B TO AFWP-1C TURBINE MY-08-14
LOW POWER FW AUTO CONTR SYSTEM 1A 8c 1B
LP HEATERS 3A & 3B DRAIN CONTROL
HEATERS 4A, 4B, 5A, 8c 5B DRAIN CONTROL
THERMOCOUPLE INPUTS TO INDICATOR Tl-09-5 SH 1
THERMOCOUPLE INPUTS TO INDICATOR Tl-09-5 SH 2
THERMOCOUPLE INPUTS TO INDICATOR Tl-09-5 SH 3
LP HEATERS 1A 8c 1B DRAIN CONTROL
LP HEATERS 2A 8c 2B DRAIN CONTROL
HEATER LEVEL ALARMS
MOISTURE SEPARATOR & DRAIN COLLECTOR, DRAIN TO HOTWELL VA'S
HEATER DRAINS 8c AUX STM SYSTEM MISC INST & CONTROL
DRAIN COLL 8c MOISTURE SEPARATOR REHTR LEVEL ALARMS
VOID
CHLORINATION SYSTEM —1
CHLORINATION SYSTEM -2CHEMICAL FEED PUMPS-1
CHEMICAL FEED PUMPS-2
ELEC 8c CLRNTN ROOMS EXH FANS HVE 26 8c 27
VOID
RESERVED
58 S/16/93 ~57 S/16/93 "
RSC
DG
JPP
RJF
CAAYJC
APPROVED
DIV: I8cC DR: BT
RM
DATE; 05 26 72REY DATE BYAPPROVED