st john the evangelist catholic church adoration chapel ...€¦ · increase for sprklr: n/a total...

7
BAS1S.com Estes Park, Colorado 80517 1692 Big Thompson Avenue, Suite 100 G1 Sheet No: fax: 970.586.9149 vox: 970.586.9140 Sheet Title: Sheet Title: Date: A R C H I T E C T U R E P. C. Architecture, P.C. Issue: © BASIS COVER SHEET St. John the Evangelist Catholic Church Adoration Chapel 1730 West 12th Street, Loveland, CO 80537 1/31/2013 Construction __ of __ PROJECT LOCATION US HIGHWAY 34 (EISENHOWER BLVD) W. 12TH STREET W. 11TH STREET W. 10TH STREET H I L L T OP D R I VE TAFT AVE. H I L L T O P C T . TYLER AVE. SITE N.T.S. W. 11TH STREET HILLTOP DRIVE 1" = 10' Vicinity Map The CE Group Paul Seward, PE Mark D'Rosario, Project Designer 400 Remington St. Suite A Fort Collins, CO 80524 970.266.9888 970.266.8876 OWNER PROJECT TEAM The Archdiocese of Denver & St John the Evangelist Parish Fr. Francisco Garcia, Pastor 1739 W 12th St Loveland, CO 80537 970.635.5800 MECHANICAL ENGINEER BASIS Architecture, P.C. Steve Lane, AIA 1692 Big Thompson Ave. Suite 100 Estes Park, CO 80517 970.586.9140 970.586.9149 GENERAL CONTRACTOR ARCHITECT Himmelman Construction, Inc 12560 West Cedar Drive Lakewood, CO 80228 303.790.1984 303.790.1988 SHEET INDEX G1.0 Cover Sheet C1.0 Grading and Drainage Plan C2.0 Sedimentation and Erosion Control C3.0 Details C4.0 Details A1.0 Site Plan A2.0 Floor & Roof Plans & Code Study A3.0 Elevations A4.0 Sections A5.0 RCP, Interior Elevations & Schedules A6.0 Details S1 Foundation Plan S2 Roof Plan S3 Details S4 Details M0.0 HVAC – Notes M0.1 HVAC – Schedules M1.0 HVAC – Floor Plan P0.0 Plumbing – Notes & Schedules P1.0 Plumbing Plan & Isometric E1.0 Electrical Notes E2.0 Electrical Site Plan E3.0 Lighting Plan & Fixture Schedule E4.0 Power Plan E5.0 Electrical One-Lines & Panel Schedule RJ McNutt & Associates Travis Pofahl, PE Ron Boone, Project Engineer 5587 West 19th Street Greeley, CO 80634 970.330.3266 970.330.3667 ELECTRICAL ENGINEER CIVIL/STRUCTURAL ENGINEER CDS Engineering Corporation Civil: Suzette Schaff, PE Struct: Bob Greenwald, PE 165 2nd Street S.W. Loveland, CO 80537 970.667.8010 970.667.8024 St John the Evangelist Catholic Church Adoration Chapel Addition

Upload: hadieu

Post on 27-May-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

BAS1S.com

Este

s Pa

rk, C

olor

ado

8051

716

92 B

ig T

hom

pson

Ave

nue,

Sui

te 1

00

G1Sheet No:

fax: 970.586.9149vox: 970.586.9140

Sheet Title:Sheet Title:

Date:

A R C H I T E C T U R E P. C.

Architecture, P.C.

Issue:

© BASIS

COVER SHEET

St.

Joh

n th

e E

vang

elis

tC

atho

lic C

hurc

hA

dora

tion

Cha

pel

1730

Wes

t 12t

h S

treet

, Lov

elan

d, C

O 8

0537

1/31/2013

Construction

__ of __

PROJECTLOCATION

US HIGHWAY 34 (EISENHOWER BLVD)

W. 12TH STREET

W. 11TH STREET

W. 10TH STREET

HILLTOP DRIVE

TAFT

AV

E.

HILLTOP CT.

TYLE

R A

VE.

SITE

N.T.S. W. 11TH STREET

HIL

LTO

P D

RIV

E

1" = 10'

Vicinity Map

The CE GroupPaul Seward, PEMark D'Rosario, Project Designer400 Remington St. Suite AFort Collins, CO 80524

970.266.9888970.266.8876

OWNER

PROJECT TEAM

The Archdiocese of Denver &St John the Evangelist ParishFr. Francisco Garcia, Pastor1739 W 12th StLoveland, CO 80537

970.635.5800

MECHANICAL ENGINEER

BASIS Architecture, P.C.Steve Lane, AIA1692 Big Thompson Ave. Suite 100Estes Park, CO 80517

970.586.9140970.586.9149

GENERAL CONTRACTORARCHITECT

Himmelman Construction, Inc

12560 West Cedar DriveLakewood, CO 80228

303.790.1984303.790.1988

SHEET INDEX

G1.0 Cover Sheet

C1.0 Grading and Drainage PlanC2.0 Sedimentation and Erosion ControlC3.0 DetailsC4.0 Details

A1.0 Site PlanA2.0 Floor & Roof Plans & Code StudyA3.0 ElevationsA4.0 SectionsA5.0 RCP, Interior Elevations & SchedulesA6.0 Details

S1 Foundation PlanS2 Roof PlanS3 DetailsS4 Details

M0.0 HVAC – NotesM0.1 HVAC – SchedulesM1.0 HVAC – Floor Plan

P0.0 Plumbing – Notes & SchedulesP1.0 Plumbing Plan & Isometric

E1.0 Electrical NotesE2.0 Electrical Site PlanE3.0 Lighting Plan & Fixture ScheduleE4.0 Power PlanE5.0 Electrical One-Lines & Panel Schedule

RJ McNutt & AssociatesTravis Pofahl, PERon Boone, Project Engineer5587 West 19th StreetGreeley, CO 80634

970.330.3266970.330.3667

ELECTRICAL ENGINEERCIVIL/STRUCTURAL ENGINEER

CDS Engineering CorporationCivil: Suzette Schaff, PEStruct: Bob Greenwald, PE165 2nd Street S.W.Loveland, CO 80537

970.667.8010970.667.8024

St John the Evangelist Catholic ChurchAdoration Chapel Addition

BAS1S.com

Este

s Pa

rk, C

olor

ado

8051

716

92 B

ig T

hom

pson

Ave

nue,

Sui

te 1

00

A1.0Sheet No:

fax: 970.586.9149vox: 970.586.9140

Sheet Title:Sheet Title:

Date:

A R C H I T E C T U R E P. C.

Architecture, P.C.

Issue:

© BASIS

Site Plan

1/31/2013

Construction

St

John

the

Eva

ngel

ist

Cat

holic

Chu

rch

Ado

rati

on C

hape

l Add

itio

n17

30 W

est 1

2th

Stre

et,L

ovel

and

Col

orad

o 80

537

N

2.5'

40.2

'

63.0' 22.3'0.5'

+/- 7.0'

17.3

' 23.3

'9.

8'

6.0' 14.4' 56.6' 8.3'

6.0'

9.0' MIN.

18.0

' MIN

.

47.75' 10.5'

12.2

'10

.3'

32.7'

8.0'

6.1' 28.0'

24.0'

7.8'

8.0'

17.8'

6.0'

6.0'

8.8'

R 6'-0"

R 9'-0"

R 9.8'

OVERHEAD ELEC

EXISTING GAS

EXISTING WATER

EXISTING WATERVALVE

EXISTINGAIR HANDLERS

EXISTING TREETO BE REMOVEDTYPICAL OF (2)

EXISTING RETAININGWALL TO BE REMOVED

NEW CHAPEL ROOFRE: ROOF PLAN

NEW COLOREDSTAMPED

CONCRETE

CONCRETE WALK

EXISTING ELECTRANSFORMER

EXISTINGSOD

EXISTING TREETYP

EXISTINGFENCE

PROPERTY LINE

EXISTING LIGHTFIXTURE

NEW CONCRETERETAINING WALL,

T.O. WALL: 5030.0'

NEW CURB,RE: DRAINAGEPLAN

NEW WALKWAYSTRIPING

EXISTING CONCWALK TO BE

REMOVED

EXISTING CONCRETEWALK

EXISTING PARKING(2 spaces removed)

RELOCATE ELEC& COMM LINES

MIN WIDTH FOR 40°PARKING + TWO-

WAY TRAFFIC

EXISTING ASPHALTTO BE REMOVED

PROPERTY LINE

COLOREDCONCRETE SLABAT STATUE BASE

NEW CMU BLOCKTRASH ENCLOSURE

EXISTING TRASHENCL/CONC PADTO BE REMOVED

NEW COLOREDCONCRETE PANRE: DRAINAGE PLAN

NEW 8" WIDE, COLOREDCONCRETE PAN

RE: DRAINAGE PLAN

ACCESSIBLE ENTRANCE

RESOD DISTURBEDAREAS -IRRIGATION DESIGN BYLANDSCAPE CONTRACTOR

EXISTING CONCRETEWALK

EXISTING FIRE RISER

EXISTING FIRE SPRINKLERCONTROL ROOM UNDER STAIR,

RE: FLOOR PLAN

38"'x38" CONCRETEEQUPMENT PAD

18" GRAVEL BORDER

SIDEWALK CHASE

EXISTING HC PARKINGSIGN TO REMAIN (1)

NEW SIGN: ADORATIONCHAPEL PARKING ONLY, TYP

SIDEWALK CHASE

BOLLARD LIGHT FIXTURE,RE: ELEC SITE PLAN

CONCRETE APRON

NEW UNDERGROUND FEEDTO CHAPEL, RE: ELEC

50295030

5028

5027

5027

5026

5025

1515HILLTOP DR

EXISTING CHURCHSANCTUARY

LOT 1, BLOCK 1OF THE AMENDED PLATOF LOTS 1 THROUGH 5

ST. JOHN ADDITION

IMMANUEL LUTHERAN CHURCHA PORTION OF LOT 1HILL TOP ADDITION

TO HILLTOP DR

FF = 5027.2'

EXIST

NEW

EXIST

NEW

EXIS

T

NEW

PROPERTY LINE

EXISTING FENCE

WATER LINE

GAS LINE

ELECTRIC LINE

COMMUNICATIONS LINE

LEGEND

8'-0

"12

'-0"

9'-4"

4X4 STEEL TUBE

6' HIGH CMUWALL

5" CONCRETESLAB/APRON

(2) 3'-6"x6'-0"STEEL FRAMEGATE PANELS

6'-0

"

STEEL FRAMEGATE

CMU WALL

4" STEEL TUBECOLUMNS

HEAVY-DUTYHINGES, WELDED

TO FRAME & COLUMN

11" = 10'

Site Plan21/4" = 1'-0"

Trash Enclosure Details0' 5' 10' 20'

BAS1S.com

Este

s Pa

rk, C

olor

ado

8051

716

92 B

ig T

hom

pson

Ave

nue,

Sui

te 1

00

A2.0Sheet No:

fax: 970.586.9149vox: 970.586.9140

Sheet Title:Sheet Title:

Date:

A R C H I T E C T U R E P. C.

Architecture, P.C.

Issue:

© BASIS

PLANS

St.

Joh

n th

e E

vang

elis

tC

atho

lic C

hurc

hA

dora

tion

Cha

pel

1730

Wes

t 12t

h S

treet

, Lov

elan

d, C

O 8

0537

1/31/2013

Construction

__ of __

N

N

101

103

102

100

1A6.0

3A6.0

7A6.0 6

A6.0

11A6.0

10A6.0

4A6.02

A6.0

F4 F1

F1 F2

F1

F5

F2 F3

2'-0" 7'-4" 16'-0" 32'-0" 5'-3"

5'-3

"6'

-10"

5'-3

"

9'-3" 1'-11"

5'-4

"15

'-2"

10"

17'-4

"

62'-7"

6'-4" 3'-4" 3'-4" 3'-4" 3'-4" 3'-4" 3'-4" 3'-4" 2'-4"

5 1/

2"7'

-10"

10"

2'-0" TYP

1/A4.0 1/A4.0

2/A4

.02/

A4.0

3/A4

.03/

A4.0

4/A4

.04/

A4.0

B

A

D

C 6/A5.0

INFILL EXISTINGOPENING w/ CMURE-FINISH STAIR SIDE

DUCT TRANSITIONABOVE, RE: MECH/SECTIONS

ELEC LOAD CENTERPANEL: SET FLUSH w/ FACE OF

STUD, ARCHITECTURAL ACCESSPANEL IN FRONT w/ SIGN

EXISTING WINGWALL TO BEREMOVED

SEMI-RECESSED WASTERECEPT. RE: INT ELEVS

FURR EXIST STUCCOWALL w/ 3/4" CHANNEL

& GYP BOARD

ALIGN FINISHRE: DETAIL

ACOUSTICINSULATION ATRESTROOM WALLS

FLOOR DRAIN,RE: PLUMBING

36" COUNTERTOPw/ DECK MOUNT LAV

FURR EXTERIOR WALLPROV 3 1/2" BATTINSUL IN CAVITY

ALUMINUMSTOREFRONT

ALUMINUM STOREFRONTENTRANCE

ROOF DRAIN &LAMBS TONGUERE: PLUMBING/SECTION

MARBLE THRESHOLD FURNISHINGS BYOWNER

RE: SITE PLANFOR WALKS

LINE OF SKYLIGHTWALLS ABOVE

KEYPAD, RE: ELEC &SECTION/ELEVATION

CL OF BEAM ABOVERE: STRUCT

WOOD FLOORING:ALIGN EXACTLY WITHWALL AND CEILING

SPRINKLERROL ROOMAIR BELOW

FROM FIREOOR BELOW

CAVITY OFFOYER

METAL STUD WALLTO STRUCTURE

MARBLE PANELON 1/2" P.T. PLY

ON WALLFURRING

EMERGENCY LIGHTFIXTURE - PROVIDE1/8" WOOD VENEERCOVER TO MATCHCEILING, RE: ELEC

CHAPEL

EXISTING CHURCHSANCTUARY

LOWER LEVEL GROUND LEVEL

DN

EXISTINGSTAIR

FOYER

RESTROOM

FACE OF MASONRY TOFACE OF MASONRY

1/4" : 12"

1/4"

: 1

2"

1/4" : 12"

1/4" : 12" 1/4" : 12"

1/4" : 12" 1/4"

: 1

2"

1/4" : 12"

1/4" : 12"1/

4" :

12"

16A6.0

17A6.0

15A6.0

5A6.0

9A6.0

13A6.0

14A6.0

8A6.0

12A6.0

1/4" : 12"

1/8" : 12"

1/A4.0 1/A4.0

2/A4

.02/

A4.0

3/A4

.03/

A4.0

4/A4

.04/

A4.0

ROOF DRAIN, TYP.RE: MECH

DOWNSPOUT IN WALLTO LAMBS TONGUERE: SECTION

NEW CRICKET TO DRAINAND WALL FLASHINGAT EXISTING ROOF/NEW

WALL INTERSECTION

EXISTING EPDMROOFINGOVER STAIR

NEW CMU/STUCCOPARAPET

OUTSIDE AIRDUCT, RE: MECH

CRICKET TO DRAINw/ TAPEREDINSULATION, TYP

PLUMBING VENT

NEW EPDM ROOF,TYP

METAL FASICARE: DETAILS

PRECAST PARAPETRE: DETAILS

EPDM MEMBRANEAT SKYLIGHT ROOF

11/4" = 1'-0"

Floor Plan

21/4" = 1'-0"

Roof Plan

2009 IBC Code Study

Use & Occupancy Class -- Chapter 3 A-3 Place of Religious Worship (Adjacent E occupancy considered separate building)

Height & Area Limitations -- Chapter 5Type III-A

Use Group: A-3Allowable area: 14,000sf (3 stories, Max ht: 65’)Increase for separation: [F/P-0.25]W/30 = [550/670-0.25]30/30 = 7,990sfIncrease for sprklr: N/A

Total Allowable: 21,990sfExisting: 19,075sfProposed Chapel: 940sfNew total: 20,015sf

Types of Construction -- Chapter 6Type III: Exterior walls: Non-combustible Interior building elements: Any materials permitted by code

Fire-resistive rating: Table 601 - Type III-AStructural Frame: 1 hr*Exterior Bearing walls 2 hrRoof 1 hr*

*Per footnote d, an NFPA13 automatic sprinkler system may be substituted for 1-hr fire-ratedconstruction where not otherwise required by code.

Exterior wall protection: Table 602A occupancy: 0 hr >30’

Fire - Resistive Construction -- Chapter 7 Unlimited unprotected openings > 30’ (east & west walls + skylight)Fire-rated exterior walls (where required) from inside only (<5’ separation)Fire barriers: Existing stair enclosure wall (1hr required, 2hr existing) creates separate Fire Area for chapel additionShaft enclosures: noneFire Partitions: noneHorizontal assemblies: noneOpening Protectives: Existing stair enclosure door - 90 minute (horizontal exit)

Interior Finishes - Chapter 8 Flame Spread:

A-3: Rooms: Class C Corridors: Class B

Fire Protection Systems -- Chapter 9 Automatic Sprinkler systems Not Required: Fire area < 12,000, occupant load < 300 NFPA13 system (connected to existing) to be provided to substitute for 1hr

rated construction (see Chapter 6 above) Fire Alarm - Required

Means of Egress - Chapter 10 Chapel: (fixed seating) = 16 occupants (1 exit required)

Note: Hall serves as continuing means of egress from stair - door to be considered a HorizontalExit (see opening protectives above)

Corridor rating: 0 hrs (sprinkler system provided)

Accessibility - Chapter 11Existing accessible parking space provided, with existing accessible route (reconfigured) toentrance.New accessible restroom.

PROJECT GENERAL NOTES

1. All construction shall conform to the International Building Code, 2009 edition asamended by the City of Loveland and all other applicable codes.2. Construction debris shall be legally removed on a continuing basis. The siteshall be maintained in a "neat" appearance.3. Dimensions are to face of stud, panel, or concrete unless otherwise indicated.Column dimensions are to centerline. Vertical dimensions are to concrete slab,subfloor or top of wall or beam.8. Provide blocking for mounting all wall mounted accessories.9. Use metal edge at all gypsum wallboard corners. Ensure factory edge orprovide metal edge trim where gypsum wallboard meets a different material.

BAS1S.com

Este

s Pa

rk, C

olor

ado

8051

716

92 B

ig T

hom

pson

Ave

nue,

Sui

te 1

00

A3.0Sheet No:

fax: 970.586.9149vox: 970.586.9140

Sheet Title:Sheet Title:

Date:

A R C H I T E C T U R E P. C.

Architecture, P.C.

Issue:

© BASIS

ELEVATIONS

St.

Joh

n th

e E

vang

elis

tC

atho

lic C

hurc

hA

dora

tion

Cha

pel

1730

Wes

t 12t

h S

treet

, Lov

elan

d, C

O 8

0537

1/31/2013

Construction

__ of __

9A6.0

8A6.0

7'-0

"2"

2'-5

"

7 1/

2"10

'-1/2

"

2'-0"

2" 3'-6" 2" 5'-0 1/2" 2"

2'-2

"2"

ENGRAVED COLOREDPRE-CAST FASICA,RE: DETAILS

FACE OF CMU OPENINGTO FACE OF CMU OPENING,RE: PLAN

LEDGESTONE VENEER

STOREFRONT SPANDRELPANEL TRANSOM

TRANSLUCENT STONELAMINATED WINDOW

EXISTING STRUCTURE

ALUMINUM ENTRANCE

STAMPEDCONCRETE

ENTRY

ALUMINUMSTOREFRONT

TRANSLUCENTSTONE SKYLIGHT

STONE STATUEBASE

FINISH FLOORTO TOP OFSTONE SILL

TOP OF STONESILL TO CEILING

LIMESTONE PILASTERSBETWEEN WINDOWS, TYP.

ERNATE TO ELMINATEZONTAL MULLION ANDPROVIDE FULL HEIGHT

DOOR, RE: SPEC

LIMESTONE VENEERAT SKYLIGHTBEYOND

BUTT SEAM IN ALABASTERGLAZING,RE: SPEC

SLOPEDLIMESTONE'SPANDREL'

FIELD VERIFY ALL STOREFRONTDIMS PRIOR TO FABRICATION

+/-

19'

-5"

6A6.0

LEDGESTONE VENEER

LIMESTONE VENEER

STUCCO @BATH BEYOND

STATUE BASE

RETAINING WALLBEYOND

ENGRAVED COLOREDPRE-CAST CONCRETEFASICA, RE: DETAILS

14A6.0

14A6.0

1'-7

1/2

"2"

7'-7

1/2

"2"

2'-2

"2"

2" 2'-11 1/4" 2"2'-11 1/4"2"

2'-11 1/4"2"

2'-11 1/4"2"

2'-11 1/4" 2"

2'-1

1 1/

2"2"

6'-6

"2"

2'-2

"2"

7'-0

"

EXISTING STRUCTUREBEYOND

EXISTING GRADE

LINE OF ORIGINALGRADE

ENGRAVED COLOREDPRE-CAST CONC FASICA

LIMESTONE PILASTERSBETWEEN WINDOWS, TYP.

LEDGESTONE VENEER

STOREFRONT SPANDRELPANEL TRANSOM

TRANSLUCENT STONELAMINATED WINDOW

TRANSLUCENT STONESKYLIGHT

SLOPING STONESILL, TYP

BATHWINDOW

STONE STATUEBASE

LINE OFFLOOR

BEYOND

LIMESTONE VENEERAT SKYLIGHT WALLS

OUTSIDE AIR INTAKERE: MECH

BATH EXHAUSTGRILLE, CENTER ONWINDOW BELOW

SLOPED STONECAP, MATCHBUILDING SILL

FIELD VERIFY ALL STOREFRONTDIMS PRIOR TO FABRICATION

NEW COLOREDCONCRETE RETAINING

WALL, RE:STRUCT

STUCCO EXTERIORAT RESTROOM WALL

STUCCO, SMOOTH FINISHALTERNATE COLOR, RE: SPEC.

4A6.0

10A6.0

LINE OF EXISTING,ADJACENT ROOF

17A6.0

MASONRY INFILLAT WINDOW,

PATCH & REPAINTSTAIR SIDE

EXISTING STAIRENCLOSURE

STUCCO, SMOOTH FINISHALTERNATE COLOR, RE: SPEC.

NEW CRICKET TO DRAIN,RE: ROOF PLAN

EXISTINGSTRUCTURE

SKYLIGHT BEYOND

CHAPEL ROOF BEYOND

11/4" = 1'-0"

West Elevation21/4" = 1'-0"

South Elevation

31/4" = 1'-0"

East Elevation41/4" = 1'-0"

North Elevation

BAS1S.com

Este

s Pa

rk, C

olor

ado

8051

716

92 B

ig T

hom

pson

Ave

nue,

Sui

te 1

00

A4.0Sheet No:

fax: 970.586.9149vox: 970.586.9140

Sheet Title:Sheet Title:

Date:

A R C H I T E C T U R E P. C.

Architecture, P.C.

Issue:

© BASIS

SECTIONS

St.

Joh

n th

e E

vang

elis

tC

atho

lic C

hurc

hA

dora

tion

Cha

pel

1730

Wes

t 12t

h S

treet

, Lov

elan

d, C

O 8

0537

1/31/2013

Construction

__ of __

15A6.0

5A5.0

17A6.0

4A5.0

14A6.0

T.O. WallEL: 120'-0"

T.O. WallEL: 113'-4"

T.O. SlabEL: 100'-0"

T.O. WallEL: 115'-4"

9'-6

"1'

-8"

10'-8

"

EQ EQ

DOOR TORESTROOM

STAINED GLASS(BY OWNER)

AT STOREFRONTGLAZING

SUSPENDED WOODCEILING

WOOD INTERIORWALLS, ALIGN w/FLOOR + CLG

SKYLIGHT

CMU WALLS w/LIMESTONE VENEER

WOOD FLOOR ON P.T. 1XSLEEPERS ON CONCRETESLAB ON GRADE

MARBLE FLOORAT ALTAR

MARBLE WALLPANEL w/ENGRAVED ANGELBEYOND

SUPPLY + RETURNDUCTWORK, RE: MECH

CIRCULAR WINDOW

FURRED WALL,RE: PLANSPANDREL PANELS

ABOVE CEILING

DROPPED CEILING

MARBLE INTERIORPANEL AT WINDOWSILLS

ALABASTER WINDOWPANELS

1 1/2" RIGID INSULUNDER SLAB

RECEPTACLERE: ELEC

WOOD BASE

WOOD CASING ATRESTROOM DOOR

PTD GYP BOARD

NEW 8" CMU WALLABOVE EXISTING,

STUCCO FINISHEXISTING STAIR

ROOF

CONC SLAB FORSTATUE (EL: 100'-8")

T.O. Chapel SlabEL: 99'-10 7/8"

WOOD PANEL

GRADE BEAMRE: STRUCT

1/2" RIGID INSULAT ISOLATION JOINT

T.O. GRADE BEAM= 100'-0"

6A6.0

8A6.0

3A5.0

T.O. ParapetEL: 115'-4"

Joist BearingEL: 114'-0"

MARBLE WALLPANEL w/ENGRAVEDANGEL BEYOND

ALTAR WALL: MOSAIC TILE,COORDINATE REQUIREMENTSw/ OWNER

SUSPENDED WOODCEILING

GOLD LEAF CENTERCHANNEL

ALABASTERLAMINATED

WINDOW PANEL

SKYLIGHT BEYOND

SLOPED STONESILL

SLOPED STONETRANSOM PANEL

ABOVE WINDOWS

DUCTWORK, RE:MECH

1 1/2" RIGIDINSULATIONUNDER SLAB

COLORED PRE-CASTBEAM, RE:STRUCTINTEGRAL ENGRAVED FASCIA

1/2" RIGID INSULATIONAT ISOLATION JOINT

T.O. Chapel SlabEL: 99'-10 7/8"

T.O. GRADE BEAM= 100'-0"

121/4

3A6.0

5A6.0

T.O. BeamEL: 112'-0 1/2"

2'-5" 2'-7"

ALUMINUMENTRANCE DOOR

LEDGESTONEVENEER

SWALE

STAINED GLASSWINDOW

DOOR TO CHAPELw/ FULL LITE

(ENGRAVED BYOWNER)

FOYER ROOF

SKYLIGHT BEYOND

SPANDREL PANELABOVE CEILING

DROPPED ACTCEILING

SPANDREL PANEL

WINDOW TO CHAPEL

TILED FLOORIN FOYER

MARBLE PANELTHIS WALL ONLY

STEEL BEAM,RE: STRUCT

ENTRY KEYPAD

DUCTWORK

LAMBS TONGUERE: PLUMBING

T.O. Foyer SlabEL: 100'-0"

GRADE BEAMRE: STRUCT

T.O. ParapetEL: 115'-4"

Joist BearingEL: 114'-0"

3'-0" EQ EQ

GOLD LEAF CEILINGREVEAL

GOLD LEAF ON WALLBEYOND

DROPPED WOODCEILING

SLOPED STONETRANSOM ABOVEWINDOWS

SLOPED STONESILL

ALABASTERWINDOWS

T+G WOODWALL BEYOND

ENGRAVED MARBLEPANELS BEYOND

WINDOW TO FOYERBEYOND

MARBLE DOORFRAME

RECEPTACLERE: ELEC

LIGHT SWITCHES BEHINDINTEGRATED WOOD

ACCESS PANEL

PRECAST BEAM,RE: STRUCT

T.O. Chapel SlabEL: 99'-10 7/8"

T.O. GRADE BEAM= 100'-0"

11/4" = 1'-0"

Longitudinal Section

21/4" = 1'-0"

Chapel Section31/4" = 1'-0"

Entry Section41/4" = 1'-0"

Chapel Section

BAS1S.com

Este

s Pa

rk, C

olor

ado

8051

716

92 B

ig T

hom

pson

Ave

nue,

Sui

te 1

00

A5.0Sheet No:

fax: 970.586.9149vox: 970.586.9140

Sheet Title:Sheet Title:

Date:

A R C H I T E C T U R E P. C.

Architecture, P.C.

Issue:

© BASIS

RCP, INT.ELEVATIONS &SCHEDULES

St.

Joh

n th

e E

vang

elis

tC

atho

lic C

hurc

hA

dora

tion

Cha

pel

1730

Wes

t 12t

h S

treet

, Lov

elan

d, C

O 8

0537

1/31/2013

Construction

__ of __

N

DOOR SCHEDULE

ID

100

101

102

103

SIZE

W

9'-1/2"

3'

3'

3'

HT

9'-7"

7'

7'

6'-8"

THK

0'-1 3/4"

0'-1 3/4"

0'-1 3/4"

0'-1 3/4"

FRM

4 1/2"

3"*

6 7/8"

6"

MATERIAL

DR

ALUM

SCW

SCW

SCW

FRM

ALUM

WD

WD

HM**

HRDWR

HW-1

HW-2

HW-3

HW-4

STYLE

FULL LITE

FULL LITE

FLUSH

FLUSH

LOCATION

LOBBY

CHAPEL

RESTROOM

STAIR

NOTES

SEE SPEC ALTERNATE FOR INCREASEDHEIGHT

SINGLE RABBET OR RIP FRAME TOSTOP, RE: DETAIL

REPLACE EXISTING DOOR, RE-USEEXISTING FRAME (REFINISH)

3A5.0

4A5.0

2'-6

"6"

2'-6

"6"

3 1/4"9 3/4" 3 1/4" 9 3/4"

3 1/4"

EQEQ1/A4.0 1/A4.0

2/A4

.02/

A4.0

3/A4

.03/

A4.0

4/A4

.04/

A4.0

GYP CEILING

SKYLIGHTOPENING

GOLD LEAFCEILING

LINE OF GOLD LEAF'COFFER'RE: SECTIONS

DROPPED WOODCEILING

WINDOWOPENINGS

RECESSED LIGHTFIXTURES, TYP.

ENTRY ROOFOVERHANG:

PTD GYP SOFFIT

FOYER ROOFOVERHANG

STOREFRONT

FURRED WALL FORDUCTWORK

DROPPED ACOUSTICCEILING, RE: SPEC.

CONCEALEDDIFFUSERS,RE: MECH.

3 1/4" x 30" RETURN AIROPENING, TYP. OF (12)RE: DETAIL 2/A5.0

BATH EXHAUST

24"x36" ACCESS PANELFOR MECH. ABOVE

RETURN AIR GRILLERE: MECH

SUPPLY AIR GRILLERE: MECH

LIGHT FIXTURE,RE: ELEC

METAL STUD WALLTO STRUCTURE

MARBLE PANELON 1/2" P.T. PLY

ON WALLFURRING

EMERGENCY LIGHTFIXTURE - PROVIDE1/8" WOOD VENEERCOVER TO MATCHCEILING, RE: ELEC

CHAPEL

EXISTING CHURCHSANCTUARY

CEILING HT:8'-0"

CEILING HT:10'-8"

CEILING HT:11'-5"

CEILING HT:9'-6"

FOYER

RESTROOM

CL

21 1/2" = 1' - 0"

31 1/2" = 1' - 0"

41 1/2" = 1' - 0"

51 1/2" = 1' - 0"

12

1

9 3/4" 3 1/4" 9 3/4" 3 1/4" 9 3/4"

3 1/4" 9 3/4" 3 1/4" 9 3/4" 3 1/4"

2"

7" 1'-0" 7"

7"

7"

7"

1'-9

"

EQEQ

CEILING TIE, TYPICAL METAL CHANNELSUPPORT, 36" O.C. WOOD SCREEN

DROPPED WOODCEILING

SUSPENDED WOODCEILING

METAL FRAMING@ 24" O.C.

CEILINGTIE, TYP.

METAL CHANNELSUPPORT

SUSPENDED WOODCEILING

CEILINGTIE, TYP.

METAL CHANNELSUPPORT @ 24" o.c.

GYP BOARD COVE& CEILINGw/ GOLD LEAFSURFACE

COVE LIGHTFIXTURE, RE: ELEC

COVE LIGHT FIXTUREEACH SIDE, RE: ELEC

GYP BOARD COVEw/ GOLD LEAFSURFACE

SUSPENDED ACT

MARBLE VENEER

PTD GYP BOARD

MARBLE VENEERON PLYWOOD

UNDERLAYMENTRE: SECTIONS

PTD WOOD FRAME(SINGLE RABBET or

RIPPED AT STOP)

FULL LITE (DOUBLE GLAZED)DOOR

TO CHAPEL

STEEL CHANNELHEADERS

MARBLE VENEERAT HEAD & JAMB

GOLD LEAF,RE: SECTIONS

GOLD LEAF

EDGE OF T+G WOODWALL BEYOND,RE: SECTIONS

METAL FRAMING

PTD WOOD OCULARWINDOW FRAME

DOUBLE GLAZED WINDOWw/ STAINED GLASS LITEFURNISHED BY OWNER

MARBLE 'CASING' ATCHAPEL SIDE,RE: SECTIONS

BLOCKING

SOUNDSEAL, RE: SPEC1 AT JAMB, 1 AT STOP,TYP HEAD AND JAMB

CHAPEL DOOR

FRAME

CHAPEL AIR RETURN"GRILLE"

CHAPEL CEILINGCHANNEL

ALTAR CEILINGDETAIL

OCULAR WINDOW/CHAPEL DOOR

REMOVABLE PLASTICLAMINATE PROTECTION

PANEL

4" BACK &SIDESPLASH

4' HIGH TILEWAINSCOT

A

11"

9"1'

-6"

2'-9

1/2

"8"

ELEC BASEBOARDRE: MECH

PROV ADA KNEE &TOE CLEARANCES

DIMS ARE MIN, TYP(except counter height)

3'-0

"

1'-6"

TILE SILLRE: 10/A6.0

PLASTIC LAMINATECOUNTERTOP

LIGHT FIXT,RE: ELECDRYWALL

CONTROL JOINT

B

2'-9

1/2

"5"

3'-0

"

6" 1'-0" 2'-0"

REMOVABLEPLASTIC LAMINATEPROTECTION PANEL

24" x 36"MIRRORWINDOW

RE: ELEV.

AUTOMATEDFAUCET, RE:PLUMBING

DECK MOUNTSOAP DISPENSER,RE: SPEC

WATER HEATER,RE: PLUMBING

T.P. DISP.

48" HIGHCERAMIC TILE

WAINSCOT

GRAB BARS,TYPICAL

C

3'-0

"4"

1'-6

"

1'-2" 2'-4" 1'-0"

3'-0"

1'-6

"

3'-1

1"

SEMI-RECESSEDPAPER TOWEL DISP &WASTE RECEPTACLE

D

11/4" = 1'-0"

Reflected Celing Plan

63/8" = 1'-0"

Restroom Elevations

SOLID COREHOLLOW COREHOLLOW METAL

WOODMOLDED SKIN

KNOCK DOWNHOLLOW METAL (WELDED FRAME)

KEY

S.C.H.C.H.M.

WDMS

KDMTL

HARDWARE SCHEDULE

ID QUANTITY ITEM

HW-1 - ENTRY DOOR 1.5 PR BUTT HINGES 1 EXTERIOR PULL 1 PANIC BAR 1 ELEC. STRIKE w/ KEY PAD 1 CLOSER 1 WEATHERSTRIP 1 INTEGRAL DOOR SWEEP 1 CONTINUOUS METAL SILL 1 WALL BUMPER

HW-2 - CHAPEL DOOR 1.5 PR BUTT HINGES 2 PULLS 1 CLOSER 2 WEATHERSTRIP - SEE DETAIL 1 INTEGRAL DOOR SWEEP 1 WALL BUMPER

HW-3 - RESTROOM DOOR 1.5 PR BUTT HINGES 1 PRIVACY LOCKSET 1 CLOSER 1 WALL BUMPER

HW-4 - STAIR DOOR 1.5 PR BUTT HINGES 1 PANIC BAR w/ CYLINDER 1 PULL 1 SMOKESEAL 1 INTEGRAL DOOR SWEEP 1 CLOSER 1 WALL BUMPER

3'-6" 7'*

BAS1S.com

Este

s Pa

rk, C

olor

ado

8051

716

92 B

ig T

hom

pson

Ave

nue,

Sui

te 1

00

A6.0Sheet No:

fax: 970.586.9149vox: 970.586.9140

Sheet Title:Sheet Title:

Date:

A R C H I T E C T U R E P. C.

Architecture, P.C.

Issue:

© BASIS

DETAILS

St.

Joh

n th

e E

vang

elis

tC

atho

lic C

hurc

hA

dora

tion

Cha

pel

1730

Wes

t 12t

h S

treet

, Lov

elan

d, C

O 8

0537

1/31/2013

Construction

__ of __

11 1/2" = 1' - 0"

31 1/2" = 1' - 0"

51 1/2" = 1' - 0"

61 1/2" = 1' - 0"

81 1/2" = 1' - 0"

91 1/2" = 1' - 0"

21 1/2" = 1' - 0"

71 1/2" = 1' - 0"

101 1/2" = 1' - 0"

111 1/2" = 1' - 0"

121 1/2" = 1' - 0"

141 1/2" = 1' - 0"

151 1/2" = 1' - 0"

131 1/2" = 1' - 0"

161 1/2" = 1' - 0"

171 1/2" = 1' - 0"

41 1/2" = 1' - 0"

12

2

12

2

12

1/8"

12

1/8"

N.T

.S.

N.T

.S.

6"

1'-4

"

1'-4

"

8 1/2"

MIN

7"

6"

30°

11.3°

METAL EDGE

1/2" RIGID INSULAT ISOLATION JOINT

GRADE

2 or 4 MASONRYCOURSES, RE:

ELEVATION

SEALANTBULLNOSE

CERAMIC TILEWAINSCOT

STUCCO ONNEW CMU WALL

CMU WALL

LIMESTONEVENEER

CUT BLOCK ONWALL ANGLE,FORM + GROUTEND CELL

METAL ANCHORS

PTD GYPBOARD

RIGID INSUL& MTL FURRING

FIELD GLAZEDSTOREFRONT

CHANNEL SECTION,RE: SPEC

STONE LAMINATEDGLAZING

SEALANT

STONE LAMINATEDGLAZING

WOOD FLOOR ONP.T. 1x SLEEPERS

PRE-FINISHED METALFASCIA/COUNTERFLASHING w/DRIP EDGE

P.T.BLOCKING

CONSISTENT REVEALAT STOREFRONTTHROUGHOUT FOYER

METAL FLASHING

CROWN T.O. PRECASTMEMBER TO DRAIN

METAL FLASHING

TERMINATION BAR

CONTINOUS EPDM

SEALANT

CHANNEL IN PRECASTTO RECEIVE FLASHING

ENGRAVED FASCIARE: ELEVATIONS

STONE VENEERANCHORS INTEGRAL

TO PRECAST BEAM

PRECAST BEAM,INTEGRAL COLOR,

RE: STRUCT

LIMESTONE VENEER

CMU WALL,RE: STRUCT

R-19 DRAPEDINSULATION

RIGID INSULATIONIN METAL FURRING

SUSPENDED T+GWOOD CEILING

T+G WOOD WALLFINISH

OPEN WEB STEELJOISTS, RE: STRUCT

METAL DECK STONE VENEERANCHORS INTEGRAL

TO PRECAST BEAM

PRECAST BEAM,INTEGRAL COLOR,

RE: STRUCT

LIMESTONE VENEER

R-19 DRAPEDINSULATION

CROWN T.O. PRECASTMEMBER TO DRAIN

METAL FLASHINGSEALANT

CHANNEL IN PRECASTTO RECEIVE FLASHING

METAL DECK

TAPERED INSULATION,RE: ROOF PLAN

DRIP CHANNELIN STONE VENEERABOVE WINDOWS

SEALANT

METAL INFILL FRAMING

STONE LAMINATEDGLAZING

SUSPENDED T+GWOOD CEILING

OPEN WEB STEELJOISTS, RE: STRUCT

SEALANTMASTIC

TERMINATION BARCONTINUOUS EPDM

TAPERED INSULATION

METAL DECK

OPEN WEB JOISTS,RE: STRUCT

STEEL ANGLERE: STRUCT

EXISTING STUCCO

CEILING TIE

SUSPENDED ACOUSTICCEILING

PTD GYP BOARD ON3/4" METAL FURRING

GRID CEILING EDGETRIM ANGLE

MIN INSULATIONTHICKNESS = 4-INCHES

TERMINATIONBAR

DRIP EDGEFLASHING

STONE VENEER

METAL ANCHORS

METAL DECK

STEEL JOISTS

METAL TRACK

METAL WALLFRAMING

CEILINGTIE

ACT

MARBLE PANELON PLYWOOD

UNDERLAYMENT

T+G WOODWALLS &CEILING

METAL WALLFRAMING

CONTINUOUSEPDM

METAL STUD PARAPETWALL

STEEL BEAM,RE: STRUCT

GOLD LEAF ONGYP CEILING

PTD GYP

METALFRAMING

METAL DECK

EPDM ROOFING

METALFLASHING

TERMINATIONBAR

DRIP CHANNELIN STONE VENEERABOVE WINDOWS

STEEL BEAM,RE: STRUCT

STEEL JOIST,RE: STRUCT

P.T. NAILER

LIMESTONEVENEER

EPDMROOFING

MIN 4" RIGIDINSULATION

BATTINSULATION

RIGIDINSULATION

CMU WALL

LINE OFSKYLIGHT

BEYOND

LIMESTONEVENEER

PARGE MASONRY PARAPET

METAL FLASHINGOVER TERMINATION BARCONTINUOS EPDMROOFING

TAPERED INSULATIONTO DRAINS

METAL DECK

STEEL JOIST

R-19 BATTINSULATION

SUSPENDEDCEILING

6" CMU PARAPET

STUCCO

NEW CRICKETON EXISTING

ROOF

STAIR ROOF

WALLFLASHING

RIGID INSULATION& METAL FRAMING

3/4" METAL FURRING

EXISTING STUCCO

LINE OF STONEVENEER ABOVE

LINE OF FLASHINGBELOW

LAMINATED STONEGLAZING

PTD GYP BOARD

STEEL PIPECOLUMN, RE: STRUCT

PREFINISHED ALUMINUMCLOSURE

PREFINISHED ALUMINUM'BREAK METAL' TRIM

BLOCKINGSPRAY FOAM CAVITY

ENTRY STOREFRONT@ NEW BLDG

STOREFRONT/RESTROOMCORNER

ENTRY STOREFRONTSILL @ EAST WALL

ENTRY STOREFRONT@ SOFFITCHAPEL WINDOW SILL

CHAPEL WINDOWJAMB

CHAPEL WINDOWHEAD

CHAPEL PILASTER@ ROOF/CEILING

BATH WINDOW SILL(HEAD SIM. - no tile)SKYLIGHT JAMBSKYLIGHT SECTIONROOF STEP

BATH WINDOW JAMBSKYLIGHT JAMB

CORNER

ROOF @ EXISTINGBUILDING (WEST)

ROOF @ EXISTINGBUILDING (SOUTH)

ENTRY STOREFRONT@ EXISTING BLDG

ALIG

N

ALIG

N

CMU WALL,RE: STRUCT

STONE VENEER

METAL ANCHOR

ALUMINUMSTOREFRONT FRAME

1/2" PLYWOODUNDERLAYMENT

SEALANT

NEW ENTRY DOOR

EXISTING STUCCO

STOREFRONT FRAME

3/4" METAL FURRING

CAULK JOINT

CONCRETE SLABON GRADE

CMU WALL

GRADE BEAMRE: STRUCT

PTD GYP BOARD

RIGID INSULATION& METAL FURRING

BLOCKING

SEALANT

WOOD SILL

STOREFRONT FRAME

GLAZING

GLAZING

STOREFRONT FRAME

SUSPENDED ACOUSTICTILE CEILING

CEILING TIESPANDREL GLAZING

STEEL BEAM, RE: STRUCT

STOREFRONT FRAME

BLOCKING

METAL FLASHING

PTD EXT GYP SOFFITON MTL FURRING

CANTILEVERED BAR JOISTTOP CHORD

METAL DECK

TAPERED INSULATION

ROOF MEMBRANE

FLEXIBLE FLASHING

METAL DRIP EDGE

CMU WALL

RIGID INSULATION &METAL FURRING

STOREFRONT FRAME

STUCCO FINISH

CERAMIC TILE SILL

GYP BOARD

EXISTING WALL

RIGID INSULATION& METAL FURRING

TILE SILL BELOW

METAL FURRING

WRAP GYP TOWINDOW FRAME

EXIST STUCCO

STOREFRONT FRAME

8" STONE SILL

GROUT SILL IN PLACE

SEALANT

11 1/2" x 2" STONE SILL

STONE LAMINATEDGLAZING, RE: SPEC.

CONCRETE SLAB ON GRADE

1/2" RIGID INSULATIONAT ISOLATION JOINT

MARBLE PANEL @ WINDOW

RIGID INSUL. &METAL FURRING

METAL STUD BLOCKING

WRAP MARBLE TO FRAME

GROUT SILL IN PLACE

LIMESTONEVENEER

CONC GRADE BEAMw/ STONE LEDGE

RE: STRUCT

4" CMU

INTERIORSTONE FINISH

BLOCKING

BLOCKING

PAINTED GYP BOARD

EXISTING CMU WALL

LIMESTONEVENEER

METAL ANCHOR

CMU WALL

RIGID INSUL. &METAL FURRING

BLOCKING

WRAP WOOD TO FRAMEFIELD GLAZED STOREFRONTCHANNEL SECTIONS,RE: SPEC.

METAL ANCHOR

METAL STUD WALL

NEW CMU WALL

STUCCO FINISH

STOREFRONT FRAME

RIGID INSULATION &METAL FURRING

SEALANT

PTD GYP BOARD

BLOCKING

METAL STUD WALLMETAL STUD WALL

BLOCKING

FIELD GLAZED STOREFRONTCHANNEL SECTIONS,RE: SPEC.

FIELD GLAZED STOREFRONTCHANNEL SECTIONS,

RE: SPEC.

EXISTING MASONRYWALL

FIELD GLAZED STOREFRONTCHANNEL SECTIONS,

RE: SPEC.

PTD GYP BOARD

EXISTING MASONRYSTAIR WALL

FIELD GLAZED STOREFRONTCHANNEL SECTIONS,RE: SPEC.