Office of the Engineer-in-Chief (R&B) Admn, SR, RSW & Bldgs Errum Manzil :: Hyderabad Circular Memo No. SSR/ EE( TEG)/ DEE-Vll/ AEE-2 Dated 22-01-2015 Sub:- R&B Department - Schedule of Rates for Road and Bridge Works for the year 2014-15 Approval of the Committee of Chief Engineers Communicated - Regarding. Ref :- 1. G.O.Ms.No.2 Dated 12.01 .2015. 2. Minutes of the Meeting of the Committee of the E-inC's/ CE's (R&B) dt. 20.01 .2015 -x-x-x- Government of Andhra Pradesh vide GO cited in the reference has ordered the (R&B) department to adopt the Specifications and Data for Road and Bridge Works of the Ministry of Road Transport and Highways, GOI with the current SSR's for speedy and quality execution of the works. Accordingly the Committee of Chief Engineers vide their meeting held on 20.01 .2015 has accorded approval for the Common Schedule of Rates for the year 2014-15. A copy of the same is here with enclosed for necessary action. Encl: As Above Fo v To, All the E-in-C's and Chief Engineers of R&B Department All the Superintending Engineers (R&B) Copy to the Superintending Engineer (R&B) D&P wing ineer-in-Ghief (R&B) n, SR, RSW & Bldgs

Upload: helloitskalai

Post on 15-Feb-2016

73 views

Category:

Documents


1 download

DESCRIPTION

SSR rates

TRANSCRIPT

Page 1: SSR 2014-2015

Office of the Engineer-in-Chief (R&B)Admn, SR, RSW & Bldgs

Errum Manzil :: Hyderabad

Circular Memo No. SSR/ EE( TEG)/ DEE-Vll/ AEE-2 Dated 22-01-2015

Sub:- R&B Department - Schedule of Rates for Road and Bridge Works for theyear 2014-15 Approval of the Committee of Chief EngineersCommunicated - Regarding.

Ref :- 1. G.O.Ms.No.2 Dated 12.01 .2015.2. Minutes of the Meeting of the Committee of the E-inC's/ CE's (R&B)

dt. 20.01 .2015

-x-x-x-

Government of Andhra Pradesh vide GO cited in the reference has ordered

the (R&B) department to adopt the Specifications and Data for Road and Bridge

Works of the Ministry of Road Transport and Highways, GOI with the current SSR's

for speedy and quality execution of the works. Accordingly the Committee of Chief

Engineers vide their meeting held on 20.01 .2015 has accorded approval for the

Common Schedule of Rates for the year 2014-15. A copy of the same is here with

enclosed for necessary action.

Encl: As Above

Fo

vTo,All the E-in-C's and Chief Engineers of R&B DepartmentAll the Superintending Engineers (R&B)Copy to the Superintending Engineer (R&B) D&P wing

ineer-in-Ghief (R&B)n, SR, RSW & Bldgs

Page 2: SSR 2014-2015

Government of Andhra PradeshRoads & Buildings DePartment

COMMON SCHEDULE OF RATESFOR THE YEAR 2014.15

(effective from 7st June, ZOt a)

COMMITTEE OF CHIEF ENGINEERS(R&B)

Page 3: SSR 2014-2015

ROADS & BRIDGE WORKS

Page 4: SSR 2014-2015

INDEX

PART.II

ROAD & BRIDGE WORKS

Description Page No.

From

Preamble

Labour Rates

5. {**n-ty-"ltt-dacr\rf,!5 ?-1 xt

Page 5: SSR 2014-2015

PREAMBLE

Page 6: SSR 2014-2015

I.O AREA ALLOWANCES:

A) CORPORATIONS & MUNICIPALITIES:

a) (i) 25o/o extra over the rates on labour component of works is allowed in all Municipal

Corporation Limits of Andhra Pradesh except Greater Hyderabad,Greater

Visakhapatnam and Vijayawada municipal corporation (Upto a belt of. L2 kms from

Munjcipal Corporation limits) and other corporations as notified by the Government

from time to time.

(11) 40o/o exfta over the rates on labour component of works for Greater Hyderabad ,

Greater Visakhapatnam and Vijayawada Municipal Corporation limits (Upto a belt of

L2 kms from Municipal corporation limits)

b) AIIow 20%o exUa over basic rates on labour component of works in all District

Headquarters and the remaining Municipal limits ( up to a belt of L2 Kms. from

Municipal limits ).

c) For works at Tirumala HiIIs in Chittoor District, 40o/o extra over the basic rates of Iabour

component is allowed.

d) For works at Horsely hills in Chittoor District, 30olo extra over the basic rates of

Iabour component is allowed.

e) For rvorks located inside Tirumala Temple, 20o/o extra over the basic rate of labour

component specified for Tirumala Hills is allowed.

0 For Works located inside T.T.D Temples of Sri Padmavathi Ammavari Temple,

Tiruchanoor, Sri Govindaraja Swamy Temple at Tirupathi, Sri Kapleswara Swamy

Temple, Kapilatheerthm, Tirupathi and Sri Kalyana Venkateswara Swamy Temple,

Srinivasa Mangapuram , 20o/o extra over the basic rates of labour component for

Tirupathi Municipal Corporation is allowed.

B) JArL COMPOUNDS:

20o/o extrais allowed over labour rates for the work in the Jail compounds. Only equivalent

number of Man Mazdoor shall be provided in the Jail premises and no women Mazdoor are

allowed inside.

C) INDUSTRIAL ARf,A:a.20o/o over basic rates on labour component works ailowed for works situated within 1-0 Kms

belt of Industrial area of, Jeedimetla, Lingampally,Ibrahimpatnam, Tandur in Ranga Reddy

District, Ibrahimpatnam, Vuyyuru,Jaggaiahpeta in Krishna District, Macherla, Gurajala,

Challapalli in Guntur District Garividi in Vijayanagaram District, Kothur in Mahabubnagar

Disgict,Patancheru, Ramachandrapur in Medak District, Bibinagar in Nalgonda

District,Ramagundam and Godavarikhani in Karimnagar District, Renigunta in Chittoor)

Page 7: SSR 2014-2015

District and Yerraguntla & Mangampet in Kadapa District, Manchiryal,Mandamarri,

Bellampalli in Adilabad District, Sarpaka, Kothagudem, Paloncha,Manuguru, Singareni

Collieries in Khammam District, Kamalapur, Bhoopalpally of Warangal District, Wadepally of

Nalgonda District, Nagapally(Centenary Colony, Begumpet "X" roads) Takkalapally of

Karimnagar District, Hindupur, Tadipatri, Anantapur, Guntakal, Rayalcheruvu, Yadiki of

Anantapur District and Adoni, Dhone, Cement Nagar, Nandyal, Kurnool, Yemmiganur &

Bethamcherla of Kurnool District ,Anakapaliy of Vishakhapatnam District.

D) AGENCY ITRItsAI., AREAS:

257o extra allowed for the works located with in the interior Agency / Tribal limits, i.e.

for the works located with in & upto16 KMs from any all weather route inside Agency /

Tribal.

40o/o extra allowed for the works located with in the interior Agency / Tribal limits, i'e. for

the works located bevond 16 KMs from any all weather route inside Agency / Tribal.

NOTE: 1. No extra percentage is permissible in respect of Forest produce such as Bamboo, Rellu

grass and for all materials obtained from outside the Agency / Tribal.

2. The extra percentage under Agency / Tribal areas allowance may be allowed on the

labour component and on the labour charges in the rates for conveyance of materials.

3.The extra percentage on cost of materials in Agency / Tribal areas can be allowed on the

labour component only, if they a-re manufactured in the Agency / Tribal areas itself

except Forest produce.

E) GHAT ROADS:

For Ghat Roads steeper than 1 in 20, the length of the road may be taken as l-.5 times the

existing length of the road for the purpose of leads only for conveyance of materials based on the

certificate for the Ghat Road given by the Superintending Engineer concerned.

Foot Note: Under compelling circumstances, the concerned Chief Engineer can adopt the

equivalent length of road as 2 L/z times of actual length.

Note below area allowances:

If more than one area allowance ( such as those ) for (1) Municipalities (2) Agency / Tribal

areas (3) Industrial areas are applicable for a particular situation, only the maximum out of the

allowable percentages is to be allowed.

a)

b)

Page 8: SSR 2014-2015

2.0 WATER LEADS:

The following labour is allowed for conveyance of water for every % Kilometer lead or part

there of over the initial lead of % kilometer.

a) Cement concrete : 1.5 Wornen Mazdoor / Cum'

b) Masonry : 1.0 Woman Mazdoor/ Cum.

c) Plastering : 0.5 Woman Mazdoor/ 10 Sq'm

Note:- For Water leads of over 2 KMs, specific approval of Chief Engineer concerned is necessary'

3.0 EXCAVATION OF TRIAL TIIENCHES, TRIAL PITS ANDEXCAVATIQN IN RESTRICTED PLACES: .

I) EXCAVATION OF TRIAL TRENCHES. TRIAL PITS AND EXCAVATIONIN RESTRICTED PLACES: -

A. TRIAL TRENCHES:

1-) Trial trenches of not more than 2 metres in width ...25% extra

B. TRIAL PITS:

1) Up to 2 Metres dePth 25o/o extra

2) 2 Metres to 4 Metres depth 50% extra

3) 4 Metres to 6 Metres depth 75o/o extra

4) 6 Metres to B Metres depth L000/o extra

5) B Metres to 9 Metres depth L50o/o extra

6) More than 9 Metres depth 200%extra

il) EXCAVATION IN RESTRICTED PLACES:.

I) Foundation of Buildings 75Vo extta

II) For pipe lines where the depth is less 75o/o extra

than 1.5 times the width

III) For pipe lines where the depth is I20o/" extra

1.5 times or more than the width

IV) Silt removal in restricted areas such I20o/o extra

U. T's., Culverts and SYPhons'

V) Excavation of field channels 75Vo extra

VI) For narrow trenches not more than

2 meters in width and dePth not less

than twice the width and for excavation 75o/o extta

of road boundary drains, model sections

of canals.

Page 9: SSR 2014-2015

VIi)High berm cutting of not more than150 mm average thickness and

sectioning for roads

50%o extra

Note: 1) The extra percentage is allowed over rate for corresponding soil. It includes the charges

for all lifts and initial lead but does not include dewatering charges if any in respect of all

the items under ( A) and (B) above.

2) The above extra percentages in respect of excavation in hard rock for restricted places

are to be allowed for (213) rd of the cost and shall not to be allowed in respect of items

involving blasting component which may be taken as 1/3 of the cost.

4.0 Proportion of First class and 2nd class workmen under Skilled Labour:

30o/o of the skilled labour provided in the data may be taken as l-st Class and the remaining

70Yo as 2nd Class.

5.0 Revetment and apron works:

D The size of stone for the volume range ( 0.015 to 0.030 Cum) shall not be less than

(0.30 X 0.30 X 0.15 to 0.30 X 0.225 X 0.225m)

il) The size of stone for the volume range (0.011 to 0.015 Cum) shall not be less than

(0.30 X 0.225 X 0.15 to 0.225X0.225 X 0. 225 m)

The rate of labour component as per the standard data book is to be adopted for

revetment work only. However for apron work Rs. 3.00 per cum. should be

deducted.

m) For the labour for the "Rock Toe" shall be taken as 2/3rd of the labour charges of

revetment as Chief Engineer, Circular No. P3/ OT2lT3l 651'67l7B,Dt 19.03.1980'

6.0 Deep cuts:Deep cuts are defined as reaches of canal where excavation in all soils is for a depth of

excavation Grn ancl more.The following increase over normal rates is permitted in deep cuts on a

graded basis.

D Up to 6 m excavation: The S. S. R. of corresponding classification of

earth work excavation is applicable.il) Beyond 6 m and uP to 9 m excavation

ilI) Beyond 9 m and up to 12 m excavation

IV) Beyond l-2 m and up to l-6 m excavation

V) Beyond 16 m and up to 30 m excavation

VI) Beyond 30 m excavation

il)

- 9o/o extra

- l2%o extra

- 1-5o/o exlra

- 20%o extra

- 40olo extra

Page 10: SSR 2014-2015

NOTE : 1-) The extra percentage is only on basic rate. 2) The above percentage are not applicable

for "LEAftS & LIFTS'. 3) The above extra percentages are to be allowed only on

items excluding the blasting component which may be taken as 1/3 of the rate.

7.0 The ccnveyance of bitumen for bulk and packed may be admitted as follows:

Packed --- Rs. 1-.75per Km/ MT

Bulk --- Rs. 1-.50 per Km/ MT (round the trip)

8.0 SEIGNIORAGE CHARGES:

Seigniorage charges for materials as fixed by the Government in G.O.Ms.No.198 (indusnies

and commerce department), dated 13.08.2009 may be added in the data of rates in the estimate. The

Provision towards Contractor's Profit and Overhead charges should not be operated on the

Seigniorage Charges while adding Seigniorage Charges to the data in the estimate. In case ofrevision, the revised rates as fixed by Mines and Geology Department have to be adopted.

9.0 EARTH WORK EXCAVATION BY MACHINERY:

For items of Earth work excavation by machinery, the rates shall be adopted as per Road &Bridge works (Part-2) of A.P. Revised Standard data.

er-ln-Chief (R&B) Admn., S.R

RSW & Buildings

Page 11: SSR 2014-2015

LABOURRATES

Page 12: SSR 2014-2015

sl.no

S.S

Item

No.

Description Unit (Per) SoRate for20t4-15

Remarks

1 2 3 4 5 6

(A) SKTLLED WORKMENFirst Class

1 a Mason and stone cutter Day 385 As per I&CAD(S.No.39)

2 b Brick Layer Day 385 As per I&CAD(S.No.11)

3 C Carpenter Day 385 As per I&CAD(S.No.4)

4 d Painter Day 440 As per I&CAD(S.No.35)

5 e Plumber Day 440 As per I&CAD(S.No.36)

6 t Welder Day 3Bs As per I&CAD(S.No.41)

gb Fitter Day 385 As per I&CAD

(S.No.6)

B h Electrician Day 440 As per I&CAD(S.No.5)

I 1 Cook Day 360 As per I&CAD(S.No.2)

Other Categorv10 2 Mechanic Day 385 As per I&CAD

(S.No.1-2)

11 3 Rigger Day 385

L2 4 Rigger Syrang Day 385

13 5 Well Sinker Day 385

L4 6 Blaster Day 440 As per I&CAD(S.No.3)

15 3 Barbender Day 450 As per I&CAD(S.No.1)

16 7 Tipper and Heavy Vehicle Driverabove 12 T

Day 440 As per I&CAD(S.No.15)

17 Tanker and medium Vehicledruver (7.5T to 1-2 T)

Day 3Bs

18 Tanker and Light Vehicle driveruD to 7.57

Day 295

19 Wagon Drill Operattor upto 7.5 T Day 385

20 B Lorrv and Heavy Vehicle Driverabove l-2 T

Day 420

2L Road Roller Driver (7.5T to 12

T)Day 385 As per I&CAD

(S.No.27)

22 Road Roller Driver 7.57 Day 295

23 I Tractor Driver above 12 T Day 420

24 Tractor Driver (7.5T to 12 T) Day 385

Page 13: SSR 2014-2015

25 Tractor Driver 7.57 Day 295

Ouerator26 10 Pan Mixer Day 385

27 Concrete Mixer Day 385 As per I&CAD(S.No.1-6)

28 Vibrator Day 385 As per I&CAD(S.No.32)

29 Composer Day 385

30 Jack Hammer Day 3Bs As per I&CAD(S.No.23)

31 Driller Day 440 As per I&CAD(S.No.34)

32 Boring Maistry Day 385

33 11 Pump operator Day 385 As per I&CAD(S.No.24)

34 12 Turner Grade-I Day 385

35 L3 Wireless Operator Day 430 As per I&CAD(S.No.12)

Other Category36 I4 Assistant Wireless Operator Day 345

37 15 Jeep Driver Day 430 As per I&CAD(S.No.15)

Other Categorv

38 1_6 Work Inspector with I.T.Iqualification

Day 440 As per I&CAD(S.No.s)

Other Category

39 T7 Work Inspector with LCE,LN,IE,L. E.E qualification

Day 550 As per I&CAD(S.No.a)

Other Categorv

40 1B Work Inspector with B.E (CivilMechanical and Electricalqualification

Day 735 As per I&CAD(s.No.7)

Other Categorv

4I 19 Work Inspector with Non-technical qualificationSSLC/SSC/HSC

Day 370 As per I&CAD(S.No.10)

42 20 Mason Spl. Grade for Mossaicand Polished shahabad stone floor

Day 385

43 2Ia(i)

Typist/Job Typist Day 430 As per I&CAD(S.No.13)

Other Categorv

a

(ii)Computer operator Day 485 As per I&CAD

(S.No.11)Other Categorv

b "CAD Operator with Diploma inEngineering /General degree withCAD certificate"

Day 600 As per I&CAD(S.No.1a)

Other Categorv

(B) SEMI -SKILLEDWORKMEN

SECOND CLASS

Page 14: SSR 2014-2015

44 1 Mason Day 345 As per I&CAD(S.No.35)

Semi-Skilled45 b Brick Laver and Stone Cutter Duy 345 As per I&CAD

(S.No.35)Semi-Skilled

46 c Carpenter Day 345 As per I&CAD(S.No.a)

Semi-Skilled47 d Painter Day 345 As per I&CAD

(S.No.37)Semi-Skilled

48 e Plumber Day 345

49 f Blacksmith Day 385 (Skitled)

50 ob Welder Day 345

51 h Fit'ler Day 345

52 I Electrician Day 345

53 2 Caulker Day 345

54 4 Tinker Day 345

55 5 Sawyer Day 345

56 6 Brick-Moulder Day 345

57 7 Pot-tile turner Day 345

5B B Pan-tile turner Day 345

59 9 Brick and Lime Kiln man/Glazzer Day 345

60 10 Telephone Operator Day 430 As per I&CAD(S.No.12)

OtherCategorv

61 11 Hand Driller Day 345

62 t2 Quarry Man Day 345

63 13 Hammer Man Day 345 As per I&CAD(S.No.a0)

Semi-skilled64 L4 'fhatcher Day 345

65 15 Fireman Day 345

66 16 Cleaner/Helper Day 345

67 17 Stone Packer Day 345

6B 1B Jawali Day 345

69 19 Ex-Service man/Goorkhawatchman

Day 345

70 20 Ratton Worker Day 345

71 21, Mate Day 345

72 I Head Mazdoor (Mukaddar) Day 345 As per I&CAD(S.No.10)

Semi Skilled(c) UNSKTLLED WORKMEN

73 2 Man Mazdoor Day 295 As per I&CAD(S.No.3)Un-Skilled

10

Page 15: SSR 2014-2015

74 3 Watch Man Day 295 As per I&CAD(S.No.5)Un-Skilled

75 5 Woman Mazdoor Day 295 As per I&CAD(S.No.a)Un-skilled

76 6(b)

Helper/Cleaners/Sweepers/S cavan

g ers/Choukidarsi S ecuritYGuardsiOffice Boys .-

Day 295

77 N"t. t \riL.*ver unskilled workmen are engaged for cleaning ot

sewers & septic Tanks, they may be paid double of the above

wages.(D) OTHER CONVEYANCE ITEMS

7B L Single bullock with driver and

cart

Day 370 As per I&CAD(S.No.6)

Semi Skilled

79 2 Buliock pair with driver Day 390

BO 3 Builock pair with driver and cart Day 39s As per I&CAD(S.No.5 )

Semi Skilled

B1 4 Bullock pair with driver and cart

with pneumatic tyres

Day 420

82 5 Bullock pair driver and kaPila Day Deleted

B3 6 Nava with uew Day 360 As per I&CAD(S.No.3)

Semi Skilled

B4 Punt thundal Day 275

B5 8 Punt lascar Day 275

Note :-Iess than the minimum wages of

schedrrle of emolorrment. subiect to out turn'

2) 25%o extra over the corresponding labour rates m respect

oi the work to be done during night time subject to issue of

certificate accordingly by the concerned estimate sanctioning

authorit.y for providing in the data and by concerned Executive

Engineer in iharge of the work for payment. The night time

allowance is applicable oniy to the works done under Greater

Hyderabab Muncipal Corporation only.

l-A,trc- -

'eEr-ln-Chief (R&B) Admn., S.R

RSW & Buildings

Page 16: SSR 2014-2015

MATERIAL & WORKITEMRATES

L2

Page 17: SSR 2014-2015

RATES OF MATERIAL & WORK ITEM RATES

st.No.

S.S. ItemNo.

DescriptionUnit(per)

SoRate for20t4-15

Remarks

1 2 3 4 J 6

:A) STONE AND ROAIIVIATERIALSROUGH STONEQUARRIED INCLUDINGWEDGING, BREAKING,BURNING, SPLITING.

1 22.a lor R.R Masonary Work (other

han Granite, Dolomite anc

frao')

1 cum 160

II

D,I lur SS 1Ltvelrn*nt worli 'l'Jr-11m

I t:urn 144 As pcr i&CAn(S.No.3) ol

Miscellaneotisiterrrs Material

other: thantovereii under

irri{atiun

b.ii For 5S l{,er,,cfilent work 30[-r1

111

I cttrir 1 ti4 As per Tr-&CAl)

(M0t)3 cfMafer ial)

Material otherilriirr <:overed

under irt'jgatjt;n

4 b.iii For SS Revetment work4S[IIn

1 cum 136

5 C Ieddy Stone above 450 mm t300 mm

1 cum 1-BB

6 dI aterite for revetment 225 mm 1 cum 118

d II. aterite for revetment 300 mm 1 cum 138

B d.iii Sranite for SS revetment 225

IIn1 cum L54

I d.iv lranite for SS revetment 30[nm

1 cum 156

\ote:- Only when other granite

s not available1_0 E Laterite for masonrv 1 cum 1_36

11 F 3yclopean stones above 0.2

tum

1 cum 254

t) L, lt*r R. R..fi,laSr:r:rV wOrkS' granilt:, clolarnitt: and tl'r:l:

,'arie ty)

.i. cuma !'- "'t As per I&CAI)

(hl.14t} ufMater:ial)

Materiai othertJriln covereci

under it'l'igatioit

1.3

Page 18: SSR 2014-2015

13 OTE:- For items 22(a) to 22K

rd 22(g) add extra Rs /cumherever quarrying is done b1

asting

1 cum 70

COURSED RUBBLEJTONE QUARRYINGWEDGING, BREAKINGBURNING AND SPLITTINGFOR SS FIRST SORIWORI(S

L4 23.a lranite. Dolamite and trap 1 cum 262

15 B ior other varieties 1 cum 1BB

16 27 -iranite stone slabs for culverts,iniels and copings (3 facet

lressed coarsed rubbltnasonrv)

1 cum L728

t7 \[OTE: - For items 23(a), 23(bltnd 27 add extra Rs. Pet

3um, wherever quarrying is

lone bv blastine

1 cum 74

1B 28 Bond stones ( 600 x 200 x 20tnm')

each 30

19 B Jhainage stones and Centre

ine stones (750x150x150xmm)each 37

20 31 Demarcation Stones ( 900

t50 x 150 mm)each 70

2L 32.a luard Stones ( 1200 x 200 >

100 mm )each L02

22 B luide Stones ( 800 x 150 x15C

nm)each 70

23 C larving letters and figures ir;tone uD to 100 mm size

each B

24 D 3arving letters and figures iitone above 100 mm size

each 9

I{ARD BROKEN STONE OF

GRANITE, TRAP ANI)DOLERITE FR-EE FROMDUST OBTAINED BIQUARRYING, WEDGINGBREAKING, BURNINGAND SPLITTING

'1r/..1 ,1,i.it 1 cunr 5;ri2 As per i&{lAn

(M050 ofMaterial )(excluding

bl;lsting chi:rgesof Rs.70r'- irutl

tul;rchiner:r'ushirrg

clrarges at'25'%\:

26 lr d* - 1ilnrm size ($5 5) i i:*nr fi1)2 As per 1&(lAn{M{151 r"rf'

l4

Page 19: SSR 2014-2015

Materiat)(ercluding

blasdng cirargesof Rs.70/- and

Machinecrushing

charges af.2\a/a',

'27 C - clo - 1.2mrn size (SS 5) 1 cum 822 As per I&CAD(M052 ofMaterial)(excluding

blasting charges

of Rs.70/- andMachinecrushing

charges af.2\ala'

2B d do - 20mm size ($S 5) I culrr 1036 As per I&CIAD(M053 ofMaterial)(excluding

ila*ing charge:of Rs.70/- nnd

Machinecrushing

:harses of 25Va

2$) e - du - 2l:mn size (S$ 5) I cutn 994 As per I&CAD(M054 ofMaterial)(excluding

biasting char:ges

of Rs.70/- and

Machinecrusiring

charges of 25%.

30 f - clo - 40nun size (SS 5) 1. cunl 62tl As per I&CAII(M055 ofMaterial)(excluding

blasting chargesof Rs"70/- anrl

Machine

I crushinglcharges of 25%

31 a - do - 50mm size (SS 5) 1 cum 456

32 h - do - 60mm size (SS 5) l- cum 4L9

33 I - do - 65mm size (SS 5) l- cum 379

34 - do - 75mm size (SS 5) 1 cum 304

35 k - do - 75 to 100mm size (SS

;)

1- cum 248

36 {OTE:- i1) Add extra Rs. l-

ter cum for items 3'3 {a) to 3ifi.t if the metal is qblqqed h

7{}

15

Page 20: SSR 2014-2015

rle sfing

"t'7 :2) Arid 25%r exlril Pcf t:urrt i{

Jre metal is obtained bY

machine nrlshing erclucliirP

rerst of l.:ilasting"

)5t:%t

3B .3) Deduct Rs. /- Per cum il]re metal or rubble is obtained

from surface stone anc

boulders.

9.90

39 ia) Add Rs. /- Per cum forl

ielection of stones and boulders

from excavated sPoil dumPs foritems 33 a to 33 k, when this

addition of Rs. /- Per Cum is

allowed, deduction of Rs. l-per Cum mentioned under

Note (3) above should

fnvariably be made.

isoFT BROKEN STONEISCREENED AND FREE

F'nOVr DUST

L7

9.9

40 33.1 -do- 40mmsize (SS5) 1 Cum r23

4I 33.m -do- 50mmsize (SS5) 1 Cum 111

42 33.n I -ao- 60mmsize (SS5) 1 Cum 87

43 33.o - do - 65 mm size ( Sll-) 1- Cum 7B

44 33.p -do- T5mmsize (SS5) 1 Cum 73

{ARD BROKEN STONE OFI

]RANITE TRAq)OLERITE AND)OLAMITE FREE FROM)UST OBTAINED BY

f,UARRYING WEDGING'BREAKING, BURNINGq.ND SPLITTING

IQUARTZTTE ANDBASALT WITHAGGREGATE IMPACT OT

LESS THAN 20)

45 33a -do- 2.36 to 5 mm size

IRC&MORTH)1 cum 308

46 b -do- 5 to 7mm size.IRC&MORTH)

1 cum 504

47 C -do- 9.5 to 1L.2mm size

:IRC&MORTH)

1 cum 656

48 d .do- 12mm to L4 mm size ( IRC

rnd MORTH')1 cum 780

49 e 'do- 19 mm to 22 mm sizt'IRC and MORTH )

1 cum 984

50 f -do- 25 mm to 27 mm size

'IRC and MORTH )

I cum 944

51 o -do- 40 mm to 45 mm siz( l- cum 5BB

16

Page 21: SSR 2014-2015

'IDC --.1 l\/fa]PTT{ \1 cum 456

52 h .do- 50 mm to 55 mm size

'IRC and MORTH )-53 I d"- 60 mm to 63 mm size

'Tfl(- "nrl I\/[ORTH )

1 cum 4t9

1 cum 37954 i

J-do- 65 mm size ( IRU ancN/tnDTT{ \

l- cum 30455 k .do- 75 mm size ( IRU anc

VIORTH )

-

1 cum 70 As proposed bY

I&CAD56 1 \OTE:- Add extra Rs. /- PeI

:um for items 33 (a) to 33 0) ilthe metal is obtained b1

uIdsLrrrH,1- cum 25% As proposed bY

I&CAD57 2 \dd 25% extra Per cum lI me

netal is obtained bY machine

:rushing excluding cost ol

1 cum 9.95B 3 )educt Rs. /- Per cum rI thi

netal or rubble is obtainet

[rom surface stones an(L^--tl^*-UULtILTtr

l- cum L7

9.9

59 4 \dd Rs. l- Per cum torl

;election of stones and bouldersl

[rorn excavated soil dumPs forl

Items 33 (a) to 33 (k), when this

addition of Rs. l- Per cum

allowed deduction of Rs' l-

per cum mentioned under note

[3) ubou. should invariablY be

hnade

rANO BROKEN STONE

)THER THAN GRANITE]UCH AS QUARTZ,f,UARTZ-NAPA AND

BASALT SCREENED ANI)DDEE IPr|M DITST

L Cum 38660 33.q An - 1O rnm size (SS 5)

1 Cum 38661 -do- 9.5 mm to l-L'2 mm stze

I ITf.' '-'l I\/ORTI{ \1 Cum 362

62 r l^ - 1J rnrn size (SS 5)1 Cum 362

63 -do- 12mm to 14 mm size ( IKL-".,t n/InpTH \

1 Cum 29364 S 'l^ - ?O rnrn size (SS 5)

1 Cum 29365 .do- 19 mm to 22 mm stz€

'IDr- "-rl I\IIORTH )1 Cum 287

66 T 'l^ - lR rnrn cize f SS 5)l- Cum L70

67 U l^ - 1O rnrn qize f SS 5)1 Cum t70

6B -do- 40 mm to 45 mm sIZ€( TDC .-rl I\IT(-)RTH \

1 Cum 15069 V An - (O rnrn qizc (SS 5)

1 Cum 15070 'do- 50 mm to 55 mm slz€

'IRC and MORTTD-t7

Page 22: SSR 2014-2015

7t 33.w - do - 65 mm size (SS 5) | 1 Cum 142

72 -do- 60 mm to 65 mm sizel l- Cum

IRC and MORTH ) |

t42

73 X do - 75 mm size (SS 5) | 1 Cum t17

74 - ao - 75 mm size ( IRCI 1- Cum

&MORTH) ,

I17

75 Y - do - 75 to l-00 mm sizel 1 Cum

SS 5)

92

76 - do - 75 to l-00 mm ( IRC&I 1 Cum

MORTH)

92

CTHER ITEMS77 33.21 Laterite 40 to 75 mm (.iN 1_01

7B z2 <ankar, hard broken kankar 401 1 Cum

:o75mm(ring) |

75

79 z3 ;oti"g stone of 150 mm size o{ 1 Cum

g,ranite, trap and Dolamitelirari cti cs I

95

BO VOTE,- (1) Add extra for itemsl 1 Cum

-o 33(23) Rs l- Per cum,l

wherever quarrying is done bYl

blasting. (2) Whereve{

conftolled blasting is resorted]

to the Chief Enginee{

concerned shall aPprove thel

bbserved data in suPPon of SSI

item No. 22 a to 22 c , ZZg' Z3 |

70 As proposed bY

I&CAD

B1 z4 otit g stone of 1-50 mm sizel I Cum

ther than granite varietY I

66

82 ,S Fsoting Stone laterite, Kankarl L Cum

h qomm srrrface stone I

4L

B3 ,6 Fieta picked metal unbroker

D0 mm size

L Cum 55

B4 z7 l- do - 25 mm size L Cum 42

85 | zB l- do - 4a mrn-ltze 1 Cum 48

86 | z9 l- do - 50 rnlq i.lze 1 Cum 42

87 | z1'0 l- do - aa .ryq-tize 1 Cum 36

BB I zl l- do - B! ntrr'-:t4 1 Cum 32

B9 NOTE:- Add Rs. /- Per Cum for

selection of stone and boulders from

excavated spoil dumps for items 33 (Q)

TO 33 Z , when this addition of Rs' l'per Cum is allowed, deduction of Rs'

per Cum should invariablY be made

towards the metal or rubbie if it isobtained frotn surface stone and

bouiders.

t7

9CI

".44

"irave I I f,uttt 10,i As per I&{lAl}{h{0fi8 stMa{ei:iai)

91 35a luarry rubbish l- Cum B1

340 As per I&LIAI){51.No.67 nttj) {Hti St*ne {-hiPs 2.3trtnru anc

re low

1 {-,utn

18

Page 23: SSR 2014-2015

Material)

(]ri ,16.* iarrd lr;r: tnortilr, Pl.asl.eriirg.

.:r':iliug r.:r;;tt incluil.ing washing

;crcening etc.,

1 i..lirrn 60fi As per 1&{l,qn{$i"No.2l} r:f

Material)

I.]4 h iaiid for concrete I cunt -{62 As per [&t"],qD(Sl.No.27.a of

Mater:ial)

()q, {l ianrl l'or I'i11'lng and l:rlinclilge 1 Cluni 342 As per l&CAn(Sl.l'io.27.b of

Mtrter:ial)

96 37 Slay for puddle and masonrY

lterns 38 (a) to 39 (h) As Pet

iocal prevailing rates based or

rompetitive quotations.

L Cum 35

iC) LIME AND CEMENT97 10 to 41(c )

As per localrrevailing rates

based oncompetitive

rates

9B 42 lement excluding cost o

rmpty cement bags

1MT Monthly rates

will be

communicatedbv Govt

@ire inclusive of sales tax. 2)As per the rates

rpplicable ro the District. 3) Least of the (1) and (2 ) above may

te allowed 4) The price of cement will be reviewed and fixed on

monthlv hasis and rates will be communicated separately'

99 C 3rinding lime mortar or Surkhj

ror[ar1" Cum 94

100 D ihell lime slaked and screened 1 Cum 940

101 E White cement 1 Kg. 30

r02 (D) MORTARS

103 43 to 45 tems 43 to 45

tE) METAL AND IRONWORKS

1AA ilrl c.teel rnds 6mm dia lMT Monthiy rates

will be

communicatetby Govt

1nq ild steel flats 1- MT

106 dild Steel, Structural Stee

.e., Angles, Channels and

ections.

1MT

r07 igh Yield Strength Deformars/TMT bars

1MT

10R ild steel olates 1MT{OTE'L1-) The rates are inclusive of sales tax' 2)As per

he rates applicable to the District. 3) Least of the (1) and

2 ) above may allowed 4) The prices of steel will be

eviewed and fixed on monthly basis and rates will be

:ommunicated seParatelY.

19

Page 24: SSR 2014-2015

III RATES OF WORKS

.A) CLEARING SITE

109 1.a :teutine heavY Jungle | 1- Sqm 2.90

L10 B lea.i.re lieht Jungle | 1 Sqm 2.60

111 C iG-iltre-s.rubJungle I rsqm 2.60

TL2 D :te.ttttg Juliflora (Prosafis)l I Sqm

lungle including uP-rooting andl

removing of Juliflora stumps. I

3.70

113 2.a.1 @ngPalmyrahl Each

rees including stacking of girthl

30 to 1-00 cm.

19

LI4 Ii - d" - 100 t" 200 cm. I Each 44

115 2.b.I ffi removingl Each

Palmyrah stumps includingl

;tacking of girth 30 to 100 cm. I

46

116 Ii - do - 100 to 200 cm. I Each 48

Ll7 2-i@oving date treesl Each

[ncluding stacking of girth 30 tol

h-oo cm

24

118 Ii i^ - tofl tn ?oo crn I Each 35

ffi removingl Each

;tumps of date trees includingl

;tackinq of girth 30 to 100 cm' I

24119 d.r

r20 Ii - d" - 100 t"200im I Each 30

t2r el @uing otherl Each

<ind of trees including stackingl

rf eirth 30 to 100 cm

30

122 Ii _ d" _ 100 t"r00 cm I Each 46

L23 iii do - above 200 cm Each 75

t24 f.I Jprooting and removinP

;tumps of other kind of trees

Lncluding stacking of girth 30 tc

100 cm.

Each 24

L25 fi - do - 100 to 200 cm Each 33.00

L26 lIl do - above 200 cm Each 41.00

t27 3.a Jprooting and clearing PricklYrear iungle

-

1- Sqm 2.30

t2B B 'do - under 2.5 meters height

ncluding burning and burrYing

rs directed

1 Sqm 3

r29 C .do - over 2.5 meters height

including burning and burrYinP

with an initital lead ol

CONVEVANCC

1 Sqm 3.50

130 4.a lemoving of natchu, goobi,

hooti etc., from drains,

:hannels including clearance ilnot more than l- metre dePth ol

water with an initial lead of Lt

metresand lift of 2 metres.

I Sqm 1.90

131 b.I Clearing alchi, tillaRemcval of Jammu

1 Sq.m 3.80

1 Sq.m 3.30L32 b.ii

20

Page 25: SSR 2014-2015

133 C.I Removal of imponea, cornea 1Sq.m 3.60134 c.ll Removal of water hvacintt

rpto 30 cm thick.1 Sqm 3.70

135 c.ur do - more than 30 cm thick 1, Sq.m 5.00r36 D Lemoval of natchu, goobi,

hooti etc., for every extra leadrr lift over the initial lead or

ifr.

1 Sqm L.40

B) DISMANTLING

5 DISMANTLING,CLEARING AWA1VIATERIALS USEFUL FOFREUSE.

L37 n.(i) Dry rough stone revetment folrprons and stacking within 4(:netres

l- cum 62.50

7 Drilling holes in hard granittrr sheet rock

a) Manuallv ( Hand)138 I 20 mm dia meter 1RM 124139 il 25 mm dia meter 1RM 131t40 llt 16 mm dia meter 1RM 151

L41 b) Pneumatic Compressor

r42 I 20 mm dia meter 1RM 140r43 II 25 mm dia meter 1RM r52t44 iii) 16 mm dia meter 1RM 165

I Grouting the holes with near

:ement slurry excluding cosr

rf steelL45 I 20 mm dia meter 1RM BB

I46 II Z5 mm dia meter 1RM 111

L47 nll J6 mm dia meter 1RM 138

White Washing and Painting,vorhs

T48 AI White washing and colourranding for guard and guidt;tones including cost ol

naterials

each 8.60

I49 BI icreeninq sand and gravel 1 cum 9.30

150 B2 jcreeninq chips and metal l- cum t_6

151 c1_ lemoving and refixingIectometre or Demarcatior;tones

each 11.50

2L

Page 26: SSR 2014-2015

ls ) ROAD WORK ITEMS

F

S

4

tN

Ir̂T

D

t\

rr

t-

F

F

Il

l

ICKTNG OLD METALLEDUTTFACE TO DEPTH OF

0 TO 100 mm SPREADING)LD METAL AND NEW4ETAL SECTTONINGNCLUDING EDGEBUNDS\ND SUBGRADETOLLING, SPREADINGITETAL INCLUDINGTLINDAGE OFGRAVELVATERING WITH ANNITIAL LEAD OF 2

IECTOMETERS ANDIAND ROLLER ( 1.5 TO 2

toNNES) ROLLING ETC.,NCLUDING}ARRICADING,)IVERSION OF TRAFFIC\ND WETTING THE NEW]ONSOLIDATION FOR AFORTNIGHT COMPLETEFor a compact thickness )

1(I) FIARD METAL

r52 A 10 mm thickness | 1"0 sqm 70

153 B ,O -* tttickness I t0 sqm 74

t54 C Z5 mm thickness 10 sqm 80.30

155 D 1"00 mm thickness 1-0 sqm 87

156 I (ii ) iFor compact thickness of sofl

metal)

L57 A i0 mm thickness L0 sqm 53.80

158 B Z5 mm thickness 1"0 sqm 63.90

159 C l-00 mm thickness 1-0 sqm 70.10

5 Ri.kittg old metalled surfac!to a depth of 40 to 100 mml

and spreading meta{

including watering with anl

initial lead of 2 Hectometersl

and rolling with Power rollersl

watering and sPreading

sravel for blindage and

[o*"t roller rolling including

firire charges of Power

Lotler( 8 to 1o T ) barricadingland diversion of raffic and

[wetting the new consolidation

hor u fortnight(for comPactedLL:-l'-o.o ^f )

FIARD METAL1-0 sqm 1_85

160 s (a) t0 mm thick ness

22

Page 27: SSR 2014-2015

i0 mm thick ness 10 sqm 2101_61_ (b)

1-0 gqm 231L62 (c) /5 mm thick ness

1-0 sqm 248.80163 (d) 00 mm thick ness

1-0 sqm 445.40L64 (e) l-50 mm thick excluding nue

:harges/J As per t&CA.t)

({V1.104 ofMaterial) otirer

tlran cover:ed

untlelr irri.g,aticln

r_65: .'*t"rtdfor: MORTF:I clata, loiivorks tif state & national lrigh

ways onlY)

llel Kg

each 1"3 As per I&CAII(M09a of

Material) other

than coverecl

under .i.n igal"ion

166 [,lectr:ic f)etr:natols( t" cl]:

N40RTI{ rJata, for rvorks of

$t.ate & national hi.git w;lvs

only)

Per Litre Rate as Perlocal

competitivequotations

A.s peL l&C,AD(M118 of

Material) otJrer

tlran covered

uncler irrigation

L67 F{ot aPPIied thermoPlasttc

compound(For MORTH data,

for works of state & national

high waYs onlY)

Per Kg 80.30168 teflectionising glass beacls ot z

nm thick(For MORTH data,

or works of state & national

righ ways onlY)196

169 R.oad marking Paint confirminl

:o IS L64(For MORTH data, fo

works of state & national higl

wavs onlY)

Per Kg

5s.30170 n ;Uout charges for laYing

!.i]+^*- -.'itl-' nnrrca 20OfPOAIP.

I cum

1 cum 30.70171 o -abour charges for iaYing rutet

wrLl- cum Deleted

As per I&CA I)

iM072 uf

Material) other

t.Jran cover:ecl

under in:igatiolt

L72 FIv Ash

173 3incling wire lKg /U.UU

\IEW ITEMS included rn tn(c^D 1n1l-1q,

Mtr 8.75t74 uLe_rjPs

r r --l: Mtr 11.00L75 Jg uurlLurrx JLTTPJ

Ltr 69.50t76 r^I

1- sqm 18.00177 lolv sheet 1-25 micronq

t78 Rural water rate 1kl 77.00

Yei-tfi-cniet (R&B) Admn., s.RFor

RSW & Buildings

Page 28: SSR 2014-2015

HIRE CHARGES OF PLANT AND

MACHINERY

24

Page 29: SSR 2014-2015

HIRE CHARGES OF PLANT& MACHNIERY FOR

ROAD & BRIDGE WORKS FOR THE YEAR 201.4.15.

sl.No.

Description UnitSoRate for

20t4-15

Remarks

Machine Activitv1 2 3 4 5 6

1 Dozer( D B0 ) Srreadins Per Hour 2575.60 As perI&CAD(S.No.B)

CuttineCleaning

2 Dozer(D50) SpreadingCuttingCleanins

Per hour 1570.00

3 Mortor Grader Clearine Per Hour 3216.00

Soreading

GSBWMM

HydraulicI:-,xr:avalor

Soil Ordinan' Per Hour 2848.50 As perI&CAD(S.No.52)

Soil h{ar:shv

Soilunsuitable

5 Front end loader SoiI loadine Per Hour 1646.00

Assreeate loading Per Hour6 Tipper- 5.5 Cum Transportation r:{

suil, G$B,WMM,Hot nrix etc

Fer l"h:ut: 922.00 As perI&CAD(S.No.5a)

7 Vibr"ator:v r:oller: B

tfinneIiart]r/Soil, GSB, Per l":l.orn: 2ri78.30 As per

I&CAD(S.No.62)

WMM

TJ Srnooth wireelerlraller B tonne

$r;ilcornpaction.BMcompac{ion

Per [-{our' 114{;.74 As perI&CAD(S.No.s0)

Ll Water tanker BI(ilnlitr e

Waier ti airsiport Per l{r:ur' 877.80 As perI&CAD(S.No.6a)

10 Water tanker 6

KilolitreWater transport 624.00

11 Tractor Pulling Per Hour 415.00

T2 Tractor withrotavator/Grader

Scarifying Per Hour 422.00

13 Tractor with ripperattachment

Scarifying Per Hour 422.00

t4 Air Compressor 5 General DurDose Per Hour 507.50 As oer

25

Page 30: SSR 2014-2015

sl.No.

Description UnitSoRate for

20t4-r5

Remarks

Machine Activitv1 2 3 4 J 6

cmm(electric) I&CAD(S.No.2)

15 Wet mix plant 60

TPHWet mix Per Hour 1646.00

16 Mechanical broomHvdraulic

Surface cleaning Per Hour 357.00

L7 Bitumen PressureDistributor

Applying bitumentack coat

Per Hour 1"498.00

1_B Emulsion PressureDistributor

Applyingemulsion tack coat

Per Hour 860.00

L9 Hot mix Plant -120 I'PH capacity

DBM/BM/SDC Per Hour 28175.00

/Premix20 Hot mix Plant -

100 TPH capacitY

DBM/BM/SDC Per Hour 24171.00

/Premix

21 Hot mix Plant - 60

TPH capacityDBM/BM/SDC Per Hour 21668.00

/Premix

22 Hot mix Plant - 40

to 60 TPHcapacity

DBM/BM/SDC Per Hour 191-20.00

/Premix

23 Paver FinisherHydrostatic withsensor control 100

TPH

DBM/BM/SDC Per Hour 3059.51

/Premix

24 Paver finisherMechanical 100

Paving of WMM,paving of DLC

Per Hour 2249.00

25 Hydraulic ChipSnrcader

Surface dressing Per Hour 2567.00

26 Tandem Roadroliei'

Rolling ofAsohaltic surface

Per Hour 1646.00

27 Pneumatic Roadroller

Rolling ofAsphaltic surface

Per Hour 1283.00

28 Pot-Hole repairmachine

Repair of pot-holes

Per Hour 845.00

29 Bitumen boiler oilfired

Bitumen SpraYing Per Hour 209.00

30 GSB Plant 50

Cum

Producing GSB Per Hour 11_43.00

31 Mastic Cooker Mastic wearingcoat

Per Hour 65.00

32 Batching andMixing Plant (a)

30 Cum capacity

Concrete mixing Per Hour 1231.90

(b) 15 - 20 Cumcapacity

Concrete mixing Per Hour 1041.60 As perI&CAD(S.No.10)

26

Page 31: SSR 2014-2015

sl.No.

DescriptionUnit

SoRate for20I4-15

Remarks

Machine ActivitvI 2 3 4 J 6

'Iransit n:.i..qer Transportation ufconcrete mix

Ptir Hclur 1i141 " 10 As perI&CAD(S.No.1)

34 Concrete pump ot45 and 30 cum

Pumping ofConcrete

Per Hour 803.00

35 Cranes(a) B0 tonnes Lifting purpose Per Hour rr7r.00ft) 35 tonnes 79t.00(c) 3 tonnes 352.00(d)Crane with grabbucket 0.75 cum

Well foundation Per Hour 2160.00

(e)Crane with grabbucket 1 cum

Well foundation Per Hour 3532.00

?fi Concrete bucket1.5{} cum

F'r:r: pouringq.:oncrete

Per ll:loun: I5.80 As perI&CAD(S.No.1a)

37 Kerb castingmachine

Kerb making Per Hour 311.00

JU

Ctlncrete mixerConcret* rrrixing, Per Huur 453.00

(a)t).28 r:um As perI&CAD(S.No.1B)

ft) l-.0 cum Concrete mixing Per Hour 649.0039 Piling rig with

bantonite pump0.75 m dia ro 1.20m dia boringattachment

Per Hour 5475.00

40 Concrete paverfinisher with 40HP motor

Paving of concretesurface

Per Hour 2900.00

4I Integrated stonecrusher

Crushing of spalls1OO TPH

Per Hour 8712.00

Crushing of spalls2OO TPH

Per Hour 18369.00

42 Pre stressing jackwith pump andACCCSS

Stressing of steel

wires/ stands

Per Hour 141.00

43 Generator250 KVA Generation of

electric energyner hour 1850.00

125 KVA oer hour 1_320.00

1OO KVA per hour 1126.00

27

Page 32: SSR 2014-2015

st.No.

DescriptionUnit

SoRate for2014-LS

Remarks

Machine Activitv1 2 3 4 5 6

30 KVA per hcrur 86i.70 As perI&CAD

(S.No.23)

44 Pneumatic sinkingof P1ants

Pneumatic sinkingof wells

Per K.m. 56.00

4tr.'t\.J li"uck 5.5 cunr per

-1.0 t.ol-rnes

fu1 ilt.er:i.i,ll trilnsiport Per Km. 889.40 As perI&CAD

(S.No.58)

46 Road markingMachine

Road marking Per Hour 111.00

47 Mobile slurry sealequiDment

Mixing and layingslurrv seal

Per Hour 1126.00

48 Plate compacter For compacting inmedians

Per Hour 48.00

49 Driiling equipnrent For drilling Per Hour 819"70 As perI&CAD

(S.No.22)

Note:The above hire harges of machinery & plant includes crewoils,conveyance ofmachinerv to site and qLIl other incidental charges.

eer-ln-Chief (R&B) Admn., S.R

RSW & Buildings

B

28

Page 33: SSR 2014-2015

CONVEYANCE CHARGES

Page 34: SSR 2014-2015

Notes: 1. No loading or unloading chaiges

Conveyance Charges of Material - Common SoR 2or4-tsA. (LEAD) CONVEYANCE CHARGES FOR MATERIALS BY HEAD LOAD

FOR THE YEAR: 2014-15

Sl No.Total distance

( Total lead includes initiallead )

Earth / Sand /Gravel/ Munum/ LimelSurki/ Size stone /Cut stone Rubble /Coarse aggregateRs/Cum

Cement /Reinforce-ment steelStr steelRs / tonne

PCC slab/Shahbad slab /CC block/ BSslablLate-rite IWood Rs /cum

I 2 3 4 5

I

Total lead up to 50 m(covered by item rate) initial lead initial lead initial lead

L Total lead up to 100 m 48.00 28.00 61.10J Total lead up to 150 m 96.10 s6.1 0 r22.30

l. No loading or unloadins charses are admissihle for c tnveyance by head load.2. For total lead exceeding 150 m conveyance charges by mechanical means only shall be

adopted irrssBesllte of mode of convevance.Note: The lead and lift charges are inclusive of L4o/o Contractor Profit and Over Head Charges

and as such the same may be deleted while calculating conveyance component.B.( LEAD) CONVEYANCE CHARGBS FOR MACHINERY PER.KTLC'iliB-TEiT.F-uR

TRANSPORTING MATERIALS BY TIPPERS AND TRUCKS EXCLUDING LOADING.UNLOADING AND IDLE HIRE CHARGES OF MACHINERY

FOR THE YEAR: 2014-15( No loading and unloading charges allowed for machinery loading and unloading )

Note: The lead an-d tift charges are inclusive of !4o/o contracton profit.and over Head chargesand as such the same may be aeleted *nir" ""r"ui.line Jonrr"yance component.

SINo. Distance

(Lead)charges fortrucks andtippers forEarth / SandlGravel IMurrum/Limel Surki/per cu.meter

(Lead) charges

for trucks andtippers forRubble/Sizestones/ CutStones/ Coarse

aggregate percu.meter

(Lead) charges fortrucks and tippersfor CemenV Steel/RCC polesl AC &GI sheets/ Packedmaterials/tonne

(Lead)charges fortrucks andtippers percu.meterfor PCCslabs/Shahabadslabs/ CC &Lateriteblocks/Wood/ cum

(Lead)chargesfortrucksand

tipperspercu.meterwaterl10

(Lead)charges fortrucksper 1000nos. ofbricks

I 2 3 4 3 6 7 8

I Lead up to I km 31.s0 30.40 19.00 44.70 18.80 i0.702 Lead up to 2 km 44.t0 42.60 26.60 62.60 26.30 1.003 Lead up to 3 km s8.90 s8.90 36.80 86.60 3s.00 )4.604 Lead up to 4 km 7t.50 7t.50 44.70 105.10 42.50 114.905 Lead up to 5 km 84.10 84.1 0 s2.60 r23.70 s0.00 r35.20

6

for Every kmbeyond 5 km up to30 km 12.60 12.60 7.90 18.50 7.50 20.30

7

for Every km beyond30 km 10.50 10.50 6.60 15.50 6.30 16.90

21

Page 35: SSR 2014-2015

Conveyance Charges of Material - Comrnon SoR 2or4-rs

C. LOADING AND UNLOADING CHARGES BY MANUAL MEANSidle hire charges of trucks are not added

Sl No. Description of item

Earth ISand/GravelMunum/ /Surki/

Rs / cum

Rubble/ sizestone/ cutstone/Coarseaggregate,Lime inRs/cum

cement inRs/tonne

steel inRs./tonne

brickworkRs/1000No

I 2 3 4 6 71 Loading 16.00 32.00 52.80 63.30 44.002 Unloading 8.00 16.00 s2.80 63.30 44.00

The lead and lift charges are.inclusive of 14o/o Contractor Profit and Over Head Chargesand as such the same may be deleted while calculating conveyance component.

D. LOADING AND UNLOADING CHARGBS BY MANUAL MEANS(including idle hire charges of trucks)

Sl No. Description of item

Earth ISand

/GravelMunum/ /

Surki/

Rs / cum

Rubble/ sizestone/ cut

stone/Coarse

aggregate,Lime inRs/cum

cement inRs/tonne

steel inRs./tonne

brickwork

Rs/1000No

I 2 3 4 J 6 7I Loading 108.20 t24.20 1s4.20 164.70 211.302 Unloading 38.60 62.r0 t54.20 164.70 211.30

Note: The lead & lift charges are inclusive of l4%o Contractor Profit and Over Head charges.

E.LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS(including idle hire charges of trucks)

Sl No. Description of item

Earth ISand/GravelMurrum/ /Surki/

Rs / cum

Rubble/ sizestone/ cutstone/Coarseaggregate,Lime inRs/cum

I 2 3 4I Loading 52.s0 10s.002 Unloadine 1s.90 15.90

Notel The lead and lift charges are inclusive of L4olo contractor profit and over Head charges andas such the same may be deteted while calculating "o;*r"yance

component

' gto

Page 36: SSR 2014-2015

ConveyanceCharges of Material - Common SoR zot4-Ls

F.LIFTCHARGESFORMATERIALSBYHEADLOAD

SI

No.

Total lift( Total lift includesinitial lift )

Earth / Sand

/GravelMunum/ Lime/SurkiiSize stone / CutstoneRubble / CoarseaggregateRs / cum

Cement /Reinforce-ment steel

Str steelRs / tonne

PCC slab/Shahbadslab / CCblock/ BSslab / Laterite/ WoodRs / cum

I ) 3 4

1

Total lift up to 3 m(covered by item rate) Initial lift Initial lift Initial lift

2

foinvery 1.00 Liftbeyond initial lift of 3

meters s.60 4.10 7.50

Note: The lead and lift charges are inclusive of t4o/o Contractor Profit and Over Head Charges

and as such the same may be deleted while calculating conveyance component.

eer-ln-Chief (R&B) Admn., S.R

RSW & Buildings

-. 3l