ssllddcc - sldccg.comsldccg.com/externaldata/2016/201607/20160721_501565... · kstps, korba east...

23
S S L L D D C C M M O O N N T T H H L L Y Y S S Y Y S S T T E E M M R R E E P P O O R R T T F F O O R R T T H H E E M M O O N N T T H H A A P P R R I I L L 2 2 0 0 1 1 6 6

Upload: truongdieu

Post on 31-Mar-2018

250 views

Category:

Documents


4 download

TRANSCRIPT

SSLLDDCC

MMOONNTTHHLLYY SSYYSSTTEEMM RREEPPOORRTT FFOORR

TTHHEE MMOONNTTHH AAPPRRIILL 22001166

1.1 Installed Capacity of SGS & Share from Central Sector

Installed Capacity

(MW)

State Sector Gen.

Stations (MW)

Central Sector Share

(MW)Total

April/16 2924.7 1125.92 4050.62

April/15 2418.7 1190.92 3609.62

% Increase 20.92% -5.46% 12.22%

1.2 Energy Requirement (Mus) & Transmission Loss (%)

EnergyUn-Restricted

Requirement (In MU)

Total Supply

(upto 132 KV)

(In MU)

Transmission

Loss %

April/16 2274.22 2263.62 2.99%

April/15 2079.85 2065.88 2.86%

% Increase 9.35% 9.57% 4.52%

1.3 Peak Demand (MW)

Demand

Max.Un-Restricted

Demand Met (In MW)

Max Demand Met

(In MW)

April/16 3935 3891

April/15 3939 3832

% Increase -0.10% 1.54%

1.4 Generation Capacity Outage

Capacity Outage SGS

Planned Outage MU

April/16 0.00

April/15 0.00

Forced Outage MU

April/16 53.26

April/15 91.71

1.5 Generation in Mus

1. SALIENT FEATURES OF CHHATTISGARH GRID FOR THE

MONTH OF APRIL-2016

41883 164.899492 470.346438 296.976 182.704 1114.92593 81.137732

0 0 0 0 0 0

42248 178.617218 446.2204 323.272 251.821 1199.930618 67.736474

164.899492

470.346438

296.976

182.704

1114.92593

81.137732

0 0

0

00 0

178.617218

446.2204323.272

251.821

1199.930618

67.736474

-150

50

250

450

650

850

1050

1250

1450

MU

s

KTPS HTPS DSPMTPS KWB Extn. MTPP#1Total

ThermalTotal Hydel

Gen.

Apr-15 192 528 341 253 0 1314 29

Apr-16 242 521 353 305 162 1584 21

Mar-16 233 561 365 317 11 1475 4

192

528

341

253

0

1314

29

242

521

353 305

162

1584

21

233

561

365 317

11

1475

40

200

400

600

800

1000

1200

1400

1600

MU

s

1.6 Demand Met in MW

Demand Met

Un Restricted Demand

1.7 Water Level of Major Reservoirs for last day of the month in Mtrs.

Demand Met Un Restricted Demand

Apr-15 3832 3939

Apr-16 3891 3935

Mar-16 3778 3887

3832

39393891 3935

37783887

3000

3100

3200

3300

3400

3500

3600

3700

3800

3900

4000

4100M

W

Hasdeo Bango Gangrel

Apr-15 355.96 340.22

Apr-16 346.67 340.84

Mar-16 348.26 342.47

355.96

340.22

346.67

340.84

348.26

342.47

330.00

335.00

340.00

345.00

350.00

355.00

360.00

Mtr

1

2

3

4

5

6

7

8

9

10

11 Total Interruption in following S/s occurred in APRIL-16.

S.No Date Name of the Sub StationTime of occurance

( hh:mm)

Restoration

Time (hh:mm)

1 21-Apr-16 220KV S/S RAIGARH 20:56 21:38

2 21-Apr-16 132KV S/S RAIGARH 20:56 21:57

3 21-Apr-16 132KV S/S SARANGARH 20:56 21:58

4 21-Apr-16 132KV S/S BARAMKELA 20:56 22:00

5 21-Apr-16 220KV S/S SARAIPALI 20:56 21:36

6 21-Apr-16 132KV S/S SANKARA 20:56 21:37

7 21-Apr-16 132KV S/S JHALAP 20:56 21:13

8 21-Apr-16 132KV S/S ADBHAR 20:56 21:55

9 21-Apr-16 132KV S/S CHAPLE 20:56 21:47

10 21-Apr-16 132KV S/S GHARGHODA 20:56 22:37

11 21-Apr-16 132KV S/S PATHHALGAON 20:56 21:15

12 30-Apr-16 132 KV S/S SARONA (RAIPUR) 03:24 03:33

131 number of planned shutdowns of transmission lines & elements in CSPTCL grid availed

in the month of APRIL-16.

18 number of force outages of CSPGCL units took place in the month of APRIL-16.

2. POWER SUPPLY POSITION & GRID PERFORMANCE DURING THE

MONTH OF APRIL-2016.

The maximum demand of Chhattisgarh met during APRIL-16 was 3891 MW on dated 16-04-

2016 , which is 1.54 % more than the APRIL-15 of 3832 MW.

The maximum unrestricted demand during the month was 3935 MW on 11-04-2016 and

minimum demand met was 2523 MW on 28-04-2016 .

The energy requirement for the APRIL-16 was 2274.22 MU which was 9.35 % more than

the requirement of 2079.85 MU in APRIL-15.

Backing down of generation for about 1.785 MU as per the requirement of the system.

Load Shedding was also excercised during the month of APRIL 2016 for 10.60 MU.

Based upon the blockwise frequency recorded in SCADA,Grid Frequency remained in the

IEGC Band of 49.9 to 50.05 Hz for 79.31 % of time during the month. It was above 50.05

Hz for 13.51 % of time and below 49.90 Hz for 7.19 % of time.

During the month there was no instance of Under Frequency Relay operation reported in

CSPTCL grid as the frequency did not touch 49.2 Hz at all.

117 number of force outages of transmission lines & elements in CSPTCL grid took place in

the month of APRIL-16.

3.1 Generating Units Commissioned during APRIL-2016.

S.No. Name of Project Unit No. Capacity (MW) Date of First Syn. C.O.D

3.2 Transmission Lines/Elements Commissioned during APRIL-2016.

S.No. Name of Project Voltage Level Length in Ckt KM No. of Ckt Date of Syn.

400 KV Lines

220 KV Lines

132 KV lines

NIL

NIL

NIL

NIL

ENERGY BALANCE STATEMENT: FY: 2016-17

S.No. PARTICULAR UNIT Apr-16

C.S.P.G.C.L GENERATION SCHEDULE & ACTUAL INJECTION (Ex-Bus)

KTPS, Korba East (sch.) MU 212.99

HTPS, Korba West (Sch.) MU 469.13

DSPM, Korba East (Sch.) MU 325.07

Korba West (Extn) (Sch.) MU 289.98

MTPP Tendubhata MU 159.98

C.S.P.G.C.L Gen. SCHEDULE MU 1297.17

KSTPS, Korba East (inj) MU 214.37

HTPS, Korba West (Inj) MU 472.02

DSPM, Korba East (Inj) MU 326.29

Korba West (Extn) (Inj) MU 290.02

MTPS Janjgir-Champa Unit #1

(FIRM) COD 31.03.2016MU 144.35

HASDEO BANGO HYDEL (Inj) MU 19.09

C.S.P.G.C.L Gen. JMR data (132

KV & above)U MU 1466.14

SHP-Gangrel (Inj) MU 1.81

SHP-Sikasar (Inj) MU 0.33

SHP-HTPS Korba West (Mini-

Micro) (Inj)MU 0.82

CO-GEN Kawardha plant (inj) MU 0.58

C.S.P.G.C.L Gen. JMR data (33

KV & Below)MU 3.54

Schedule Energy, Actual Energy Injection & OD(+)/UD(-)

2 CPP/IPP/BIOMASS SCHEDULE & ACTUAL INJECTION

INTER REGIONAL POWER PURCHASE / IMPORT [EX-CG] (SCHEDULED)

Bilateral/Banking via STOA &

MTOA (Sch)CSEB STOA MU 295.57

MTOA MU 15.82

PX (Sch)(Collective) CSEB+OAC MU 18.31

2(B)

INTRA REGIONAL POWER

PURCHASE/IMPORT [EX-CG]

(SCHEDULED) via PPA (upto 33

KV)

CSEB MU 0.000

INTER REGIONAL POWER SALE/EXPORT [EX-CG] (SCHEDULED)

STOA MU 0.00

MTOA MU -212.95

Total -212.95

STOA MU 0.00MTOA MU 0.00

Total 0.00PX (Sch) CSEB+OAC MU -56.07

CSEB

OAC

1

2(A)

2'(C) BILATERAL POWER

SALE/EXPORT [EX-CG]

(SCHEDULED) via MTOA & STOA

ENERGY BALANCE STATEMENT: FY: 2016-17

S.No. PARTICULAR UNIT Apr-16

2(D)TOTAL CPP/IPP/Biomass

INJECTION 132 KV & ABOVEV MU 101.84

2(E)

TOTAL

CPP/IPP/Biomass/RENEWABLE

SOURCE INJECTION 33 KV &

Below

MU 0.00

3 CENTRAL SECTOR GENERATION SCHEDULE & ACTUAL INJECTION

3(A) SAIL (BSP) NSPCL SCHEDULE

(Ex-CG)MU 134.39

3(B)CEN. SECTOR SCHEDULED

ENERGY (EX-ISGS) MU 695.92

3'(C)CEN. SECTOR SCHEDULED

ENERGY (EX-CG) MU 668.57

3(D)Drawal/Injection from CTU Grid at

CG Periphery (EXCL. BSP)W MU 695.63

4

SCHEDULE POWER INCLUDING

BI-LAT. EXCHANGE (Ex-CG

periphery) as per WRPC Weekly UI

Accounts

B MU 867.85

5

NET DRAWL FROM CENTRAL

SECTOR INCL BI-LATERALS as

per WRPC Weekly UI Account

C MU 867.78

6 OD/UD ( + / - ) D=C-B MU -0.07

6(A) Total Overdrawal (+) E 45.55

6(B) Total Underdrawal (-) -45.63

6(C) DSM Rate for UD Rs/Kwh 1.39

6(D) DSM Rate for OD Rs/Kwh 2.70

6(E) NET DSM Rate Rs. 837.43

7CG SUPPLY (EXCL.AUX.CONS)

At 132 KV & ABOVE X=U+V+W MU 2263.62

8CG CONSUMPTION AT 33KV

XMER SIDE + EHV SalesY MU 2195.86

9 Z=X-Y MU 67.75

% 2.99%

10 LOAD SHEDDING MU 10.60

11 Requirement MU 2274.22

TRANSMISSION LOSS OF CG

SYSTEM

5. DEMAND PARTICULARS FOR THE MONTH OF APRIL-2016

Demand MW Date Time Frequency

Demand Met (MW) 3891 16-Apr-16 22:00 50.09

Un restricted Demand (MW) 3935 11-Apr-16 22:00 50.06

Minimum Demand 2523 28-Apr-14 4:00 50.00

Break-Up of Generation / Injection at the time of monthly Peak Demand

16/04/2016 (22:00 hrs)

MW %

CSPGCL Thermal 2044 53%

CSPGCL Hydel 122 3%

CPP/IPP's (STOA+PPA) Injection 81 2%

Other Injection 105 3%

CS Share including BSP share in

NSPCL 1250 32%

Net Import / Export 204 5%

OD(+) / UD(-) 85 2%

Demand Met (MW) 3891

2,044

122 81 105

1,250

20485

0

500

1000

1500

2000

2500

CSPGCL Thermal CSPGCL Hydel CPP/IPP's (STOA+PPA)

Injection

Other Injection CS Share including BSP share in

NSPCL

Net Import / Export OD(+) / UD(-)

Max. Demand Met (3891 MW)

on 16.04.16 at 22:00 Hrs.

Contribution

MW

Apr-16Prog. From

01.04.2016Apr-16

Prog. From

01.04.2016

1 50 48.00 28.31 28.31 78.63 78.63

2 50 43.00 19.27 19.27 53.54 53.54

3 50 46.00 29.98 29.98 83.28 83.28

4 50 47.00 30.23 30.23 83.97 83.97

5 120 107.00 66.02 66.02 76.42 76.42

6 120 102.00 68.26 68.26 79.01 79.01

STN. 440 385.00 242.07 242.07 76.41 76.41

1 250 507.00 175.54 175.54 97.52 97.52

2 250 255.00 177.73 177.73 98.74 98.74

STN. 500 506.00 353.274 353.27 98.131667 98.13

1 210 212.00 141.83 141.83 93.80 93.80

2 210 212.00 135.23 135.23 89.44 89.44

3 210 42795.00 42522.00 42522.00 42887.00 100.07

4 210 200.00 122.84 122.84 81.24 81.24

STN. 840 794.00 521.25 521.25 86.19 86.19

4 KWB Extn.1 1 500 473.00 304.94 304.942 84.706111 84.71

1 500 457 162.313 162.313 45.086944 45.09

2 500 - - - - -

6 2780 1421.54 1421.54 79.13 71.02

1 40 -- 8.08 8.08

2 40 -- 6.97 6.97

3 40 -- 4.14 4.14

STN. -- 19.19 19.19

1 2.5 -- 0.35 0.35

2 2.5 -- 0.54 0.54

3 2.5 -- 0.43 0.43

4 2.5 -- 0.51 0.51

STN. -- 1.83 1.83

1 3.5 -- 0.00 0.00

2 3.5 -- 0.34 0.34

STN. -- 0.34 0.34

1 850 KW -- 0.43 0.435

2 850 KW -- 0.41 0.408

STN. -- 0.842449 0.842

Max.

Demand

(MW)

4

Marwa TPS5

Gangrel

Sikasar

KWB

Mini Micro

TOTAL THERMAL

HYDEL

2

3

6. ENERGY GENERATED, PLF & MAX. DEMAND OF GENERATING

STATIONS/UNITS FOR THE MONTH OF APRIL-2016

Hasdeo Bango1

Hasdeo Thermal

Power Station3

Korba Thermal

Power Station,

Korba East

Dr Shyama

Prasad

Mukherjee TPS

2

Power Station Unit

No.

THERMAL

1

Energy generation (MU) PLF (%)

S.No.

Installed

Capacity

(MW)

Date Max Min Average

01-Apr-16 50.09 49.81 49.98 7.29 87.50 5.21

02-Apr-16 50.12 49.71 49.99 10.42 72.92 16.67

03-Apr-16 50.15 49.90 50.03 0.00 68.75 31.25

04-Apr-16 50.08 49.76 49.96 14.58 84.38 1.04

05-Apr-16 50.11 49.91 50.01 0.00 87.50 12.50

06-Apr-16 50.09 49.75 50.00 8.33 79.17 12.50

07-Apr-16 50.07 49.86 49.98 5.21 92.71 2.08

08-Apr-16 50.09 49.86 50.00 2.08 95.83 2.08

09-Apr-16 50.08 49.67 50.00 3.13 92.71 4.17

10-Apr-16 50.12 49.83 50.00 6.25 78.13 15.63

11-Apr-16 50.17 49.76 49.98 12.50 73.96 13.54

12-Apr-16 50.10 49.86 50.01 2.08 83.33 14.58

13-Apr-16 50.13 49.82 50.01 1.04 89.58 9.38

14-Apr-16 50.08 49.83 49.97 11.46 85.42 3.13

15-Apr-16 50.08 49.85 49.98 12.50 84.38 3.13

16-Apr-16 50.16 49.83 50.00 10.42 64.58 25.00

17-Apr-16 50.11 49.91 50.02 0.00 85.42 14.58

18-Apr-16 50.17 49.88 50.03 1.04 64.58 34.38

19-Apr-16 50.16 49.77 50.00 4.17 72.92 22.92

20-Apr-16 50.06 49.79 49.98 5.21 92.71 2.08

21-Apr-16 50.18 49.88 50.01 1.04 84.38 14.58

22-Apr-16 50.14 49.91 50.02 0.00 75.00 25.00

23-Apr-16 50.16 49.77 50.01 4.17 69.79 26.04

24-Apr-16 50.17 49.83 50.00 5.21 73.96 20.83

25-Apr-16 50.04 49.78 49.96 14.58 85.42 0.00

26-Apr-16 50.16 49.72 49.93 31.25 61.46 7.29

27-Apr-16 50.20 49.76 49.96 29.17 53.13 17.71

28-Apr-16 50.11 49.79 49.99 8.33 85.42 6.25

29-Apr-16 50.12 49.87 50.01 1.04 88.54 10.42

30-Apr-16 50.17 49.76 50.02 3.13 65.63 31.25

Monthly 50.20 49.67 49.99 7.19 79.31 13.51

% of Time

Freq.was >50.05

Hz

7. FREQUENCY PROFILE DURING APR-2016

(As per block wise frequency recorded in SLDC Raipur)

FREQUENCY (Hz)% of Time

Freq.was <49.9

Hz

% of Time

Freq.was

between 49.9

to 50.05 Hz

GENER

ATOR UNIT #

INSTALLED

CAPACITY (IN

MW)

OUTAGE DATE &

TIME SYN. DATE & TIME

OUTAGE

(HH:MM) LOSS(IN MU) REASON

1 50 NIL NIL NIL NIL NIL

2 50 NIL NIL NILNIL NIL

3 50 NIL NIL NILNIL NIL

4 50 NIL NIL NIL NIL NIL

5 120 NIL NIL NIL NIL NIL

6 120 NIL NIL NIL NIL NIL

1 210NIL NIL NIL NIL NIL

2 210NIL NIL NIL NIL NIL

3 210 NIL NIL NIL NIL NIL

4 210 NIL NIL NIL NIL NIL

5 500NIL NIL

NILNIL NIL

DSPM 1 250 NIL NIL NIL NIL NIL

2 250NIL NIL

NILNIL NIL

Total 0.000

8.1 PLANNED OUTAGES OF GENERATORS FOR THE MONTH OF APRIL-2016

KTPS

HTPS

StationUnit

No.

INSTALLED

CAPACITY (IN

MW)

NO.OF

TRIPPINGS

OUTAGE DATE &

TIMESYN. DATE & TIME OUTAGE (HH:MM)

GENERATION

LOSS(IN MU)REASON

1 50 04/04/16 18:29 04/04/16 20:15 1:46:00 0.088 DUE TO HEAVY SYSTEM JERK

1 50 05/04/16 08:55 08/04/16 04:04 67:09:00 3.357 DUE TO TUBE LKG. IN SCREEN S/H RHS

2 50 01/04/16 01:31 04/04/16 06:08 76:37:00 3.831DUE TO TUBE LEAKAGE IN ECO-1st. STAGE

RHS

2 50 11/04/16 00:02 13/04/16 16:48 64:46:00 3.238 DUE TO TUBE LEAKAGE IN ECO

2 50 25/04/16 17:11 27/04/16 18:05 48:54:00 2.445 DUE TO OUTAGE OF MF 2A

2 50 30/04/16 09:47 01/05/16 00:00 14:13:00 0.711

DUE TO TUBE LEAKAGE IN ECO-I STAGE

RHS

3 50 0 NIL NIL NIL NIL NIL

4 50 14/04/16 21:55 14/04/16 22:48 0:53:00 0.044DUE TO FURNACE PRESSURE VACCUM

HIGH

4 50 30/04/16 08:28 01/05/16 00:00 15:32:00 0.777 DUE TO OUTAGE OF MILL FAN 4B

5 120 04/04/16 16:39 04/04/16 23:10 6:31:00 0.782 DUE TO SYSTEM JARK

5 120 23/04/16 16:30 25/04/16 10:50 42:20:00 5.080DUE TO TUBE LEAKAGE IN PENDENT

REHEAT

6 120 0 NIL NIL NIL NIL NIL

1 210 1 21/04/16 10:30 22/04/16 05:42 19:12:00 4.032LTSH Tube Leakage

2 210 18/04/16 09:41 18/04/16 12:03 2:22:00 0.497 Flame failure

2 210 22/04/16 11:55 23/04/16 10:40 22:45:00 4.777 Re-Heater Tube Leakage

2 210 30/04/16 07:40 01/05/16 00:00 16:20:00 3.430 Water Wall Tube Leakage

3 210 1 27/04/16 00:40 28/04/16 05:00 28:20:00 5.950 Condenser tube leakage

4 210 09/04/16 21:45 10/04/16 23:54 26:09:00 5.492 Economizer Tube Leakage

4 210 16/04/16 09:32 17/04/16 06:31 20:59:00 4.406 S/H Tube Leakage

4 210 29/04/16 19:43 30/04/16 16:17 20:34:00 4.319 S/H Tube Leakage

5 500 0 NIL NIL NIL NIL NIL

1 250 0 NIL NIL NIL NIL NIL

2 250 0 NIL NIL NIL NIL NIL

Total 18 495:22:00 53.257

8.2 FORCED OUTAGES OF STATE GENERATING STATIONS FOR THE MONTH OF APRIL-2016

2

DSPM

4

2

3

3

KTPS

HTPS

2

9.1 FORCED OUTAGES OF TRANSMISSION LINES FOR THE MONTH OF APRIL-2016

S.No. Date Name of Trnsmission element Tripping From ToOutage Hours

(hh:mm)

1 1-Apr-16 220 KV DSPM - SUHELA CKT 04:15 04:43 0:28:00

2 1-Apr-16 220 KV DSPM - SUHELA CKT 05:15 17:35 12:20:00

3 1-Apr-16 132 KV BAIKUNTHPUR - BISHRAMPUR CKT 13:07 13:22 0:15:00

4 1-Apr-16 132 KV JAMNIPALI - BANGO CKT 13:04 13:15 0:11:00

5 1-Apr-16 132 KV BANGO - BISHRAMPUR CKT 13:05 13:30 0:25:00

6 2-Apr-16 160 MVA X-MER AT 220 KV S/S BHILAI 22/07/2014 13:35 02/04/2016 13:40 14880:05:00

7 2-Apr-16 132 KV URLA - BIRGAON CKT 15:05 15:32 0:27:00

8 3-Apr-16 132 KV RAIGARH - BARAMKELA CKT 03:55 04:15 0:20:00

9 3-Apr-16 132 KV GURUR - BALOD CKT 05:40 05:51 0:11:00

10 3-Apr-16 132 KV BALOD DALLI RAJHARA CKT 05:40 05:53 0:13:00

11 3-Apr-16 400 KV BHILAI - NTPC KORBA CKT NO. I 13:29 14:50 1:21:00

12 4-Apr-16 132KV BANGO - BISHRAMPUR - CKT. 16:22 17:11 0:49:00

13 4-Apr-16 220KV CHHURI - KORBA(W) CKT. NO. I 16:40 17:00 0:20:00

14 4-Apr-16 220KV CHHURI - KORBA(W) CKT. NO. II 16:40 17:20 0:40:00

15 4-Apr-16 220KV KORBA(W) - KORBA(E) CKT. NO. II 17:11 20:00 2:49:00

16 4-Apr-16 132KV KORBA(E) - RANKI CKT. 16:15 16:35 0:20:00

17 4-Apr-16 220KV KORBA(W) - DSPM CKT. 18:45 19:07 0:22:00

18 4-Apr-16 132KV SARANGARH - RAIGARH CKT. 18:40 18:47 0:07:00

19 4-Apr-16 220KV DSPM - BANARI CKT. 20:07 20:27 0:20:00

20 4-Apr-16 132KV KORBA - CHAMPA CKT. NO.1&2 19:54 20:23 0:29:00

21 4-Apr-16 220KV RAIGARH - GIRWANI CKT. 20:45 21:16 0:31:00

22 4-Apr-16 132KV KORBA - CHAMPA CKT. NO.1&2 21:20 21:42 0:22:00

23 4-Apr-16 220KV SARAIPALI - RAIGARH CKT. NO. II 04/04/2016 23:27 05/04/2016 0:09 0:42:00

24 5-Apr-16 132KV RAIGARH - SARANGARH CKT. I 00:35 00:55 0:20:00

25 5-Apr-16 220KV GURUR - RAITA CKT. 01:46 02:12 0:26:00

26 5-Apr-16 132KV GURUR - DHAMTARI CKT. NO. I& II 01:46 01:51 0:05:00

27 5-Apr-16 132KV GURUR - KURUD CKT. 01:46 01:51 0:05:00

28 5-Apr-16 220KV GURUR - RAITA CKT. 03:21 03:53 0:32:00

29 5-Apr-16 132KV GURUR - DHAMTARI CKT. NO. I& II 03:21 03:24 0:03:00

30 5-Apr-16 132KV GURUR - KURUD CKT. 03:21 03:24 0:03:00

31 5-Apr-16 400KV BHILAI - NTPC CKT. NO. I 18:46 20:36 1:50:00

32 5-Apr-16 132KV KORBA(E) - RANKI CKT. 18:55 19:05 0:10:00

33 6-Apr-16 132 KV SARANGARH - RAIGARH CKT 01:08 01:29 0:21:00

34 7-Apr-16 220 KV CHHURI - BISHRAMPUR CKT 17:45 18:05 0:20:00

35 7-Apr-16 132 KV AMBIKAPUR - BISHRAMPUR CKT No.II 19:35 19:55 0:20:00

9.1 FORCED OUTAGES OF TRANSMISSION LINES FOR THE MONTH OF APRIL-2016

S.No. Date Name of Trnsmission element Tripping From ToOutage Hours

(hh:mm)

36 8-Apr-16 132 KV RAIGARH - SARANGARH CKT No.II 04:01 04:03 0:02:00

37 8-Apr-16 132 KV RAIGARH - SARANGARH CKT No.II 05:44 05:59 0:15:00

38 8-Apr-16 132 KV RAIGARH - SARANGARH CKT No.II 06:05 16:50 10:45:00

39 8-Apr-16 40 MVA XMER NO. I AT 132 KV S/S RAIGARH 06:15 10:40 4:25:00

40 8-Apr-16 40 MVA XMER NO. II AT 132 KV S/S ADBHAR 13:40 18:34 4:54:00

41 8-Apr-16 63 MVA X-MER AT 132 KV S/S SECTOR - C 08:53 15:50 6:57:00

42 8-Apr-16 132 KV KOTMIKALA - MANENDRAGARH CKT NO. II 19:20 19:29 0:09:00

43 8-Apr-16 220 KV KOTMIKALA - ANUPPUR CKT NO. II 19:18 D.FAULTY --

44 8-Apr-16 132 KV KOTMIKALA - MANENDRAGARH CKT NO. II 19:55 20:09 0:14:00

45 8-Apr-16 220 KV KOTMIKALA RLY TRACTION NO. II 21:22 21:40 0:18:00

46 8-Apr-16 132 KV KOTMIKALA - MANENDRAGARH CKT NO. II 21:25 21:35 0:10:00

47 9-Apr-16 132 KV RAIGARH - SARANGARH CKT NO. II 09/04/2016 6:56 18/04/2016 16:35 225:39:00

48 9-Apr-16 220 KV KOTMIKALA - ANUPPUR CKT NO. II 08/04/2016 19:18 09/04/2016 9:15 13:57:00

49 9-Apr-16 400 KV MAIN BUS NO. I AT 400 KV S/S KHEDAMARA 09:59 11:52 1:53:00

50 9-Apr-16 MAIN BREAKER OF 400 KV NTPC - KHEDAMARA CKT NO. II 09:59 20:04 10:05:00

51 9-Apr-16 400 KV ICT NO. I AT 400 KV S/S KHEDAMARA 09:59 11:54 1:55:00

52 9-Apr-16 400 KV KHEDAMARA - SEONI CKT 16:39 17:24 0:45:00

53 10-Apr-16 220 KV GURUR - BARSOOR CKT NO. II 12:58 13:08 0:10:00

54 10-Apr-16 132 KV SIMGA - PATHARIYA CKT 16:36 16:54 0:18:00

55 12-Apr-16 132KV GHARGHORA - PATTALGAON CKT. 00:05 01:00 0:55:00

56 12-Apr-16 132KV GHARGHORA - PATTALGAON CKT. 03:45 04:05 0:20:00

57 12-Apr-16 132KV GHARGHORA - PATTALGAON CKT. 04:10 05:25 1:15:00

58 13-Apr-16 400KV BHILAI - SEONI LINE 13:36 14:17 0:41:00

59 14-Apr-16 132 KV THELKADIH - DHAMDHA CKT 08:25 13:16 4:51:00

60 15-Apr-16 132 KV SIMGA - CHAKARBHATA CKT 16:35 16:44 0:09:00

61 17-Apr-16 220 KV BHILAI - GURUR CKT 19:33 19:43 0:10:00

62 17-Apr-16 132 KV AKALTARA RLY TRACTION NO. II 20:10 20:15 0:05:00

63 17-Apr-16 132 KV KORBA - CHAMPA CKT NO. I & II 21:12 21:56 0:44:00

64 17-Apr-16 220 CHHURI - MOPKA CKT 22:08 22:25 0:17:00

65 17-Apr-16 132 KV CHAMPA - JAIJAIPUR CKT 22:02 D. FAULTY --

66 18-Apr-16 132KV RAIGARH - SARANGARH CKT. NO. II 09/04/2016 6:56 18/04/2016 16:35 225:39:00

67 18-Apr-16 132KV CHAMPA - JAIJAIPUR CKT. 17/04/2016 22:02 18/04/2016 11:10 13:08:00

68 18-Apr-16 132KV REKI - AT 132KV S/S KORBA 08:50 08:56 0:06:00

69 18-Apr-16 132KV SWASTIK - AT 132KV S/S KORBA 08:50 09:02 0:12:00

70 18-Apr-16 132KV DONGARGARH - BALAGHAT CKT. 21:04 21:31 0:27:00

9.1 FORCED OUTAGES OF TRANSMISSION LINES FOR THE MONTH OF APRIL-2016

S.No. Date Name of Trnsmission element Tripping From ToOutage Hours

(hh:mm)

71 20-Apr-16 132KV SUHELA - BALODA BAZAR CKT. NO. II 11:32 17:32 6:00:00

72 20-Apr-16 132KV SIMGA - CHAKARBHATA CKT. 13:29 13:43 0:14:00

73 20-Apr-16 132KV BISHRAMPUR - BAIKUNTHPUR CKT. 17:26 17:46 0:20:00

74 21-Apr-16 132KV SUHELA - BALODA BAZAR CKT. NO. I 11:12 11:23 0:11:00

75 21-Apr-16 132KV SUHELA - BALODA BAZAR CKT. NO. II 11:12 FAULTY --

76 21-Apr-16 220KV RAIGARH(CSPTCL) - RAIGARH(PGCIL) CKT.NO. I 20:56 22:10 1:14:00

77 21-Apr-16 220KV RAIGARH(CSPTCL) - RAIGARH(PGCIL) CKT.NO. II 21/04/2016 20:56 22/04/2016 1:45 4:49:00

78 21-Apr-16 220KV KORBA(E) - RAIGARH CKT. 20:56 21:38 0:42:00

79 21-Apr-16 220KV RAIGARH - BUDHIPADAR CKT. 21/04/2016 20:56 22/04/2016 2:27 5:31:00

80 22-Apr-16 220 KV CHHURI - KOTMIKALA CKT No.II 07:43 07:55 0:12:00

81 22-Apr-16 132 KV KOTMIKALA - MANENDRAGARH CKT No.II 07:43 08:12 0:29:00

82 22-Apr-16 220 KV RAIGARH - BUDHIPADHAR CKT 12:21 13:32 1:11:00

83 23-Apr-16 132 KV SARANGARH - SARAIPALI CKT No.I 17:20 17:35 0:15:00

84 23-Apr-16 132 KV SIMGA - CHAKARBHATA CKT 18:58 19:09 0:11:00

85 24-Apr-16 132 KV AKALTARA RLY TRACTION NO. I 18:50 19:05 0:15:00

86 24-Apr-16 132 KV AKALTARA RLY TRACTION NO. II 18:50 D.FAULTY --

87 26-Apr-16 220 KV KEB - BUDHIPADAR CKT NO. II 12:47 13:26 0:39:00

88 26-Apr-16 400 KV KWB - NTPC CKT 16:32 18:34 2:02:00

89 26-Apr-16 220 KV RAITA - GURUR CKT 17:05 17:28 0:23:00

90 26-Apr-16 132 KV BALOD - DALLI RAJHARA CKT 17:45 17:55 0:10:00

91 26-Apr-16 132 KV KUHERA - MANDIR HASAUD 26/04/2016 22:40 27/04/2016 8:01 9:21:00

92 27-Apr-16 220 KV RAIGARH - JSPL CKT NO. I AND II 09:45 13:04 3:19:00

93 28-Apr-16 220KV RAITA - GURUR CKT. 01:24 01:46 0:22:00

94 28-Apr-16 220KV KHEDAMARA - BEMETARA CKT. 02:06 02:38 0:32:00

95 28-Apr-16 220KV RAITA - GURUR CKT. 02:14 03:27 1:13:00

96 28-Apr-16 220KV RAITA - URLA CKT. 02:13 03:26 1:13:00

97 28-Apr-16 132KV SUHELA - GRASIM CKT. 02:17 04:03 1:46:00

98 28-Apr-16 132KV SUHELA - BALODA-BAZAR CKT. 02:38 03:03 0:25:00

99 28-Apr-16 132KV AKALTARA - KVK ENERGY CKT. 03:12 03:20 0:08:00

100 28-Apr-16 132KV SIMGA - CENTURY CKT. 02:17 16:16 13:59:00

101 28-Apr-16 132KV SIMGA - BHILAI CKT. 02:05 02:47 0:42:00

102 28-Apr-16 40MVA Xmer NO. II AT 132KV S/S SARAIPALI 05:20 05:50 0:30:00

103 28-Apr-16 132KV KUHERA - MANDIR-HASAUD CKT. 02:53 15:54 13:01:00

104 28-Apr-16 132KV KEB - CHAMPA CKT. NO. II 19:20 19:44 0:24:00

105 29-Apr-16 132KV GURUR - BHANUPRATAPPUR CKT. 06:07 6:12 0:05:00

9.1 FORCED OUTAGES OF TRANSMISSION LINES FOR THE MONTH OF APRIL-2016

S.No. Date Name of Trnsmission element Tripping From ToOutage Hours

(hh:mm)

106 30-Apr-16 400 KV MADWA- KHEDAMARA CKT. 00:10 20:45 20:35:00

107 30-Apr-16 132 KV DHAMDHA -AJURE POWER CKT. 01:39 05:30 3:51:00

108 30-Apr-16 400 KV NTPC KORBA- KHEDAMARA CKT.-II 02:53 03:22 0:29:00

109 30-Apr-16 400 KV RAITA- KHEDAMARA CKT.-I 02:53 03:38 0:45:00

110 30-Apr-16 132K BHILAI-SECTOR-C, URLA CKT. 03:24 11:32 8:08:00

111 30-Apr-16 132K BHILAI-RAIPUR CKT. 03:24 03:35 0:11:00

112 30-Apr-16 132K URLA-SECTOR-C, URLA CKT. 03:24 03:40 0:16:00

113 30-Apr-16 220 KV RAITA-GURUR 03:29 04:09 0:40:00

114 30-Apr-16 400 KV MADWA- RAITA CKT.-II 04:31 04:48 0:17:00

115 30-Apr-16 400/220KV, 315 MVA ICT AT 400 KV S/S MADWA P.H. 04:31 04:52 0:21:00

116 30-Apr-16 220 KV CHHURI-BISHRAMPUR CKT. 16:09 16:54 0:45:00

117 30-Apr-16 220 KV SUHELA-PARASWANI CKT.-I 21:11 22:10 0:59:00

9.2 PLANNED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF APRIL-2016

S.No. Date Name of the Transmission Elements FROM TOOutage Hours

(hh:mm)

1 1-Apr-16 220 KV KOTMIKALA - ANUPPUR CKT NO. I 08:16 18:43 10:27:00

2 1-Apr-16 220 KV KOTMIKALA - ANUPPUR CKT NO. II 08:35 18:45 10:10:00

4 1-Apr-16 40 MVA X-MER NO. I AT 132 KV S/S BILASPUR 08:50 17:35 8:45:00

5 1-Apr-16 220 KV KWB - CHHURI CKT NO. I 09:15 17:43 8:28:00

6 1-Apr-16 40 MVA X-MER NO. I AT 132 KV S/S MUNGELI 09:05 15:12 6:07:00

7 1-Apr-16 400 KV TIE BKR OF BHATAPARA - BHADRAWATI LINE 11:31 19:29 7:58:00

8 1-Apr-16 160 MVA X-MER AT 220 KV S/S SUHELA 10:35 17:07 6:32:00

10 2-Apr-16 220 KV KOTMIKALA - CHHURI CKT NO. II 07:17 11:28 4:11:00

11 2-Apr-16 40 MVA X-MER NO. II AT 132 KV S/S BILASPUR 09:10 13:18 4:08:00

12 2-Apr-16 160 MVA X-MER NO. I AT 220 KV S/S DOMA 09:20 17:00 7:40:00

13 2-Apr-16 220 KV KHEDAMARA - URLA CKT 10:29 14:19 3:50:00

15 2-Apr-16 220 KV KOTMIKALA - CHHURI CKT NO. I 11:34 15:40 4:06:00

16 4-Apr-16 160MVA Xmer NO. II AT 220KV S/S MOPKA 06:20 11:18 4:58:00

17 4-Apr-16 40MVA Xmer NO.III AT132KV S/S BILASPUR 08:50 14:15 5:25:00

18 4-Apr-16 220KV KWB - DSPM CKT. 11:04 15:13 4:09:00

20 4-Apr-16 400KV RAITA - MARWA CKT.NO. I 11:27 16:37 5:10:00

21 4-Apr-16 132KV RAIGARH - SARANGARH CKT. 11:52 15:58 4:06:00

22 5-Apr-16 132KV URLA - KACHNA CKT. NO. I 06:05 10:07 4:02:00

23 5-Apr-16 132/33KV 40MVA Xmer NO. I AT 220KV S/S MOPKA 06:15 11:24 5:09:00

24 5-Apr-16 132KV KOTMIKALA - MANENDRAGARH CKT. NO. I 07:03 9:21 2:18:00

26 5-Apr-16 132KV KOTMIKALA - MANENDRAGARH CKT. NO. II 09:24 11:11 1:47:00

27 5-Apr-16 40MVA Xmer AT 132KV S/S PATHARIYA 09:30 12:55 3:25:00

28 5-Apr-16 220KV BUS - 1P AT KORBA(E) 09:15 17:30 8:15:00

29 5-Apr-16 160MVA Xmer NO. I AT 220KV S/S RAIGARH 12:14 18:15 6:01:00

31 5-Apr-16 160MVA Xmer 220/132KV AT 220KV S/S GURUR 16:31 18:23 1:52:00

32 6-Apr-16 40 MVA XMER No.II AT 132 KV S/S MOPKA 06:14 12:55 6:41:00

33 6-Apr-16 160 MVA XMER No.I AT 220 KV S/S SILTARA 07:35 08:34 0:59:00

34 6-Apr-16 160 MVA XMER No.II AT 220 KV S/S SILTARA 08:38 09:05 0:27:00

35 6-Apr-16 40 MVA XMER No.IV AT 132 KV S/S BILASPUR 08:47 12:30 3:43:00

37 6-Apr-16 220 KKV CHHURI - BISHRAMPUR CKT No.I 10:04 17:01 6:57:00

38 6-Apr-16 220 KV CHHURI - MOPKA CKT No.I 10:39 17:15 6:36:00

39 6-Apr-16 220 KV RAIGARH - SARAIPALI CKT No.I 10:38 17:44 7:06:00

40 6-Apr-16 220 KV RAIGARH - SARAIPALI CKT No.II 10:38 17:44 7:06:00

9.2 PLANNED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF APRIL-2016

S.No. Date Name of the Transmission Elements FROM TOOutage Hours

(hh:mm)

42 6-Apr-16 132 KV BANGO - CHHURI CKT 10:52 17:20 6:28:00

43 6-Apr-16 160 MVA XMER No.II AT 220 KV S/S RAIGARH 11:35 17:54 6:19:00

44 6-Apr-16 220 KV KWB - CHHURI CKT No.I 11:00 16:49 5:49:00

45 7-Apr-16 40 MVA XMER No.III AT 220 KV S/S MOPKA 06:15 11:24 5:09:00

47 7-Apr-16 100 MVA XMER No.I AT 220 KV S/S KOTMIKALA 07:00 13:31 6:31:00

48 7-Apr-16 132 KV CHAKARBHATA - BILASPUR CKT 09:10 11:34 2:24:00

49 7-Apr-16 132 KV DARRI - BANGO CKT 09:34 15:01 5:27:00

50 7-Apr-16 132 KV DOMA - MANA CKT No.I 10:05 15:54 5:49:00

51 7-Apr-16 160 MVA XMER No.III AT 220 KV S/S RAIGARH 10:45 15:03 4:18:00

53 7-Apr-16 132 KV THELKADIH - DONGARGARH CKT No.II 12:20 14:10 1:50:00

54 8-Apr-16 160 MVA XMER No.-I AT 220 KV S/S MOPKA 06:20 11:10 4:50:00

55 8-Apr-16 100 MVA XMER No.II AT 220 KV S/S KOTMIKALA 07:06 14:35 7:29:00

56 8-Apr-16 40 MVA XMER AT 132 KV S/S BHANUPRATAPPUR 09:08 19:48 10:40:00

58 8-Apr-16 132 KV BILASPUR - PATHARIYA CKT 09:30 11:35 2:05:00

59 8-Apr-16 132 KV DOMA - MANA CKT No.II 10:00 15:01 5:01:00

60 8-Apr-16 220 KV GURUR - RAITA CKT 12:15 19:25 7:10:00

61 8-Apr-16 132 KV DCDS RAIGARH - SARANGARH CKT No.I 10:15 16:53 6:38:00

63 8-Apr-16 132 KV DCDS RAIGARH - SARANGARH CKT No.II 10:15 16:50 6:35:00

64 9-Apr-16 40 MVA X-MER NO. II AT 132 KV S/S MUNGELI 09:09 14:05 4:56:00

65 9-Apr-16 160 MVA X-MER NO. II AT 220 KV S/S DOMA 09:00 17:00 8:00:00

66 9-Apr-16 20 MVA X-MER AT 220 KV S/S KOTMIKALA 09:55 13:22 3:27:00

67 9-Apr-16 400 KV KORBA - SARNI TIE BAY AT 400 KV S/S BHILAI 09:54 20:26 10:32:00

69 9-Apr-16 63 MVA X-MER AT 132 KV S/S SECTOR - A (URLA) 15:05 18:25 3:20:00

70 11-Apr-16 132 KV MAIN BUS SECTION - II AT 132 KV S/S BILASPUR 07:55 08:57 1:02:00

71 11-Apr-16 132 KV DOMA - RAWAN BHATA CKT NO. I 10:10 15:10 5:00:00

72 11-Apr-16 132 KV BILASPUR - RLY TRACTION NO. I 09:25 11:03 1:38:00

74 11-Apr-16 20 MVA X-MER NO. II AT 220 KV S/S KOTMIKALA 10:20 16:15 5:55:00

75 11-Apr-16 132 KV BILASPUR - RLY TRACTION NO. II 11:20 12:44 1:24:00

76 11-Apr-16 132 KV BORJHARA - PRIME ISPAT CKT 17:40 19:50 2:10:00

77 12-Apr-16 160MVA Xmer 220/132KV AT S/S CHHURI 08:00 14:36 6:36:00

78 12-Apr-16 220KV MAIN BUS-II AT KEB 08:47 16:34 7:47:00

80 12-Apr-16 132KV DOMA - RAWANBHATA CKT. 10:05 14:55 4:50:00

9.2 PLANNED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF APRIL-2016

S.No. Date Name of the Transmission Elements FROM TOOutage Hours

(hh:mm)

81 12-Apr-16 132KV PATTALGAON - GHARGHORA CKT. 11:57 17:55 5:58:00

82 13-Apr-16 132KV MUNGELI - NAVAGARH CKT. 07:10 10:40 3:30:00

83 13-Apr-16 40MVA Xmer NO. II AT 132KV S/S JAMUNIPALI 08:10 11:35 3:25:00

85 13-Apr-16 220KV RLY. TRACTION NO. I AT 220KV S/S KOTMIKALA 08:48 12:29 3:41:00

86 13-Apr-16 40MVA Xmer NO. I AT 220KV S/S DOMA 09:20 16:02 6:42:00

87 13-Apr-16 AUTO Xmer NO. I AT KORBA(E) 10:04 17:30 7:26:00

88 13-Apr-16 40MVA Xmer NO. I AT 132KV S/S RAJIM 11:21 12:31 1:10:00

90 13-Apr-16 220KV RLY. TRACTION NO. II AT 220KV S/S KOTMIKALA 13:00 14:55 1:55:00

91 13-Apr-16 220KV BHILAI - SILTARA CKT. 06/04/2016 9:05 13/04/2016 4:16 163:11:00

92 14-Apr-16 AUTO XMER No.II AT 220 KV S/S KEB 10:06 12:45 2:39:00

93 15-Apr-16 400 KV KW - RAITA CKT 08:35 16:59 8:24:00

94 15-Apr-16 63 MVA XMER AT 132 KV S/S SANKARA 10:31 12:26 1:55:00

96 17-Apr-16 132 KV JAGDALPUR - NAGARNAR CKT 08:17 19:17 11:00:00

97 18-Apr-16 400KV RAITA - KHEDAMARA CKT. NO. I 08:55 15:40 6:45:00

98 18-Apr-16 220KV KEB - BUDHIPADAR CKT. NO. II 10:55 19:01 8:06:00

99 19-Apr-16 220 KV KEB - RAIGARH CKT 08:06 12:08 4:02:00

101 20-Apr-16 220KV( PGCIL) RAIGARH - RAIGARH(CSEB) CKT. NO. I 00:56 04:30 3:34:00

102 20-Apr-16 132KV BISHRAMPUR - PRATAPPUR CKT. 10:15 17:35 7:20:00

103 20-Apr-16 132KV PRATAPPUR - BALRAMPUR CKT. 10:15 17:35 7:20:00

104 21-Apr-16 40MVA Xmer NO. I AT 132KV S/S JAMNIPALI 08:04 10:12 2:08:00

106 21-Apr-16 400KV BHILAI - RAITA CKT. NO. II 09:02 18:06 9:04:00

107 22-Apr-16 40 MVA XMER No.I AT 132/33 KV S/S SILPAHARI 06:23 10:15 3:52:00

108 22-Apr-16 220 KV KE IP BUS AT KEB 08:42 18:45 10:03:00

109 23-Apr-16 400 KV KORBA WEST - NTPC CKT 21/04/2016 8:56 23/04/2016 9:57 49:01:00

110 23-Apr-16 40 MVA XMER AT 132 KV S/S SEC- C URLA 09:20 16:05 6:45:00

112 23-Apr-16 132 KV SECTOR 'A' - BIRGAON CKT 07:20 09:46 2:26:00

113 23-Apr-16 40 MVA XMER No.II AT 132 KV S/S SILPAHARI 06:20 11:00 4:40:00

114 23-Apr-16 125 MVA XMER No.II AT 220 KV S/S BHATAPARA 10:01 16:54 6:53:00

115 23-Apr-16 220 KV KW - CHHURI CKT No.II 23/04/2016 21:44 24/04/2016 11:01 13:17:00

117 25-Apr-16 400 KV KHEDAMARA - SEONI CKT 09:49 18:57 9:08:00

118 25-Apr-16 12.5 MVA X-MER NO. I AT 132 KV S/S DALLIRAJHARA 25/04/2016 10:17 10/05/2016 19:24 369:07:00

119 26-Apr-16 132 KV MUNGELI - PANDARIYA CKT 07:36 10:34 2:58:00

120 26-Apr-16 220 KV KEB - BUDHIPADAR CKT NO. II 15:34 21:00 5:26:00

9.2 PLANNED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF APRIL-2016

S.No. Date Name of the Transmission Elements FROM TOOutage Hours

(hh:mm)

121 27-Apr-16 160 MVA X-MER AT 220 KV S/S MUNGELI 08:25 14:04 5:39:00

123 27-Apr-16 1 P BUS AT 220 KV S/Y KEB 08:45 11:15 2:30:00

124 27-Apr-16 40 MVA X-MER AT 220 KV S/S DOMA 09:25 18:30 9:05:00

125 27-Apr-16 40 MVA X-MER NO. II AT 132 KV S/S MAGARLOD 09:59 13:33 3:34:00

126 27-Apr-16 132 KV AKALTARA - RLY TRACTION NO. II 16:50 19:45 2:55:00

128 28-Apr-16 40MVA Xmer NO. II AT 220KV S/S MUNGELI 07:34 11:34 4:00:00

129 28-Apr-16 500MW 400/220KV CT. AT KWB 24/04/2016 8:47 28/04/2016 16:11 103:24:00

130 30-Apr-16 132/33 KV, 40 MVA X-MER AT 132 KV S/S KOTA 09:04 14:02 4:58:00

131 30-Apr-16 132/33 KV, 40 MVA X-MER-II AT 132 KV S/S JAGDALPUR 15:02 19:25 4:23:00

10. LOAD SHEDDING DONE IN APRIL-2016

DATE FROM TO GROUPAvg MW

ReliefDURATION

Equivalent Load

Relief in MU

1 4-Apr-16 18:30 20:45 INDUSTRIAL PLAN ( ALL GROUP) 47 2:15:00 0.11

2 4-Apr-16 19:01 20:10 INDUSTRIAL H/T GROUP - IV 57.7 1:09:00 0.07

3 4-Apr-16 19:01 20:32 INDUSTRIAL H/T GROUP - II 73 1:31:00 0.11

4 4-Apr-16 19:01 20:38 INDUSTRIAL H/T GROUP - III 112 1:37:00 0.18

5 4-Apr-16 19:01 20:07 INDUSTRIAL H/T GROUP - I 121 1:06:00 0.13

6 5-Apr-16 17:30 20:01 INDUSTRIAL PLAN ( ALL GROUP) 43.3 2:31:00 0.11

7 5-Apr-16 19:10 19:40 I 94.4 0:30:00 0.05

8 5-Apr-16 19:10 19:40 J 27.2 0:30:00 0.01

9 6-Apr-16 06/04/2016 18:30 07/04/2016 3:38 INDUSTRIAL PLAN ( ALL GROUP) 38.5 9:08:00 0.35

10 6-Apr-16 18:56 19:42 A 115.5 0:46:00 0.09

11 6-Apr-16 18:56 19:15 B 79 0:19:00 0.03

12 6-Apr-16 18:56 19:15 C 147 0:19:00 0.05

13 6-Apr-16 19:16 20:16 D 102 1:00:00 0.10

14 6-Apr-16 19:16 20:16 E 109 1:00:00 0.11

15 6-Apr-16 20:16 21:18 F 88.5 1:02:00 0.09

16 6-Apr-16 20:47 21:55 G 95 1:08:00 0.11

17 6-Apr-16 20:53 22:03 H 57 1:10:00 0.07

18 6-Apr-16 21:27 22:03 I 70.8 0:36:00 0.04

19 6-Apr-16 22:16 23:16 J 56 1:00:00 0.06

20 6-Apr-16 06/04/2016 22:00 07/04/2016 0:42 INDUSTRIAL H/T GROUP - I 108 2:42:00 0.29

21 6-Apr-16 06/04/2016 22:00 07/04/2016 0:42 INDUSTRIAL H/T GROUP - II 77 2:42:00 0.21

22 7-Apr-16 00:42 03:02 INDUSTRIAL H/T GROUP - III 118 2:20:00 0.28

23 7-Apr-16 00:42 03:02 INDUSTRIAL H/T GROUP - IV 60.8 2:20:00 0.14

24 7-Apr-16 17:30 23:40 INDUSTRIAL PLAN ( ALL GROUP) 37.2 6:10:00 0.23

25 7-Apr-16 18:43 22:33 INDUSTRIAL H/T GROUP - I 143 3:50:00 0.55

26 7-Apr-16 19:04 22:45 INDUSTRIAL H/T GROUP - II 73 3:41:00 0.27

27 7-Apr-16 19:25 23:15 INDUSTRIAL H/T GROUP - III 115.4 3:50:00 0.44

28 9-Apr-16 09/04/2016 18:00 10/04/2016 5:45 INDUSTRIAL PLAN ( ALL GROUP) 33 11:45:00 0.39

29 9-Apr-16 09/04/2016 22:41 10/04/2016 0:05 INDUSTRIAL H/T GROUP - IV 58.9 1:24:00 0.08

30 9-Apr-16 09/04/2016 22:41 10/04/2016 0:05 INDUSTRIAL H/T GROUP - I 104 1:24:00 0.15

31 9-Apr-16 09/04/2016 23:00 10/04/2016 0:27 INDUSTRIAL H/T GROUP - II 84.5 1:27:00 0.12

32 9-Apr-16 09/04/2016 23:02 10/04/2016 0:27 INDUSTRIAL H/T GROUP - III 108 1:25:00 0.15

33 10-Apr-16 01:04 02:34 A 99.00 1:30:00 0.15

34 10-Apr-16 01:04 02:34 B 71.50 1:30:00 0.11

35 10-Apr-16 01:04 02:34 C 130.50 1:30:00 0.20

36 10-Apr-16 02:34 04:04 D 93.70 1:30:00 0.14

37 10-Apr-16 02:34 04:04 E 80.50 1:30:00 0.12

38 10-Apr-16 02:34 04:04 F 59.00 1:30:00 0.09

39 10-Apr-16 10/04/2016 17:00 11/04/2016 6:00 INDUSTRIAL PLAN ( ALL GROUP) 32.30 13:00:00 0.42

40 10-Apr-16 10/04/2016 18:25 11/04/2016 0:01 INDUSTRIAL H/T GROUP - IV 38.50 5:36:00 0.22

41 10-Apr-16 10/04/2016 18:25 11/04/2016 0:01 INDUSTRIAL H/T GROUP - I 133.00 5:36:00 0.74

42 10-Apr-16 10/04/2016 18:25 11/04/2016 0:01 INDUSTRIAL H/T GROUP - II 84.00 5:36:00 0.47

10. LOAD SHEDDING DONE IN APRIL-2016

DATE FROM TO GROUPAvg MW

ReliefDURATION

Equivalent Load

Relief in MU

43 11-Apr-16 11/04/2016 17:30 12/04/2016 6:00 INDUSTRIAL PLAN ( ALL GROUP) 40.80 12:30:00 0.51

44 11-Apr-16 11/04/2016 19:04 12/04/2016 0:05 INDUSTRIAL H/T GROUP - III 119.00 5:01:00 0.60

45 11-Apr-16 19:08 19:32 INDUSTRIAL H/T GROUP - IV 54.20 0:24:00 0.02

46 11-Apr-16 11/04/2016 19:14 12/04/2016 0:05 INDUSTRIAL H/T GROUP - I 113.00 4:51:00 0.55

47 11-Apr-16 11/04/2016 21:38 12/04/2016 0:05 INDUSTRIAL H/T GROUP - II 93 2:27:00 0.23

48 12-Apr-16 19:00 21:16 INDUSTRIAL PLAN ( ALL GROUP) 35.5 2:16:00 0.08

49 20-Apr-16 20/04/2016 19:15 21/04/2016 0:16 INDUSTRIAL PLAN ( ALL GROUP) 27 5:01:00 0.14

50 20-Apr-16 20/04/2016 23:16 21/04/2016 0:16 G 98.5 1:00:00 0.10

51 20-Apr-16 20/04/2016 23:16 21/04/2016 0:16 H 71.7 1:00:00 0.07

52 21-Apr-16 15:28 16:38 I 76.2 1:10:00 0.09

53 21-Apr-16 15:28 16:38 J 73 1:10:00 0.09

54 21-Apr-16 16:38 17:56 A 119 1:18:00 0.15

55 21-Apr-16 16:38 17:56 B 70 1:18:00 0.09

56 21-Apr-16 18:00 19:54 INDUSTRIAL PLAN ( ALL GROUP) 47 1:54:00 0.09

80.62 153:45:00 10.60

11. LOAD DURATIUON CURVE: APRIL-2016

2000

2100

2200

2300

2400

2500

2600

2700

2800

2900

3000

3100

3200

3300

3400

3500

3600

3700

3800

3900

4000

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100

% OF TIME

DEM

AN

D (

MW

)

LOAD DURATION CURVE OF APRIL-2016

[MAX DEMAND MET= 3891 MW & MIN DEMAND MET= 2523 MW]

% OF TIME

DEM

AN

D (

MW

)