Fabrication:
Cement silo (200 MT) Spiral Conveyer
Bearing Housing SS Ribbon blender Assembly
Machinery
![Page 2: SS Ribbon blender Assembly · 2014-11-07 · SS Ribbon blender Assembly ... Dry ice shrink fitting, assembly and testing. Exports SS 304 -Machined and Polished Cone SS 316L Machined](https://reader030.vdocuments.mx/reader030/viewer/2022040302/5e824476656340707c65e991/html5/thumbnails/2.jpg)
Vertical Machining Center
(X650mm – Y550mm – Z500mm) CNC Lathe
Horizontal Boring Machine with rotary table
(X2000mm – Y1800mm – Z700mm)
Floor Boring Machine
(X6000mm – Y1800mm – Z700mm)
![Page 3: SS Ribbon blender Assembly · 2014-11-07 · SS Ribbon blender Assembly ... Dry ice shrink fitting, assembly and testing. Exports SS 304 -Machined and Polished Cone SS 316L Machined](https://reader030.vdocuments.mx/reader030/viewer/2022040302/5e824476656340707c65e991/html5/thumbnails/3.jpg)
Radial Drilling Machine
(Radius: 1300mm; Drill Dia: 75mm) Center Lathe
Horizontal Boring Machine with rotary table
Repair and Maintenance :
Ball Mill :
Ball Mill weighing 25MT broken end drive shaft removed and replaced with new shaft.
Concentricity maintained within 0.05mm with reference to the tail end shaft. This work was
completed in a time span of 21 days.
Aligning the Ball Mill Face. Aligning the Ball Mill Side.
![Page 4: SS Ribbon blender Assembly · 2014-11-07 · SS Ribbon blender Assembly ... Dry ice shrink fitting, assembly and testing. Exports SS 304 -Machined and Polished Cone SS 316L Machined](https://reader030.vdocuments.mx/reader030/viewer/2022040302/5e824476656340707c65e991/html5/thumbnails/4.jpg)
Removing Old Shaft Fixing of new shaft (4.jpg,5.jpg)
Repair and Reconditioning:
1600 T Clutch Assembly :
![Page 5: SS Ribbon blender Assembly · 2014-11-07 · SS Ribbon blender Assembly ... Dry ice shrink fitting, assembly and testing. Exports SS 304 -Machined and Polished Cone SS 316L Machined](https://reader030.vdocuments.mx/reader030/viewer/2022040302/5e824476656340707c65e991/html5/thumbnails/5.jpg)
End cover of Heat exchanger
Diesel, Petrol, Desalinated water and water Tanks designed as per API 650. Fabrication, Erection
welding sand blasting food grade epoxy Painting and commissioning carried out in Maldives.
Sugarcane crusher drive shaft and gear assembly
![Page 6: SS Ribbon blender Assembly · 2014-11-07 · SS Ribbon blender Assembly ... Dry ice shrink fitting, assembly and testing. Exports SS 304 -Machined and Polished Cone SS 316L Machined](https://reader030.vdocuments.mx/reader030/viewer/2022040302/5e824476656340707c65e991/html5/thumbnails/6.jpg)
1600 T Mechanical Forging Press
Dismantling, repairing the Crank shaft, Connecting rod and Gears of 1600 T press, which
includes Machining, Shaft Grinding, Blue Matching, Dry ice shrink fitting, assembly and testing.
![Page 7: SS Ribbon blender Assembly · 2014-11-07 · SS Ribbon blender Assembly ... Dry ice shrink fitting, assembly and testing. Exports SS 304 -Machined and Polished Cone SS 316L Machined](https://reader030.vdocuments.mx/reader030/viewer/2022040302/5e824476656340707c65e991/html5/thumbnails/7.jpg)
Exports
SS 304 - Machined and Polished Cone SS 316L - Machined and Polished Turn Buckle
![Page 8: SS Ribbon blender Assembly · 2014-11-07 · SS Ribbon blender Assembly ... Dry ice shrink fitting, assembly and testing. Exports SS 304 -Machined and Polished Cone SS 316L Machined](https://reader030.vdocuments.mx/reader030/viewer/2022040302/5e824476656340707c65e991/html5/thumbnails/8.jpg)
Mechanical Press (150 MT) Sheet rolling machine
(Plate: 16 mm Thick 2400mm Width)
Shearing Machine (6mm x 2400 mm) Drilling Machine
Geothermal Project :
40 inch carbon steel (CS) steam piping project which includes Pipe pre-fabrication, erection,
Commissioning and Testing, from Steam well to Power plant for a distance of 3kms executed in
Kenya.
![Page 9: SS Ribbon blender Assembly · 2014-11-07 · SS Ribbon blender Assembly ... Dry ice shrink fitting, assembly and testing. Exports SS 304 -Machined and Polished Cone SS 316L Machined](https://reader030.vdocuments.mx/reader030/viewer/2022040302/5e824476656340707c65e991/html5/thumbnails/9.jpg)
Condenser Pipe Erection and Welding Steamline Pipe Erection and Welding
Hot Air generator and Ducting :
Hot Air generator which will produce 800 o C Commissioned in Ceramic plant, which includes
site fabrication and erection of SS 310 Hot Air Duct (Dia: 2.1m; 30m Ling) with Dampers,
expansion bellows and support.
Hot Air generator Site fabrication of SS duct (2)
![Page 10: SS Ribbon blender Assembly · 2014-11-07 · SS Ribbon blender Assembly ... Dry ice shrink fitting, assembly and testing. Exports SS 304 -Machined and Polished Cone SS 316L Machined](https://reader030.vdocuments.mx/reader030/viewer/2022040302/5e824476656340707c65e991/html5/thumbnails/10.jpg)
Erection of 90 o Elbow Erection of 90 o Elbow
Insulation of SS duct Site fabrication of SS duct
Vertical Storage Tanks (Maldives) :
Diesel, Petrol, Desalinated water and water Tanks designed as per API 650. Fabrication, Erection
welding sand blasting food grade epoxy Painting and commissioning carried out in Maldives.
![Page 11: SS Ribbon blender Assembly · 2014-11-07 · SS Ribbon blender Assembly ... Dry ice shrink fitting, assembly and testing. Exports SS 304 -Machined and Polished Cone SS 316L Machined](https://reader030.vdocuments.mx/reader030/viewer/2022040302/5e824476656340707c65e991/html5/thumbnails/11.jpg)
Storage Tank for Desalinated water Storage tank for Drinking water
Flat Barge Petrol Tank
![Page 12: SS Ribbon blender Assembly · 2014-11-07 · SS Ribbon blender Assembly ... Dry ice shrink fitting, assembly and testing. Exports SS 304 -Machined and Polished Cone SS 316L Machined](https://reader030.vdocuments.mx/reader030/viewer/2022040302/5e824476656340707c65e991/html5/thumbnails/12.jpg)
Storage tank for diesel and petrol
Machining
Precision Machining
Glands for various Valves Gear case for Automobile Industry
![Page 13: SS Ribbon blender Assembly · 2014-11-07 · SS Ribbon blender Assembly ... Dry ice shrink fitting, assembly and testing. Exports SS 304 -Machined and Polished Cone SS 316L Machined](https://reader030.vdocuments.mx/reader030/viewer/2022040302/5e824476656340707c65e991/html5/thumbnails/13.jpg)
Bearing Brake Drum Assembly Front CAM cover (Aluminium)
Aluminium Ferrules Buzzer Wheel Assembly for
Printing Machine (Harris)
![Page 14: SS Ribbon blender Assembly · 2014-11-07 · SS Ribbon blender Assembly ... Dry ice shrink fitting, assembly and testing. Exports SS 304 -Machined and Polished Cone SS 316L Machined](https://reader030.vdocuments.mx/reader030/viewer/2022040302/5e824476656340707c65e991/html5/thumbnails/14.jpg)
Paper Machinery Spare
Precision Machining (Heavy)
Bearing Housing assembly for Ships Nozzle Frame Assembly for windmills
Dryice Shrink Fit Bush Fixing Oil groove and Blue Matching
![Page 15: SS Ribbon blender Assembly · 2014-11-07 · SS Ribbon blender Assembly ... Dry ice shrink fitting, assembly and testing. Exports SS 304 -Machined and Polished Cone SS 316L Machined](https://reader030.vdocuments.mx/reader030/viewer/2022040302/5e824476656340707c65e991/html5/thumbnails/15.jpg)
Forging Hammer HeatExchanger Outer Shell Machining
Material Handling :
PRESS FEEDING CONVEYOR(between IBH & Press) :
This is the high temperature conveyor the top portion with ss 310 matl. And the speed will be 25
per mint.THE HOT MATERIL Approx heat of 1100 to 1200 deg will reach press with in one
mints.it will help to remain in plastic stage. Top width and around 100 mm long 2m.
PRESS OUTLET CONVEYOR(between Press & Trimming Press) :
This is 300 mm width conveyor the top portion with ss 310 matl. And the speed will be 25 per
mint.THE HOT MATERIL Approx heat of 900 to 1000 deg will reach press with required speed
CONTROLLED BY VFD.it will help to keep more than 5 pieces at the time Top width and
around300 mm---- 3 M long
![Page 16: SS Ribbon blender Assembly · 2014-11-07 · SS Ribbon blender Assembly ... Dry ice shrink fitting, assembly and testing. Exports SS 304 -Machined and Polished Cone SS 316L Machined](https://reader030.vdocuments.mx/reader030/viewer/2022040302/5e824476656340707c65e991/html5/thumbnails/16.jpg)