Eastleigh Local Plan 31/07/2018
Reference number 105599
SRTM MODELLING – DATA EXTRACTION OF JUNCTIONS IN SOUTHAMPTON BASED ON THE DO SOMETHING 3 SCENARIO
EASTLEIGH LOCAL PLAN SRTM MODELLING – DATA EXTRACTION OF JUNCTIONS IN SOUTHAMPTON
BASED ON THE DO SOMETHING 3 SCENARIO
IDENTIFICATION TABLE
Client/Project owner Eastleigh Borough Council
Project Eastleigh Local Plan
Study SRTM Modelling – Data Extraction of Junctions in Southampton based on the Do Something 3 Scenario
Type of document Results of Further Data Extraction
Date 31/07/2018
File name 180731_Eastleigh Local Plan Southampton Junctions.docx
Reference number 105599
Number of pages 22
APPROVAL
Version Name Position Date Modifications
1
Author Michael Hornung
Consultant 31/07/2018
Checked by
Claire Stephens Associate 02/08/2018
Approved by
Claire Stephens Associate 02/08/2018
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 3/22
TABLE OF CONTENTS
1. INTRODUCTION 5
1.1 INTRODUCTION 5
1.2 STUDY BACKGROUND 5
2. DATA EXTRACTION 6
2.1 LIST OF JUNCTIONS 6
2.2 ASSESSMENT CRITERIA 7
2.3 JUNCTION IMPACTS 7
2.4 DETAILED LIST OF JUNCTIONS 8
2.5 HIGHWAY FLOW DIFFERENCE PLOTS – SOUTHAMPTON 19
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 4/22
LIST OF FIGURES
Figure 1. 2036 DS3 (DPP) vs Baseline (DOP) Flow Difference – AM Peak 20 Figure 2. 2036 DS3 (DPP) vs Baseline (DOP) Flow Difference – PM Peak 21
LIST OF TABLES
Table 1. 2036 Do Something 3 - Locations of Significant or Severe Impact 8 Table 2. Bassett Avenue/A27 Bassett Green Road/M3 J14 (Chilworth Roundabout) AM Peak Junction Performance 9 Table 3. Bassett Avenue/A27 Bassett Green Road/M3 J14 (Chilworth Roundabout) PM Peak Junction Performance 9 Table 4. A33 Bassett Avenue/A35 Winchester Road AM Peak Junction Performance 10 Table 5. A33 Bassett Avenue/A35 Winchester Road PM Peak Junction Performance 10 Table 6. A33 Bassett Avenue/A35 Burgess Road AM Peak Junction Performance 11 Table 7. A33 Bassett Avenue/A35 Burgess Road PM Peak Junction Performance 11 Table 8. A35 Burgess Rd/High Rd/Stoneham Way AM Peak Junction Performance 12 Table 9. A35 Burgess Rd/High Rd/Stoneham Way PM Peak Junction Performance 12 Table 10. Stoneham Way/Stoneham Ln AM Peak Junction Performance 13 Table 11. Stoneham Way/Stoneham Ln PM Peak Junction Performance 13 Table 12. A335 Stoneham Way/A335 Thomas Lewis Way AM Peak Junction Performance 14 Table 13. A335 Stoneham Way/A335 Thomas Lewis Way PM Peak Junction Performance 14 Table 14. A335 Stoneham Way/A27 Wide Ln/Bassett Green Rd AM Peak Junction Performance 15 Table 15. A335 Stoneham Way/A27 Wide Ln/Bassett Green Rd PM Peak Junction Performance 15 Table 16. A27 Kanes Hill/A334 Thornhill Park Road AM Peak Junction Performance 16 Table 17. A27 Kanes Hill/A334 Thornhill Park Road PM Peak Junction Performance 16 Table 18. A334 Thornhill Park Road/Hinkler Road AM Peak Junction Performance 18 Table 19. A334 Thornhill Park Road/Hinkler Road PM Peak Junction Performance 18
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 5/22
1. INTRODUCTION
1.1 Introduction
1.1.1 Eastleigh Borough Council (EBC) commissioned SYSTRA to undertake strategic modelling using the Solent Transport’s Sub-Regional Traffic Model (SRTM) to test the traffic impacts of a range of development options as part of its Local Plan process.
1.1.2 The SRTM was developed to support a wide-ranging set of interventions across the Solent Transport sub-region, and is specifically required to be capable of:
Forecasting changes in travel demand, road traffic, public transport patronage and active mode use over time as a result of changing economic conditions, land-use policies and development, and transport improvement and interventions (schemes);
Testing the impacts of land-use and transport policies and strategies within a relatively short model run time; and
Testing the impacts of individual transport interventions in the increased detail necessary for preparing submissions for inclusion in funding programmes.
1.1.3 All outputs in this report focus on 2036 forecast conditions. This narrative summarises the key SRTM modelling assumptions and presents the modelling results.
1.2 Study Background
1.2.1 The SRTM was previously used to undertake a Baseline (committed development) and a number of Do Minimum (Local Plan additional development allocations) scenarios for 2036. In July 2017, the emerging Local Plan strategy of a 5,200 dwelling Strategic Growth Option (SGO) site north of Bishopstoke / North East of Fair Oak (SGO sites B and C), alongside provision of a new northern link road between M3 J12 and Fair Oak, via Allbrook was initially proposed.
1.2.2 In December 2017, EBC commissioned SYSTRA to undertake an Interim Do Something SRTM scenario that included a range of highway interventions to support the full Council in making a decision on the SGO site.
1.2.3 On December 11th 2017, the Council agreed that the Local Plan for submission will feature a strategic growth option of around 5,200 dwellings at North Bishopstoke / North East of Fair Oak which will enable achievement of the Council’s housing delivery targets. This is subject to completion of evidence, including a Transport Assessment.
1.2.4 The focus of the study reported in the transport assessment was the impact of potential packages of “off-site” infrastructure schemes to mitigate congestion impacts resulting from the Local Plan. Traffic flow data output from the SRTM also formed inputs to an ecology and air quality assessment that was reported by a third party in a separate document.
1.2.5 Alongside the preferred development option, a number of other development options have been specified by EBC and modelled using the SRTM.
1.2.6 On 25th July 2018, EBC commissioned SYSTRA to undertake further data extraction on defined junctions in Southampton based on the existing Do Something 3 Scenario. The
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 6/22
outputs will be presented in tables highlighting the RFC and indicating which junction arms will have significant or severe impacts compared to the 2036 Baseline. This document also includes flow difference plots.
1.2.7 This document presents the results from the additional data extraction from DS3, but does not provide commentary to the level presented within the Transport Assessment.
2. DATA EXTRACTION
2.1 List of Junctions
2.1.1 The junctions in Southampton for which further data extraction has been undertaken are as follows:
A33 Bassett Avenue/A27 Bassett Green Road/M3 J14 Rbt (Chilworth Rbt) A33 Bassett Avenue/A35 Winchester Road Rbt A33 Bassett Avenue/A35 Burgess Road Sgn A35 Burgess Rd/High Rd/Stoneham Way Sgn Stoneham Way/Stoneham Ln Sgn A335 Stoneham Way/A335 Thomas Lewis Way Sgn A335 Stoneham Way/A27 Wide Ln/Bassett Green Rd Sgn A27 Kanes Hill/A334 Thornhill Park Road Rbt A334 Thornhill Park Road/Hinkler Road Sgn
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 7/22
2.2 Assessment Criteria
2.2.1 To provide a consistent measure of the impacts arising from the Local Plan proposals all scenarios previously modelled have been assessed against the criteria below (these criteria match those applied to other SRTM commissions relating to Local Plan TAs). Volume to Capacity (V/C) is reported as a percentage to express the forecast take-up of available highway capacity at individual locations - hence identifying links with a high V/C is a proxy for identifying junctions with capacity issues:
a junction where the ratio of volume to capacity (V/C) on any approach arm was 85% or more in the Do-Something or Do-More scenario and has increased by 5% or more compared with the Baseline scenario, is considered as experiencing a significant impact;
a junction where the ratio of volume to capacity (V/C) on any approach arm was 95% or more in the Do-Something or Do-More scenario and has increased by 10% or more compared with the Baseline scenario, is considered as experiencing a severe impact;
a junction where the average delay per vehicle in the Do-Something or Do-More scenario was two minutes or more in any period and has increased by one minute or more compared with the Baseline scenario, is considered as experiencing a severe impact.
2.3 Junction Impacts
2.3.1 Table 1 below shows where significant or severe impacts are expected to occur based on the assessment criteria above.
2.3.2 Only one junction is forecast a significant impact (A334 Thornhill Park Road/Hinkler Road Sgn).
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 8/22
Table 1. 2036 Do Something 3 - Locations of Significant or Severe Impact
LINK/JUNCTION
ID BASELINE DS 3
AM PM AM PM
A33 Bassett Avenue/A27 Bassett Green Road/M3 J14 Rbt (Chilworth Rbt)
116
A33 Bassett Avenue/A35 Winchester Road Rbt 117
A33 Bassett Avenue/A35 Burgess Road Sgn 118
A35 Burgess Rd/High Rd/Stoneham Way Sgn 119
Stoneham Way/Stoneham Ln Sgn 120
A335 Stoneham Way/A335 Thomas Lewis Way Sgn
121
A335 Stoneham Way/A27 Wide Ln/Bassett Green Rd Sgn
122
A27 Kanes Hill/A334 Thornhill Park Road Rbt 123
A334 Thornhill Park Road/Hinkler Road Sgn 124 Sig
TOTALS
Sig
1 0 0 0
1 0
Sev
0 0 0 0
0 0
2.4 Detailed List of Junctions
2.4.1 The following tables summarise the AM and PM peak hour performance statistics, by arm, for the Baseline (BL) and the Do Something 3 (DS3) Scenario. Where assessment criteria for “significant” or “severe” impacts are met, these are highlighted in yellow and red respectively.
2.4.2 As shown above, the only junction identified with a significant impact is forecast in the AM peak for the westbound A334 Thornhill Park Road approach to the signalised junction.
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 9/22
Bassett Avenue/A27 Bassett Green Road/M3 J14 (Chilworth Roundabout)
Table 2. Bassett Avenue/A27 Bassett Green Road/M3 J14 (Chilworth Roundabout) AM Peak Junction Performance
AM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
SB A27 106 106 78 90 110 123
WB A27 Basset Green Rd 108 108 11 10 250 259
NB A33 Bassett Ave 105 105 62 62 102 101
Table 3. Bassett Avenue/A27 Bassett Green Road/M3 J14 (Chilworth Roundabout) PM Peak Junction Performance
PM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
SB A27 106 106 77 83 117 126
WB A27 Basset Green Rd 100 100 7 7 78 83
NB A33 Bassett Ave 100 100 7 6 17 15
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 10/22
A33 Bassett Avenue/A35 Winchester Road
Table 4. A33 Bassett Avenue/A35 Winchester Road AM Peak Junction Performance
AM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
SB A33 Bassett Ave 110 110 89 90 185 187
NB A33 Bassett Ave 99 97 6 5 22 18
EB A35 Winchester Rd 111 109 58 50 234 194
Table 5. A33 Bassett Avenue/A35 Winchester Road PM Peak Junction Performance
PM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
SB A33 Bassett Ave 107 107 65 68 142 148
NB A33 Bassett Ave 75 75 1 1 8 8
EB A35 Winchester Rd 101 101 15 16 52 55
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 11/22
A33 Bassett Avenue/A35 Burgess Road
Table 6. A33 Bassett Avenue/A35 Burgess Road AM Peak Junction Performance
AM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
SB A33 Bassett Ave 79 76 10 10 47 46
WB A35 Burgess Rd 102 103 16 17 173 182
NB The Avenue 98 98 13 13 65 66
EB A35 Burgess Rd 108 106 29 26 278 240
Table 7. A33 Bassett Avenue/A35 Burgess Road PM Peak Junction Performance
PM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
SB A33 Bassett Ave 59 58 7 7 41 41
WB A35 Burgess Rd 99 100 8 8 124 133
NB The Avenue 99 99 12 12 74 74
EB A35 Burgess Rd 97 97 9 9 99 102
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 12/22
A35 Burgess Rd/High Rd/Stoneham Way
Table 8. A35 Burgess Rd/High Rd/Stoneham Way AM Peak Junction Performance
AM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
SB Stoneham Way 21 20 2 2 16 16
NB High Rd 42 45 2 2 44 44
EB A35 Burgess Rd 46 45 2 2 18 18
Table 9. A35 Burgess Rd/High Rd/Stoneham Way PM Peak Junction Performance
PM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
SB Stoneham Way 19 20 1 1 8 8
NB High Rd 28 29 1 1 54 54
EB A35 Burgess Rd 40 39 2 2 10 10
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 13/22
Stoneham Way/Stoneham Ln
Table 10. Stoneham Way/Stoneham Ln AM Peak Junction Performance
AM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
SB Stoneham Way 17 17 2 2 20 20
NB Stoneham Way 47 47 5 5 25 26
EB Stoneham Lane 46 47 3 3 43 43
Table 11. Stoneham Way/Stoneham Ln PM Peak Junction Performance
PM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
SB Stoneham Way 18 19 2 2 18 19
NB Stoneham Way 36 36 3 3 21 21
EB Stoneham Lane 34 36 2 2 44 44
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 14/22
A335 Stoneham Way/A335 Thomas Lewis Way
Table 12. A335 Stoneham Way/A335 Thomas Lewis Way AM Peak Junction Performance
AM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
WB A335 Stoneham Way 106 106 51 52 168 171
NB A335 Thomas Lewis Way
70 70 10 10 65 64
EB Stoneham Way 26 27 2 2 11 11
Table 13. A335 Stoneham Way/A335 Thomas Lewis Way PM Peak Junction Performance
PM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
WB A335 Stoneham Way 102 103 23 26 104 111
NB A335 Thomas Lewis Way
58 59 8 8 42 43
EB Stoneham Way 25 24 2 2 11 11
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 15/22
A335 Stoneham Way/A27 Wide Ln/Bassett Green Rd
Table 14. A335 Stoneham Way/A27 Wide Ln/Bassett Green Rd AM Peak Junction Performance
AM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
SB A335 Stoneham Way 89 90 8 8 30 31
WB A27 Wide Ln 81 79 4 4 36 35
NB A335 Stoneham Way 97 99 20 15 74 72
EB A27 Bassett Green Rd 22 21 1 1 18 17
Table 15. A335 Stoneham Way/A27 Wide Ln/Bassett Green Rd PM Peak Junction Performance
PM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
SB A335 Stoneham Way 98 98 13 12 59 59
WB A27 Wide Ln 63 64 3 3 30 30
NB A335 Stoneham Way 96 90 9 9 51 34
EB A27 Bassett Green Rd 24 23 1 1 17 17
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 16/22
A27 Kanes Hill/A334 Thornhill Park Road
Table 16. A27 Kanes Hill/A334 Thornhill Park Road AM Peak Junction Performance
AM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
SB Approach A27 Moorhill Rd
74 77 9 8 42 35
WB Approach Charles Watts Way
49 49 23 22 119 115
WB Approach Comines Way
32 34 1 1 9 9
NB Approach A27 Kanes Hill
75 65 2 2 11 11
EB Approach Thornhill Park Rd
102 98 25 9 77 33
Table 17. A27 Kanes Hill/A334 Thornhill Park Road PM Peak Junction Performance
PM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
SB Approach A27 Moorhill Rd
67 72 6 8 29 33
WB Approach Charles Watts Way
66 67 39 40 178 181
WB Approach Comines Way
29 33 0 0 8 8
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 17/22
PM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
NB Approach A27 Kanes Hill
57 58 2 3 11 15
EB Approach Thornhill Park Rd
84 85 9 10 30 32
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 18/22
A334 Thornhill Park Road/Hinkler Road
Table 18. A334 Thornhill Park Road/Hinkler Road AM Peak Junction Performance
AM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
NB Hinkler Rd 99 101 0 4 99 124
EB A334 Thornhill Park Rd 96 100 2 3 49 72
WB A334 Thornhill Park Rd 87 96 9 3 25 42
Table 19. A334 Thornhill Park Road/Hinkler Road PM Peak Junction Performance
PM PEAK
(ARM)
V/C (%) AVE QUEUE (PCU)
DELAY (S/PCU)
BL DS3 BL DS3 BL DS3
NB Hinkler Rd 87 88 1 1 61 63
EB A334 Thornhill Park Rd 95 95 3 3 38 40
WB A334 Thornhill Park Rd 83 85 2 2 18 20
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 19/22
2.5 Highway Flow Difference Plots – Southampton
2.5.1 Figures 1 and 2 show the change in traffic flow (PCUs) in the AM and PM peak hours between the Baseline and the Do Something 3 scenario, at an overall district level for Southampton.
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 20/22
Figure 1. 2036 DS3 (DPP) vs Baseline (DOP) Flow Difference – AM Peak
60
31
90
-61
-41
-21-40
52
-29
37
21
36
42-27
-21
31
8553
26
236
62
-2823
-24-24
22
23
37
21
32
-24
-24-23
29
2535 -27
-22
-36 42
23
30
47
24
20
2821
-44
30
27
43
3629
52
29
-23-30
-23-23-52
-45
-32
-41-35
66
3629
30
23
33
2323
26-36
26
-28
27
-33
-30
59
25
-35
26
27104 23113
-27-27
-33
-42
24-3521
-32
-41
34
-33 20
24
-24-32
4823-21
-42
28
-24
-42
-28
-42-156
-37
-28
24
-24
-45
-48
-39-62
-48-37
-51
30
-63
304848
-50
-69
-80
-23-41
-84
-80
-23-20
-20
-23
-22
-22
-21
-47
-36-38
-37
48
-22 -42
-36
-23
-23
-35
-22
-28
-30-27
-31
-34-26 -24
-34-23
-29
-41
-31-30
-28 -30
2323
21 9753
22
-37
-36
-20-35
75
-77
57
21
14068
70 -55
-68
-139
-38
67
-38
20
21
-44
52
-38
136
189
-27
157
-71
-721
-63730
-65
861
984
-155
-440
-137
-438
-855
739
861
240
-69
255
-42
-32
451
65
-71 31
63
555
161
26151
1151
1162
2684
-29
207
-46
-34
-66
-30
27
-30 -87
43-44
44 212
-44
33-64
59
68
28
23
69
-156
20
-50
32
-84
-145
23
46186
-4138 70
-59
-50
36
-36
-203
-2192
5636
92
-21169
-80
-134
43
-65
60
-30
-3144-3
4
54
97
-27
-23
27
61
84
-2878
85
75
49
58
58 44
29
4026
-40
92
4922
29
44
89293
329
82
2435
56
304
98
66
-40
84
6953
80
-93
-32
-241
-48
747444
-25
31
92
-40165-156 -2
0 27
-85
133112
165
-27
-22
-31
-23
23
-27
-52
58
47 -38
-140
-140
141
129
-48
67
-50
62
21-56
57
-140
-23
-61
101
21
236
21
-95
45
34
92
173
92
-56-29
479
136
332
119
137
93
479
136 -64
84
-56
108
33
195
81
114
59
-44
35
24
85
81 -38
-35
77
-36
87
148
17247
112
42
-37-35
24
23 156
237
-32
58
57-40
561
154
59
59
81300
80
-31-31
Eastleigh Local Plan Do Something 3 – Southampton Extracts 105599
Results of Further Data Extraction 31/07/2018 Page 21/22
Figure 2. 2036 DS3 (DPP) vs Baseline (DOP) Flow Difference – PM Peak
34
25
41
-31
36
35
40
-38
86
98
22243
79
130
-22
-21
23
334051
39
24
224424
-27
34
2524
22
2222
2178
66
40
49
2228
-22
-32
35
23
24
-26
30
-29
-26
-29
-42
-21
-29
28
-34
-36-35
-30
-49
-35
-26-31
-26-23
-34
-29
-35
-43
-28
-31
-39
21
21
21
21
78
-2046
-32
49
-35
43
61
154-2
8-21-2355
-36
22
-85 63
61
44
21
164
151
-28
-783
-661
78
64
144
912
740
-235
-291
-244
-308
-966811
658
113
48
110
45
88
63
294
-47
40
100
-50
274
116
-32
149
1233
1075
66
-57
83
74
28
27
74
32-27
-47-31
83
80
-49
58
-44
-45
60
94
-41
-59
-51
30
48
-20
2328
23
47
95
-22
48
-42
36
37
61
56
5556
-88-88
56
5730
67
139103
-55
-51
34
50
32
49
25
475966
70
50
126
48
-26 48
-26
40
-11027
8642
5437
-118
82
207
181
41
27
-35
223
29
-41
110
29243
21
124
42
-50
-56-29-2936
5252
36
34
-715174
-40
728851-2
2
-24
-2321
52
2928 25
-9788
33
5478
77
-9022
-90
-24
-7210
6-82
99
-41-31
61-23
22
24
-90
-54
69
285
87
300
-35
-287
-27
227
23
472
352
48
-5511
8
472
-56
93
-73
94
162
22
40
140
-58
30
-159
61
30
28
-24
28
25
24
3322
156
19038
158
36
25 2421
24 250
30
48-26
59
5448
-26
271
85
58
58
42327
24
-36
-33
SYSTRA provides advice on transport, to central, regional and local government, agencies, developers, operators and financiers.
A diverse group of results-oriented people, we are part of a strong team of professionals worldwide. Through client business planning, customer research and strategy development we create solutions that work for real people in the real world.
For more information visit www.systra.co.uk
Birmingham – Newhall Street 5th Floor, Lancaster House, Newhall St, Birmingham, B3 1NQ T: +44 (0)121 393 4841 Birmingham – Innovation Court Innovation Court, 121 Edmund Street, Birmingham B3 2HJ T: +44 (0)121 393 4841
Dublin 2nd Floor, Riverview House, 21-23 City Quay Dublin 2,Ireland T: +353 (0) 1 566 2028
Edinburgh – Thistle Street Prospect House, 5 Thistle Street, Edinburgh EH2 1DF United Kingdom T: +44 (0)131 460 1847 Edinburgh – Manor Place 37 Manor Place, Edinburgh, EH3 7EB Telephone +44 (0)131 460 1847
Glasgow – St Vincent St Seventh Floor, 124 St Vincent Street Glasgow G2 5HF United Kingdom T: +44 (0)141 468 4205
Glasgow – West George St 250 West George Street, Glasgow, G2 4QY T: +44 (0)141 468 4205 Leeds 100 Wellington Street, Leeds, LS1 1BA T: +44 (0)113 360 4842
London 3rd Floor, 5 Old Bailey, London EC4M 7BA United Kingdom T: +44 (0)20 3855 0079
Manchester – 16th Floor, City Tower 16th Floor, City Tower, Piccadilly Plaza Manchester M1 4BT United Kingdom T: +44 (0)161 504 5026 Newcastle Floor B, South Corridor, Milburn House, Dean Street, Newcastle, NE1 1LE United Kingdom T: +44 (0)191 249 3816
Perth 13 Rose Terrace, Perth PH1 5HA T: +44 (0)131 460 1847
Reading Soane Point, 6-8 Market Place, Reading, Berkshire, RG1 2EG T: +44 (0)118 206 0220
Woking Dukes Court, Duke Street Woking, Surrey GU21 5BH United Kingdom T: +44 (0)1483 357705
Other locations: France: Bordeaux, Lille, Lyon, Marseille, Paris Northern Europe: Astana, Copenhagen, Kiev, London, Moscow, Riga, Wroclaw Southern Europe & Mediterranean: Algiers, Baku, Bucharest, Madrid, Rabat, Rome, Sofia, Tunis Middle East: Cairo, Dubai, Riyadh Asia Pacific: Bangkok, Beijing, Brisbane, Delhi, Hanoi, Hong Kong, Manila, Seoul, Shanghai, Singapore, Shenzhen, Taipei Africa: Abidjan, Douala, Johannesburg, Kinshasa, Libreville, Nairobi Latin America: Lima, Mexico, Rio de Janeiro, Santiago, São Paulo North America: Little Falls, Los Angeles, Montreal, New-York, Philadelphia, Washington