SRF Accelerator Test Facility at NML
Jerry Leibfritz
May 23, 2011
![Page 2: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/2.jpg)
May 23, 2011 AEM Meeting 2
Outline
• Quick Recap of NML Facility• Current Status
– Cryomodule testing– Expansion construction– Cryomodule Test Facility (CMTF) – Development of linac
• Future Plans• Schedule
![Page 3: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/3.jpg)
3
NML Test Facility
May 23, 2011 AEM Meeting
![Page 4: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/4.jpg)
4May 23, 2011 AEM Meeting 4
Phase-1 Layout of NML
Cryomodule-1 (CM1) (Type III+)
Capture Cavity 2 (CC2)
CC2 RF System5 MW RF System for CM1
![Page 5: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/5.jpg)
5May 23, 2011 AEM Meeting
RF Gun & Capture Cavity II (CC2)
![Page 6: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/6.jpg)
6
Cryomodule-1 (CM1)
May 23, 2011 AEM Meeting
![Page 7: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/7.jpg)
7
CM1 Test Plan
• Virtually identical to DESY run plan for XFEL modules (courtesy of Dennis Kostin) and Fermilab experience at HTS and CC2
• TEST PROCEDURE: – 1. RF Cable Calibration done– 2. Technical Interlock / Sensor checkout done– 3. RF source / Waveguides / LLRF done– 4. Warm Input RF Coupler Conditioning done– 5. Cooldown to 2K done– 6. Cavity Spectra measurements done– 7. Cavity Tuners Test and Tuning done– 8. Coupler Qload measurement done– 9. Set Cavities On Resonance done– 10. Cold Input RF Coupler and Cavity Conditioning done– 11. Single Cavity RF Measurements in progress– 12. RF Measurement of 8 Cavity Cryomodule– 13. Cryo performance testing
May 23, 2011 AEM Meeting
![Page 8: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/8.jpg)
8
CM1 – RF Distribution
May 23, 2011 AEM Meeting
![Page 9: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/9.jpg)
9
Phase-1 Civil Construction
Existing NML Building
New Underground Tunnel Expansion
(Space for 6 Cryomodules (2 RF Units), AARD Test Beam Lines)
Funded by ARRA
May 23, 2011 AEM Meeting
![Page 10: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/10.jpg)
10May 23, 2011 AEM Meeting
NML Expansion
Existing NML Building Alcove for Cryoplant Tie-in
CM6CM5
Rack Room/Laser Lab
Beam Dump
Test Beamlines/AARD Area
- Construction Complete 4/11
10 meter Ring
![Page 11: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/11.jpg)
11
NML Expansion Construction
May 23, 2011 AEM Meeting
Finished Tunnel Electrical Service BuildingDigging Tunnel
![Page 12: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/12.jpg)
12
Phase-2 Layout of NML
CryomoduleCapture Cavity 1 (CC1)
5MW RF System for Gun
CC1 & CC2 RF Systems
RF Gun
10MW RF System for Cryomodules
High Energy Beam Absorber
CC2
Test Beam Lines
May 23, 2011 AEM Meeting
![Page 13: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/13.jpg)
Utility Upgrade
• New Transformers, Switchboards, Generator• New Chiller for LCW System
May 23, 2011 AEM Meeting 13
![Page 14: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/14.jpg)
Beam Absorber/Dump
• Three High Power (75 kW) Beam Absorbers
May 23, 2011 AEM Meeting 14
![Page 15: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/15.jpg)
Beam Absorber/Dump
• Recycled over 600 Tons of Class-1 Steel from Railhead (value of ~ $500k)
May 23, 2011 AEM Meeting 15
![Page 16: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/16.jpg)
16
Phase-2 Civil Construction (CMTF)
New Cryoplant & CM Test Facility
(300 W Cryogenic Plant, Cryomodule Test Stands, RF Test Area, Vacuum Cleanroom)
Vacuum Cleanroom
Cryomodule Test StandsRF Systems
Compressor Building
Cryogenic Refrigerators
Funded by ARRA
May 23, 2011 AEM Meeting
![Page 17: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/17.jpg)
17
CMTF Construction
May 23, 2011 AEM Meeting
![Page 18: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/18.jpg)
New Cryogenic Plant
• Ordered 12/10 from Linde
with ARRA Funds– 24 month lead time
• Supplement system with
SLAC Refrigerator
• Recycle Tevatron Equip.– Compressors– Storage Tanks– Cryogenic Piping
May 23, 2011 AEM Meeting 18
![Page 19: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/19.jpg)
19
Phase-3 of NML and CMTF
May 23, 2011 AEM Meeting
![Page 20: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/20.jpg)
20
NML Complex
May 23, 2011 AEM Meeting
![Page 21: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/21.jpg)
21
NML Complex
May 23, 2011 AEM Meeting
![Page 22: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/22.jpg)
Summary and Future Plans
• Phase-1 of Project is complete!– CC2 and CM1 have been cooled to 2K and RF powered– Upcoming talk on CM1 Operations – Elvin Harms
• Phase-2 in progress– Installation of gun, injector, beam lines, absorber/dump– First Beam in 2012
• Phase-3– Full Accelerator Operations (beam through at least 3 CM’s)– Advanced Accelerator R&D (AARD) Program
May 23, 2011 AEM Meeting 22
![Page 23: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/23.jpg)
AARD Program
May 23, 2011 AEM Meeting 23
![Page 24: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/24.jpg)
AARD Program - 2
May 23, 2011 AEM Meeting 24
![Page 25: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/25.jpg)
Results of FNAL/ANL AARD Meeting
• Selected Three “Phase-1” AARD Experiments for NML
– Double Emittance Exchange (D-EEX) beam line for pulse shaping experiments (at 250-350 MeV)
– Integrable Optics Test Accelerator (IOTA) to demonstrate new nonlinear optics solution (at 150-300 MeV)
– High Brightness Compact Diamond Radiator (NIU/Vanderbilt) test experiment (at 40 MeV)
May 23, 2011 AEM Meeting 25
![Page 26: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/26.jpg)
26May 23, 2011 AEM Meeting
NML Schedule/Milestones
• Phase-1 Cryogenic System Operational (August 2007)
• Delivery of First Cryomodule to NML (August 2008)• Begin Construction of CMTF Building (August 2010)• Cold RF Testing of First Cryomodule (Dec. 2010)• Complete Construction of NML Expansion (April 2011)
• Install Injector & Test Beam Lines (2011-2012)• First Beam (2012)• New Cryoplant Installation/Operation (2013-2014)• Install 3 Cryomodule String (2013-2014)• RF Unit Test with Beam (S2) (2014)
![Page 27: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/27.jpg)
27
NML M&S Budget
• SRF (18.2) – FY11 $1,100k• Beamline/Facility Equipment (ARRA) $9,800k
– FY10-FY11
• Expansion Construction (ARRA GPP) $4,900k– Essentially Complete
• CMTF Construction (ARRA GPP) $7,100k– Expected Completion – 9/11
• Cryoplant Purchase (ARRA MIE) $9,300k– Ordered 12/10, Delivery ~ 2013
• RF Equipment for HTS2 & CMTF (ARRA) $2,900k
• Total $35,100k
May 23, 2011 AEM Meeting
![Page 28: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/28.jpg)
Thanks to…
May 23, 2011 AEM Meeting 28
The Entire NML Team!
![Page 29: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/29.jpg)
Backup Slides
Additional Information
May 23, 2011 AEM Meeting 29
![Page 30: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/30.jpg)
30AEM Meeting
NML Project Overview
• Overall Goals– Build an RF Unit Test Facility at the New Muon Lab (NML)
• ILC RF Unit = 3 cryomodules• 10-MW RF system• Beam with ILC parameters (3.2 nC/bunch @3 MHz, Up to 3000 bunches @ 5Hz,
300-μm rms bunch length)
– Build Test facilities for Project-X cryomodules
• Phase-1 (FY07 – FY10) (Completed Dec. 2010)– Prepare facility for testing first cryomodule (CM1) without beam
• Infrastructure, RF power, cryogenics (Tevatron satellite refrigerators #1 & #2)
• Install first cryomodule (CM1) and Capture Cavity-2 (CC2), cooldown, and begin RF testing
• New tunnel civil construction (capability for 2 RF units)
May 23, 2011
![Page 31: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/31.jpg)
31AEM Meeting
NML Project Overview
• Phase-2 (FY11 – FY12)– Prepare for First Beam
• Civil construction for new cryoplant and test stands• Move parts from FNPL photo-injector to NML• Install new gun, injector, Test beamlines, and beam dump• Swap CM1 with second cryomodule (CM2) - (S1)• Commission gun – generate first beam• Accelerate beam through single cryomodule
• Phase-3 (FY12 – FY14)– Complete RF Unit
• Upgrade RF system to 10 MW• Install RF Unit (3 cryomodules)• Commission new Cryogenic Plant• Operate full RF Unit with beam - (S2)
May 23, 2011
![Page 32: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/32.jpg)
NML Project-X Test Stands
• CMTF (FY14 – FY15)– Test Stands for Project X
• Install shielding, RF, cryo for PX test stands• 1300 MHz (pulsed) CM test stand (with India)• 650 MHz (CW) CM test stand (with India)• 325 MHz (CW) CM test stand (with India)
May 23, 2011 32AEM Meeting
![Page 33: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/33.jpg)
33
Beam Parameters
May 23, 2011 AEM Meeting
![Page 34: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/34.jpg)
AEM Meeting 34May 23, 2011
Cooldown of CM1
Cool down to 4.5 Kelvin(2+ days)
Cool down to 2 Kelvin(~2 hours)
![Page 35: SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5518c3cd550346b31f8b56c0/html5/thumbnails/35.jpg)
May 23, 2011 AEM Meeting 35
Cavity #1 Performance
Fast Thermometry response during a possible quench
Gradient (22 MV/m)
HOM temperature
Cavity vacuum