SPRINGETTSBURY TOWNSHIP. Springettsbury Township. Wastewater Treatment Plant. Springettsbury Watewater Treatment Plant. Service Area WWTP History BNR Upgrade UV Disinfection Upgrade Administration Addition Construction Costs. Service Area. Springettsbury Township Windsor Borough - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: SPRINGETTSBURY TOWNSHIP

SPRINGETTSBURYTOWNSHIP

Page 2: SPRINGETTSBURY TOWNSHIP

Springettsbury TownshipWastewater Treatment Plant

Page 3: SPRINGETTSBURY TOWNSHIP

Springettsbury Watewater Treatment Plant

Service Area

WWTP History

BNR Upgrade

UV Disinfection Upgrade

Administration Addition

Construction Costs

Page 4: SPRINGETTSBURY TOWNSHIP

Service Area

Springettsbury Township Windsor Borough Red Lion Borough Yoe Borough Dallastown Borough Windsor Township

And Portions of: Manchester Township Spring Garden Township York Township

Approximate Population Serviced - 70,000

Page 5: SPRINGETTSBURY TOWNSHIP

Service Area

Collection System withinSpringettsbury Includes 120 Miles of Gravity Sewer

7 Pumping Stations

20 Miles of Forcemain

Page 6: SPRINGETTSBURY TOWNSHIP

Springettsbury Watewater Treatment Plant

Service Area

WWTP History

BNR Upgrade

UV Disinfection Upgrade

Administration Addition

Construction Costs

Page 7: SPRINGETTSBURY TOWNSHIP

Wastewater Treatment Plant History

The Springettsbury Wastewater Treatment Plant as it appeared in 1970

The Plant was Permitted for 8 Million Gallons Per Day

Page 8: SPRINGETTSBURY TOWNSHIP

Wastewater Treatment Plant History

In 1984 the Wastewater Treatment Plant Underwent an Upgrade and Expansion to 15 Million Gallons Per Day

Page 9: SPRINGETTSBURY TOWNSHIP

Springettsbury Watewater Treatment Plant

Service Area

WWTP History

BNR Upgrade

UV Disinfection Upgrade

Administration Addition

Construction Costs

Page 10: SPRINGETTSBURY TOWNSHIP

BNR Upgrade Project

Why Upgrade in 2011?

PA DEP Bay Strategy

Biological Nutrient Removal (BNR)Reduce Nitrogen and Phosphorous discharges to the Chesapeake Bay

Page 11: SPRINGETTSBURY TOWNSHIP

BNR Upgrade Project

2011 BNR Upgrade

BNR Strategy The main goal of this project was to design a BNR systemthat would meet the new effluent requirements withoutincurring the substantial expense of building new tanks (about 25 % more expensive).

Page 12: SPRINGETTSBURY TOWNSHIP

BNR Upgrade Project

Integrated Fixed Film System (IFAS) Conventional Aeration Systems – Microorganisms

are suspended in tank IFAS Systems – Microorganisms are attached to a

suspended media; media offers greater surface area for microorganisms to grow

More microorganisms: Provide higher degree of treatment Can offset the need for additional aeration

basin capacity

Page 13: SPRINGETTSBURY TOWNSHIP

BNR Upgrade Project

Kruger IFAS System

Media Facts-38% Fill -85,000 CF - 274 SF/CF-23M SF- 536 ACRES

Page 14: SPRINGETTSBURY TOWNSHIP

BNR Upgrade Project

BNR System Site Plan

Anoxic Stage #1 (N1)

OxicStage #3 (N3)

Internal Nitrate Recycle

Internal Nitrate Recycle

To 2nd Clarifiers

To 2nd Clarifiers

Sludge Digesters

(N4)

Influent

RAS

North Train

South Train

Anaerobic

Anaerobic

Anaerobic

Anaerobic

Oxic (IFAS)Stage #2 (N2)

Anaerobic

Anaerobic

Anoxic Stage #1 (N1)

OxicStage #3 (N3)

Sludge Digesters

(N4)

Oxic (IFAS)Stage #2 (N2)

Page 15: SPRINGETTSBURY TOWNSHIP

BNR Upgrade Project

- 50 Screens-16” Diameter-10’ Long

Media Retention Screens

Page 16: SPRINGETTSBURY TOWNSHIP

BNR Upgrade Project

Additional Upgrades Required

New High Efficiency Diffused Air System Blowers and Blower Building Internal Mixed Liquor Recycle Pumps Conversion of Primary Clarifiers to Anaerobic/ Anoxic

Selectors (anaerobic portion for phosphorous removal; anoxic portion for nitrogen removal)

Page 17: SPRINGETTSBURY TOWNSHIP

BNR Upgrade Project

Additional Plant Considerations

Motor Control Center (MCC) Upgrade Emergency Power Upgrade Final Clarifier Improvements

Current Density Baffles Algae Control System

Headworks Screening System Upgrade Relocated Septage Dump Station

Page 18: SPRINGETTSBURY TOWNSHIP

BNR Upgrade Project

Influent Screening is CRITICAL

3 mm opening

Page 19: SPRINGETTSBURY TOWNSHIP

Springettsbury Watewater Treatment Plant

Service Area

WWTP History

BNR Upgrade

UV Disinfection Upgrade

Administration Addition

Construction Costs

Page 20: SPRINGETTSBURY TOWNSHIP

UV Lights do not Contact the water

UV Disinfection Upgrade

Enaqua UV Disinfection System

Page 21: SPRINGETTSBURY TOWNSHIP

Front view

UV Lamps

Flowout

Flow in

Front view Side view

UV Lamps

Flowout

Flow in

Flow in

Flowout

Flow tubes

• Non - Contact UV reactor configuration

• Contact UV reactor configuration

Enaqua UV Disinfection System

UV Disinfection Upgrade

Page 22: SPRINGETTSBURY TOWNSHIP

UV Disinfection Upgrade

Page 23: SPRINGETTSBURY TOWNSHIP

Springettsbury Watewater Treatment Plant

Service Area

WWTP History

BNR Upgrade

UV Disinfection Upgrade

Administration Addition

Construction Costs

Page 24: SPRINGETTSBURY TOWNSHIP

18 MGD Unit ready for Channel Mount

Administration Addition

Enhanced Security Required Post 9/11

Added Needed Office/Storage Space

Added Multi-Use Training Room

Existing Lab Updated

Page 25: SPRINGETTSBURY TOWNSHIP

Administration Addition

Page 26: SPRINGETTSBURY TOWNSHIP

Administration Addition

Use of Regional Materials for Construction

New High Efficiency Geothermal Heating/ Cooling

Energy Efficient Windows throughout Building

Passive Heating in Conference Room

Day Lighting Throughout Entire Addition

"Green" Features

Page 27: SPRINGETTSBURY TOWNSHIP

Springettsbury Watewater Treatment Plant

Service Area

WWTP History

BNR Upgrade

UV Disinfection Upgrade

Administration Addition

Construction Costs

Page 28: SPRINGETTSBURY TOWNSHIP

- General $18M

- Electrical $ 4M

- Mechanical $ 1M

TOTAL $23M

Construction Costs