specifications for non-residential and three phase

59
SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE RESIDENTIAL PAD-MOUNTED TRANSFORMER INSTALLATIONS (RED BOOK) SUPPLEMENTING THE GENERAL SPECIFICATIONS FOR ELECTRIC INSTALLATIONS (BLUE BOOK) Orange and Rockland Utilities, Inc. One Blue Hill Plaza Pearl River, New York 10965 Rockland Electric Company One Lethbridge Plaza Suite 32 Second Floor, Route 17 North Mahwah, New Jersey 07430 November 2020 Edition

Upload: others

Post on 21-Oct-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE

SPECIFICATIONS FOR

NON-RESIDENTIAL AND THREE PHASE RESIDENTIAL

PAD-MOUNTED TRANSFORMER INSTALLATIONS

(RED BOOK)

SUPPLEMENTING THE

GENERAL SPECIFICATIONS FOR

ELECTRIC INSTALLATIONS (BLUE BOOK)

Orange and Rockland Utilities, Inc.

One Blue Hill Plaza

Pearl River, New York 10965

Rockland Electric Company

One Lethbridge Plaza – Suite 32 – Second Floor, Route 17 North

Mahwah, New Jersey 07430

November 2020 Edition

Page 2: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE

These specifications, which protect the mutual interests of the Customer and the Company, will be revised or amended as required in keeping with developments and progress of the industry. The latest revisions should always be used. Additional copies of this booklet and any revisions thereof may be obtained at the Company's Field Offices. Previous editions are outdated and invalid. Revisions are denoted by an arrow in the left margin. This document (Red Book), the General Specifications for Electric Installations (Blue Book) and the Electric Meter Approved Equipment List can also be found on the Company’s website at oru.com/contractorresources.

New Construction Services Field Offices: Projects will be coordinated through the New Construction Services Field Offices at one of the following locations: Blooming Grove 500 Route 208 Monroe, NY 10950 Telephone Number …………………………………………… (845) 577-3324 Fax Number …………………………………………………… (845) 783-5504 Middletown 71 Dolson Avenue Middletown, NY 10940 Telephone Number …………………………………………… (845) 577-3324 Fax Number …………………………………………………… (845) 342-8939 Mahwah One Lethbridge Plaza Suite 32 – Second Floor, Route 17 North Mahwah, NJ 07430 Telephone Number ………………………………………….. (845) 577-3324 Fax Number ………………………………………………….. (201) 327-4521 Spring Valley Operations Center 390 West Route 59 Spring Valley, NY 10977 Telephone Number ………………………………………….. (845) 577-3324 Fax Number ………………………………………………….. (845) 577-3319

i

Page 3: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE

Call Before You Dig For your safety and protection, the Utility Notification Service provides details on the location of underground electric wires, gas lines and communication cables. This service is provided to reduce the risk of personal injury, prevent damage to underground facilities, and avoid unnecessary repair costs and fines. Before you dig, please call: Underground Utilities Call Center of New York: 811 NY Code 753 requires 2-10 working days’ notice. Garden State Underground of New Jersey: 811 NJ Code requires 3-10 working days’ notice. For Gas Emergencies Call: 911 or 800-533-LEAK (5325). High Voltage Proximity Clearances: When work will take place in proximity to overhead high voltage lines, you have the responsibility of notifying the utility in writing at least five (5) normal working days before the job is scheduled. If the notification is made by regular postal mail, allow for ample delivery time to ensure the notice is received prior to the five (5) working day deadline. All correspondence for Orange and Rockland Utilities, Inc. and Rockland Electric Company is to be directed to your New Construction Services Field Office.

ii

Page 4: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE

TABLE OF CONTENTS

Page

I. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

II. DEFINITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 III. CODES, STANDARDS AND WIRING ADEQUACY . . . . . . . . . 4

IV. APPROVAL AND INSPECTIONS . . . . . . . . . . . . . . . . . . . . . . . 5

V. SCOPE OF CUSTOMER WORK . . . . . . . . . . . . . . . . . . . . . . . 6

VI. TRANSFORMER PAD LOCATION . . . . . . . . . . . . . . . . . . . . . . 7

VII. TRANSFORMER FOUNDATION . . . . . . . . . . . . . . . . . . . . . . . 8

VIII. TRENCH AND CONDUIT WORK . . . . . . . . . . . . . . . . . . . . . . . 8

IX. GROUNDING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

X. PRIMARY CABLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

XI. PRIMARY CABLE TERMINATIONS . . . . . . . . . . . . . . . . . . . . . 14

XII. SECONDARY CABLE AND BUS DUCT . . . . . . . . . . . . . . . . . . 16

XIII. METERING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

XIV. CLEARANCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

XV. ENERGIZATION PROCEDURE . . . . . . . . . . . . . . . . . . . . . . . . 20

XVI. BACKFILL AND GRADING . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

XVII. SPECIFICATIONS FOR CONCRETE . . . . . . . . . . . . . . . . . . . . 21

XVIII. COMPANY PROCEDURE NUMBER 091

(CUSTOMER INSTALLED, TO BE COMPANY OWNED) . . . . . 23

ABBREVIATIONS: N.E.C. - National Electrical Code, NFPA 70, Latest Edition N.E.S.C. - National Electrical Safety Code, ANSI C2, Latest Edition UL - Underwriter’s Laboratory EPR - Ethyl Propylene Rubber

Page 5: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 6: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 7: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 8: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 9: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 10: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE

The Company requires inspections of the primary service installation, for which inspection

checklists will be provided. At the completion of each portion of the installation, the

customer/contractor is to submit the respective checklist using the contact information

provided therein, and an inspection will be arranged.

For each inspection checklist issued and submitted properly, the Company will

perform the initial inspection at no charge. Where repeat inspections are necessary

because of non-compliance or non-completion, a repeat inspection fee will be

assessed to the responsible party. Further details will be provided with the project

specification.

In addition to the Company inspections, it is the customer's responsibility to arrange for

inspection by the Board of Fire Underwriters or the authority having jurisdiction. Before

service can be provided, the customer will furnish a certificate of satisfactory evidence as to

the safe condition of their wiring.

III. SCOPE OF CUSTOMER WORK

The customer shall provide all materials (unless otherwise specified), labor and equipment

required for completion of the installation as specified herein and as called for in the drawings

or as directed by the Company's authorized engineering representative. The customer shall

include items incidental to the work not specifically mentioned herein so as to make the

finished work fully complete and satisfactory in every respect.

In general, the customer's work will consist of the following major items, and the specific

notations with respect to these shall apply:

Page 11: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 12: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 13: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 14: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 15: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 16: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 17: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 18: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 19: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 20: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 21: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 22: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
BROWND
Rectangle
Page 23: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 24: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 25: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 26: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 27: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 28: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 29: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 30: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 31: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 32: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 33: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 34: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 35: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 36: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 37: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 38: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 39: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 40: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 41: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 42: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 43: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 44: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 45: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 46: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 47: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 48: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 49: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 50: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 51: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE

Ø

Page 52: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 53: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE

Ø

Page 54: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 55: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE

Ø

Page 56: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 57: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE

Ø

Page 58: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE
Page 59: SPECIFICATIONS FOR NON-RESIDENTIAL AND THREE PHASE