specification for anchor flange 40rsn 00 bd pl spc 2006 a0
TRANSCRIPT
-
7/27/2019 Specification for Anchor Flange 40RSN 00 BD PL SPC 2006 A0
1/8
Iranian Gas
Development &Engineering
Company
BASIC AND DETAIL DESIGN OF 40"GAS PIPELINE
RASHT/SARI/NEKA
DOCUMENT NO.DOCUMENT TITLE:
REV.Ser.NoDoc T!eD#c.Co$ePro.P%ePro.Sec'o(PRO) NO.S!ec*c&'o( For A(c%or
F+&(,e 40RSN
S!ec*c&'o( ForA(c%or F+&(,e
-
7/27/2019 Specification for Anchor Flange 40RSN 00 BD PL SPC 2006 A0
2/8
Iranian Gas
Development &Engineering
Company
BASIC AND DETAIL DESIGN OF 40"GAS PIPELINE
RASHT/SARI/NEKA
DOCUMENT NO.DOCUMENT TITLE:
REV.Ser.NoDoc T!eD#c.Co$ePro.P%ePro.Sec'o(PRO) NO.S!ec*c&'o( For A(c%or
F+&(,e 40RSN
TABLE OF CONTENTS
REV
PAGE
A0 A- A A A4
REV
PAGE
A0 A- A A A4
REV
PAGE
A0 A- A A A4
1 X 23 45
2 X 24 46
3 X 25 47
4 X 26 48
5 X 27 49
6 X 28 50
7 X 29 51
8 X 30 52
9 31 53
10 32 54
11 33 55
12 34 56
13 35 57
14 36 58
15 37 59
16 38 60
17 39 61
18 40 62
19 41
20 42
21 43
22 44
-
7/27/2019 Specification for Anchor Flange 40RSN 00 BD PL SPC 2006 A0
3/8
Iranian Gas
Development &Engineering
Company
BASIC AND DETAIL DESIGN OF 40"GAS PIPELINE
RASHT/SARI/NEKA
DOCUMENT NO.DOCUMENT TITLE:
REV.Ser.NoDoc T!eD#c.Co$ePro.P%ePro.Sec'o(PRO) NO.S!ec*c&'o( For A(c%or
F+&(,e 40RSN
1-INTRODUCTION...........................................................................................5
2-DEFINITIONS................................................................................................5
3-SCOPE...............................................................................................................5
4-REFERENCES................................................................................................5
5- DESIGN REQUIREMENTS........................................................................6
6-MATERIALS...................................................................................................7
7-WELDING........................................................................................................7
8-INSPECTION AND TESTING....................................................................7
9-DOCUMENTATION......................................................................................8
10-MARING.....................................................................................................8
11-PACING......................................................................................................9
-
7/27/2019 Specification for Anchor Flange 40RSN 00 BD PL SPC 2006 A0
4/8
Iranian Gas
Development &Engineering
Company
BASIC AND DETAIL DESIGN OF 40"GAS PIPELINE
RASHT/SARI/NEKA
DOCUMENT NO.DOCUMENT TITLE:
REV.Ser.NoDoc T!eD#c.Co$ePro.P%ePro.Sec'o(PRO) NO.S!ec*c&'o( For A(c%or
F+&(,e 40RSN
-INTRODUCTION
Iranian Gas Engineering & Development Company a subsidiary of National Iranian Gas
Company (NIGC). Has intended to perform a !" gas transmission pipeline about #$%
m in 'oute of 'ast*ariNe+a. te ,ro-et /ill be E0euted in % ,ase as 1asi &
Detail Engineering Contrat.
2e purpose of onstruting tis pipeline is to transfer !!!!34! #5#per day 6ean Gas
from 'ast Compressor *tation to Ne+a Compressor station and onsumers loated
along side of te pipeline7 also beause of e0ist #!" old pipeline te ne/ !" pipeline /ill
andle a part of e0isting pipeline duty in about 8! ,erent of 9verall ,ipeline route.
De*('o(#
:itin te onte0t of tis doument7 te follo/ing definitions are appliable.
C+e(' Iranian Gas Engineering & Development Company (I.G.E.D.C)
Co(#1+'&(' 5iddle East Energy Development Consulting Engineers
S%&++ Indiates a 5andatory 'e;uirement
S%o1+$ 'eommendation or tat /i is advised
Sco!e
2is *tandard *peifiation ,rovides ,ro-et
-
7/27/2019 Specification for Anchor Flange 40RSN 00 BD PL SPC 2006 A0
5/8
Iranian Gas
Development &Engineering
Company
BASIC AND DETAIL DESIGN OF 40"GAS PIPELINE
RASHT/SARI/NEKA
DOCUMENT NO.DOCUMENT TITLE:
REV.Ser.NoDoc T!eD#c.Co$ePro.P%ePro.Sec'o(PRO) NO.S!ec*c&'o( For A(c%or
F+&(,e 40RSN
in aordane /it te standards speified erein an as supplemented in tis
speifiation.
4.-. NORMATIVE REFERENCES:
? =*5E setion @III Div. I & Div. II ,ressure vessel ode
? =*5E setion IX Aualifiation for /elding and braBing proedures
? =*5E 1#4.$ Gas transmission and distribution (end preparation) piping
system
? 5** *,% *tandard mar+ing system for valves7 fittings 7 flanges &
unions
? =*25 = 4! *tandard speifiation for arbon steel forging for ,iping
omponents
?=*25 = F *tandards speifiation for arbon and alloy steel
forging for pipe flanges fittings 7 and parts for igpressure transmission servies
? =*25 E%# *tandard test metods for noted bar impat testing of
metalli material
? IG*5,6!%8 *teel ,ipe te flanges
2DESIGN RE3UIREMENTS
2.-. 2e 5anufaturer *upplier *all >urnis Dra/ings =nd Calulations 2o 2e,uraser.
2. ,ermissible design stresses sall not e0eed tose speified by te =*5E setion @III.
([email protected] & %.) 7 latest edition. (=s appliable.).
2. =s temperature inreases (2!)7 design and manufaturing load alulation sould be
based on follo/ing formula
> (J. 2.E. K!.% L) Mt (Dt) O> 6oad on anor flange. (N)
J 2ermal e0pansion oeffiient (ININ) C!
2 2emperature differenes of design and installation (C
!
)E 5odulus of elastiity of arbon steel (PNI26E**)
L Hoop tensile stress (N or ,*I)t ,ipe /all ti+ness (IN)
-
7/27/2019 Specification for Anchor Flange 40RSN 00 BD PL SPC 2006 A0
6/8
Iranian Gas
Development &Engineering
Company
BASIC AND DETAIL DESIGN OF 40"GAS PIPELINE
RASHT/SARI/NEKA
DOCUMENT NO.DOCUMENT TITLE:
REV.Ser.NoDoc T!eD#c.Co$ePro.P%ePro.Sec'o(PRO) NO.S!ec*c&'o( For A(c%or
F+&(,e 40RSN
D ,ipe outside diameter (IN)
2.42ransition piee sall be sop /elded to te ubs and te entire assembly to be stress
relieved and ten radiograped.
MATERIALS
.- >lange material sall be arbon steel or alloy steel in aordane /it =*25 =4! or
=*25 =F7 6>X7 /i ma0. Qield strengt differenes bet/een flange and pipe piee
sall be !R of pipe yield strengt.
.>or te transition piees te material sall be made by te openSeart7 basi o0ygen or
eletri furnae proesses and is suitable for field /elding at !C to mating pipe
/itout pre eating. 2e transition piees sall ave mill ertifiate or tested FR of
yield strengt or 4. times of design pressure 5a0.
. TEST SPECIMENS SELECTION:
..-2/o speimens for tensile test sall be ta+en from te dis of flange7 one aving its
lengt/ise a0is diretionally normal to flange bore7 te seond speimen to be ta+en /it
its lengt/ise a0is diretionally at rigt angles to te e;uivalent a0is of te first
speimen.
..2ree arpynot impat test speimens7 ea t/oStird siBe as speified in =*25
E %#7 sall be ta+en from te ub7 /it teir lengt/ise a0is tangential to te flange bore
and tree speimens e;ually spaed around te ub. 2ests sall be arried out at S4! C
and te average obtained value from tree tests sall not be less tan %.4 gf and no
individual test result being less tan 4. gf.
56ELDING
2e sop /elding sall onform to te relevant part of =*5E ode. *etion @III & IX as*ummariBed as follo/s
5.- :elder performane test sall onform to te =*5E ode setion IX.
5.*op /elding sall be eiter by manual ='C or automati or semi submerged ar or
inert gas sielded proess.
5.,re eating proedures sall be mentioned in :,* as per =*5E ode.
5.4Heat treatment sall onform to te defined proedures of =*5E *EC7 @III.
7INSPECTION AND TESTING
Inspetion & nondestrutive testing of flange assembly sall onform to te
re;uirements of =*5E ode7 setion IX as summariBed ereunder
-
7/27/2019 Specification for Anchor Flange 40RSN 00 BD PL SPC 2006 A0
7/8
Iranian Gas
Development &Engineering
Company
BASIC AND DETAIL DESIGN OF 40"GAS PIPELINE
RASHT/SARI/NEKA
DOCUMENT NO.DOCUMENT TITLE:
REV.Ser.NoDoc T!eD#c.Co$ePro.P%ePro.Sec'o(PRO) NO.S!ec*c&'o( For A(c%or
F+&(,e 40RSN
7.- :elds sall be e0amined eiter ultrasonially or radiograpy at full lengt after
ydrostati testing
7.2e flange assembly inluding transition piees sall be ydrostatially tested /it
4. times of te speified design pressure and te proedures sall onform to =*5E
ode se @III.
2e duration of test sall be at least #! minutes /itout loss of pressure as speified by
end user. :elding repair is not permitted after te above test7 unless /it te prior
agreement of te end user.
8DOCUMENTATION
2e manufaturer supplier sall submit te follo/ing douments to end user7 as
speified in te ,urase order (tree set).
8.- Certifiate of /or+s inspetion
8.:elding proedure7 /elder ;ualifiation and ,A'.
8.Certified report provides emial analysis and pysial properties of ra/ material.
8.4*tress relieves & eat treatment reports.8.2Non S destrutive test report.
8.Hydrostati test report.
8.5=sbuilt dra/ing.
-0 MARKING
5ar+ing sall onform eiter to =*5E 14. or 5***, % as speified by end user
and sall be inluded follo/ing items on body of flange
? Design ode. (=*5E *EC.@III [email protected] &%.)
? Design pressure. (,*I).
? 2rust fore.(N or ,*I)
? 5anufaturer
-
7/27/2019 Specification for Anchor Flange 40RSN 00 BD PL SPC 2006 A0
8/8
Iranian Gas
Development &Engineering
Company
BASIC AND DETAIL DESIGN OF 40"GAS PIPELINE
RASHT/SARI/NEKA
DOCUMENT NO.DOCUMENT TITLE:
REV.Ser.NoDoc T!eD#c.Co$ePro.P%ePro.Sec'o(PRO) NO.S!ec*c&'o( For A(c%or
F+&(,e 40RSN
--PACKING
=ll flanges sall be suitably pa+ed so to prevent damage during sipment. 2e pa+ing
sall be appropriated for storage /itout over7 order no. & te speifi item no sall be
learly identified on ea pa+age.
--.- Pp to %! in.7 sall be pa+ed in /ooden bo0.
--.6arger tan %! in.7 sall be pa+ed on te pallet /it bevel protetor.
DATA SHEET 9TO BE COMPLETED B PURCHASER;
Pro!er'e# Re