specification for anchor flange 40rsn 00 bd pl spc 2006 a0

Upload: hgolestani

Post on 13-Apr-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/27/2019 Specification for Anchor Flange 40RSN 00 BD PL SPC 2006 A0

    1/8

    Iranian Gas

    Development &Engineering

    Company

    BASIC AND DETAIL DESIGN OF 40"GAS PIPELINE

    RASHT/SARI/NEKA

    DOCUMENT NO.DOCUMENT TITLE:

    REV.Ser.NoDoc T!eD#c.Co$ePro.P%ePro.Sec'o(PRO) NO.S!ec*c&'o( For A(c%or

    F+&(,e 40RSN

    S!ec*c&'o( ForA(c%or F+&(,e

  • 7/27/2019 Specification for Anchor Flange 40RSN 00 BD PL SPC 2006 A0

    2/8

    Iranian Gas

    Development &Engineering

    Company

    BASIC AND DETAIL DESIGN OF 40"GAS PIPELINE

    RASHT/SARI/NEKA

    DOCUMENT NO.DOCUMENT TITLE:

    REV.Ser.NoDoc T!eD#c.Co$ePro.P%ePro.Sec'o(PRO) NO.S!ec*c&'o( For A(c%or

    F+&(,e 40RSN

    TABLE OF CONTENTS

    REV

    PAGE

    A0 A- A A A4

    REV

    PAGE

    A0 A- A A A4

    REV

    PAGE

    A0 A- A A A4

    1 X 23 45

    2 X 24 46

    3 X 25 47

    4 X 26 48

    5 X 27 49

    6 X 28 50

    7 X 29 51

    8 X 30 52

    9 31 53

    10 32 54

    11 33 55

    12 34 56

    13 35 57

    14 36 58

    15 37 59

    16 38 60

    17 39 61

    18 40 62

    19 41

    20 42

    21 43

    22 44

  • 7/27/2019 Specification for Anchor Flange 40RSN 00 BD PL SPC 2006 A0

    3/8

    Iranian Gas

    Development &Engineering

    Company

    BASIC AND DETAIL DESIGN OF 40"GAS PIPELINE

    RASHT/SARI/NEKA

    DOCUMENT NO.DOCUMENT TITLE:

    REV.Ser.NoDoc T!eD#c.Co$ePro.P%ePro.Sec'o(PRO) NO.S!ec*c&'o( For A(c%or

    F+&(,e 40RSN

    1-INTRODUCTION...........................................................................................5

    2-DEFINITIONS................................................................................................5

    3-SCOPE...............................................................................................................5

    4-REFERENCES................................................................................................5

    5- DESIGN REQUIREMENTS........................................................................6

    6-MATERIALS...................................................................................................7

    7-WELDING........................................................................................................7

    8-INSPECTION AND TESTING....................................................................7

    9-DOCUMENTATION......................................................................................8

    10-MARING.....................................................................................................8

    11-PACING......................................................................................................9

  • 7/27/2019 Specification for Anchor Flange 40RSN 00 BD PL SPC 2006 A0

    4/8

    Iranian Gas

    Development &Engineering

    Company

    BASIC AND DETAIL DESIGN OF 40"GAS PIPELINE

    RASHT/SARI/NEKA

    DOCUMENT NO.DOCUMENT TITLE:

    REV.Ser.NoDoc T!eD#c.Co$ePro.P%ePro.Sec'o(PRO) NO.S!ec*c&'o( For A(c%or

    F+&(,e 40RSN

    -INTRODUCTION

    Iranian Gas Engineering & Development Company a subsidiary of National Iranian Gas

    Company (NIGC). Has intended to perform a !" gas transmission pipeline about #$%

    m in 'oute of 'ast*ariNe+a. te ,ro-et /ill be E0euted in % ,ase as 1asi &

    Detail Engineering Contrat.

    2e purpose of onstruting tis pipeline is to transfer !!!!34! #5#per day 6ean Gas

    from 'ast Compressor *tation to Ne+a Compressor station and onsumers loated

    along side of te pipeline7 also beause of e0ist #!" old pipeline te ne/ !" pipeline /ill

    andle a part of e0isting pipeline duty in about 8! ,erent of 9verall ,ipeline route.

    De*('o(#

    :itin te onte0t of tis doument7 te follo/ing definitions are appliable.

    C+e(' Iranian Gas Engineering & Development Company (I.G.E.D.C)

    Co(#1+'&(' 5iddle East Energy Development Consulting Engineers

    S%&++ Indiates a 5andatory 'e;uirement

    S%o1+$ 'eommendation or tat /i is advised

    Sco!e

    2is *tandard *peifiation ,rovides ,ro-et

  • 7/27/2019 Specification for Anchor Flange 40RSN 00 BD PL SPC 2006 A0

    5/8

    Iranian Gas

    Development &Engineering

    Company

    BASIC AND DETAIL DESIGN OF 40"GAS PIPELINE

    RASHT/SARI/NEKA

    DOCUMENT NO.DOCUMENT TITLE:

    REV.Ser.NoDoc T!eD#c.Co$ePro.P%ePro.Sec'o(PRO) NO.S!ec*c&'o( For A(c%or

    F+&(,e 40RSN

    in aordane /it te standards speified erein an as supplemented in tis

    speifiation.

    4.-. NORMATIVE REFERENCES:

    ? =*5E setion @III Div. I & Div. II ,ressure vessel ode

    ? =*5E setion IX Aualifiation for /elding and braBing proedures

    ? =*5E 1#4.$ Gas transmission and distribution (end preparation) piping

    system

    ? 5** *,% *tandard mar+ing system for valves7 fittings 7 flanges &

    unions

    ? =*25 = 4! *tandard speifiation for arbon steel forging for ,iping

    omponents

    ?=*25 = F *tandards speifiation for arbon and alloy steel

    forging for pipe flanges fittings 7 and parts for igpressure transmission servies

    ? =*25 E%# *tandard test metods for noted bar impat testing of

    metalli material

    ? IG*5,6!%8 *teel ,ipe te flanges

    2DESIGN RE3UIREMENTS

    2.-. 2e 5anufaturer *upplier *all >urnis Dra/ings =nd Calulations 2o 2e,uraser.

    2. ,ermissible design stresses sall not e0eed tose speified by te =*5E setion @III.

    ([email protected] & %.) 7 latest edition. (=s appliable.).

    2. =s temperature inreases (2!)7 design and manufaturing load alulation sould be

    based on follo/ing formula

    > (J. 2.E. K!.% L) Mt (Dt) O> 6oad on anor flange. (N)

    J 2ermal e0pansion oeffiient (ININ) C!

    2 2emperature differenes of design and installation (C

    !

    )E 5odulus of elastiity of arbon steel (PNI26E**)

    L Hoop tensile stress (N or ,*I)t ,ipe /all ti+ness (IN)

  • 7/27/2019 Specification for Anchor Flange 40RSN 00 BD PL SPC 2006 A0

    6/8

    Iranian Gas

    Development &Engineering

    Company

    BASIC AND DETAIL DESIGN OF 40"GAS PIPELINE

    RASHT/SARI/NEKA

    DOCUMENT NO.DOCUMENT TITLE:

    REV.Ser.NoDoc T!eD#c.Co$ePro.P%ePro.Sec'o(PRO) NO.S!ec*c&'o( For A(c%or

    F+&(,e 40RSN

    D ,ipe outside diameter (IN)

    2.42ransition piee sall be sop /elded to te ubs and te entire assembly to be stress

    relieved and ten radiograped.

    MATERIALS

    .- >lange material sall be arbon steel or alloy steel in aordane /it =*25 =4! or

    =*25 =F7 6>X7 /i ma0. Qield strengt differenes bet/een flange and pipe piee

    sall be !R of pipe yield strengt.

    .>or te transition piees te material sall be made by te openSeart7 basi o0ygen or

    eletri furnae proesses and is suitable for field /elding at !C to mating pipe

    /itout pre eating. 2e transition piees sall ave mill ertifiate or tested FR of

    yield strengt or 4. times of design pressure 5a0.

    . TEST SPECIMENS SELECTION:

    ..-2/o speimens for tensile test sall be ta+en from te dis of flange7 one aving its

    lengt/ise a0is diretionally normal to flange bore7 te seond speimen to be ta+en /it

    its lengt/ise a0is diretionally at rigt angles to te e;uivalent a0is of te first

    speimen.

    ..2ree arpynot impat test speimens7 ea t/oStird siBe as speified in =*25

    E %#7 sall be ta+en from te ub7 /it teir lengt/ise a0is tangential to te flange bore

    and tree speimens e;ually spaed around te ub. 2ests sall be arried out at S4! C

    and te average obtained value from tree tests sall not be less tan %.4 gf and no

    individual test result being less tan 4. gf.

    56ELDING

    2e sop /elding sall onform to te relevant part of =*5E ode. *etion @III & IX as*ummariBed as follo/s

    5.- :elder performane test sall onform to te =*5E ode setion IX.

    5.*op /elding sall be eiter by manual ='C or automati or semi submerged ar or

    inert gas sielded proess.

    5.,re eating proedures sall be mentioned in :,* as per =*5E ode.

    5.4Heat treatment sall onform to te defined proedures of =*5E *EC7 @III.

    7INSPECTION AND TESTING

    Inspetion & nondestrutive testing of flange assembly sall onform to te

    re;uirements of =*5E ode7 setion IX as summariBed ereunder

  • 7/27/2019 Specification for Anchor Flange 40RSN 00 BD PL SPC 2006 A0

    7/8

    Iranian Gas

    Development &Engineering

    Company

    BASIC AND DETAIL DESIGN OF 40"GAS PIPELINE

    RASHT/SARI/NEKA

    DOCUMENT NO.DOCUMENT TITLE:

    REV.Ser.NoDoc T!eD#c.Co$ePro.P%ePro.Sec'o(PRO) NO.S!ec*c&'o( For A(c%or

    F+&(,e 40RSN

    7.- :elds sall be e0amined eiter ultrasonially or radiograpy at full lengt after

    ydrostati testing

    7.2e flange assembly inluding transition piees sall be ydrostatially tested /it

    4. times of te speified design pressure and te proedures sall onform to =*5E

    ode se @III.

    2e duration of test sall be at least #! minutes /itout loss of pressure as speified by

    end user. :elding repair is not permitted after te above test7 unless /it te prior

    agreement of te end user.

    8DOCUMENTATION

    2e manufaturer supplier sall submit te follo/ing douments to end user7 as

    speified in te ,urase order (tree set).

    8.- Certifiate of /or+s inspetion

    8.:elding proedure7 /elder ;ualifiation and ,A'.

    8.Certified report provides emial analysis and pysial properties of ra/ material.

    8.4*tress relieves & eat treatment reports.8.2Non S destrutive test report.

    8.Hydrostati test report.

    8.5=sbuilt dra/ing.

    -0 MARKING

    5ar+ing sall onform eiter to =*5E 14. or 5***, % as speified by end user

    and sall be inluded follo/ing items on body of flange

    ? Design ode. (=*5E *EC.@III [email protected] &%.)

    ? Design pressure. (,*I).

    ? 2rust fore.(N or ,*I)

    ? 5anufaturer

  • 7/27/2019 Specification for Anchor Flange 40RSN 00 BD PL SPC 2006 A0

    8/8

    Iranian Gas

    Development &Engineering

    Company

    BASIC AND DETAIL DESIGN OF 40"GAS PIPELINE

    RASHT/SARI/NEKA

    DOCUMENT NO.DOCUMENT TITLE:

    REV.Ser.NoDoc T!eD#c.Co$ePro.P%ePro.Sec'o(PRO) NO.S!ec*c&'o( For A(c%or

    F+&(,e 40RSN

    --PACKING

    =ll flanges sall be suitably pa+ed so to prevent damage during sipment. 2e pa+ing

    sall be appropriated for storage /itout over7 order no. & te speifi item no sall be

    learly identified on ea pa+age.

    --.- Pp to %! in.7 sall be pa+ed in /ooden bo0.

    --.6arger tan %! in.7 sall be pa+ed on te pallet /it bevel protetor.

    DATA SHEET 9TO BE COMPLETED B PURCHASER;

    Pro!er'e# Re