specifications for electrical installations and supplements
TRANSCRIPT
od15008
SOURCE
Date
LOAD
GROUNDED WYE
3Ф PRIMARY METERING
LOADSOURCE
(NOTE 4)RISER POLE
MPR
Drawing
DELTA3Ф PRIMARY METERING
Designer
PRIMARY METERING APPLICATION GUIDE
12/13/21
(NOTE 1)1Ф PRIMARY METERING
LOAD
SOURCE
VT'S& CT'S
DELTA3Ф PRIMARY METERING
SWITCHLOADBREAK
GROUNDED WYE3Ф PRIMARY METERING
LOAD LOAD
(NOTE 1)1Ф PRIMARY METERING
SOURCESOURCE LOAD
15-500 15-501 15-502
15-504
1. SINGLE PHASE DELTA TO HAVE 2 WIRES
SINGLE POLE ARRANGEMENT
OR BY UG RISER POLELOAD CONNECTED BY OPEN WIRETWO POLE ARRANGEMENT
ALL POLESMINIMUM FOR25'-0"
NOTES:
GUYING ARRANGEMENT SHALL BE REVIEWED BY NATIONAL GRID FOR ACCEPTANCE (I.E. SPAN GUY)
RECEIVING STRUCTURE) REQUIRES SUITABLE GUYING.THE CUSTOMER-OWNED PRIMARY SWITCH POLE (AKA 2.
3. METERING CLUSTER SHOWN ON LOAD SIDE, BUT CAN BE ON LINE SIDE.
4. RISER POLE OPTIONAL, WHERE APPLICABLE
(NOTE 4)RISER POLE
(NOTE 4)RISER POLE
GUY
WIR
E
SWITCHLOADBREAK
VT'S& CT'S
GUY
WIR
E
SWITCHLOADBREAK
VT'S& CT'S
GUY
WIR
E
SWITCHLOADBREAK
VT'S& CT'S
GUY
WIR
E
SWITCHLOADBREAK
VT'S& CT'S
GUY
WIR
E
SWITCHLOADBREAK
SOURCE
GUY
WIR
E
VT'S& CT'S
5. EQUIPMENT WITHIN HATCHED AREAS TO BE PROVIDED BY UTILITY AND INSTALLED BY CUSTOMER
ALL POLESMINIMUM FOR25'-0" 15-503 15-505
ALL POLESMINIMUM FOR25'-0"
753ER-1